CN209114332U - A kind of long big section bent cap bracket system of overhanging - Google Patents
A kind of long big section bent cap bracket system of overhanging Download PDFInfo
- Publication number
- CN209114332U CN209114332U CN201821664724.6U CN201821664724U CN209114332U CN 209114332 U CN209114332 U CN 209114332U CN 201821664724 U CN201821664724 U CN 201821664724U CN 209114332 U CN209114332 U CN 209114332U
- Authority
- CN
- China
- Prior art keywords
- plate
- channel steel
- side form
- bracket
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses it is a kind of it is long overhang big section bent cap bracket system, including side form landing beam, to pull rod, to drawing distribution beam, side form bracket and support frame;Side form landing beam and to drawing distribution beam to fix pier stud, to drawing distribution beam to fix with the vertically disposed support frame in two sides;It is arranged in parallel with bed die support frame above side form landing beam, bed die support frame is connect below by relief arrangement with sub-truss;Sub-truss and the support frame of two sides are fixed;The setting of side form bracket is fixed in pier stud front with side form landing beam;Outside below pier stud is provided with reserved bracket anchor box;Two groups to pull rod by two sides to drawing distribution beam being fixedly connected.The structure design of the utility model is reasonable, has the characteristics that easily to manipulate, can have enough to meet the need, is safe and reliable, it is poor to solve traditional bent cap support system overall stability, the inconvenient problem of installation is limited by place, bracket peace can substantially be shortened simultaneously and tear the period open, labor intensity is reduced, improve construction speed.
Description
Technical field
The utility model relates to road and bridge construction technical field more particularly to a kind of long big section bent cap pallet bodies of overhanging
System.
Background technique
With era development and scientific and technological progress, high mountains and deep gullies, big section are passed through in the more and more traffic route selections of China
The science of bridge building of the high only column of pier is more and more, and the integral construction difficulty of bent cap is also increasing.In the big section bent cap bridge of high pier
In construction process, due to being continuously increased for Coping Construction difficulty, the requirement to bracket system itself is also higher and higher, bracket
System becomes the deciding factor of Coping Construction.Traditional bent cap bracket, which the methods of mostly uses Hold Hoop method or sets up bracket, to be applied
Work, dismounting installation workload is big, and security risk is big, and high pier capping beam constructing operation difficulty is big, and construction efficiency is low, and all kinds of corrupt practices creep in,
It is difficult to meet high pier capping beam construction demand.
Utility model content
The purpose of this utility model is to overcome the defects of the above-mentioned prior art, and a kind of long big section of overhanging proposed
Bent cap bracket system.
To achieve the goals above, the utility model adopts the technical scheme that
It is a kind of it is long overhang big section bent cap bracket system, including side form landing beam, to pull rod, to drawing distribution beam, side form support
Frame and support frame;The side form landing beam and to drawing distribution beam to fix pier stud, described pair of drawing distribution beam is vertically arranged with two sides
Support frame fix;It is arranged in parallel with bed die support frame above the side form landing beam, bed die support frame is filled below by off-load
It sets and is connect with sub-truss;Sub-truss and the support frame of two sides are fixed;The side form bracket setting is positive in pier stud, and and side
Mould landing beam is fixed;Outside below the pier stud is provided with reserved bracket anchor box;Described in two groups to pull rod by two sides to drawing
Distribution beam is fixedly connected.
Further, the sub-truss includes channel steel and gusset plate;The channel steel include the first channel steel, the second channel steel,
Third channel steel and the 4th channel steel;The gusset plate includes first segment contact plate, second node plate, third gusset plate and fourth node
Plate;First channel steel is horizontally disposed, and upper surface is connect with relief arrangement;The second channel steel, third is provided below in first channel steel
Channel steel and the 4th channel steel;First channel steel is connect by first segment contact plate with the second channel steel;Third channel steel and the 4th channel steel lead to respectively
It crosses second node plate and third gusset plate is connect with the first channel steel, and third channel steel and the 4th channel steel all pass through fourth node plate
Triangular support frame is connected into the second channel steel.
Further, the relief arrangement include bottom plate, the first otic placode, the second otic placode, upper cover plate, lower cover plate, support plate,
Spanner, shaft, limit plate and pin shaft;First otic placode and the second otic placode are connected by pin shaft;It is fixed with below first otic placode
Bottom plate, the second otic placode are fixed by upper cover plate and lower cover plate;The support plate connecting with bottom plate is provided below in the lower cover plate;Institute
It states spanner to be arranged in support plate lateral surface, spanner is fixed by shaft and limit plate with bottom plate.
Further, vertical bar is provided between the upper cover plate and lower cover plate;The pin shaft is arranged in casing;The branch
Cushion block is provided between fagging and spanner, cushion block is located at below spanner;The pin shaft both ends are fixed by split pin.
Further, bridging is provided on the sub-truss;The bridging includes I-steel, first flange, angle
Steel and connecting plate, two angle steel are arranged in a crossed manner by connecting plate, and are connected by the I-steel at first flange and both ends.
Further, the side form bracket includes top boom, brace, gusset and second flange;The top boom setting exists
Below side form landing beam;Fixed below described brace one end and top boom, the other end is fixed with support frame;It is set on the top boom
It is equipped with the second flange for connection;The gusset for reinforcing stability is provided on the brace.
Further, side form bracket embedded board and bracket hole to be provided are provided on the reserved bracket anchor box;The die shoe
Frame embedded board is fixed with side form bracket;The bracket hole to be provided is for installing steel corbel.
Further, guardrail is respectively arranged on the outside of the side form landing beam and bed die support frame.
The utility model has the beneficial effects that the structure design of the utility model is reasonable, have easily manipulate, can have enough to meet the need, safely can
By the characteristics of, solve that traditional bent cap support system overall stability is poor, limited the inconvenient problem of installation by place, while can
Substantially shorten bracket peace and tear the period open, is significantly reduced the investment of resource and reduces labor intensity, improve construction speed.
Detailed description of the invention
Fig. 1 is the utility model structure of the main view.
Fig. 2 is the utility model structure right side view.
Fig. 3 is the utility model supporting girder structure schematic diagram.
Fig. 4 is the utility model relief arrangement schematic view of the front view.
Fig. 5 is the utility model relief arrangement right side structural representation.
Fig. 6 is the utility model bridging structural schematic diagram.
Fig. 7 is the utility model side form carrier structure schematic diagram.
Fig. 8 is that the utility model reserves bracket anchor box structure schematic diagram.
Wherein: 1, pier stud, 2, side form landing beam, 3, sub-truss, 4, to pull rod, 5, relief arrangement, 6, to drawing distribution beam,
7, guardrail, 8, bridging, 9, side form bracket, 10, reserved bracket anchor box, 11, bed die support frame, 12, support frame, the 31, first slot
Steel, the 32, second channel steel, 33, third channel steel, the 34, the 4th channel steel, 35, first segment contact plate, 36, second node plate, 37, third section
Contact plate, 38, fourth node plate, 51, bottom plate, the 52, first otic placode, the 53, second otic placode, 54, upper cover plate, 55, vertical bar, 56, lower cover
Plate, 57, casing, 58, support plate, 59, spanner, 510, cushion block, 511, shaft, 512, limit plate, 513, pin shaft, 514, opening
Pin, 81, I-steel, 82, first flange, 83, angle steel, 84, connecting plate, 91, top boom, 92, brace, 93, gusset, 94, second
Flange, 101, side form bracket embedded board, 102, bracket hole to be provided.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
As shown in Figures 1 to 8, it is a kind of it is long overhang big section bent cap bracket system, including side form landing beam 2, to pull rod 4,
To drawing distribution beam 6, side form bracket 9 and support frame 12;The side form landing beam 2 and to distribution beam 6 is drawn that pier stud 1 is fixed, it is described
It is fixed to the vertically disposed support frame 12 of drawing distribution beam 6 and two sides;Bed die support is arranged in parallel with above the side form landing beam 2
Frame 11, bed die support frame 11 are connect below by relief arrangement 5 with sub-truss 3;Sub-truss 3 and the support frame 12 of two sides are solid
It is fixed;The setting of side form bracket 9 is fixed in 1 front of pier stud, and with side form landing beam 2;Outside below the pier stud 1 is provided with
Reserved bracket anchor box 10;Described in two groups to pull rod 4 by two sides to drawing distribution beam 6 being fixedly connected.Side form landing beam 2 is by three Duan Ping
Platform beam is bolted.To draw distribution beam 6 by above and below to pull rod 4 connect, on to pull rod use 8 32 finish rolling of Φ
Screw-thread steel, 30 tons of every root application Prestressing, it is lower to pull rod use 4 32 fining twisted steels of Φ, 20 tons of every root application Prestressing, on
Under pier is located to pull rod, 1 two sides, external tensioning, described pair of drawing distribution beam 6, which passes through, applies prestressing force, one-end tension to pull rod 4;
Secondary need to be carried out to drawing distribution beam 6 for stress relaxation to drawing distribution beam 6 to check again before concreting
It draws.Entire bracket system, by bent cap load reasonable distribution, is effectively passed by relief arrangement 5, bed die support frame 11 and sub-truss 3
It is handed to pier stud 1.
As a preferred embodiment of the present invention, as shown in figure 3, the sub-truss 3 includes channel steel and gusset plate;It is described
Channel steel includes the first channel steel 31, the second channel steel 32, third channel steel 33 and the 4th channel steel 34;The gusset plate includes first segment contact plate
35, second node plate 36, third gusset plate 37 and fourth node plate 38;First channel steel 31 is horizontally disposed, upper surface with unload
Lotus device 5 connects;The second channel steel 32, third channel steel 33 and the 4th channel steel 34 is provided below in first channel steel 31;First channel steel 31
It is connect by first segment contact plate 35 with the second channel steel 32;Third channel steel 33 and the 4th channel steel 34 pass through 36 He of second node plate respectively
Third gusset plate 37 is connect with the first channel steel 31, and third channel steel 33 and the 4th channel steel 34 all pass through fourth node plate 38 and the
Two channel steels 32 connect into triangular support frame.
As a preferred embodiment of the present invention, as shown in Figure 4 and Figure 5, the relief arrangement 5 includes bottom plate 51, first
Otic placode 52, the second otic placode 53, upper cover plate 54, lower cover plate 56, support plate 58, spanner 59, shaft 511, limit plate 512 and pin shaft
513;First otic placode 52 and the second otic placode 53 are connected by pin shaft 513;First otic placode 52 is fixed with bottom plate 51 below, and second
Otic placode 53 is fixed by upper cover plate 54 and lower cover plate 56;The support plate connecting with bottom plate 51 is provided below in the lower cover plate 56
58;In 58 lateral surface of support plate, spanner 59 is fixed by shaft 511 and limit plate 512 and bottom plate 51 for the setting of spanner 59.It unloads
5 bottom of lotus device is fixed on sub-truss 3, top and 2 fixation of side form landing beam.Relief arrangement 5 is in measuring table point
When with back portion point adjustment elevation with level, safety is good;And have the characteristics that installation is firm, is conducive to off-load.Support plate 58
Upper surface is arcuate structure, adjusts the height of entire relief arrangement by adjusting the height of the support plate 58 and lower cover plate 56
Degree.When installing side form bracket 9, support plate 58 connect with lower cover plate 56 and adjusts to suitable position, and cushion block is welded at bottom plate 51
510 prevent support plate 58 to be detached from;Cushion block 510 is cut off when unloading, and support plate 58 and lower cover plate 56 are made it by tapping spanner 59
It is detached from, load is unloaded in realization.
As a preferred embodiment of the present invention, vertical bar 55 is provided between the upper cover plate 54 and lower cover plate 56;It is described
Pin shaft 513 is arranged in casing 57;Cushion block 510 is provided between the support plate 58 and spanner 59, cushion block 510 is located at spanner 59
Below;513 both ends of pin shaft are fixed by split pin 514.
As a preferred embodiment of the present invention, as shown in fig. 6, being provided with bridging 8 on the sub-truss 3;It is described
Bridging 8 includes I-steel 81, first flange 82, angle steel 83 and connecting plate 84, and two angle steel 83 are handed over by connecting plate 84
Fork setting, and connect by first flange 82 with the I-steel 81 at both ends.
As a preferred embodiment of the present invention, as shown in fig. 7, the side form bracket 9 include top boom 91, brace 92,
Gusset 93 and second flange 94;The top boom 91 is arranged below side form landing beam 2;Described 92 one end of brace and top boom 91
It fixes below, the other end and support frame 12 are fixed;The second flange 94 for connection is provided on the top boom 91;It is described oblique
The gusset 93 for reinforcing stability is provided on bar 92.Side form bracket 9 and support frame 12 constitute the main stress of entire bracket
Component, and reduce high altitude operation engineering amount, reduce construction safety risk.
As a preferred embodiment of the present invention, as shown in figure 8, being provided with side form bracket on the reserved bracket anchor box 10
Embedded board 101 and bracket hole to be provided 102;The die shoe frame embedded board 101 and side form bracket 9 are fixed;The bracket hole to be provided 102
For installing steel corbel.Reserved 10 deviation of bracket anchor box is no more than ± 5mm.Reserved 10 surrounding pier stud reinforcing bar of bracket anchor box needs to be arranged
Corner reinforcing rib prevents reserved 10 circumferential concrete of bracket anchor box cracking.To prevent concrete or mortar in casting process from entering
Reserved bracket anchor box 10, collar extension are blocked using the template or extruded sheet of suitable dimension.
As a preferred embodiment of the present invention, the outside of the side form landing beam 2 and bed die support frame 11 is respectively set
There is guardrail 7.The guardrail 7 is 1.2m high regularization guardrail, and guardrail material is the steel pipe of Φ 33*2, is covered in surrounding side form landing beam
2 upper lobes, to form whole strict protection.
The side form bracket 9, relief arrangement 5 and sub-truss 3 integral hoisting after installation on ground, to reduce
High altitude operation engineering amount.Bracket itself load and wind load setting are considered simultaneously, by the way that bent cap bracket bearing system is calculated
Member stress form and size determine the parameters such as member section and size under the premise of meeting stress and tower crane hoist, for
Weak node is reinforced by adding gusset, cross rib etc..The installation of this bracket system is simple and convenient, and receiving overhanging load is big, peace
It is complete reliable, it is easy to have enough to meet the need, and include rod piece negligible amounts, key position rod piece can carry out preassembling on ground.It is existing meeting
Lifting number is reduced under the premise of the tower crane hoist of field.And traditional bent cap system then needs to carry out multiple lifting operation, installation effect
Rate is low, is unfavorable for site operation and accuracy control.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (8)
1. it is a kind of it is long overhang big section bent cap bracket system, including side form landing beam, to pull rod, to drawing distribution beam, side form bracket
And support frame;It is characterized by: the side form landing beam and to drawing distribution beam to fix pier stud, described pair of drawing distribution beam and two sides
Vertically disposed support frame is fixed;It is arranged in parallel with bed die support frame above the side form landing beam, leads to below bed die support frame
Relief arrangement is crossed to connect with sub-truss;Sub-truss and the support frame of two sides are fixed;Side form bracket setting pier stud just
Face, and fixed with side form landing beam;Outside below the pier stud is provided with reserved bracket anchor box;To pull rod by two described in two groups
Side is fixedly connected with drawing distribution beam.
2. a kind of long big section bent cap bracket system of overhanging according to claim 1, it is characterised in that: the sub-truss
Including channel steel and gusset plate;The channel steel includes the first channel steel, the second channel steel, third channel steel and the 4th channel steel;The gusset plate
Including first segment contact plate, second node plate, third gusset plate and fourth node plate;First channel steel is horizontally disposed, upper surface
It is connect with relief arrangement;The second channel steel, third channel steel and the 4th channel steel is provided below in first channel steel;First channel steel passes through first
Gusset plate is connect with the second channel steel;Third channel steel and the 4th channel steel pass through second node plate and third gusset plate and the first slot respectively
Steel connection, and third channel steel and the 4th channel steel all pass through fourth node plate and the second channel steel connects into triangular support frame.
3. a kind of long big section bent cap bracket system of overhanging according to claim 1, it is characterised in that: the relief arrangement
Including bottom plate, the first otic placode, the second otic placode, upper cover plate, lower cover plate, support plate, spanner, shaft, limit plate and pin shaft;Described
One otic placode and the second otic placode are connected by pin shaft;Bottom plate is fixed with below first otic placode, the second otic placode passes through upper cover plate and lower cover
Plate is fixed;The support plate connecting with bottom plate is provided below in the lower cover plate;The spanner is arranged in support plate lateral surface, spanner
It is fixed by shaft and limit plate with bottom plate.
A kind of long overhang big section bent cap bracket system 4. according to claim 3, it is characterised in that: the upper cover plate and
Vertical bar is provided between lower cover plate;The pin shaft is arranged in casing;Cushion block, cushion block are provided between the support plate and spanner
Below spanner;The pin shaft both ends are fixed by split pin.
5. a kind of long big section bent cap bracket system of overhanging according to claim 1, it is characterised in that: the sub-truss
On be provided with bridging;The bridging includes I-steel, first flange, angle steel and connecting plate, and two angle steel pass through company
Fishplate bar is arranged in a crossed manner, and is connected by the I-steel at first flange and both ends.
6. a kind of long big section bent cap bracket system of overhanging according to claim 1, it is characterised in that: the side form bracket
Including top boom, brace, gusset and second flange;The top boom is arranged below side form landing beam;Described brace one end with
Fixed below top boom, the other end is fixed with support frame;The second flange for connection is provided on the top boom;It is described oblique
The gusset for reinforcing stability is provided on bar.
7. a kind of long big section bent cap bracket system of overhanging according to claim 1, it is characterised in that: the reserved bracket
Side form bracket embedded board and bracket hole to be provided are provided on anchor box;The die shoe frame embedded board is fixed with side form bracket;The ox
Leg hole to be provided is for installing steel corbel.
8. a kind of long big section bent cap bracket system of overhanging according to claim 6, it is characterised in that: the side form platform
Guardrail is respectively arranged on the outside of beam and bed die support frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821664724.6U CN209114332U (en) | 2018-10-15 | 2018-10-15 | A kind of long big section bent cap bracket system of overhanging |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821664724.6U CN209114332U (en) | 2018-10-15 | 2018-10-15 | A kind of long big section bent cap bracket system of overhanging |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209114332U true CN209114332U (en) | 2019-07-16 |
Family
ID=67200984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821664724.6U Active CN209114332U (en) | 2018-10-15 | 2018-10-15 | A kind of long big section bent cap bracket system of overhanging |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209114332U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109267487A (en) * | 2018-10-15 | 2019-01-25 | 中建三局第二建设工程有限责任公司 | A kind of long big section bent cap bracket system of overhanging |
CN110593099A (en) * | 2019-08-12 | 2019-12-20 | 中铁十局集团第五工程有限公司 | Bridge construction support bracket |
CN110747746A (en) * | 2019-10-21 | 2020-02-04 | 宁波市政工程建设集团股份有限公司 | Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof |
CN112030748A (en) * | 2020-07-15 | 2020-12-04 | 中交第一航务工程局有限公司 | Construction method for large cantilever bent cap detachable bracket |
CN117286803A (en) * | 2023-11-25 | 2023-12-26 | 山西省水利建筑工程局集团有限公司 | Double-hoop hydraulic support system steel mould for single-column bent cap construction |
-
2018
- 2018-10-15 CN CN201821664724.6U patent/CN209114332U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109267487A (en) * | 2018-10-15 | 2019-01-25 | 中建三局第二建设工程有限责任公司 | A kind of long big section bent cap bracket system of overhanging |
CN110593099A (en) * | 2019-08-12 | 2019-12-20 | 中铁十局集团第五工程有限公司 | Bridge construction support bracket |
CN110593099B (en) * | 2019-08-12 | 2021-10-29 | 中铁十局集团第五工程有限公司 | Bridge construction support bracket |
CN110747746A (en) * | 2019-10-21 | 2020-02-04 | 宁波市政工程建设集团股份有限公司 | Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof |
CN112030748A (en) * | 2020-07-15 | 2020-12-04 | 中交第一航务工程局有限公司 | Construction method for large cantilever bent cap detachable bracket |
CN117286803A (en) * | 2023-11-25 | 2023-12-26 | 山西省水利建筑工程局集团有限公司 | Double-hoop hydraulic support system steel mould for single-column bent cap construction |
CN117286803B (en) * | 2023-11-25 | 2024-02-06 | 山西省水利建筑工程局集团有限公司 | Double-hoop hydraulic support system steel mould for single-column bent cap construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209114332U (en) | A kind of long big section bent cap bracket system of overhanging | |
CN109267487A (en) | A kind of long big section bent cap bracket system of overhanging | |
CN101824800B (en) | Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam | |
CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
CN211447708U (en) | Super high-rise building construction elevator feeding platform support system that encorbelments | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN113550578A (en) | High-altitude overhanging structure formwork support and upper protection system construction method | |
CN110409318B (en) | Assembling and erecting method for large-span simply-supported steel-concrete composite beam | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN102900024A (en) | Overturning die plate for large-scale concrete structure and using method for overturning die plate | |
CN103216103A (en) | Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof | |
CN207159827U (en) | No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge | |
CN204198225U (en) | A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device | |
CN201648978U (en) | Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam | |
CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
CN209260578U (en) | Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation | |
CN208981155U (en) | A kind of pin-connected panel support frame of round pier capping beam | |
CN209603163U (en) | A kind of tower crane bearing platform ruggedized construction | |
CN208748518U (en) | A kind of formwork for placing support device | |
CN201158932Y (en) | Self-chucking platform especially for high-rise building elevator shaft formwork supports | |
CN109736202A (en) | Great cantilever bent cap Bracket method for construction method | |
CN105971287B (en) | Counter force wall vertical prestressing construction method | |
CN109467014A (en) | Large-tonnage tower crane super large load attached wall structure in a kind of strong wind atmosphere | |
CN214885625U (en) | Multi-point prefabricated part mounting platform | |
CN109098395A (en) | A kind of installation method of the prefabricated piping lane of assembly concrete |