CN210597828U - Novel suspended ceiling - Google Patents

Novel suspended ceiling Download PDF

Info

Publication number
CN210597828U
CN210597828U CN201920961208.8U CN201920961208U CN210597828U CN 210597828 U CN210597828 U CN 210597828U CN 201920961208 U CN201920961208 U CN 201920961208U CN 210597828 U CN210597828 U CN 210597828U
Authority
CN
China
Prior art keywords
rod
supporting rod
left supporting
suspended ceiling
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920961208.8U
Other languages
Chinese (zh)
Inventor
刘延庚
张艳晓
王海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuhui Design Co ltd
Original Assignee
Xuhui Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuhui Design Co ltd filed Critical Xuhui Design Co ltd
Priority to CN201920961208.8U priority Critical patent/CN210597828U/en
Application granted granted Critical
Publication of CN210597828U publication Critical patent/CN210597828U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to the technical field of building ceiling construction materials, in particular to a novel suspended ceiling, which comprises a plurality of keels between two opposite walls and a buckle plate between frameworks, wherein each keel comprises a pressing rod, the two ends of each pressing rod are respectively provided with a left supporting rod and a right supporting rod, the left supporting rod is horizontally arranged, one end of each left supporting rod is a vertical cross section, the other end of each left supporting rod is an inclined plane which is sequentially lengthened from top to bottom, the right supporting rod and the left supporting rod are symmetrically arranged, and the two ends of each pressing rod are provided with inclined planes respectively corresponding to the left supporting rod and the right supporting rod; the buckle plate comprises a panel and a buckle piece on one side of the panel. The utility model discloses can take buckle and fossil fragments to dismantle together, and the installation of furred ceiling need not to make a hole to the structure of building, can satisfy noiseless construction requirement.

Description

Novel suspended ceiling
Technical Field
The utility model belongs to the technical field of building ceiling construction material technique and specifically relates to a novel furred ceiling is related to.
Background
The suspended ceiling is decoration for decorating the top of a house living environment, the existing decoration can not be separated from the suspended ceiling, and the suspended ceiling can beautify the indoor space of people and bring a comfortable and warm living environment for people. The suspended ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption, and is also a hidden layer for projects such as electric, ventilation air-conditioning, communication and fire prevention, alarm pipeline equipment and the like.
The home decoration suspended ceiling is a common link in home decoration, the keel is a main material of the suspended ceiling, is generally made of light steel and is connected with a floor slab through a screw rod to fix the suspended ceiling or objects. During the construction of a suspended ceiling, the method generally comprises the following steps: 1. line snapping: according to the elevation horizontal line, the height is measured to the designed elevation of the ceiling by a ruler vertically, the elevation horizontal line of the ceiling is ejected along the periphery of the wall, and a keel grading position line is marked on the wall surface along the elevation horizontal line of the ceiling. 2. Installing a suspender: the method comprises the steps of firstly assembling a suspender nut at one end of a suspender, then determining the elevation of an end head below the suspender according to the level horizontal line of the bounced ceiling and a keel position line, and connecting and fixing the other end of the suspender with a floor slab according to the position of a main keel and a hanging interval. The distance between the hanging rod and the end of the main keel is not more than 300mm, otherwise, the hanging rod is added. Additional suspension rods should be arranged at the ceiling lamp, the air opening, the access hole and the like. 3. Installing a main keel: and (3) pre-assembling a hanging piece on the main keel, assembling the main keel of the hanging piece, enabling the hanging piece to penetrate into a corresponding suspender nut according to the position of the stepping line, and screwing the nut. The main keels are connected by adopting connecting pieces, and the arch camber height is adjusted by stay wires. The main joist is installed in the long direction of a parallel room, the arching height is 1/200-1/300 of a short span of the room, the cantilever end of the main joist is not larger than 300mm, otherwise, a suspender is added, the main joist is lengthened by adopting butt joint, and joints of adjacent joists are staggered. 4. Installing secondary keels: and (3) clamping and placing the secondary keel hanging pieces according to the grade line of the bounced secondary keel, hanging the secondary keel on the main keel through the hanging pieces according to the secondary keel interval specified by the design, wherein the interval is generally 500 plus 600 when the design is not required. 5. Panel installation: the ceiling panel is selected according to the design, and the panel is directly placed on the keel. During installation, the arrow direction and the white line direction of the back of the plate are in accordance so as to ensure the integrity of the pattern.
Along with the improvement of the living standard of people, more and more families choose to install new fan in the furred ceiling of kitchen bathroom, because new fan's overhaul of equipments space is big, and it is more frequent to trade operations such as filter core, and traditional integrated furred ceiling can not very make things convenient for these operations.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at prior art not enough, provide a novel furred ceiling, can take buckle and fossil fragments to dismantle together, and the installation of furred ceiling need not to make a hole to the structure of building, can satisfy noiselessness construction requirement.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a novel suspended ceiling comprises a plurality of keels between two opposite walls and a buckle plate between frameworks, wherein each keel comprises a pressing rod, a left supporting rod and a right supporting rod are respectively arranged at two ends of each pressing rod, each left supporting rod is horizontally arranged, one end of each left supporting rod is a vertical cross section, the other end of each left supporting rod is an inclined plane which is sequentially lengthened from top to bottom, the right supporting rods and the left supporting rods are symmetrically arranged, and inclined planes which respectively correspond to the left supporting rods and the right supporting rods are arranged at two ends of each pressing rod; the buckle plate comprises a panel and a buckle piece on one side of the panel.
Furthermore, two ends of the compressing rod are respectively connected with the left supporting rod and the right supporting rod in a tenon-and-mortise structure.
Furthermore, the connection part of the left support rod or the right support rod and the wall is respectively provided with a support block with certain elasticity.
Furthermore, the compressing rod is an adjusting rod with a variable length.
Furthermore, the adjusting rod comprises a left rod and a right rod which are connected through a plurality of corresponding holes arranged in the length direction.
The utility model has the advantages that:
when the utility model is used, the vertical end of the left support rod and the right support rod is abutted to the wall and is temporarily and simply fixed by hand holding, and the pressing rod is arranged between the left support rod and the right support rod and is pressed downwards, the pressing rod pushes the left support rod and the right support rod to two sides respectively under the action of the inclined planes at the two ends, and the left support rod and the right support rod are abutted to the wall, so that the fixation of the keel can be completed; and accomplish the fixed of a plurality of fossil fragments in proper order, then with the buckle joint spare card of buckle on fossil fragments, accomplish fixedly, the panel of adjacent buckle forms the ceiling, realizes the installation of whole furred ceiling.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of an implementation state of the present invention;
fig. 2 is a schematic structural view of the keel of the present invention;
fig. 3 is a schematic structural view of the buckle plate of the present invention.
In the figure: 1-wall, 2-keel, 201-left film, 202-left support bar, 203-left rod, 204-bolt, 205-clip, 206-bolt hole, 207-right rod, 208-right support bar, 209-right film, 3-buckle plate, 301-buckle piece, 302-panel.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1, 2 and 3, a novel suspended ceiling comprises a plurality of keels 2 between two opposite walls 1 and a pinch plate 3 between frameworks, wherein each keel 2 comprises a pressing rod, a left support rod 202 and a right support rod 208 are respectively arranged at two ends of each pressing rod, the left support rod 202 is horizontally arranged, one end of each left support rod is a vertical cross section, the other end of each left support rod is an inclined plane which is sequentially lengthened from top to bottom, the right support rod 208 and the left support rod 202 are symmetrically arranged, and inclined planes corresponding to the left support rod 202 and the right support rod 208 are respectively arranged at two ends of each pressing rod; the buckle plate 3 comprises a panel 302 and buckle pieces 301 on one side of the panel 302, the number of the buckle pieces 301 is at least two arranged at the diagonal positions of the panel 302, the buckle pieces 301 can be a plurality of hooks connected with the panel 302, and can also be in the form of a connecting piece which has certain elasticity and is provided with a recess adapting to the keel 2 in the middle. When the keel 2 fixing device is used, the vertical ends of the left supporting rod 202 and the right supporting rod 208 are abutted to the wall 1 and are temporarily and simply fixed in a handheld mode and the like, then the pressing rod is placed between the left supporting rod 202 and the right supporting rod 208 and is pressed downwards, the pressing rod pushes the left supporting rod 202 and the right supporting rod 208 to two sides respectively under the action of inclined planes at two ends, and the left supporting rod 202 and the right supporting rod 208 are abutted to the wall 1, so that the keel 2 can be fixed; and accomplish the fixed of a plurality of fossil fragments 2 in proper order, then with buckle piece 301 card of buckle 3 on fossil fragments 2, accomplish fixedly, the panel 302 of adjacent buckle 3 forms the ceiling, realizes the installation of whole furred ceiling.
In this embodiment, further, two ends of the compressing rod are respectively connected with the left supporting rod 202 and the right supporting rod 208 in a tenon-and-mortise structure, and a bevel dovetail is arranged between the two ends of the compressing rod and the left supporting rod 202 and the right supporting rod respectively. The tenon-and-mortise structure is widely applied to buildings and furniture, and shows the close relationship between the furniture and the buildings. The tenon-and-mortise structure is not strong in individual strength, but combined with each other and supported with each other, and the structure becomes a basic mode of later generation buildings and middle furniture. The tenon-and-mortise work is a concave-convex combination connection mode adopted on two members, and the protruding part is called a tenon (or tenon); the concave part is called as mortise (or mortise, mortise), and the tenon and the mortise are occluded to play a role in connection. The mortise and tenon joint that this device adopted is for the recess or the arch that can interconnect that sets up on the vertical direction on inclined plane, not only is favorable to accomplishing the fixing between compression bar and left branch vaulting pole 202 and the right branch vaulting pole 208 through adopting above-mentioned mortise and tenon joint structure on the inclined plane, does not also influence it and moves the fixed of realizing fossil fragments 2 on relative wall 1 on the inclined plane.
In this embodiment, further, the joints between the left support bar 202 or the right support bar 208 and the wall 1 are respectively provided with a support block having a certain elasticity. The purpose that the supporting shoe set up is in order to provide certain reaction force after connecting the completion for it is more firm between compressing tightly pole and left branch vaulting pole 202 and the right branch vaulting pole 208, and on the other hand makes fossil fragments 2 have certain ability of resisting external vibrations, prevents to lead to fossil fragments 2 to drop because vibrations, makes its and wall 1's connection more firm. The supporting shoe is preferably the rubber pad, including the left film 3 that sets up between left branch vaulting pole 202 and the wall 1, and the right film 209 that sets up between right branch vaulting pole 208 and the wall 1, left film 3 and right film 209 are except increasing the above-mentioned effect that fossil fragments 2 possessed, and left film 3 and right film 209 have also increaseed the frictional force between fossil fragments 2 and the wall 1, avoid fossil fragments 2 to slide on wall 1 for paste the ceramic tile in this device and bathroom etc., the comparatively wet and slippery environment of wall 1 is more practical.
In this embodiment, further, the compressing rod is an adjusting rod with a variable length. The adjusting rod can be a structure that two sections are respectively provided with a thread or nut structure and are mutually connected through threads, the relative position of the threads and the nuts can be changed through rotation, the length adjusting mode is realized, and the adjusting rod can also be a common structure such as a telescopic cylinder and a sleeve to realize the length adjusting purpose. Preferably, the adjusting rod comprises a straight rod consisting of a left rod 203 and a right rod 207, clamping pieces 205 are arranged at the adjacent positions of the left rod 203 and the right rod 207, a plurality of bolt holes 206 which are arranged in the length direction and correspond to each other are formed in the clamping pieces 205 of the left rod 203 and the right rod 207, through the change of different positions of the bolt holes 206 between the clamping pieces 205 of the left rod 203 and the right rod 207, the fixation is realized through the arrangement of bolts 204, the change and the adjustment of different lengths of the adjusting rod are realized, and the application of the adjusting rod between the walls 1 with different distances is realized.
It should be understood that the above detailed description of the present invention is only for illustrating the present invention and is not limited by the technical solutions described in the embodiments of the present invention, and those skilled in the art should understand that the present invention can still be modified or equivalently replaced to achieve the same technical effects; as long as the use requirement is satisfied, the utility model is within the protection scope.

Claims (5)

1. A novel suspended ceiling, its characterized in that: the wall comprises a plurality of keels (2) between two opposite walls (1) and a buckle plate (3) between frameworks, wherein each keel (2) comprises a pressing rod, a left supporting rod (202) and a right supporting rod (208) are arranged at two ends of each pressing rod respectively, the left supporting rod (202) is horizontally arranged, one end of each left supporting rod is a vertical cross section, the other end of each left supporting rod is an inclined plane which is sequentially lengthened from top to bottom, the right supporting rods (208) and the left supporting rods (202) are symmetrically arranged, and inclined planes corresponding to the left supporting rods (202) and the right supporting rods (208) are arranged at two ends of each pressing rod respectively; the buckle plate (3) comprises a panel (302) and a buckle piece (301) arranged on one side of the panel (302).
2. The novel suspended ceiling of claim 1, wherein: and two ends of the compression rod are respectively in tenon-and-mortise structure connection with the left support rod (202) and the right support rod (208).
3. The novel suspended ceiling of claim 1, wherein: and supporting blocks with certain elasticity are respectively arranged at the joints of the left supporting rod (202) or the right supporting rod (208) and the wall (1).
4. A new ceiling as claimed in any one of claims 1 to 3, characterised in that: the compressing rod is an adjusting rod with a variable length.
5. The novel suspended ceiling of claim 4, wherein: the adjusting rod comprises a left rod (203) and a right rod (207), and the left rod (203) and the right rod (207) are connected through a plurality of corresponding holes arranged in the length direction.
CN201920961208.8U 2019-06-25 2019-06-25 Novel suspended ceiling Active CN210597828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920961208.8U CN210597828U (en) 2019-06-25 2019-06-25 Novel suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920961208.8U CN210597828U (en) 2019-06-25 2019-06-25 Novel suspended ceiling

Publications (1)

Publication Number Publication Date
CN210597828U true CN210597828U (en) 2020-05-22

Family

ID=70694440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920961208.8U Active CN210597828U (en) 2019-06-25 2019-06-25 Novel suspended ceiling

Country Status (1)

Country Link
CN (1) CN210597828U (en)

Similar Documents

Publication Publication Date Title
WO2014135056A1 (en) Assembled-type light steel beam plasterboard irregularly-shaped dropped ceiling system
CN107724588B (en) Integrated curved surface suspended ceiling structure and construction method thereof
CN210597828U (en) Novel suspended ceiling
CN211774828U (en) Multifunctional light steel keel and partition wall
CN213868520U (en) Light steel keel frame with stable structure for indoor suspended ceiling
CN112982799B (en) Energy-saving building interior decoration structure
CN219992857U (en) Assembled furred ceiling structure
CN203160503U (en) Invertedly concave connecting structure of indoor ceiling and wall body
CN111075056A (en) Multifunctional light steel keel and partition wall
CN219491407U (en) Base for assembled wall and assembled wall
CN112523394A (en) Light steel keel partition wall
CN219196438U (en) Assembled building design structure
CN210597823U (en) Top surface gypsum board capable of preventing cracking
CN215716472U (en) Decorative suspended ceiling
CN115247469B (en) Anti-cracking suspended ceiling structure and construction method thereof
CN211774609U (en) A pre-buried mounting structure for single-sided wall cabinet
CN113653254B (en) Assembly type small space suspended ceiling mounting structure
CN216740513U (en) Novel light wallboard
CN214461687U (en) Indoor sound absorption ceiling structure
CN217420200U (en) Light steel keel with shock absorption effect
CN212926800U (en) Insulating brick for building
CN215760035U (en) Roofing tile with antidetonation, waterproof, bearing function
CN215483823U (en) Staircase fire wall
CN215442639U (en) Fossil fragments-free gypsum decorative board for furred ceiling
CN221298373U (en) Modularized flexible suspended ceiling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant