CN213927506U - Connecting and locking device for building template - Google Patents

Connecting and locking device for building template Download PDF

Info

Publication number
CN213927506U
CN213927506U CN202022558298.1U CN202022558298U CN213927506U CN 213927506 U CN213927506 U CN 213927506U CN 202022558298 U CN202022558298 U CN 202022558298U CN 213927506 U CN213927506 U CN 213927506U
Authority
CN
China
Prior art keywords
template
piece
tightening bolt
sleeve
locking device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022558298.1U
Other languages
Chinese (zh)
Inventor
张胜龙
王倩
崔云皓
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yangdu Water Conservancy Construction Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022558298.1U priority Critical patent/CN213927506U/en
Application granted granted Critical
Publication of CN213927506U publication Critical patent/CN213927506U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a connect locking device for building templates, including connecting rod mechanism and template support mechanism, template support mechanism movable mounting is at the both ends of connecting rod mechanism, through the sleeve pipe activity suit that supports the mechanism setting with the template on the guide pillar, and the equal activity suit sleeve pipe on the guide pillar at center support piece both ends, when locking building templates, through moving the sleeve pipe on the guide pillar, reach the purpose of adjusting the distance between the template support mechanism of guide pillar both sides, be applicable to the demand of different length, after adjusting, through screwing up the second tightening bolt of screw thread mounting in the side of sleeve pipe, carry out the rigidity, carry out preliminary clamping treatment to the both sides template; when the template supports tight mechanism and carries out preliminary tight processing of clamp to the both sides template, through screwing up the third bolt of screwing up for the second rubber supports piece and carries out in close contact with the both sides template, and supports the both sides template, increases locking connection's effect, and can effectually prevent that the phenomenon of both sides template slope from taking place.

Description

Connecting and locking device for building template
Technical Field
The utility model relates to a construction equipment technical field specifically is a connect locking device for building templates.
Background
The building template is a temporary supporting structure, is manufactured according to the design requirement, enables a concrete structure and a member to be formed according to the specified position and geometric dimension, keeps the correct position, bears the self weight of the building template and the external load acted on the building template, and is used for construction so as to ensure the quality and the construction safety of concrete, accelerate the construction progress and reduce the engineering cost; the building formwork structure used at present mainly comprises a panel and a connecting piece, wherein the panel is a bearing plate directly contacting newly-poured concrete, and the connecting piece is an accessory connecting the panels into a whole.
The existing connecting and locking device for the building template cannot change the length in the connecting and locking process and has poor abutting effect on the template.
To the above problem, the utility model provides a connect locking device for building templates.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a connect locking device for building templates, support tight mechanism including connecting rod mechanism and template, the template supports tight mechanism movable mounting at connecting rod mechanism's both ends, can carry out the change of length, and supports tightly effectually to the problem in the background art has been solved.
In order to achieve the above object, the utility model provides a following technical scheme: a connecting and locking device for building templates comprises a connecting rod mechanism and template abutting mechanisms, wherein the template abutting mechanisms are movably arranged at two ends of the connecting rod mechanism, the connecting rod mechanism is provided with connecting guide post pieces and a central abutting piece, the connecting guide post pieces are arranged in two groups, and the two groups of connecting guide post pieces are fixedly welded at two ends of the central abutting piece to form a connecting rod mechanism whole;
the template supports tight mechanism and is provided with suit connector, spliced pole and side and supports the piece, and suit connector movable sleeve is on connecting the guide post spare, and the fixed welding spliced pole in side of suit connector, and the other end fixed welding side of spliced pole supports the piece.
Preferably, the connecting guide post part comprises a guide post and a limiting head, one end of the guide post is fixedly welded on the side surface of the central abutting part, and the other end of the guide post is fixedly welded with the limiting head.
Preferably, the center abutting part comprises a thickened central column, a first screwing bolt and a first rubber abutting piece, the first screwing bolt is installed in the middle of the thickened central column in a threaded mode, the first screwing bolt penetrates through the thickened central column, and the first rubber abutting piece is fixedly arranged at one end of the first screwing bolt.
Preferably, the sleeving connector is provided with a sleeve and a second tightening bolt, the sleeve is movably sleeved on the guide post, and the second tightening bolt is installed on the side face of the sleeve in a threaded mode and penetrates through the side wall of the sleeve.
Preferably, the diameter of the inner ring of the sleeve is matched with that of the guide pillar, and the diameter of the inner ring of the sleeve is smaller than that of the limiting head.
Preferably, the lateral tightening part comprises a reinforcing block, a threaded hole, a third tightening bolt and a second rubber tightening piece, the reinforcing block is fixedly welded at one end of the connecting column, the threaded hole is formed in the middle of the reinforcing block, the third tightening bolt is installed on the reinforcing block through threads of the threaded hole, and the second rubber tightening piece is fixedly arranged at one end of the third tightening bolt.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model provides a pair of connect locking device for building templates, through the sleeve pipe activity suit that supports tight mechanism setting with the template on the guide pillar, and the center supports all movable suit sleeve pipes on the guide pillar at tight piece both ends, when locking building templates, through moving the sleeve pipe on the guide pillar, reach the purpose of adjusting guide pillar both sides template and supporting the distance between the tight mechanism, be applicable to the demand of different length, after adjusting, through screwing up the second tightening bolt of screw thread installation in the sheathed tube side, carry out the rigidity, carry out preliminary clamp to the both sides template and handle.
2. The utility model provides a pair of connect locking device for building templates, through installing first tightening bolt screw thread in the centre of adding thick center post, and support the fixed one end that sets up at first tightening bolt with first rubber and support the mechanism and carry out preliminary tight fixed back of clamp to the both sides template when guide pillar both sides template, support the processing through screwing up first tightening bolt to the template in centre for the template is connected inseparabler, has stopped the phenomenon of the template slope in centre and has taken place.
3. The utility model provides a pair of connect locking device for building templates, through set up the anchor block on the side support piece that supports tight mechanism at the template, and be provided with the third that second rubber supports the piece with one end and screw up bolt thread installation in the centre of anchor block, support tight mechanism when the template and carry out preliminary clamp to the both sides template and handle, screw up the bolt through screwing up the third, make second rubber support the piece and carry out in close contact with the both sides template, and support the both sides template, increase locking connection's effect, and can effectually prevent that the phenomenon of both sides template slope from taking place.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the connecting rod mechanism of the present invention;
FIG. 3 is a schematic view of a central abutment of the present invention;
FIG. 4 is a schematic structural view of the template abutting mechanism of the present invention;
fig. 5 is a schematic structural view of the side abutting member of the present invention.
In the figure: 1. a connecting rod mechanism; 11. connecting the guide post piece; 111. a guide post; 112. a limiting head; 12. a central abutment member; 121. thickening the central column; 122. a first tightening bolt; 123. a first rubber abutting piece; 2. a template abutting mechanism; 21. sleeving a connector; 211. a sleeve; 212. a second tightening bolt; 22. connecting columns; 23. a side abutment member; 231. a reinforcing block; 232. a threaded hole; 233. thirdly, screwing the bolt; 234. the second rubber supporting sheet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, a connecting and locking device for building templates includes a connecting rod mechanism 1 and a template abutting mechanism 2, wherein the template abutting mechanism 2 is movably installed at two ends of the connecting rod mechanism 1.
Referring to fig. 2-3, the connecting rod mechanism 1 is provided with two sets of connecting guide post members 11 and a central abutting member 12, the two sets of connecting guide post members 11 are fixedly welded at two ends of the central abutting member 12 to form an integral connecting rod mechanism 1, the connecting guide post members 11 include guide posts 111 and limiting heads 112, one ends of the guide posts 111 are fixedly welded at the side surfaces of the central abutting member 12, the other ends of the guide posts are fixedly welded at the limiting heads 112, the central abutting member 12 includes a thickened central post 121, a first tightening bolt 122 and a first rubber abutting piece 123, the first tightening bolt 122 is installed in the middle of the thickened central post 121 through a thread, the first tightening bolt 122 penetrates through the thickened central post 121, the first rubber abutting piece 123 is fixedly arranged at one end of the first tightening bolt 122, the first tightening bolt 122 is installed in the middle of the thickened central post 121 through a thread, and the first rubber abutting piece 123 is fixedly arranged at one end of the first tightening bolt 122, and the guide posts 111 are used for abutting against the formworks at two sides of the formworks 2 After the preliminary clamping and fixing, the middle template is abutted by tightening the first tightening bolt 122, so that the template is connected more tightly, and the phenomenon that the middle template is inclined is avoided.
Referring to fig. 4-5, the formwork fastening mechanism 2 is provided with a sleeve connector 21, a connecting post 22 and a side fastening member 23, the sleeve connector 21 is movably sleeved on the connecting guide post member 11, the side surface of the sleeve connector 21 is fixedly welded with the connecting post 22, the other end of the connecting post 22 is fixedly welded with the side fastening member 23, the sleeve connector 21 is provided with a sleeve 211 and a second fastening bolt 212, the sleeve 211 is movably sleeved on the guide post 111, the second fastening bolt 212 is installed on the side surface of the sleeve 211 in a threaded manner and penetrates through the side wall of the sleeve 211, the diameter of the inner ring of the sleeve 211 is matched with the diameter of the guide post 111, the diameter of the inner ring of the sleeve 211 is smaller than the diameter of the limiting head 112, the sleeve 211 arranged on the formwork fastening mechanism 2 is movably sleeved on the guide post 111, and the sleeve 211 is movably sleeved on the guide posts 111 at both ends of the central fastening member 12, when the building formwork is locked, by moving the sleeve 211 on the guide post 111, the purpose of adjusting the distance between the template abutting mechanisms 2 on the two sides of the guide post 111 is achieved, the template abutting mechanisms are suitable for requirements of different lengths, after the template abutting mechanisms are adjusted, the second tightening bolts 212 which are arranged on the side surfaces of the sleeve 211 through tightening threads are fixed in position, preliminary clamping treatment is carried out on the templates on the two sides, the side abutting part 23 comprises a reinforcing block 231, a threaded hole 232, a third tightening bolt 233 and a second rubber abutting piece 234, the reinforcing block 231 is fixedly welded at one end of the connecting post 22, the threaded hole 232 is arranged in the middle of the reinforcing block 231, the third tightening bolt 233 is arranged on the reinforcing block 231 through the threaded hole 232 in a threaded manner, the second rubber abutting piece 234 is fixedly arranged at one end of the third tightening bolt 233, the reinforcing block 231 is arranged on the side abutting part 23 of the template abutting mechanism 2, and the third tightening bolt 233 of which is provided with the second rubber abutting piece 234 at one end is arranged in the middle of the reinforcing block 231, when the template abutting mechanism 2 carries out preliminary clamping treatment on the templates on the two sides, the third tightening bolt 233 is tightened, so that the second rubber abutting pieces 234 are in close contact with the templates on the two sides and abut against the templates on the two sides, the effect of locking connection is increased, and the phenomenon that the templates on the two sides incline can be effectively prevented.
In summary, the following steps: the utility model provides a connect locking device for building templates, including connecting rod mechanism 1 and template abutting mechanism 2, template abutting mechanism 2 movable mounting is at the both ends of connecting rod mechanism 1, through the sleeve pipe 211 activity suit that template abutting mechanism 2 set up on guide pillar 111, and the equal activity suit sleeve pipe 211 on the guide pillar 111 at center abutting piece 12 both ends, when locking building templates, through moving sleeve pipe 211 on guide pillar 111, reach the purpose of adjusting the distance between guide pillar 111 both sides template abutting mechanism 2, be applicable to the demand of different length, after adjusting, install the second bolt 212 of screwing up in the side of sleeve pipe 211 through screwing up the screw thread, carry out the rigidity, carry out preliminary clamping treatment to both sides template; the first tightening bolt 122 is installed in the middle of the thickened central column 121 in a threaded manner, the first rubber abutting piece 123 is fixedly arranged at one end of the first tightening bolt 122, and after the template abutting mechanisms 2 on the two sides of the guide column 111 preliminarily clamp and fix the templates on the two sides, the first tightening bolt 122 is tightened to abut the template in the middle, so that the templates are connected more tightly, and the phenomenon that the template in the middle is inclined is avoided; set up on the side holding member 23 through abutting mechanism 2 at the template reinforcing block 231 to screw up bolt 233 with the third that one end was provided with second rubber and supports piece 234 in the centre of reinforcing block 231, support mechanism 2 when the template and carry out preliminary clamping processing to the both sides template, screw up bolt 233 through screwing up the third, make second rubber support piece 234 and both sides template carry out in close contact with, and support both sides template, increase locking connection's effect, and can effectually prevent that the phenomenon of both sides template slope from taking place.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a connect locking device for building templates, includes that connecting rod mechanism (1) and template support tight mechanism (2), the template supports tight mechanism (2) movable mounting at the both ends of connecting rod mechanism (1), its characterized in that: the connecting rod mechanism (1) is provided with connecting guide column members (11) and a central abutting member (12), the connecting guide column members (11) are arranged in two groups, and the two groups of connecting guide column members (11) are fixedly welded at two ends of the central abutting member (12) to form the whole connecting rod mechanism (1);
the template supports tight mechanism (2) and is provided with suit connector (21), spliced pole (22) and side and supports tight piece (23), and suit connector (21) movable sleeve is on connecting guide post spare (11), and the fixed welding spliced pole (22) in side of suit connector (21), and the other end fixed welding side of spliced pole (22) supports tight piece (23).
2. An attachment and locking device for building forms as claimed in claim 1, wherein: the connecting guide post piece (11) comprises a guide post (111) and a limiting head (112), one end of the guide post (111) is fixedly welded on the side surface of the central abutting piece (12), and the other end of the guide post is fixedly welded with the limiting head (112).
3. An attachment and locking device for building forms as claimed in claim 1, wherein: the center abutting piece (12) comprises a thickened center column (121), a first tightening bolt (122) and a first rubber abutting piece (123), the first tightening bolt (122) is installed in the middle of the thickened center column (121) in a threaded mode, the first tightening bolt (122) penetrates through the thickened center column (121), and the first rubber abutting piece (123) is fixedly arranged at one end of the first tightening bolt (122).
4. An attachment and locking device for building forms as claimed in claim 1, wherein: the sleeved connector (21) is provided with a sleeve (211) and a second tightening bolt (212), the sleeve (211) is movably sleeved on the guide post (111), and the second tightening bolt (212) is installed on the side face of the sleeve (211) in a threaded mode and penetrates through the side wall of the sleeve (211).
5. An attachment and locking device for building forms as claimed in claim 4, wherein: the diameter of the inner ring of the sleeve (211) is matched with that of the guide post (111), and the diameter of the inner ring of the sleeve (211) is smaller than that of the limiting head (112).
6. An attachment and locking device for building forms as claimed in claim 1, wherein: side support piece (23) support piece (234) including reinforcing block (231), screw hole (232), third tightening bolt (233) and second rubber, and the fixed welding in the one end of spliced pole (22) of reinforcing block (231), and the centre at reinforcing block (231) is seted up in screw hole (232), and screw hole (233) are installed on reinforcing block (231) through screw hole (232) screw thread to third tightening bolt (233), and second rubber supports the fixed one end that sets up at third tightening bolt (233) of piece (234).
CN202022558298.1U 2020-11-07 2020-11-07 Connecting and locking device for building template Active CN213927506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022558298.1U CN213927506U (en) 2020-11-07 2020-11-07 Connecting and locking device for building template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022558298.1U CN213927506U (en) 2020-11-07 2020-11-07 Connecting and locking device for building template

Publications (1)

Publication Number Publication Date
CN213927506U true CN213927506U (en) 2021-08-10

Family

ID=77166739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022558298.1U Active CN213927506U (en) 2020-11-07 2020-11-07 Connecting and locking device for building template

Country Status (1)

Country Link
CN (1) CN213927506U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022179191A1 (en) * 2021-02-26 2022-09-01 通鼎互联信息股份有限公司 Modified structure of laser bracket for optical fiber preform core layer sintering apparatus
CN115419191A (en) * 2022-09-22 2022-12-02 北京建工新型建材科技股份有限公司 Prefabricated hollow superposed shear wall cavity pouring node grout blocking and formwork erecting integrated tool and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022179191A1 (en) * 2021-02-26 2022-09-01 通鼎互联信息股份有限公司 Modified structure of laser bracket for optical fiber preform core layer sintering apparatus
CN115419191A (en) * 2022-09-22 2022-12-02 北京建工新型建材科技股份有限公司 Prefabricated hollow superposed shear wall cavity pouring node grout blocking and formwork erecting integrated tool and using method thereof
CN115419191B (en) * 2022-09-22 2024-05-24 北京建工新型建材科技股份有限公司 Prefabricated hollow superimposed shear wall cavity pouring node slurry blocking and formwork supporting integrated tool and application method thereof

Similar Documents

Publication Publication Date Title
CN213927506U (en) Connecting and locking device for building template
CN211597809U (en) Steel plate net fixing device
CN215717195U (en) Bolt reinforcing structure is exempted from to wear by super large cross-section shaped steel concrete column template
CN203257079U (en) Scaffold steel tie fixing device
CN214424017U (en) Large-size component short-edge template reinforcing device
CN211007615U (en) Scaffold groove type shape fixing device
CN215254804U (en) Reinforcing apparatus for ancient building is repaired
CN211229531U (en) Screw type fixture for steel frame template
CN203769327U (en) Tower concrete pump pipe fixing device
CN214996047U (en) Connecting and locking device for building template
CN110593561B (en) Screw fixture for steel frame template
CN209891426U (en) Bilateral equal-strength connecting node
CN112459483A (en) Large-size component short-edge template reinforcing device
CN219471512U (en) Wall connecting device for scaffold
CN220247183U (en) I-steel stand electromechanical device and pipeline installing support
CN216446515U (en) Template connecting piece for building engineering
CN220058796U (en) Connecting fastener for fastener type steel pipe scaffold
CN216810312U (en) Thin-wall steel beam connecting structure
CN222025450U (en) Beam penetrating sleeve fixing device
CN216041715U (en) Construction locking device for building steel structure
CN220620786U (en) General type assembled structure stair protective structure
CN210264026U (en) Laminated beam reinforcing and supporting device
CN221399806U (en) Building pipe support
CN214980390U (en) Steel fixing device is used in steel construction processing
CN215670572U (en) Angle speed type color steel tile roof photovoltaic module mounting fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230607

Address after: Shop 01, Building C2, Yanjie Building, Zhisheng Hot Spring City, Chaoyang Road, Yinan County, Linyi, Shandong Province 276000

Patentee after: Shandong Yangdu Water Conservancy Construction Engineering Co.,Ltd.

Address before: 33 daqitan village, Shangyu Town, Jiangshan City, Quzhou City, Zhejiang Province

Patentee before: Wang Gang

TR01 Transfer of patent right