CN213926335U - Variable cross section raft foundation - Google Patents

Variable cross section raft foundation Download PDF

Info

Publication number
CN213926335U
CN213926335U CN202022831775.7U CN202022831775U CN213926335U CN 213926335 U CN213926335 U CN 213926335U CN 202022831775 U CN202022831775 U CN 202022831775U CN 213926335 U CN213926335 U CN 213926335U
Authority
CN
China
Prior art keywords
raft foundation
variable cross
section
main building
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022831775.7U
Other languages
Chinese (zh)
Inventor
杨韶馨
许友真
邱进锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyu Design Co ltd
Original Assignee
Zhongyu Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyu Design Co ltd filed Critical Zhongyu Design Co ltd
Priority to CN202022831775.7U priority Critical patent/CN213926335U/en
Application granted granted Critical
Publication of CN213926335U publication Critical patent/CN213926335U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a variable cross section raft foundation belongs to construction engineering technical field, variable cross section raft foundation includes main building raft foundation, the skirt building raft foundation has been seted up on main building raft foundation right side, variable cross section foundation has been seted up between main building raft foundation and the skirt building raft foundation. The utility model discloses an establish the raft board of variable cross section for the heavy thick board of correspondence of load, the thin board of little correspondence of load, the holistic subsides of ground are even, reachs economy safe and reliable again promptly, is fit for being extensively promoted and used.

Description

Variable cross section raft foundation
Technical Field
The utility model relates to a construction engineering technical field especially relates to a variable cross section raft foundation.
Background
The flat raft foundation has large bottom area, so that the pressure intensity of the foundation can be reduced, the bearing capacity of the foundation soil can be improved, the integrity of the foundation can be effectively enhanced, and the uneven settlement can be adjusted.
At present, in order to facilitate design and construction, raft foundations with the same thickness are usually adopted for main buildings and skirt buildings. The design is not only uneconomical but also has potential safety hazard because the main building has large load, especially for high-rise buildings, the settlement is large, the skirt building has small load and small settlement, and the same thickness of the raft can cause larger settlement difference.
Disclosure of Invention
The utility model provides a variable cross section raft foundation through establishing variable cross section's raft for the heavy thick board of correspondence of load, the thin board of the little correspondence of load, the holistic settlement of ground is even, reachs economy safe and reliable again promptly, can effectively solve the problem in the background art.
The utility model provides a specific technical scheme as follows:
the utility model provides a pair of variable cross section raft foundation, including main building raft foundation, undaria raft foundation has been seted up on main building raft foundation right side, variable cross section basis has been seted up between main building raft foundation and the undaria raft foundation.
Optionally, the main building raft foundation and the skirt building raft foundation are manufactured in a specific mode that the lower independent foundations or the strip foundations of the columns are connected through the connecting beams, and the bottom plate is integrally poured below the lower independent foundations or the strip foundations.
Optionally, the pouring bottom plate concrete of the main building raft foundation and the undaria raft foundation is impervious concrete, and the watering maintenance period is not less than fourteen days.
Optionally, main building wall columns are arranged at the upper ends of the main building raft foundations.
The utility model has the advantages as follows:
1. the utility model discloses it is practical, excellent in use effect, the concrete mode of making of main building raft foundation and skirt building raft foundation is with the whole even roof beam of using of independent basis under the post or bar basis link up, and the bottom plate of monolithic casting below, the bottom plate concrete of pouring of main building raft foundation and skirt building raft foundation is impervious concrete, and the maintenance cycle that waters is no less than fourteen days, through establishing the raft of variable cross section, make the big thick board of correspondence of load, the little thin board of correspondence of load, the holistic settlement of ground is even, reach economy promptly and safe and reliable again.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of a variable cross-section raft foundation according to an embodiment of the present invention;
in the figure: 1. a main building wall column; 2. a raft foundation of a main building; 3. a raft foundation of the undaria pinnatifida; 4. variable cross-section foundation.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail with reference to the accompanying drawings, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The following will describe in detail a variable cross-section raft foundation according to an embodiment of the present invention with reference to fig. 1.
As shown in fig. 1, a variable cross-section raft foundation comprises a main building raft foundation 2, a skirt raft foundation 3 is provided on the right side of the main building raft foundation 2, and a variable cross-section foundation 4 is provided between the main building raft foundation 2 and the skirt raft foundation 3.
In this embodiment, as shown in fig. 1, through setting up the raft board of variable cross section for the heavy corresponding thick board of load, the light corresponding thin board of load, the holistic settlement of foundation is even, reachs economy again safe and reliable promptly.
The main building raft foundation 2 and the apron building raft foundation 3 are manufactured in a mode that the lower independent foundations or the strip foundations are connected through the connecting beams, and the bottom plate is integrally poured below the lower independent foundations or the strip foundations.
In this embodiment, as shown in fig. 1, the raft foundation frame is made by connecting the lower independent foundations or the strip foundations with the connecting beams, and then the bottom plate is integrally cast below the raft foundation frame, so that the foundation is stabilized during construction, and construction is facilitated.
Wherein, the pouring bottom plate concrete of the main building raft foundation 2 and the undaria raft foundation 3 is impervious concrete, and the watering maintenance period is not less than fourteen days.
In the embodiment, as shown in fig. 1, impervious concrete is selected for pouring, and watering maintenance is performed for more than fourteen days, so that the stability of the raft foundation after pouring is ensured.
Wherein, main building wall columns 1 are arranged at the upper ends of the main building raft foundations 2.
In this embodiment, as shown in fig. 1, the main building wall column 1 plays a skeleton supporting role for the main building of a higher floor.
What need explain, the utility model relates to a variable cross section raft foundation, in operation, main building raft foundation 2 and the 3 concrete preparation methods of skirt raft foundation are with the post under independent basis or the bar basis is whole to be linked up with the tie beam, and below the whole pouring bottom plate, main building raft foundation 2 and skirt raft foundation 3 pour the bottom plate concrete and be impervious concrete, and the maintenance cycle of watering is no less than fourteen days, through establishing variable cross section's raft, make the big thick board of corresponding of load, the little thin board of corresponding of load, the holistic settlement of ground is even, reach economy promptly and safe and reliable again.
The utility model discloses a main building wall column 1; a raft foundation 2 of a main building; a raft foundation 3 of the undaria pinnatifida; the parts of the variable cross-section foundation 4 are all universal standard parts or parts known to those skilled in the art, and the structure and the principle of the variable cross-section foundation are known to those skilled in the art through technical manuals or through routine experiments.
It is apparent that those skilled in the art can make various changes and modifications to the embodiments of the present invention without departing from the spirit and scope of the embodiments of the present invention. Thus, if such modifications and variations of the embodiments of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (4)

1. The utility model provides a variable cross section raft foundation, includes main building raft foundation (2), its characterized in that, undaria raft foundation (3) have been seted up on main building raft foundation (2) right side, variable cross section basis (4) have been seted up between main building raft foundation (2) and undaria raft foundation (3).
2. The variable cross-section raft foundation of claim 1, wherein the main building raft foundation (2) and the skirt raft foundation (3) are manufactured by connecting the independent foundations or strip foundations below the columns by using connecting beams, and integrally pouring a bottom plate below the independent foundations or strip foundations.
3. The variable cross-section raft foundation of claim 1, wherein the cast bottom plate concrete of the main building raft foundation (2) and the apron raft foundation (3) is impervious concrete, and the watering curing period is not less than fourteen days.
4. The variable cross-section raft foundation of claim 1, wherein the upper end of the main building raft foundation (2) is provided with a main building wall column (1).
CN202022831775.7U 2020-12-01 2020-12-01 Variable cross section raft foundation Active CN213926335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022831775.7U CN213926335U (en) 2020-12-01 2020-12-01 Variable cross section raft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022831775.7U CN213926335U (en) 2020-12-01 2020-12-01 Variable cross section raft foundation

Publications (1)

Publication Number Publication Date
CN213926335U true CN213926335U (en) 2021-08-10

Family

ID=77147559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022831775.7U Active CN213926335U (en) 2020-12-01 2020-12-01 Variable cross section raft foundation

Country Status (1)

Country Link
CN (1) CN213926335U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114277829A (en) * 2021-12-31 2022-04-05 中国建筑第五工程局有限公司 Integral fall raft foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114277829A (en) * 2021-12-31 2022-04-05 中国建筑第五工程局有限公司 Integral fall raft foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN209114332U (en) A kind of long big section bent cap bracket system of overhanging
CN213926335U (en) Variable cross section raft foundation
CN109025103A (en) Light steel grating concrete folding stair
CN107882234A (en) A kind of connecting node between the vertical member and floor of plate-column structure
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN214498388U (en) Assembled overhanging formwork support bent
CN113846746A (en) Basement structure beneficial to efficient construction and construction method
CN202627327U (en) Haunching double-hinge straight arch beam
CN208803649U (en) Light steel grating concrete folding stair
CN209603163U (en) A kind of tower crane bearing platform ruggedized construction
CN208803614U (en) Light steel grating concrete folding plate
CN215977664U (en) Basement structure beneficial to efficient construction
CN108999326A (en) Light steel grating concrete folding plate
CN207568030U (en) A kind of connecting node between the vertical member and floor of plate-column structure
CN208803627U (en) Light steel grating concrete composite beam
CN207210930U (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN207027854U (en) The initial approach to become a Buddhist believer type that misplaces section assembled stainless steel beam making bench
CN206971727U (en) The bearing platform of post mould diagonal brace
CN1072747C (en) Force transfer key structure for basement construction of tall building and construction method
CN209723434U (en) Precast stair
CN218880942U (en) Basement roof lifts post structure and basement structure
CN214739360U (en) Novel gutter beam body
CN212896521U (en) Reinforcement of building structure of rectifying
CN214461457U (en) Building energy-saving anti-seismic wall
CN216516133U (en) Supporting structure with cross-shaped steel-concrete combination

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant