CN213979522U - Ceiling assembled metal keel structure - Google Patents

Ceiling assembled metal keel structure Download PDF

Info

Publication number
CN213979522U
CN213979522U CN202022198732.XU CN202022198732U CN213979522U CN 213979522 U CN213979522 U CN 213979522U CN 202022198732 U CN202022198732 U CN 202022198732U CN 213979522 U CN213979522 U CN 213979522U
Authority
CN
China
Prior art keywords
keel
fixedly connected
ceiling
spring
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022198732.XU
Other languages
Chinese (zh)
Inventor
陈迪飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Maxima Decoration Group Co ltd
Original Assignee
Shenzhen Maxima Decoration Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Maxima Decoration Group Co ltd filed Critical Shenzhen Maxima Decoration Group Co ltd
Priority to CN202022198732.XU priority Critical patent/CN213979522U/en
Application granted granted Critical
Publication of CN213979522U publication Critical patent/CN213979522U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a ceiling assembled metal keel structure, which belongs to the field of architectural decoration ceiling keels, and adopts the technical proposal that the structure comprises a hanging wire, the surface of the hanging wire is fixedly connected with a detachable baking finish large hanger, the front surface of the baking finish large hanger is provided with a screw, the screw penetrates through the baking finish large hanger and extends to the outside of the baking finish large hanger, the utility model discloses a large baking finish hanger is arranged on the surface of the hanging wire by arranging the hanging wire and the baking finish large hanger, thereby being convenient for rapidly installing the main keel, improving the installation speed of the main keel, and facilitating the joint of a hanging ceiling plate and a secondary keel by arranging a fixing mechanism, thereby leading the installation of the hanging plate and the secondary keel to be more rapid, and leading a bearing block to be jacked by a spring after the joint of the main keel and the secondary keel by arranging a locking mechanism, thereby leading the connection relationship of the main keel and the secondary keel to be more compact, preventing the main keel and the secondary keel from shaking and generating noise, situations arise that affect the life of the resident.

Description

Ceiling assembled metal keel structure
Technical Field
The utility model relates to an architectural decoration furred ceiling fossil fragments field, more specifically say, relate to a smallpox assembled metal keel structure.
Background
The structure layer or decoration layer of the upper part of the building indoor space is a ceiling (suspended ceiling) for the requirements of indoor beauty and heat preservation and insulation, the ceiling (suspended ceiling) is mostly arranged to conceal the structure of the roof so as to meet the indoor use requirement, the ceiling is also called a ceiling, a ceiling and a flat top, the suspended ceiling for decoration is composed of a surface layer, a base layer and a suspender, and the common unit ceiling made of surface layer materials comprises gypsum boards, gypsum corner lines, mineral wool boards, aluminous gusset plates and the like; the common base layer comprises main keel hanging pieces, main keels, keel hanging pieces, secondary keels and other profiles; the common hanger rods comprise hanging ribs, profile steel hanger rods and wood hanger rods.
But current suspended ceiling keel structure installation procedure is loaded down with trivial details, is unfavorable for improving efficiency of construction, consequently, technical personnel in the field provide a smallpox assembled metal keel structure to solve the problem that proposes among the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a smallpox assembled metal keel structure, its advantage lies in that the installation procedure is simple, is convenient for improve staff's installation effectiveness.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A ceiling assembled metal keel structure comprises suspension wires, wherein the surfaces of the suspension wires are fixedly connected with a detachable large baking varnish hanger, the front surface of the baking varnish big hanger is provided with a screw which penetrates through the baking varnish big hanger and extends to the outside of the baking varnish big hanger, the inner bottom wall of the baking finish large crane is provided with a main keel, the main keel penetrates through the baking finish large crane and extends to the outside of the baking finish large crane, the bottom of the main keel is clamped with a secondary keel, the main keel penetrates through the secondary keel and extends into the secondary keel, the inner bottom wall of the secondary keel is provided with locking mechanisms distributed at equal intervals, the bottom of the secondary keel is clamped with a ceiling board, the top fixedly connected with equidistance of furred ceiling board distributes fixed establishment, fixed establishment has the inside that runs through the secondary joist and extend to the secondary joist, the fixed slot that the equidistance distributes is seted up to the bottom of secondary joist.
Further, the bottom fixedly connected with equidistance of main joist distributes the buckle, the equal fixedly connected with elastic metal piece in both sides of buckle.
Furthermore, the top fixedly connected with quantity of secondary joist is two arc shell fragment, arc shell fragment and elastic metal piece joint.
Further, locking mechanism includes first spring, the movable groove that the equidistance distributes is seted up to the interior diapire of secondary joist, the bottom of first spring and the interior diapire fixed connection in movable groove, the top fixedly connected with pressure-bearing piece of first spring, the pressure-bearing piece runs through movable groove and contacts with the bottom of buckle.
Further, fixed establishment includes the dead lever, the bottom and the furred ceiling board fixed connection of dead lever, the dead lever runs through the fixed slot and extends to the inside of fixed slot, the equal fixedly connected with soft sheetmetal of the left and right sides of dead lever, the opposite side fixedly connected with kicking block of two soft sheetmetals.
Further, a clamping groove is formed in the bottom of the ejecting block, sliding grooves are formed in the left side and the right side of the clamping groove, a second spring and a clamping block are fixedly connected to the inner wall of the sliding groove, the two springs are fixed to the opposite sides of the second spring, the clamping block penetrates through the sliding groove and the clamping groove in sequence and extends to the inside of the clamping groove, a clamping rod is fixedly connected to the top of the fixing rod and penetrates through the clamping groove and extends to the inside of the clamping groove.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) according to the scheme, the hanging wire and the baking varnish large hanger are arranged, the baking varnish large hanger is arranged on the surface of the hanging wire, the main keel is convenient to install quickly, the installation speed of the main keel is improved, the hanging plate and the secondary keel are convenient to clamp through the fixing mechanism, so that the hanging plate and the secondary keel are installed more quickly, and the locking mechanism is arranged, so that the bearing block is jacked up by the spring after the main keel and the secondary keel are clamped, the connection relation between the main keel and the secondary keel is tighter, the main keel and the secondary keel are prevented from shaking to generate noise, and the condition that the life of a resident is influenced is generated;
(2) through setting up buckle and elastic metal piece, the elastic metal piece possesses certain elasticity, is convenient for install secondary joist, through setting up arc-shaped elastic piece, is convenient for carry out the joint with arc-shaped elastic piece and elastic metal piece to be convenient for carry out the joint to secondary joist and main joist fast, thereby improve secondary joist's installation rate, through setting up joint pole and fixture block, prevent that fixed establishment from taking place to warp after the installation is accomplished, thereby can prevent that the furred ceiling board from taking place to drop.
Drawings
Fig. 1 is a perspective view of the present invention;
fig. 2 is a front sectional view of the present invention;
FIG. 3 is an enlarged view of the point A in FIG. 2 according to the present invention;
fig. 4 is a schematic structural diagram of the fixing mechanism 4 of the present invention before installation.
The reference numbers in the figures illustrate:
1. hoisting wires; 2. a secondary keel; 201. fixing grooves; 3. a ceiling plate; 4. a fixing mechanism; 401. fixing the rod; 402. a top block; 403. a flexible metal sheet; 404. a clamping groove; 405. a sliding groove; 406. a second spring; 407. a clamping block; 408. a clamping and connecting rod; 5. a main keel; 6. baking finish hanging; 7. an arc-shaped elastic sheet; 8. a locking mechanism; 801. a pressure-bearing block; 802. a first spring; 803. a movable groove; 9. buckling; 901. a resilient metal sheet; 10. and (4) screws.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-4, in the embodiment of the present invention, a ceiling assembly type metal keel structure comprises a hanging wire 1, a detachable baking varnish large hanger 6 is fixedly connected to the surface of the hanging wire 1, a screw 10 is arranged on the front surface of the baking varnish large hanger 6, the screw 10 penetrates through the baking varnish large hanger 6 and extends to the outside of the baking varnish large hanger 6, a main keel 5 is arranged on the inner bottom wall of the baking varnish large hanger 6, the main keel 5 penetrates through the baking varnish large hanger 6 and extends to the outside of the baking varnish large hanger 6, a secondary keel 2 is clamped at the bottom of the main keel 5, the main keel 5 penetrates through the secondary keel 2 and extends to the inside of the secondary keel 2, a locking mechanism 8 is arranged on the inner bottom wall of the secondary keel 2 at equal intervals, a hanging plate 3 is clamped at the bottom of the secondary keel 2, a fixing mechanism 4 is fixedly connected to the top of the hanging plate 3 at equal intervals, the fixing mechanism 4 penetrates through the secondary keel 2 and extends to the inside of the secondary keel 2, the fixed slot 201 that the equidistance distributes is seted up to the bottom of secondary joist 2, hangs 6 greatly through setting up hanging wire 1 and baking finish, hangs 6 greatly and installs on the surface of hanging wire 1 with the baking finish, is convenient for quick installs main joist 5, improves main joist 5's installation rate.
Referring to fig. 1 and 2, the bottom of the main keel 5 is fixedly connected with the buckles 9 distributed at equal intervals, the two sides of each buckle 9 are fixedly connected with the elastic metal sheets 901, and the elastic metal sheets 901 have certain elasticity by arranging the buckles 9 and the elastic metal sheets 901, so that the secondary keel 2 is convenient to install.
Referring to fig. 1 and 2, the top fixedly connected with quantity of the secondary joist 2 is two arc-shaped elastic pieces 7, the arc-shaped elastic pieces 7 are clamped with the elastic metal sheet 901, and the arc-shaped elastic pieces 7 are clamped with the elastic metal sheet 901 conveniently by arranging the arc-shaped elastic pieces 7, so that the secondary joist 2 and the main joist 5 can be clamped conveniently, and the installation speed of the secondary joist 2 is increased.
Referring to fig. 2, locking mechanism 8 includes first spring 802, movable groove 803 that the equidistance distributes is seted up to the inner bottom wall of secondary joist 2, the bottom of first spring 802 and the inner bottom wall fixed connection of movable groove 803, the top fixedly connected with bearing block 801 of first spring 802, bearing block 801 runs through movable groove 803 and contacts with the bottom of buckle 9, through setting up locking mechanism 8, can be after main joist 5 and secondary joist 2 joint, bearing block 801 is by first spring 802 jack-up, thereby make main joist 5 inseparabler with secondary joist 2's relation of connection, prevent that main joist 5 from taking place to rock with secondary joist 2 and producing the noise, the condition that influences the resident family life appears.
Referring to fig. 2, 3 and 4, the fixing mechanism 4 comprises a fixing rod 401, the bottom of the fixing rod 401 is fixedly connected with the ceiling plate 3, the fixing rod 401 penetrates through the fixing groove 201 and extends to the inside of the fixing groove 201, the left side and the right side of the fixing rod 401 are fixedly connected with soft metal sheets 403, opposite side fixedly connected with ejector blocks 402 of the two soft metal sheets 403 are fixedly connected with each other, and the ceiling plate 3 is conveniently clamped with the secondary keel 2 by arranging the fixing mechanism 4, so that the ceiling plate 3 and the secondary keel 2 can be installed more rapidly.
Referring to fig. 2, fig. 3, fig. 4, the bottom of kicking block 402 has been seted up joint groove 404, sliding tray 405 has all been seted up to the left and right sides in joint groove 404, the inner wall fixedly connected with second spring 406 of sliding tray 405, the equal fixedly connected with fixture block 407 of the opposite side of two second springs 406, fixture block 407 runs through sliding tray 405 and joint groove 404 in proper order and extends to the inside in joint groove 404, the top fixedly connected with joint pole 408 of dead lever 401, joint pole 408 runs through joint groove 404 and extends to the inside in joint groove 404, through setting up joint pole 408 and fixture block 407, prevent that fixed establishment 4 from taking place to warp after the installation is accomplished, thereby can prevent that furred ceiling board 3 from taking place to drop.
The utility model discloses a theory of operation is: when the device is used, firstly, the suspension wires 1 are fixedly connected with the large baking varnish hanger 6 through screws 10, then the suspension wires 1 are fixedly connected with a roof, the suspension wires 1 are required to be distributed on the roof at equal intervals according to actual conditions, then the main keel 5 is hung on the inner bottom wall of the large baking varnish hanger 6, the large baking varnish hanger 6 is arranged on the surface of the suspension wires 1 through the arrangement of the suspension wires 1 and the large baking varnish hanger 6, the main keel 5 is conveniently and quickly installed, the installation speed of the main keel 5 is improved, then the secondary keel 2 is lifted to the lower side of the main keel 5, then the arc-shaped elastic sheets 7 and the buckles 9 are clamped through the elastic metal sheets 901, the elastic metal sheets 901 have certain elasticity through the arrangement of the buckles 9 and the elastic metal sheets 901, the installation of the secondary keel 2 is convenient, the arc-shaped elastic sheets 7 are conveniently clamped with the elastic metal sheets 901 through the arrangement of the arc-shaped elastic sheets 7, and therefore the secondary keel 2 and the main keel 5 can be quickly clamped, thereby improving the installation speed of the secondary keel 2, at the moment, the buckle 9 is pressed to the bearing block 801, the bearing block 801 presses the first spring 802, the first spring 802 is deformed under stress, so that after the secondary keel 2 is clamped with the primary keel 5, the first spring 802 props against the bearing block 801 by the elasticity of the first spring 802, the bearing block 801 props against the buckle 9, thereby the primary keel 5 is tightly connected with the secondary keel 2, by arranging the locking mechanism 8, the bearing block 801 is jacked up by the first spring 802 after the primary keel 5 is clamped with the secondary keel 2, thereby the connection relation between the primary keel 5 and the secondary keel 2 is tighter, the situation that the primary keel 5 and the secondary keel 2 shake to generate noise and influence the life of a resident is prevented, the secondary keel 2 is equidistantly distributed at the bottom of the primary keel 5, then the ceiling board 3 is lifted to the lower part of the secondary keel 2, the fixing mechanism 4 at the top of the ceiling board 3 is aligned with the fixing groove 201, through setting up fixed establishment 4, be convenient for carry out the joint with furred ceiling board 3 and secondary joist 2, thereby make the installation of furred ceiling board 3 and secondary joist 2 quicker, impress fixed establishment 4 into fixed slot 201 with strength, kicking block 402 contacts the interior roof of fixed slot 201 afterwards, kicking block 402 atress conducts pressure for soft sheetmetal 403, soft sheetmetal 403 atress is crooked, clamping rod 408 removes to extrudeing fixture block 407 in clamping slot 404, fixture block 407 extrudees second spring 406 and contracts in sliding groove 405, when fixture block 407 is crossed at the top of clamping rod 408, fixture block 407 is popped out sliding groove 405 by the elasticity of second spring 406 self, thereby block clamping rod 408 can, through setting up clamping rod 408 and fixture block 407, prevent that fixed establishment 4 from taking place to warp after the installation, thereby can prevent that furred ceiling board 3 from taking place to drop.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides a smallpox assembled metal keel structure, includes hanging wire (1), its characterized in that: the surface of the hanging wire (1) is fixedly connected with a detachable large baking varnish crane (6), the front of the large baking varnish crane (6) is provided with a screw (10), the screw (10) runs through the large baking varnish crane (6) and extends to the outside of the large baking varnish crane (6), the inner bottom wall of the large baking varnish crane (6) is provided with a main keel (5), the main keel (5) runs through the large baking varnish crane (6) and extends to the outside of the large baking varnish crane (6), the bottom of the main keel (5) is clamped with a secondary keel (2), the main keel (5) runs through the secondary keel (2) and extends to the inside of the secondary keel (2), the inner bottom wall of the secondary keel (2) is provided with locking mechanisms (8) distributed at equal intervals, the bottom of the secondary keel (2) is clamped with a hanging plate (3), the top of the hanging plate (3) is fixedly connected with fixing mechanisms (4) distributed at equal intervals, fixed establishment (4) have the inside that runs through secondary joist (2) and extend to secondary joist (2), fixed slot (201) that the equidistance distributes are seted up to the bottom of secondary joist (2).
2. A ceiling-mounted metal grid structure as claimed in claim 1, wherein: the bottom fixedly connected with equidistance of main joist (5) distributes buckle (9), the equal fixedly connected with elasticity sheetmetal (901) in both sides of buckle (9).
3. A ceiling-mounted metal grid structure as claimed in claim 2, wherein: the top of the secondary keel (2) is fixedly connected with two arc-shaped elastic sheets (7), and the arc-shaped elastic sheets (7) are clamped with the elastic metal sheet (901).
4. A ceiling-mounted metal grid structure as claimed in claim 2, wherein: locking mechanism (8) include first spring (802), movable groove (803) that the equidistance distributes are seted up to the interior diapire of secondary joist (2), the bottom of first spring (802) and the interior diapire fixed connection of movable groove (803), the top fixedly connected with pressure-bearing block (801) of first spring (802), pressure-bearing block (801) run through movable groove (803) and contact with the bottom of buckle (9).
5. A ceiling-mounted metal grid structure as claimed in claim 1, wherein: the fixing mechanism (4) comprises a fixing rod (401), the bottom of the fixing rod (401) is fixedly connected with the ceiling plate (3), the fixing rod (401) penetrates through the fixing groove (201) and extends to the inside of the fixing groove (201), soft metal sheets (403) are fixedly connected to the left side and the right side of the fixing rod (401), and ejector blocks (402) are fixedly connected to the opposite sides of the two soft metal sheets (403).
6. A ceiling-mounted metal grid structure as claimed in claim 5, wherein: joint groove (404) have been seted up to the bottom of kicking block (402), sliding tray (405) have all been seted up to the left and right sides in joint groove (404), inner wall fixedly connected with second spring (406) of sliding tray (405), two equal fixedly connected with fixture block (407) of opposite side of second spring (406), fixture block (407) run through sliding tray (405) and joint groove (404) in proper order and extend to the inside in joint groove (404), the top fixedly connected with joint pole (408) of dead lever (401), joint pole (408) run through joint groove (404) and extend to the inside in joint groove (404).
CN202022198732.XU 2020-09-29 2020-09-29 Ceiling assembled metal keel structure Active CN213979522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022198732.XU CN213979522U (en) 2020-09-29 2020-09-29 Ceiling assembled metal keel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022198732.XU CN213979522U (en) 2020-09-29 2020-09-29 Ceiling assembled metal keel structure

Publications (1)

Publication Number Publication Date
CN213979522U true CN213979522U (en) 2021-08-17

Family

ID=77255201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022198732.XU Active CN213979522U (en) 2020-09-29 2020-09-29 Ceiling assembled metal keel structure

Country Status (1)

Country Link
CN (1) CN213979522U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775101A (en) * 2021-10-18 2021-12-10 深圳市深装业建设集团有限公司 Light steel keel gypsum board suspended ceiling structure and construction process thereof
CN114718241A (en) * 2022-04-15 2022-07-08 中建一局集团第三建筑有限公司 Ultrahigh-height hollow slab suspended ceiling structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775101A (en) * 2021-10-18 2021-12-10 深圳市深装业建设集团有限公司 Light steel keel gypsum board suspended ceiling structure and construction process thereof
CN114718241A (en) * 2022-04-15 2022-07-08 中建一局集团第三建筑有限公司 Ultrahigh-height hollow slab suspended ceiling structure and construction method

Similar Documents

Publication Publication Date Title
CN213979522U (en) Ceiling assembled metal keel structure
CN113530071B (en) Assembled simple suspended ceiling mounting structure
CN210288842U (en) Penetrating grid furred ceiling structure
CN215888806U (en) Assembled sound insulation furred ceiling mounting structure
CN113073767A (en) Top-mounted assembly type suspended ceiling structure and mounting method thereof
CN219343659U (en) Fireproof heat-insulating curtain wall
CN217379481U (en) Light gauge steel furred ceiling gypsum board mounting structure
CN212405697U (en) Connection structure for assembled ceiling keel
CN209874182U (en) Aluminum plate mounting structure is closely pieced together to furred ceiling and system thereof
CN114775943A (en) Assembled light gauge steel cuts off wall body
CN203821677U (en) Composite ceiling system
CN212773033U (en) Fast-assembling architectural decoration curtain
CN220469224U (en) Suspended ceiling assembling structure
CN218970393U (en) Clip type suspended ceiling keel construction structure
CN210597828U (en) Novel suspended ceiling
CN112302277B (en) Mounting structure of massive facing glass magnesium board
CN220598874U (en) Top surface large-span overlength aluminium grid
CN219825810U (en) Novel aluminum grid joint mounting system of whole surface course
CN214785225U (en) Aluminum alloy suspended ceiling assembly convenient to overhaul
CN221878513U (en) Supporting structure of gypsum board furred ceiling
CN212641898U (en) Connecting piece of furred ceiling structure and furred ceiling panel
CN214833940U (en) Green environmental protection light gauge steel building frame
CN214785223U (en) Close type aluminum plate furred ceiling connection structure of piecing together
CN213597277U (en) Aluminum veneer curtain wall structure
CN212106488U (en) Calcium silicate board connects fixed subassembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant