CN213927382U - Climbing type building construction operation platform - Google Patents

Climbing type building construction operation platform Download PDF

Info

Publication number
CN213927382U
CN213927382U CN202022686449.1U CN202022686449U CN213927382U CN 213927382 U CN213927382 U CN 213927382U CN 202022686449 U CN202022686449 U CN 202022686449U CN 213927382 U CN213927382 U CN 213927382U
Authority
CN
China
Prior art keywords
base
movable arm
hydraulic cylinder
sleeve
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022686449.1U
Other languages
Chinese (zh)
Inventor
张凯
周明
杨志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Qiancheng Construction Engineering Co Ltd
Original Assignee
Jiangsu Qiancheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Qiancheng Construction Engineering Co Ltd filed Critical Jiangsu Qiancheng Construction Engineering Co Ltd
Priority to CN202022686449.1U priority Critical patent/CN213927382U/en
Application granted granted Critical
Publication of CN213927382U publication Critical patent/CN213927382U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model is suitable for a building technical field provides a climbing formula building construction operation platform, including lifting unit, lifting unit includes the base, and the top of base is provided with the operation panel, is provided with first digging arm between base and the operation panel, and the both ends of first digging arm are connected with operation panel and base rotation respectively, and the rear surface of first digging arm is provided with the second digging arm, and the both ends of second digging arm are connected with operation panel and base slip respectively, and the upper surface of base is provided with pneumatic cylinder one, and the output shaft of pneumatic cylinder one is articulated with first digging arm; through setting up lifting unit, when the during operation of pneumatic cylinder, the output shaft of pneumatic cylinder one stretches out or contracts to drive first digging arm and the motion of second digging arm, further drive the operation panel and reciprocate, thereby be convenient for constructor with the operation panel adjustment to the position that is fit for work, and be convenient for remove this device to the construction site through the universal wheel.

Description

Climbing type building construction operation platform
Technical Field
The utility model belongs to the technical field of the building, especially, relate to a formula of climbing construction operation platform.
Background
With the development of the building industry, more and more projects need to be implemented in high altitude, and an important construction equipment, namely an operation platform for high altitude construction, is needed in the process. The common operating platforms include a movable operating platform and a cantilever type steel platform.
The existing construction operation platform is built as before, so that the building process is time-consuming and is not easy to move; on the other hand, the guardrail on the current operating platform can not be detached and the height can not be adjusted.
SUMMERY OF THE UTILITY MODEL
The utility model provides a climbing type construction operation platform, aiming at solving the problems that the prior construction operation platform is built as used, the building process is time-consuming and is not easy to move; on the other hand, the guardrail on the current operating platform can not be detached and the height can not be adjusted.
The utility model is realized in such a way, the climbing type building construction operation platform comprises a lifting component, wherein the lifting component comprises a base; an operation table is arranged above the base, a first movable arm is arranged between the base and the operation table, and two ends of the first movable arm are respectively in rotating connection with the operation table and the base; a second movable arm is arranged on the rear surface of the first movable arm, the second movable arm is hinged with the first movable arm, and two ends of the second movable arm are respectively connected with the operating platform and the base in a sliding manner; the upper surface of the base is provided with a first hydraulic cylinder, the first hydraulic cylinder is hinged with the base, and an output shaft of the first hydraulic cylinder is hinged with the first movable arm; the bottom wall of the base is provided with universal wheels.
Preferably, sliding grooves are formed in the joints of the base and the operating platform with the second movable arm, and the two sliding grooves are fixedly connected with the base and the operating platform respectively; the inside at second digging arm both ends all installs the slider, the second digging arm passes through the slider with the spout respectively with the base with operation panel sliding connection.
Preferably, one side of the universal wheel is provided with a second hydraulic cylinder, and the second hydraulic cylinder is fixedly connected with the base; and a rectangular block is arranged on an output shaft of the second hydraulic cylinder.
Preferably, the device further comprises a protection component; the protection assembly comprises two sleeves, the two sleeves are arranged on the operating platform in parallel and are detachably connected with the operating platform; be provided with the guardrail between the sleeve, two the sleeve passes through guardrail fixed connection.
Preferably, a rod body is arranged on the top wall of the operating platform, one end of the rod body is fixedly connected with the operating platform, and the other end of the rod body penetrates through the bottom wall of the sleeve and extends into the sleeve; and a locking bolt is arranged on the front surface of the sleeve, penetrates through the sleeve and is in threaded connection with the rod body.
Preferably, a plurality of bolt holes are arranged on the side wall of the rod body, and the bolt holes are distributed on the rod body at equal intervals.
Compared with the prior art, the beneficial effects of the utility model are that: by arranging the lifting assembly, when the first hydraulic cylinder works, an output shaft of the first hydraulic cylinder extends or contracts and drives the first movable arm and the second movable arm to move, and the operating platform is further driven to move up and down, so that a constructor can conveniently adjust the operating platform to a position suitable for working, and the device can be conveniently moved to a construction site through the universal wheels;
through setting up protection component, when the staff need adjust the height of guardrail, unscrew the locking bolt, then adjust telescopic height, screw up the locking bolt after that, make the locking bolt enter into the bolt hole, can accomplish the altitude mixture control to the guardrail, can directly pull down the sleeve from the operation panel through the locking bolt simultaneously, the staff of being convenient for changes or washs the guardrail.
Drawings
Fig. 1 is an overall front view of the present invention;
FIG. 2 is an enlarged view of the structure at the position A on the operation table of the present invention;
in the figure: 1-lifting component, 11-base, 12-operation table, 13-first movable arm, 14-second movable arm, 15-first hydraulic cylinder, 16-universal wheel, 17-sliding groove, 18-sliding block, 19-second hydraulic cylinder, 191-rectangular block, 2-protection component, 21-sleeve, 22-guardrail, 23-rod body, 24-locking bolt and 25-bolt hole.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-2, a climbing building construction operation platform includes a lifting assembly 1, the lifting assembly 1 includes a base 11; an operation table 12 is arranged above the base 11, a first movable arm 13 is arranged between the base 11 and the operation table 12, and two ends of the first movable arm 13 are respectively connected with the operation table 12 and the base 11 in a rotating manner; a second movable arm 14 is arranged on the rear surface of the first movable arm 13, the second movable arm 14 is hinged with the first movable arm 13, and two ends of the second movable arm 14 are respectively connected with the operating table 12 and the base 11 in a sliding manner; the upper surface of the base 11 is provided with a first hydraulic cylinder 15, the first hydraulic cylinder 15 is hinged with the base 11, and an output shaft of the first hydraulic cylinder 15 is hinged with the first movable arm 13; the bottom wall of the base 11 is provided with universal wheels 16.
In the present embodiment, the base 11, the first movable arm 13, and the second movable arm 14 are provided, and the console 12 is attached to the base 11 via the first movable arm 13 and the second movable arm 14. By arranging the operation table 12, the operation table 12 can provide a placing environment for objects and is convenient for constructors to stand on the operation table 12. By arranging the first movable arm 13 and the second movable arm 14, when the output shaft of the first hydraulic cylinder 15 extends out, the first movable arm 13 rotates on the base 11 and the operating platform 12, and the two ends of the second movable arm 14 drive the sliding block 18 to slide in the sliding groove 17. By arranging the universal wheels 16, the base 11 can move on the ground through the universal wheels 16, and the device can be conveniently moved to a construction site.
Through setting up pneumatic cylinder one 15, wherein still be provided with oil tank, oil pump and oil pipe on the base 11, make the oil pump transmission connect the oil tank, the oil tank passes through oil pipe intercommunication pneumatic cylinder one 15, makes in the oil tank can be pumped to pneumatic cylinder one 15 through the oil pump, and the pressure increase in pneumatic cylinder one 15 this moment makes the output shaft of pneumatic cylinder one 15 stretch out, and in addition the oil in pneumatic cylinder one 15 can flow back to the oil tank through oil pipe in, and pressure reduces this moment, and the output shaft of pneumatic cylinder one 15 withdraws.
Further, a sliding chute 17 is arranged at the joint of the base 11 and the operating platform 12 with the second movable arm 14, and the two sliding chutes 17 are respectively fixedly connected with the base 11 and the operating platform 12; the inside at second movable arm 14 both ends is all installed slider 18, and second movable arm 14 passes through slider 18 and spout 17 respectively with base 11 and operation panel 12 sliding connection.
In the embodiment, by arranging the sliding block 18 and the sliding groove 17, when the output shaft of the first hydraulic cylinder 15 extends out, the second movable arm 14 drives the sliding block 18 to move to the left in the sliding groove 17, so that the operation table 12 is lifted; when the output shaft of the first hydraulic cylinder 15 retracts, the second movable arm 14 drives the sliding block 18 to move rightwards in the sliding groove 17, and therefore the operation table 12 is lifted.
Furthermore, a second hydraulic cylinder 19 is arranged on one side of the universal wheel 16, and the second hydraulic cylinder 19 is fixedly connected with the base 11; the output shaft of the second hydraulic cylinder 19 is provided with a rectangular block 191.
In this embodiment, by providing the second hydraulic cylinder 19 and the rectangular block 191, when the output shaft of the second hydraulic cylinder 19 extends, the output shaft of the second hydraulic cylinder 19 drives the rectangular block 191 to move downward until the rectangular block 191 reaches the ground, so as to improve the stability of the device. The bottom wall of the rectangular block 191 is provided with anti-slip grains, so that the friction force between the rectangular block 191 and the ground is increased through the anti-slip grains, and the stability of the device on the ground is further improved.
Further, the device also comprises a protection component 2; the protection assembly 2 comprises two sleeves 21, the two sleeves 21 are arranged on the operating platform 12 in parallel and are detachably connected with the operating platform 12; a guardrail 22 is arranged between the sleeves 21, and the two sleeves 21 are fixedly connected through the guardrail 22.
In the present embodiment, the sleeves 21 and the guard rails 22 are provided so that the two sleeves 21 fix both ends of the guard rails 22, respectively; and protection for the construction personnel is provided by the guard rail 22.
Further, a rod body 23 is arranged on the top wall of the operating platform 12, one end of the rod body 23 is fixedly connected with the operating platform 12, and the other end of the rod body 23 penetrates through the bottom wall of the sleeve 21 and extends into the sleeve 21; a locking bolt 24 is provided on the front surface of the sleeve 21, and the locking bolt 24 penetrates the sleeve 21 and is threadedly engaged with the rod body 23.
In this embodiment, by providing the locking bolt 24 and the rod 23, when the height of the guardrail 22 needs to be adjusted by the operator, the locking bolt 24 is loosened, then the height of the sleeve 21 is adjusted, and then the locking bolt 24 is tightened to enable the locking bolt 24 to enter the bolt hole 25, so that the height adjustment of the guardrail 22 can be completed, and meanwhile, the sleeve 21 can be directly detached from the operating platform 12 through the locking bolt 24, so that the operator can conveniently replace or clean the guardrail 22.
Further, a plurality of bolt holes 25 are formed in the side wall of the rod body 23, and the bolt holes 25 are equidistantly distributed on the rod body 23.
In the present embodiment, by providing a plurality of bolt holes 25, when the user screws the locking bolt 24 into the bolt holes 25 with different heights, the height of the guardrail 22 can be adjusted, which not only saves cost, but also is convenient for the user to operate.
In summary, the base 11 is firstly pushed to move the base 11 on the ground through the universal wheels 16 until the device is moved to a construction site, then the output shaft of the second hydraulic cylinder 19 drives the rectangular block 191 to move downwards until the rectangular block 191 reaches the ground, so as to improve the stability of the device, then a user stands on the operating platform 12 and starts the oil pump to make oil in the oil tank flow into the first hydraulic cylinder 15, so that the output shaft of the first hydraulic cylinder 15 extends out and drives the first movable arm 13 to rotate on the base 11 and the operating platform 12, and both ends of the second movable arm 14 drive the sliding block 18 to slide in the sliding groove 17, so that the operating platform 12 moves upwards, and thus a constructor can adjust the operating platform 12 to a position suitable for working conveniently.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. The utility model provides a formula of climbing construction operation platform, includes lifting unit (1), its characterized in that: the lifting assembly (1) comprises a base (11);
an operating table (12) is arranged above the base (11), a first movable arm (13) is arranged between the base (11) and the operating table (12), and two ends of the first movable arm (13) are respectively in rotating connection with the operating table (12) and the base (11);
a second movable arm (14) is arranged on the rear surface of the first movable arm (13), the second movable arm (14) is hinged to the first movable arm (13), and two ends of the second movable arm (14) are respectively connected with the operating table (12) and the base (11) in a sliding manner;
a first hydraulic cylinder (15) is arranged on the upper surface of the base (11), the first hydraulic cylinder (15) is hinged to the base (11), and an output shaft of the first hydraulic cylinder (15) is hinged to the first movable arm (13);
the bottom wall of the base (11) is provided with universal wheels (16).
2. A climbing building construction work platform according to claim 1, wherein: sliding grooves (17) are formed in the connection positions of the base (11) and the operating platform (12) and the second movable arm (14), and the two sliding grooves (17) are fixedly connected with the base (11) and the operating platform (12) respectively;
slider (18) are all installed to the inside at second digging arm (14) both ends, second digging arm (14) pass through slider (18) with spout (17) respectively with base (11) with operation panel (12) sliding connection.
3. A climbing building construction work platform according to claim 1, wherein: a second hydraulic cylinder (19) is arranged on one side of the universal wheel (16), and the second hydraulic cylinder (19) is fixedly connected with the base (11);
and a rectangular block (191) is mounted on an output shaft of the second hydraulic cylinder (19).
4. A climbing building construction work platform according to claim 1, wherein: also comprises a protective component (2);
the protection assembly (2) comprises two sleeves (21), the two sleeves (21) are arranged on the operating platform (12) in parallel, and the two sleeves (21) are detachably connected with the operating platform (12);
be provided with guardrail (22) between sleeve (21), two sleeve (21) pass through guardrail (22) fixed connection.
5. A climbing building construction work platform according to claim 4, wherein: a rod body (23) is arranged on the top wall of the operating platform (12), one end of the rod body (23) is fixedly connected with the operating platform (12), and the other end of the rod body (23) penetrates through the bottom wall of the sleeve (21) and extends into the sleeve (21);
the front surface of the sleeve (21) is provided with a locking bolt (24), and the locking bolt (24) penetrates through the sleeve (21) and is in threaded connection with the rod body (23).
6. A climbing building construction work platform according to claim 5, wherein: have a plurality of bolt holes (25) on the lateral wall of body of rod (23), it is a plurality of bolt hole (25) equidistance distributes on body of rod (23).
CN202022686449.1U 2020-11-19 2020-11-19 Climbing type building construction operation platform Active CN213927382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022686449.1U CN213927382U (en) 2020-11-19 2020-11-19 Climbing type building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022686449.1U CN213927382U (en) 2020-11-19 2020-11-19 Climbing type building construction operation platform

Publications (1)

Publication Number Publication Date
CN213927382U true CN213927382U (en) 2021-08-10

Family

ID=77170639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022686449.1U Active CN213927382U (en) 2020-11-19 2020-11-19 Climbing type building construction operation platform

Country Status (1)

Country Link
CN (1) CN213927382U (en)

Similar Documents

Publication Publication Date Title
CN108678666B (en) Multifunctional drilling machine and pipe shed mounting device
CN209636567U (en) A kind of adjustable subway track-laying vehicle
CN204386487U (en) A kind of derrick lifting oil cylinder is installed and retraction mechanism
CN103912031B (en) Scaling jumbo
CN213927382U (en) Climbing type building construction operation platform
CN210659998U (en) Wellhead operation platform for coiled tubing operation
CN205600242U (en) Mine equipment liquid press wheel dismouting maintenance device
CN204212691U (en) One can be walked Universal rotary rig
CN102817558B (en) Support device for inclined strut of pile frame
CN206233879U (en) Oil drilling machine quadruple board platform pipe arranging robot tubing string pawl
CN212376600U (en) Hydraulic support of prestressed steel strand prospecting drilling machine
CN2561910Y (en) Anchor rod drill on tunneller
CN204889113U (en) Liftable formula workstation
CN213623191U (en) Supporting platform for oil pipeline anticorrosion and heat preservation construction operation
CN205170321U (en) Lifting platform
CN107161923B (en) Energy storage power station staff protection device
CN214657024U (en) Foundation pit anchor cable cutting machine
CN215718420U (en) Engineering ladder for electromechanical equipment maintenance
CN220647703U (en) Site surveying and mapping auxiliary device
CN219472033U (en) Herringbone frame supporting leg
CN109208673A (en) A kind of illuminating street lamp underground distribution construction winding displacement ditch excavating device
CN205159882U (en) Novel electric power overhauls frame
CN221027532U (en) Subway aerial work platform
CN219491682U (en) Scaffold support steel pipe device of scalable regulation
CN214270091U (en) Portable lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant