CN213954838U CN202023189399.2U CN202023189399U CN213954838U CN 213954838 U CN213954838 U CN 213954838U CN 202023189399 U CN202023189399 U CN 202023189399U CN 213954838 U CN213954838 U CN 213954838U
Authority
CN
China
Prior art keywords
spring
assembly
rod
area
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023189399.2U
Other languages
Chinese (zh)
Inventor
薛守玲
曹卫
吴晓光
郭叶东
索成善
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023189399.2U priority Critical patent/CN213954838U/en
Application granted granted Critical
Publication of CN213954838U publication Critical patent/CN213954838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of The Respiration, Hearing Ability, Form, And Blood Characteristics Of Living Organisms (AREA)

Abstract

The utility model discloses a device for planning completion measurement, which relates to the technical field of measuring devices and comprises a first area rod mechanism, a second area rod assembly and a base, wherein the first area rod mechanism, the second area rod assembly and the base are connected in series, the first area rod mechanism comprises a first area rod, a control assembly is arranged at the top end inside the first area rod, an ejection assembly is connected inside the first area rod and below the control assembly, a first interception piece is fixedly arranged on the inner surface of the first area rod and below the ejection assembly, a connecting rod is fixedly arranged below the ejection assembly, a first fixing bolt is arranged at the top of the connecting rod, an adjusting assembly is fixedly arranged at the bottom of the connecting rod, the bottom of a support can be extended and contracted through a structure arranged inside the first area rod, the effect of solving the long traditional tripod is achieved, furthermore, because the support is retracted into the interior, the positioning foot can not cause harm to human body when the device is carried and used.

Description

Device for planning completion measurement
Technical Field
The utility model relates to a measuring device technical field specifically is a device for planning completion measurement.
Background
When surveying and mapping, measuring instruments such as a level and a theodolite are the most central instruments, and for the traditional measuring instruments, the measuring instruments are usually required to be placed on a mounting base of a tripod, and the tripod can adjust the height position of the measuring instrument on one hand and can be better adapted to different ground terrains on the other hand.
However, the existing tripod is long in shape, and the positioning foot of the tripod is easy to hurt people by mistake when the tripod is placed and used, so that a device for planning completion measurement is provided.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a be used for planning as construction survey's device, it is longer to have solved the tripod bodily form, and when placing and using, the easy mistake of location foot of tripod harms the problem of people moreover.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an apparatus for planning completion measurements includes a first area bar mechanism, a second area bar assembly, and a base, the first area bar mechanism, the second area bar assembly, and the base being serially interconnected.
First district rod mechanism includes first district pole, install control assembly on the inside top of first district pole, the below that just is located control assembly in first district pole inside is connected with and launches the subassembly, just be located and launch subassembly below fixed mounting at first district pole internal surface has first interception piece, there is the connecting rod below fixed mounting who launches the subassembly, first gim peg is installed at the top of connecting rod, there is the adjusting part bottom fixed mounting at the connecting rod.
Furthermore, the control assembly comprises a control piece and a first spring fixing piece, the control piece is used for installing the top end inside the first area rod, a first spring is fixedly installed inside the first spring fixing piece, and the first spring fixing piece form a connecting structure.
Further, the ejection assembly comprises a second spring fixing piece installed below the control assembly, a first groove with the same size as the bottom of the control piece is formed in the top end of the second spring fixing piece, a first moving piece is installed and rotated in the second spring fixing piece, a second groove is formed in the top end of the first moving piece and is the same as the first groove in size, a third groove with the same size as the bottom of the first moving piece is formed in the second spring fixing piece, the top end of the second spring fixing piece is located above the first moving piece, a second spring is fixedly installed on the top end of the second spring fixing piece, and a second intercepting piece with the size smaller than the bottom of the first moving piece is fixedly installed at the bottom end of the second spring fixing piece.
Further, the regulating assembly includes third spring mounting and the mounting of fixed mounting at the connecting rod, there are second motion piece and third spring at the inside fixed mounting of third spring mounting, the top fixed mounting of level bubble has the level bubble, be connected with first dead lever in the bottom of mounting, the mounting is fixed through first dead lever with the pivot, there is the carriage release lever at the external connection of first dead lever, the top surface mounting of carriage release lever has the second gim peg.
Furthermore, the second section bar assembly comprises a second section bar, a second fixing bar is connected inside the second section bar, a plurality of bolt holes are formed in the outer surface of the second fixing bar, and the second section bar and the second fixing bar are fixed through a third fixing bolt.
Furthermore, a groove with the same shape as the ejection assembly is formed in the first area rod, and a groove with the same size as the control assembly is formed in the inner side of the top of the first area rod.
Advantageous effects
The utility model provides a device for planning completion measurement. Compared with the prior art, the method has the following beneficial effects:
1. the utility model provides a device for planning completion measurement, through installing the structure in first district pole inside, can stretch out and draw back the support bottom, effectually longer has obtained the solution to traditional tripod bodily form, moreover, because the support has taken in inside, when carrying and using, the location foot can not cause the injury to the human body yet, still can carry out angle modulation to the bottom support according to the level bubble.
2. A device for planning as built measurements, through second district's pole subassembly, can adjust the tripod height, further shortened the length of traditional tripod.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the utility model in a contracted state;
fig. 3 is a schematic structural view of the first zone rod mechanism of the present invention;
fig. 4 is a schematic structural diagram of the control assembly of the present invention;
fig. 5 is a schematic structural view of the ejection assembly of the present invention;
FIG. 6 is a schematic structural diagram of the adjusting assembly of the present invention;
fig. 7 is a schematic structural view of a second zone bar assembly of the present invention.
In the figure: 1. a first zone bar mechanism; 11. a first zone bar; 12. a first interception member; 13. a control component; 131. a control member; 132. a first spring mount; 133. a first spring; 14. an ejection assembly; 141. a second spring mount; 142. a first groove; 143. a first moving member; 144. a second groove; 145. a third groove; 146. a second spring; 147. a second interception member; 15. a connecting rod; 16. a first securing latch; 17. an adjustment assembly; 171. a third spring mount; 172. a second moving member; 173. a third spring; 174. a fixing member; 175. horizontal bubble; 176. a first fixing lever; 177. a rotating shaft; 178. a travel bar; 179. a second securing latch; 2. a second wand assembly; 21. a second zone bar; 22. a second fixing bar; 23. a keyhole; 24. a third securing latch; 3. a base.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a device for planning completion measurement comprises a first area rod mechanism 1, a second area rod assembly 2 and a base 3, wherein the first area rod mechanism 1, the second area rod assembly 2 and the base 3 are connected in series;
referring to fig. 3, the first area bar mechanism 1 includes a first area bar 11, a control assembly 13 is installed at a top end inside the first area bar 11, an ejection assembly 14 is connected inside the first area bar 11 and below the control assembly 13, a first interception member 12 is fixedly installed on an inner surface of the first area bar 11 and below the ejection assembly 14, a connection bar 15 is fixedly installed below the ejection assembly 14, a first fixing bolt 16 is installed at a top of the connection bar 15, an adjustment assembly 17 is fixedly installed at a bottom of the connection bar 15, a groove having a shape identical to that of the ejection assembly 14 is formed inside the first area bar 11, and a groove having a size identical to that of the control assembly 13 is formed inside a top of the first area bar 11.
Referring to fig. 4, the control assembly 13 includes a control member 131 and a first spring fixing member 132 installed at the top end of the first section bar 11, a first spring 133 is fixedly installed in the first spring fixing member 132, and the first spring fixing member 132 form a connection structure.
Referring to fig. 5, the ejection assembly 14 includes a second spring fixing member 141 installed below the control assembly 13, a first groove 142 having the same size as the bottom of the control member 131 is formed at the top end of the second spring fixing member 141, a first moving member 143 is installed inside the second spring fixing member 141, a second groove 144 having the same size as the first groove 142 is formed at the top end of the first moving member 143, a third groove 145 having the same size as the bottom of the first moving member 143 is formed inside the second spring fixing member 141, a second spring 146 is fixedly installed at the top end of the second spring fixing member 141 and located above the first moving member 143, and a second blocking member 147 having a size smaller than the bottom of the first moving member 143 is fixedly installed at the bottom end of the second spring fixing member 141.
Referring to fig. 6, the adjusting assembly 17 includes a third spring fixing member 171 and a fixing member 174 fixedly installed on the connecting rod 15, a second moving member 172 and a third spring 173 are fixedly installed inside the third spring fixing member 171, a horizontal bubble 175 is fixedly installed at a top end of the horizontal bubble 175, a first fixing rod 176 is connected to a bottom end of the fixing member 174, the fixing member 174 and a rotating shaft 177 are fixed by the first fixing rod 176, a moving rod 178 is connected to an outer portion of the first fixing rod 176, and a second fixing bolt 179 is installed on an outer surface of a top portion of the moving rod 178.
Referring to fig. 7, the second section bar assembly 2 includes a second section bar 21, a second fixing bar 22 is connected to the inside of the second section bar 21, a plurality of bolt holes 23 are formed on the outer surface of the second fixing bar 22, and the second section bar 21 and the second fixing bar 22 are fixed by a third fixing bolt 24.
When the control assembly 13 is pressed down to release the restraint of the control assembly control member 131 on the ejection assembly 14, the second spring 146 arranged in the ejection assembly 14 pushes the first moving member 143 to drive the ejection assembly 14 to move downwards, when the adjusting assembly 17 moves to the outside of the first section bar mechanism 1, the third spring 173 arranged in the connecting rod 15 pushes the second moving member 172 to work, so as to drive the moving rod 178 to move around the rotating shaft 177, at the moment, the first fixing bolt 16 is arranged to fix the connecting rod 15 by the first fixing bolt 16, then the tripod is placed at a desired position, then the third fixing bolt 24 is detached to release the restraint of the third fixing bolt 24 on the second section bar 21, the second section bar 21 is adjusted according to a required height, when the height is adjusted to a certain height, the third fixing bolt 24 is arranged to enable the third fixing bolt 24 to retrain the second section bar 21, then, looking at the horizontal bubble 175, when the horizontal angle needs to be adjusted, the second fixing bolt 179 is removed, the second fixing bolt 179 releases the movable bar 178, the movable bar 178 is adjusted according to the horizontal bubble 175, and when the adjustment is completed, the second fixing bolt 179 is installed, the second fixing bolt 179 is made to re-bind the movable bar 178, and similarly, after the use is completed, the second zone bar 21 is retracted to the original position, the first fixing bolt 16 is removed, and the internal components of the first zone bar mechanism 1 are retracted to the original position.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. An apparatus for planning as built measurements comprising a first area bar mechanism (1), a second area bar assembly (2) and a base (3), characterized in that: the first zone rod mechanism (1), the second zone rod assembly (2) and the base (3) are connected in series;
first district rod mechanism (1) includes first district pole (11), install control assembly (13) on first district pole (11) inside top, the below that just is located control assembly (13) inside first district pole (11) is connected with and launches subassembly (14), just be located and launch subassembly (14) below fixed mounting at first district pole (11) internal surface and have first interception piece (12), there is connecting rod (15) below fixed mounting who launches subassembly (14), first gim peg (16) is installed at the top of connecting rod (15), there is adjusting part (17) bottom fixed mounting at connecting rod (15).
2. An apparatus for planning as built measurements according to claim 1, wherein: the control assembly (13) comprises a control piece (131) and a first spring fixing piece (132), wherein the control piece (131) is arranged at the top end inside the first area rod (11), a first spring (133) is fixedly arranged inside the first spring fixing piece (132), and the first spring fixing piece (132) form a connecting structure.
3. An apparatus for planning as built measurements according to claim 1, wherein: the ejection assembly (14) comprises a second spring fixing member (141) arranged below the control assembly (13), the top end of the second spring fixing part (141) is provided with a first groove (142) with the same size as the bottom of the control part (131), a first moving part (143) is arranged and rotated in the second spring fixing part (141), the top end of the first moving piece (143) is provided with a second groove (144) with the same size as the first groove (142), a third groove (145) with the same size as the bottom end of the first moving part (143) is arranged in the second spring fixing part (141), the second spring (146) is fixedly arranged at the top end in the second spring fixing part (141) and above the first moving part (143), and a second interception member (147) with the size smaller than that of the bottom end of the first moving member (143) is fixedly arranged at the bottom end of the second spring fixing member (141).
4. An apparatus for planning as built measurements according to claim 1, wherein: adjusting part (17) are including third spring mounting (171) and mounting (174) of fixed mounting at connecting rod (15), there are second moving member (172) and third spring (173) at the inside fixed mounting of third spring mounting (171), the top fixed mounting of level bubble (175) has level bubble (175), be connected with first dead lever (176) in the bottom of mounting (174), mounting (174) are fixed through first dead lever (176) with pivot (177), there is carriage release lever (178) at the external connection of first dead lever (176), the top surface mounting of carriage release lever (178) has second fixing bolt (179).
5. An apparatus for planning as built measurements according to claim 1, wherein: the second section bar assembly (2) comprises a second section bar (21), a second fixing bar (22) is connected to the inside of the second section bar (21), a plurality of bolt holes (23) are formed in the outer surface of the second fixing bar (22), and the second section bar (21) and the second fixing bar (22) are fixed through a third fixing bolt (24).
6. An apparatus for planning as built measurements according to claim 1, wherein: the inside of the first area rod (11) is provided with a groove which is the same as the ejection component (14) in shape, and the inner side of the top of the first area rod (11) is provided with a groove which is the same as the control component (13) in size.
CN202023189399.2U 2020-12-26 2020-12-26 Device for planning completion measurement Expired - Fee Related CN213954838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023189399.2U CN213954838U (en) 2020-12-26 2020-12-26 Device for planning completion measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023189399.2U CN213954838U (en) 2020-12-26 2020-12-26 Device for planning completion measurement

Publications (1)

Publication Number Publication Date
CN213954838U true CN213954838U (en) 2021-08-13

Family

ID=77194546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023189399.2U Expired - Fee Related CN213954838U (en) 2020-12-26 2020-12-26 Device for planning completion measurement

Country Status (1)

Country Link
CN (1) CN213954838U (en)

Similar Documents

Publication Publication Date Title
CN103938722B (en) A kind of have that width height is adjustable and the GIS dw of flexible ceiling function
CN210771284U (en) Surveying instrument positioner for surveying and mapping engineering
CN214368851U (en) Surveying instrument positioner for surveying and mapping engineering
CN109375277B (en) Fixed source transient electromagnetic tunnel face advanced forecasting and transmitting device
CN206514855U (en) A kind of total powerstation
CN213954838U (en) Device for planning completion measurement
CN114857418A (en) Detachable lifting device for ocean surveying and mapping
CN212273565U (en) Portable geographic information surveying instrument
CN207439412U (en) A kind of three corner steadies for total powerstation supporting leg
CN117072839A (en) A convenient geographical mapping appearance for forestry reconnaissance
CN218916343U (en) Topography mapping device
CN208735199U (en) A kind of portable multi-function instrument of surveying and mapping tripod
CN208588379U (en) A kind of indoor design plotting board
CN211475318U (en) Land surveying level
CN215722192U (en) Mapping instrument positioning device for engineering mapping
CN214200098U (en) Measuring device for surveying and mapping engineering
CN211291472U (en) Measuring instrument for territorial space planning
CN218626252U (en) Positioning marker post for land survey
CN216131617U (en) Theodolite horizontal adjusting device
CN219243242U (en) Ring art design location range unit
CN221776072U (en) Unmanned aerial vehicle survey and drawing stabilizing mean
CN207263181U (en) A kind of unmanned plane photo control point laying positioner
CN213874430U (en) Adjustable autogiration structure of surveying instrument for land surveying and mapping
CN220338131U (en) Portable topographic map mapping device for highway measurement
CN221526185U (en) Positioning device for engineering mapping

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210813