CN213923946U - Liftable support for construction engineering construction - Google Patents

Liftable support for construction engineering construction Download PDF

Info

Publication number
CN213923946U
CN213923946U CN202022822771.2U CN202022822771U CN213923946U CN 213923946 U CN213923946 U CN 213923946U CN 202022822771 U CN202022822771 U CN 202022822771U CN 213923946 U CN213923946 U CN 213923946U
Authority
CN
China
Prior art keywords
fixedly connected
construction
building engineering
groups
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022822771.2U
Other languages
Chinese (zh)
Inventor
陈金强
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022822771.2U priority Critical patent/CN213923946U/en
Application granted granted Critical
Publication of CN213923946U publication Critical patent/CN213923946U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a lifting support technical field just discloses a building engineering construction is with promoting support, the on-line screen storage device comprises a base, the top fixedly connected with supporting shoe of base, the top fixedly connected with rotating electrical machines of supporting shoe, the output fixedly connected with dwang of rotating electrical machines, the outside fixedly connected with towline of dwang, the inside sliding connection of supporting shoe has places the case, place the top fixedly connected with roof-rack of case. This building engineering construction is with promoting support, through promoting the kicking block after placing the incasement and putting into the article, and then make the connection rope by the kicking block top, thereby make the clamp splice be connected the rope and is driving downstream and centre gripping article, then after second card rod card goes into the second fixed orifices, the kicking block will be fixed at the current position, can make the stable centre gripping article of clamp splice from this, prevent rocking of article, reduce the possibility that the potential safety hazard takes place, bring the facility for operating personnel's work.

Description

Liftable support for construction engineering construction
Technical Field
The utility model relates to a lifting support technical field specifically is a building engineering construction is with promoting support.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. The term "support" is translated from the english "Scaffold" and is also translated into a "Scaffold", which is a term used in the construction industry, and specifically refers to a temporary support erected when a building is constructed, and the support is removed along with the construction of the building. However, nowadays, the stent is widely applied and can be seen everywhere in work and life, such as a tripod of a camera, a heart stent used in the medical field and the like. In the work progress of building wall, in order to make things convenient for the operation, often need promote the eminence with materials such as brick for building, grit, traditional method mainly accomplishes through the manual work, not only work efficiency is low, high in labor strength, still there is certain danger, some can replace artificial hoisting device has appeared now, but still have the shortcoming among a lot of practical application, the elevating platform lift in-process can go up and down stably inadequately, control and rock, lead to the building material of the inside to receive the influence, thereby influence normal construction.
According to a building engineering construction is with promoting support disclosed in chinese notice No. CN211226163U, through setting up the slider, and slider and spout looks adaptation, can make the elevating platform go up and down according to fixed route, do not control and rock, the support column supports the elevating platform simultaneously, and along with the elevating platform is in the spout activity, make the lift process of elevating platform more stable, through the spout, the transmission case, the pivot, the lifting rope, the cooperation setting of elevating platform, can make the lift process of elevating platform more stable, make the building material on the elevating platform not influenced, but such mode can only ensure the removal of elevating platform and can not rock when in-service use, can't ensure the condition of material at the elevating platform, thereby produce certain potential safety hazard easily.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering construction is with promoting support has solved the problem that can't prevent that the article from rocking.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a lifting support for building engineering construction comprises a base, wherein a supporting block is fixedly connected to the top of the base, a rotating motor is fixedly connected to the top of the supporting block, a rotating rod is fixedly connected to the output end of the rotating motor, a hauling rope is fixedly connected to the outer side of the rotating rod, a placing box is slidably connected to the inside of the supporting block, a top frame is fixedly connected to the top of the placing box, the bottom end of the hauling rope is fixedly connected with the top frame, a cavity is formed in the placing box, a top block is slidably connected to the inside of the cavity, a first fixing hole and a second fixing hole are formed in the inner walls of the left side and the right side of the cavity respectively, two groups of fixing columns are fixedly connected to the inside of the placing box, clamping blocks are sleeved on the outer sides of the fixing columns, the left side and the right side of the bottom of each clamping block are fixedly connected with the left end and the right end of a connecting rope respectively, and the connecting rope is slidably connected to the inside of the placing box, the middle part of connecting the rope is located the cavity, two sets of recesses have been seted up to the inside of kicking block, recess left side inner wall fixedly connected with multiunit second spring, the right-hand member and the connecting plate fixed connection of second spring, two sets of through-holes have been seted up on the right side of recess, the first card rod of right side fixedly connected with and the second card rod of connecting plate, first card rod and second card rod run through two sets of through-holes respectively, second card rod joint is in first fixed orifices.
Preferably, the outer side of the rotating rod is fixedly connected with two groups of anti-falling blocks, and the two groups of anti-falling blocks are respectively positioned on the left side and the right side of the hoisting rope.
Preferably, place the incasement portion the left and right sides and all seted up smooth chamber, the equal fixedly connected with balancing piece in the left and right sides of clamp splice, balancing piece sliding connection is in smooth intracavity.
Preferably, the front side of the top block is fixedly connected with a handle, and the length of the handle is greater than the width of the inner wall of the cavity.
Preferably, the inside fixedly connected with first spring of placing the case, the top and the bottom fixed connection of clamp splice of first spring, first spring is located the outside of fixed column.
Preferably, the rear side of the ejector block is fixedly connected with two groups of baffles, and the two groups of baffles are respectively positioned above and below the connecting rope.
(III) advantageous effects
Compared with the prior art, the utility model provides a building engineering construction is with promoting support possesses following beneficial effect:
1. this building engineering construction is with promoting support, through promoting the kicking block after placing the incasement and putting into the article, and then make the connection rope by the kicking block top, thereby make the clamp splice be connected the rope and is driving downstream and centre gripping article, then after second card rod card goes into the second fixed orifices, the kicking block will be fixed at the current position, can make the stable centre gripping article of clamp splice from this, prevent rocking of article, reduce the possibility that the potential safety hazard takes place, bring the facility for operating personnel's work.
2. This building engineering construction is with promoting support, through setting up second spring and connecting plate, and then before promoting the kicking block, press down first card rod and can make the connecting plate drive the second card rod and get into in the recess, the second spring receives the extrusion simultaneously, and when second card rod and second fixed orifices coincide, loosen first card rod and can make the second spring bounce-off connecting plate, consequently can make the quick bullet of second card rod go into in the second fixed orifices, the fixed of kicking block has been ensured.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the placing box of the present invention;
FIG. 3 is a sectional view of the structure of the placing box of the present invention;
fig. 4 is a sectional view of the structure of the top block of the present invention.
In the figure: 1. a base; 2. placing a box; 3. fixing a column; 4. a top frame; 5. a support block; 6. a rotating electric machine; 7. rotating the rod; 8. an anti-drop block; 9. a hoisting rope; 10. a slide chamber; 11. a counterbalance; 12. connecting ropes; 13. a first spring; 14. a handle; 15. a top block; 16. a clamping block; 17. a groove; 18. a connecting plate; 19. a second spring; 20. a first clamping roller; 21. a through hole; 22. a first fixing hole; 23. a second clamping roller; 24. a second fixing hole; 25. a cavity; 26. and a baffle plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a lifting support for construction of building engineering comprises a base 1, a supporting block 5 fixedly connected to the top of the base 1, a rotating motor 6 fixedly connected to the top of the supporting block 5, a rotating rod 7 fixedly connected to the output end of the rotating motor 6, a hoisting rope 9 fixedly connected to the outer side of the rotating rod 7, a placing box 2 slidably connected to the inside of the supporting block 5, a top frame 4 fixedly connected to the top of the placing box 2, the bottom end of the hoisting rope 9 fixedly connected to the top frame 4, a cavity 25 formed in the placing box 2, a top block 15 slidably connected to the inside of the cavity 25, a first fixing hole 22 and a second fixing hole 24 respectively formed on the inner wall of the left side and the right side of the cavity 25, two sets of fixing columns 3 fixedly connected to the inside of the placing box 2, clamping blocks 16 sleeved on the outer sides of the fixing columns 3, the left side and the right side of the bottom of the clamping blocks 16 fixedly connected to the left end and the right end of the connecting rope 12 respectively, the connecting rope 12 is connected in the placing box 2 in a sliding manner, the middle part of the connecting rope 12 is positioned in the cavity 25, the top block 15 is pushed after articles are placed in the placing box 2, and then the connecting rope 12 is pushed by the top block 15, so that the clamping block 16 is driven by the connecting rope 12 to move downwards and clamp the articles, then after the second clamping roller 23 is clamped into the second fixing hole 24, the top block 15 is fixed at the current position, thereby the articles can be stably clamped by the clamping block 16, the shaking of the articles is prevented, the possibility of potential safety hazards is reduced, convenience is brought to the work of an operator, two groups of grooves 17 are formed in the top block 15, a plurality of groups of second springs 19 are fixedly connected to the inner wall of the left side of each groove 17, the right end of each second spring 19 is fixedly connected with the connecting plate 18, two groups of through holes 21 are formed in the right side of each groove 17, a first clamping roller 20 and a second clamping roller 23 are fixedly connected to the right side of the connecting plate 18, first card rod 20 and second card rod 23 run through two sets of through-holes 21 respectively, second card rod 23 joint is in first fixed orifices 22, through setting up second spring 19 and connecting plate 18, and then before promoting kicking block 15, press first card rod 20 and can make connecting plate 18 drive second card rod 23 get into in the recess 17, second spring 19 receives the extrusion simultaneously, and when second card rod 23 and second fixed orifices 24 are coincided, loosen first card rod 20 and can make second spring 19 bounce-off connecting plate 18, consequently can make in the second fixed orifices 24 is gone into to the quick bullet of second card rod 23, the fixing of kicking block 15 has been ensured.
Specifically, in order to prevent the hoist rope 9 from being dislocated, two sets of anti-falling blocks 8 are fixedly connected to the outer side of the rotating rod 7, and the two sets of anti-falling blocks 8 are respectively located on the left and right sides of the hoist rope 9, so that the hoist rope 9 can be prevented from being dislocated.
Specifically, in order to keep the balance of the clamping block 16, the sliding cavities 10 are formed in the left side and the right side of the interior of the placing box 2, the balance blocks 11 are fixedly connected to the left side and the right side of the clamping block 16, and the balance blocks 11 are connected into the sliding cavities 10 in a sliding mode, so that the balance of the clamping block 16 can be kept through the balance blocks 11.
Specifically, in order to conveniently move the ejector block 15 and prevent the ejector block 15 from wholly entering the cavity 25, the handle 14 is fixedly connected to the front side of the ejector block 15, and the length of the handle 14 is greater than the width of the inner wall of the cavity 25, so that the ejector block 15 can be conveniently moved and the ejector block 15 is prevented from wholly entering the cavity 25.
Specifically, in order to facilitate the upward movement of the clamping block 16, a first spring 13 is fixedly connected inside the placing box 2, the top end of the first spring 13 is fixedly connected with the bottom of the clamping block 16, and the first spring 13 is located on the outer side of the fixing column 3, so that the clamping block 16 can be conveniently moved upward through the first spring 13.
Specifically, in order to prevent the connection rope 12 from being dislocated, two sets of baffles 26 are fixedly connected to the rear side of the top block 15, and the two sets of baffles 26 are respectively located above and below the connection rope 12, so that the connection rope 12 can be prevented from being dislocated.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the device is used, the output end of the rotating motor 6 can be driven to rotate the rotating rod 7 by starting the rotating motor 6, the rotating rod 7 can drag the hauling rope 9, so that the hauling rope 9 can stretch the placing box 2, the position of the placing box 2 can be adjusted, when an object is placed, the object is placed in the placing box 2 and is positioned below the clamping block 16, then the first clamping rod 20 is pressed into the groove 17, so that the connecting plate 18 drives the second clamping rod 23 to enter the groove 17, meanwhile, the second spring 19 is extruded, then the jacking block 15 is pushed, so that the connecting rope 12 is jacked by the jacking block 15, so that the clamping block 16 is driven by the connecting rope 12 to move downwards and clamp the object, then when the second clamping rod 23 and the second fixing hole 24 are overlapped, the second spring 19 springs the connecting plate 18, so that the second clamping rod 23 quickly springs into the second fixing hole 24, the fixing of the jacking block 15 is ensured, and the object can be stably clamped by the clamping block 16, prevent rocking of article, reduce the possibility that the potential safety hazard takes place, and when unloading, only need press first calorie of rod 20 once more and make second card rod 23 break away from second fixed orifices 24, then first spring 13 will upwards bounce clamp splice 16, unloading that from this can be light.
To sum up, this building engineering construction is with promoting support promotes kicking block 15 through after placing the article in placing case 2, and then makes and connect rope 12 by kicking block 15 and push up to make clamp splice 16 drive downstream and centre gripping article by connecting rope 12, then go into behind second fixed orifices 24 at second card rod 23 card, kicking block 15 will be fixed at the current position, can make the stable centre gripping article of clamp splice 16 from this, prevent rocking of article, reduce the possibility that the potential safety hazard takes place, bring the facility for operating personnel's work.
This building engineering construction is with promoting support, through setting up second spring 19 and connecting plate 18, and then before promoting kicking block 15, press first card rod 20 and can make connecting plate 18 drive second card rod 23 get into in the recess 17, second spring 19 receives the extrusion simultaneously, and when second card rod 23 and second fixed orifices 24 coincide, loosen first card rod 20 and can make second spring 19 bounce connecting plate 18, consequently can make in the quick bullet of second card rod 23 goes into second fixed orifices 24, the fixing of kicking block 15 has been ensured.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a but building engineering construction is with promoting support, includes base (1), its characterized in that: the top of the base (1) is fixedly connected with a supporting block (5), the top of the supporting block (5) is fixedly connected with a rotating motor (6), the output end of the rotating motor (6) is fixedly connected with a rotating rod (7), the outer side of the rotating rod (7) is fixedly connected with a hoisting rope (9), the interior of the supporting block (5) is slidably connected with a placing box (2), the top of the placing box (2) is fixedly connected with a top frame (4), the bottom end of the hoisting rope (9) is fixedly connected with the top frame (4), a cavity (25) is formed in the placing box (2), a top block (15) is slidably connected in the cavity (25), a first fixing hole (22) and a second fixing hole (24) are formed in the inner walls of the left side and the right side of the cavity (25), and two groups of fixing columns (3) are fixedly connected in the placing box (2), clamping blocks (16) are sleeved on the outer sides of the fixing columns (3), the left side and the right side of the bottoms of the clamping blocks (16) are respectively fixedly connected with the left end and the right end of the connecting rope (12), the connecting rope (12) is connected in the placing box (2) in a sliding way, the middle part of the connecting rope (12) is positioned in the cavity (25), two groups of grooves (17) are arranged inside the top block (15), the inner wall of the left side of each groove (17) is fixedly connected with a plurality of groups of second springs (19), the right end of the second spring (19) is fixedly connected with a connecting plate (18), two groups of through holes (21) are arranged on the right side of the groove (17), the right side of the connecting plate (18) is fixedly connected with a first clamping roller (20) and a second clamping roller (23), the first clamping rod (20) and the second clamping rod (23) penetrate through the two groups of through holes (21) respectively, and the second clamping rod (23) is clamped in the first fixing hole (22).
2. The liftable support for construction of building engineering according to claim 1, wherein: the outside fixedly connected with two sets of anticreep pieces (8) of dwang (7), two sets of anticreep piece (8) are located the left and right sides of towline (9) respectively.
3. The liftable support for construction of building engineering according to claim 1, wherein: place the inside left and right sides of case (2) and all seted up smooth chamber (10), the equal fixedly connected with balancing piece (11) of the left and right sides of clamp splice (16), balancing piece (11) sliding connection is in smooth chamber (10).
4. The liftable support for construction of building engineering according to claim 1, wherein: the front side of the top block (15) is fixedly connected with a handle (14), and the length of the handle (14) is larger than the width of the inner wall of the cavity (25).
5. The liftable support for construction of building engineering according to claim 1, wherein: the inside fixedly connected with first spring (13) of placing case (2), the top of first spring (13) and the bottom fixed connection of clamp splice (16), first spring (13) are located the outside of fixed column (3).
6. The liftable support for construction of building engineering according to claim 1, wherein: the rear side of the ejector block (15) is fixedly connected with two groups of baffles (26), and the two groups of baffles (26) are respectively positioned above and below the connecting rope (12).
CN202022822771.2U 2020-11-30 2020-11-30 Liftable support for construction engineering construction Expired - Fee Related CN213923946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022822771.2U CN213923946U (en) 2020-11-30 2020-11-30 Liftable support for construction engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022822771.2U CN213923946U (en) 2020-11-30 2020-11-30 Liftable support for construction engineering construction

Publications (1)

Publication Number Publication Date
CN213923946U true CN213923946U (en) 2021-08-10

Family

ID=77146069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022822771.2U Expired - Fee Related CN213923946U (en) 2020-11-30 2020-11-30 Liftable support for construction engineering construction

Country Status (1)

Country Link
CN (1) CN213923946U (en)

Similar Documents

Publication Publication Date Title
CN112758836A (en) Automatic lifting device of building engineering
CN213923946U (en) Liftable support for construction engineering construction
CN212425137U (en) Concrete block hoist device
CN212105028U (en) Safe type scaffold frame for construction
CN219573774U (en) Steel intensity detection device for building detection
CN212897672U (en) Aluminum die conveying machine
CN212398702U (en) High-frequency induction heating welding equipment for heat pipe radiator
CN211226194U (en) Descending movable formwork bridge fabrication machine is demolishd and is used hoisting device template
CN112408192A (en) Large plastic pipeline lifting device
CN217838250U (en) Aluminum alloy template floor hoisting device
CN111186789A (en) Promote handling device with adjustable angle that construction used
CN220226155U (en) Liftable temporary support
CN219864146U (en) Construction system for green building
CN214731726U (en) Brick moving device
CN210530285U (en) Assembled movable aerial work platform
CN113023366B (en) Wallboard discharging device and method
CN217254121U (en) Pipeline welding device for building fire control
CN217478331U (en) Steel structural member processing conveyer
CN213923771U (en) A mould hoist device for mould processing
CN214651146U (en) Discharging device of full-automatic plate pressing machine
CN219341583U (en) Building material hoisting device for building construction
CN210857942U (en) Building construction equipment is with supporting base convenient to remove
CN217076759U (en) Engineering material lifting device
CN210762543U (en) Conveyer of glue bucket for shoes that workshop was used
CN213623087U (en) Building engineering material lifting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210810

Termination date: 20211130

CF01 Termination of patent right due to non-payment of annual fee