CN214003705U - Wire arranging device for electric power engineering construction - Google Patents

Wire arranging device for electric power engineering construction Download PDF

Info

Publication number
CN214003705U
CN214003705U CN202022242732.5U CN202022242732U CN214003705U CN 214003705 U CN214003705 U CN 214003705U CN 202022242732 U CN202022242732 U CN 202022242732U CN 214003705 U CN214003705 U CN 214003705U
Authority
CN
China
Prior art keywords
workbench
motor
baffle
electric power
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022242732.5U
Other languages
Chinese (zh)
Inventor
董艳江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022242732.5U priority Critical patent/CN214003705U/en
Application granted granted Critical
Publication of CN214003705U publication Critical patent/CN214003705U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of electric power engineering, especially, be a winding displacement device is used in electric power engineering construction, comprises a workbench, one side of workstation is connected with the handle, the opposite side of workstation is connected with first hinge, one side of first hinge is connected with first baffle, the side of first baffle is connected with the support column, the bottom of workstation is connected with the supporting leg, the bottom of supporting leg is connected with the universal wheel, the bottom of supporting leg is connected with the brake block. The electric wire is fixed through the hydraulic cylinder and the two arc-shaped plates of the clamping ring, so that the electric wire with different sizes can be fixed, the practicability of the device is improved, the first motor drives the screw rod to rotate, so that the sliding block can reciprocate on the screw rod, the electric wire is uniformly wound on the wire arranging rod, the occurrence of the conditions such as wire stringing is reduced, the working efficiency and the wire arranging effect are greatly improved, the clamping block can assist in fixing the sliding block, and the sliding block is prevented from shaking left and right.

Description

Wire arranging device for electric power engineering construction
Technical Field
The utility model belongs to the technical field of electric power engineering, concretely relates to winding displacement device is used in electric power engineering construction.
Background
Electric power engineering, i.e. engineering related to the production, transmission, distribution of electric energy, also broadly includes engineering where electricity is used as a power and energy source in a variety of fields. Meanwhile, the method can be understood to the transmission and transformation business expansion project.
A large amount of electric wires need to be used in the electric power engineering, so a convenient and fast wire arranging device is needed, the existing wire arranging device is complex in structure and inconvenient to move, the requirements during construction cannot be met, and the wire arranging process often causes disorder wires to influence the transportation and use of the electric wires.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a winding displacement device is used in electric power engineering construction has solved the problem of makeing mistakes easily.
In order to achieve the above object, the utility model provides a following technical scheme: a wire arranging device for electric power engineering construction comprises a workbench, wherein one side of the workbench is connected with a handle, the other side of the workbench is connected with a first hinge, one side of the first hinge is connected with a first baffle, the side surface of the first baffle is connected with a support column, the bottom of the workbench is connected with a support leg, the bottom of the support leg is connected with a universal wheel, the bottom of the support leg is connected with a brake pad, the front side of the workbench is connected with a second hinge, the back side of the second hinge is connected with a waterproof plate, the front side of the workbench is connected with a third hinge, the back side of the third hinge is connected with a second baffle, the back side of the second baffle is connected with a wire arranging rod, the inner wall of the workbench is connected with a storage battery, the inner wall of the workbench is provided with a chute, the inner wall of the workbench is connected with a charging port, and the top of, the top of workstation is connected with first motor, the output of first motor is connected with the hob, the surface of hob is connected with the slider, the side of slider is connected with the fixture block, the top of slider is connected with the second motor, the output of second motor is connected with the clamp ring.
Preferably, a layer of partition plate is arranged between the first motor and the screw rod, and the sum of the lengths of the first motor and the screw rod is smaller than the width of the workbench.
Preferably, the waterproof plate is located outside the charging port, and the other side of the charging port is connected with the storage battery.
Preferably, the tops of the sliding blocks are arranged into two blocks with different heights, the second motor is arranged at the top of the higher block, and the clamping ring is arranged above the lower block.
Preferably, one side of the workbench, which is close to the first baffle, is an inclined plane, and the maximum inclined angle of the first baffle is the same as the inclined plane of the workbench.
Preferably, the clamping ring comprises a fixed plate, a hydraulic cylinder and two arc-shaped plates, and the two arc-shaped plates are respectively connected with the fixed plate and the hydraulic cylinder.
Compared with the prior art, the beneficial effects of the utility model are that:
the electric wire is fixed through the pneumatic cylinder and two arcs of clamp ring, thereby can fix the electric wire of multiple equidimension thickness, the practicality of the device is improved, thereby it makes slider reciprocating motion on the hob to drive the hob through first motor and rotate, thereby make the even winding of electric wire on the winding displacement pole, thereby reduce the emergence of the circumstances such as strikeing, work efficiency and winding displacement effect have been improved greatly, the fixture block of setting can also assist fixed sliding block, prevent to rock about the slider, behind a period of winding displacement, the electric coil of grow gradually can touch the inductor, the inductor can instruct first motor and second motor stop work, prevent to continue the winding displacement and lead to the strikeing.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a complete structural schematic diagram of the present invention;
fig. 2 is a cross-sectional view of a front view of the present invention;
fig. 3 is a cross-sectional view of a side view of the present invention.
In the figure: 1, a workbench; 2, a handle; 3, an inductor; 4, supporting legs; 5, universal wheels; 6, brake pads; 7, a storage battery; 8 a first hinge; 9 a first baffle; 10 support columns; 11, third folding; 12 a second baffle; 13 wire arranging rods; 14 a second hinge; 15 waterproof board; 16 a first motor; 17 a screw rod; 18 a slide block; 19 a second motor; 20, a clamping ring; 21, a fixture block; 22 chute; 23 charging port.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: a wire arranging device for electric power engineering construction comprises a workbench 1, a handle 2 is connected to one side of the workbench 1, a first hinge 8 is connected to the other side of the workbench 1, a first baffle 9 is connected to one side of the first hinge 8, a support column 10 is connected to the side surface of the first baffle 9, a support leg 4 is connected to the bottom of the workbench 1, a universal wheel 5 is connected to the bottom of the support leg 4, a brake pad 6 is connected to the bottom of the support leg 4, a second hinge 14 is connected to the front of the workbench 1, a waterproof plate 15 is connected to the back of the second hinge 14, a third hinge 11 is connected to the front of the workbench 1, a second baffle 12 is connected to the back of the third hinge 11, a wire arranging rod 13 is connected to the back of the second baffle 12, a storage battery 7 is connected to the inner wall of the workbench 1, a chute 22 is arranged on the inner wall of the workbench 1, a charging port 23 is connected to the inner wall of the workbench 1, an inductor 3 is connected to the top of the workbench 1, the top of workstation 1 is connected with first motor 16, and the output of first motor 16 is connected with hob 17, and the surface of hob 17 is connected with slider 18, and the side of slider 18 is connected with fixture block 21, and the top of slider 18 is connected with second motor 19, and the output of second motor 19 is connected with clamp ring 20.
In this embodiment, after the electric wire to be arranged is wound on the wire arranging rod 13 for one circle, one section of the electric wire is moved onto the clamping ring 20, and the electric wire is fixed through the hydraulic cylinder and the two arc plates of the clamping ring 20, so that the electric wire with different sizes and thicknesses can be fixed, the practicability of the device is improved, then the second motor 19 drives the clamping ring 20 to rotate, the electric wire itself can not be wound on the clamping ring 20, but the wire arranging rod 13 is driven to rotate, so that the electric wire is wound on the wire arranging rod 13 for one circle, the screw rod 17 is driven to rotate through the first motor 16, so that the sliding block 18 reciprocates on the screw rod 17, the electric wire is uniformly wound on the wire arranging rod 13, thereby reducing the occurrence of the situations of wire stringing and the like, greatly improving the working efficiency and the wire arranging effect, the set clamping block 21 can also assist in fixing the sliding block 18, preventing the sliding block 18 from shaking left and right, and after a period of wire arranging, the gradually-increased electric coil touches the inductor 3, the inductor 3 commands the first motor 16 and the second motor 19 to stop working, so as to prevent the wire from being wound to cause wire stringing, and after the electric wire is taken down from the clamping ring 20, the two second baffles 12 and the first baffle 9 are opened to roll the wound coil off the device, so that the wire stringing is finished.
Specifically, a layer of partition plate is arranged between the first motor 16 and the screw rod 17, the sum of the lengths of the first motor 16 and the screw rod 17 is smaller than the width of the workbench 1, and the sliding block 18 is prevented from sliding off the screw rod 17 through the partition plate or damaging the first motor 16.
Specifically, the waterproof plate 15 is located outside the charging port 23, and the other side of the charging port 23 is connected with the storage battery 7, so that the waterproof plate 15 prevents rainwater from wetting the storage battery 7 through the charging port 23.
Specifically, the top of the sliding block 18 is set to be two blocks with different heights, the second motor 19 is positioned on the top of the higher block, and the clamping ring 20 is positioned above the lower block, so that enough space is provided for the rotation of the clamping ring 20 through the sliding block 18.
Specifically, one side of the workbench 1 close to the first baffle 9 is an inclined slope, the maximum inclined angle of the first baffle 9 is the same as the inclined plane of the workbench 1, and the wire-wound coil can roll off the device under the action of gravity through the first baffle 9.
Specifically, the clamp ring 20 comprises a fixed plate, a hydraulic cylinder and two arc-shaped plates, the two arc-shaped plates are respectively connected with the fixed plate and the hydraulic cylinder, and electric wires with different thicknesses can be fixed through the clamp ring 20.
The utility model discloses a theory of operation and use flow: after the utility model is installed, when in use, after the electric wire to be arranged is wound on the wire arranging rod 13 for one circle, one section of the electric wire is moved to the clamping ring 20, the electric wire is fixed through the hydraulic cylinder of the clamping ring 20 and the two arc-shaped plates, then the second motor 19 drives the clamping ring 20 to start rotating, the electric wire can not be wound on the clamping ring 20 but drives the wire arranging rod 13 to rotate, so that the electric wire is wound on the wire arranging rod 13 for one circle, the first motor 16 drives the screw rod 17 to rotate so as to make the sliding block 18 reciprocate on the screw rod 17, so that the electric wire is uniformly wound on the wire arranging rod 13, the set clamping block 21 can also assist in fixing the sliding block 18, after the electric wire arranging for a period, the gradually increased electric coil can touch the inductor 3, the inductor 3 can command the first motor 16 and the second motor 19 to stop working, after the electric wire is taken down from the clamping ring 20, the coil after the wire is rolled off the device by opening the two second baffle plates 12 and the first baffle 9, therefore, the wire arrangement is finished, and the input ends of the electric equipment in the equipment are electrically connected with the external power supply.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a winding displacement device is used in electric power engineering construction, includes workstation (1), one side of workstation (1) is connected with handle (2), its characterized in that: the novel wire arranging machine is characterized in that a first hinge (8) is connected to the other side of the workbench (1), a first baffle (9) is connected to one side of the first hinge (8), a supporting column (10) is connected to the side face of the first baffle (9), a supporting leg (4) is connected to the bottom of the workbench (1), a universal wheel (5) is connected to the bottom of the supporting leg (4), a brake pad (6) is connected to the bottom of the supporting leg (4), a second hinge (14) is connected to the front face of the workbench (1), a waterproof plate (15) is connected to the back face of the second hinge (14), a third hinge (11) is connected to the front face of the workbench (1), a second baffle (12) is connected to the back face of the third hinge (11), a wire arranging rod (13) is connected to the back face of the second baffle (12), and a storage battery (7) is connected to the inner wall of the workbench (1), the inner wall of workstation (1) is provided with spout (22), the inner wall connection of workstation (1) has mouthful (23) of charging, the top of workstation (1) is connected with inductor (3), the top of workstation (1) is connected with first motor (16), the output of first motor (16) is connected with hob (17), the surface connection of hob (17) has slider (18), the side of slider (18) is connected with fixture block (21), the top of slider (18) is connected with second motor (19), the output of second motor (19) is connected with clamp ring (20).
2. The cable arranging device for electric power engineering construction according to claim 1, wherein: a layer of partition plate is arranged between the first motor (16) and the screw rod (17), and the sum of the lengths of the first motor (16) and the screw rod (17) is smaller than the width of the workbench (1).
3. The cable arranging device for electric power engineering construction according to claim 1, wherein: the waterproof plate (15) is positioned on the outer side of the charging port (23), and the other side of the charging port (23) is connected with a storage battery (7).
4. The cable arranging device for electric power engineering construction according to claim 1, wherein: the tops of the sliding blocks (18) are arranged into two blocks with different heights, the second motor (19) is arranged at the top of the higher block, and the clamping ring (20) is arranged above the lower block.
5. The cable arranging device for electric power engineering construction according to claim 1, wherein: one side of the workbench (1) close to the first baffle (9) is an inclined plane, and the maximum inclined angle of the first baffle (9) is the same as the inclined plane of the workbench (1).
6. The cable arranging device for electric power engineering construction according to claim 1, wherein: the clamping ring (20) comprises a fixed plate, a hydraulic cylinder and two arc-shaped plates, and the two arc-shaped plates are respectively connected with the fixed plate and the hydraulic cylinder.
CN202022242732.5U 2020-10-10 2020-10-10 Wire arranging device for electric power engineering construction Active CN214003705U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022242732.5U CN214003705U (en) 2020-10-10 2020-10-10 Wire arranging device for electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022242732.5U CN214003705U (en) 2020-10-10 2020-10-10 Wire arranging device for electric power engineering construction

Publications (1)

Publication Number Publication Date
CN214003705U true CN214003705U (en) 2021-08-20

Family

ID=77299007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022242732.5U Active CN214003705U (en) 2020-10-10 2020-10-10 Wire arranging device for electric power engineering construction

Country Status (1)

Country Link
CN (1) CN214003705U (en)

Similar Documents

Publication Publication Date Title
CN205985981U (en) Cable pay -off rack of adjustable size
CN111620182B (en) High-efficient coiling mechanism of cable for power cable
CN110817568B (en) Electric wire unwinding device for electric power grid line laying
CN214003705U (en) Wire arranging device for electric power engineering construction
CN208059559U (en) A kind of series connection middle frequency furnace integral type and it is easily installed protection cabinet
CN211707973U (en) Power line bracing coil clamping mechanism
CN219620557U (en) Wire rope coiling machine and wire rope coiling and unwinding device
CN210724138U (en) Line support for municipal works
CN207119885U (en) It is a kind of more welding gun control device
CN115631921A (en) Oil-immersed distribution transformer
CN212387448U (en) Electric power construction kinking device
CN210485060U (en) Mounting bracket for UPS power supply
CN212908475U (en) Crimping machine for electric power engineering
CN214779916U (en) Automatic winding device for winding machine
CN215185526U (en) Power cable erecting device with good insulation property
CN206040834U (en) Formation machine
CN213259927U (en) Fixing device for cable iron-wood disc machining sawing machine
CN207090654U (en) A kind of bobbin winoler
CN214298726U (en) Electric power construction support frame
CN213572887U (en) Waterproof sheet material laying device for underground waterproof engineering
CN216471463U (en) Cable winding equipment for control cable
CN208644447U (en) A kind of combination connection system of steel construction jigsaw
CN215789661U (en) Workstation for power plant booster station
CN217750481U (en) Positioning tool for heat tracing pipe of prefabricated heat preservation layer
CN217453002U (en) Fixing device is used in precious processing that charges

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant