CN213898075U - Adjustable attached climbing frame for super high-rise building structure - Google Patents

Adjustable attached climbing frame for super high-rise building structure Download PDF

Info

Publication number
CN213898075U
CN213898075U CN202022114507.3U CN202022114507U CN213898075U CN 213898075 U CN213898075 U CN 213898075U CN 202022114507 U CN202022114507 U CN 202022114507U CN 213898075 U CN213898075 U CN 213898075U
Authority
CN
China
Prior art keywords
climbing frame
sides
building structure
super high
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022114507.3U
Other languages
Chinese (zh)
Inventor
樊庆玲
孙旭
许丹红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022114507.3U priority Critical patent/CN213898075U/en
Application granted granted Critical
Publication of CN213898075U publication Critical patent/CN213898075U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a building structure correlation technique field just discloses a super high-rise building structure of regulation formula adheres to formula and climbs frame, including climbing frame, storing box, buckle and lag, the both sides of climbing the frame all are provided with the electric lift loop bar, and the inboard of electric lift loop bar all is provided with the footboard, the inside of footboard is provided with the slipmat, and the both sides of slipmat all are provided with the magic subsides, outer wall one side that the magic was pasted is provided with the haulage rope, and the both sides of haulage rope all are provided with first slide rail, the inside of first slide rail all is provided with first pulley, and the outside below of first pulley all is provided with a fixing bolt. The utility model discloses, through the setting of footboard, slipmat and magic subsides, the effect that can effectively skid-proof play, at the in-process that uses, can be according to the user demand, when the easy landing when the workman tramples, and the slipmat that sets up can play effectual antiskid to the device's life has been improved.

Description

Adjustable attached climbing frame for super high-rise building structure
Technical Field
The utility model relates to a building structure correlation technique field specifically is a frame is climbed to super high-rise building structure attached to of regulation formula.
Background
The building structure is a system which is composed of various components and can bear various functions in the house building, the heightening device for connecting the climbing frame and the building structure is a connecting piece for splicing the climbing frame and the building structure so as to achieve the effect of continuously heightening, the climbing frame is also called a lifting frame, and the climbing frame can be divided into hydraulic type, electric type, manual pull type and other main types according to the power source, is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type building boards.
But the frame is climbed to super high-rise building structure attached type of present regulation formula in-process in use, does not possess the function of slipmat, leads to can not effectual carrying out anti-skidding and handles, and the easy landing when the workman tramples to the result of use of device has been reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model is not enough to prior art, the utility model provides a super high-rise building structure of regulation formula adheres to formula and climbs frame, possess the function of slipmat, when needing antiskid, paste through slipmat and magic and carry out skid-proof effect to the device, thereby the effectual availability factor that promotes the device, and when needs carry out the storing to the device, use advantages such as storing box effect, the super high-rise building structure of present regulation formula adheres to formula and climbs frame, in the in-process that uses, the function of slipmat does not have, thereby can not effectually carry out antiskid, easy landing when the workman tramples, thereby the availability factor of the device has been reduced.
Technical scheme
For realizing the above-mentioned function that possesses the slipmat, when needs are anti-skidding, paste through slipmat and magic and carry out skid-proof effect to the device to effectual availability factor who promotes the device, the utility model provides a following technical scheme: an attached climbing frame of an adjustable super high-rise building structure comprises a climbing frame, a storage box, a buckle and a protective sleeve, wherein electric lifting sleeve rods are arranged on two sides of the climbing frame, pedals are arranged on the inner sides of the electric lifting sleeve rods, anti-slip pads are arranged inside the pedals, magic tapes are arranged on two sides of the anti-slip pads, a traction rope is arranged on one side of the outer wall of each magic tape, first sliding rails are arranged on two sides of the traction rope, first pulleys are arranged inside the first sliding rails, first fixing bolts are arranged below the outer sides of the first pulleys, threaded rods are arranged below the first fixing bolts, a supporting plate is arranged below the threaded rods, the storage box is arranged on two sides of the electric lifting sleeve rods, second sliding rails are arranged on two sides of the storage box, second pulleys are arranged inside the second sliding rails, and the buckle is arranged above the outer sides of the second pulleys, meanwhile, the other side of the buckle is provided with a clamping groove, the protecting sleeves are arranged on two sides of the climbing frame, and second fixing bolts are arranged on two sides of each protecting sleeve.
Preferably, the footboard passes through magic subsides and slipmat swing joint, and the magic is pasted for cylindrical structure.
Preferably, the haulage rope, the first slide rail and the first pulley constitute sliding structure, and first pulley is the equidistant distribution setting inside the first slide rail.
Preferably, the supporting plate, the electric lifting sleeve rod and the first fixing bolt form a lifting structure, and the electric lifting sleeve rod and the supporting plate are vertically distributed.
Preferably, the supporting plate is in threaded connection with the electric lifting sleeve rod through a threaded rod, and the threaded rod is symmetrically arranged along the axis of the supporting plate.
Preferably, the storage box, the second slide rail and the second pulley constitute a sliding structure, and the second pulley is arranged inside the second slide rail at equal intervals.
Preferably, the protecting sleeve is in threaded connection with the climbing frame through a second fixing bolt, and the protecting sleeve is symmetrically arranged along the axial line of the climbing frame.
Advantageous effects
Compared with the prior art, the utility model provides a super high-rise building structure of regulation formula adheres to formula and climbs frame possesses following beneficial effect:
1. this kind of regulation formula super high-rise building structure attached form climbs frame, through the setting that footboard, slipmat and magic were pasted, can effectively play skid-proof effect, at the in-process that uses, can according to the user demand, easy landing when the workman tramples can play effectual anti-skidding through setting up the slipmat and handle to the device's result of use has been improved.
2. This kind of frame is climbed to regulation formula super high-rise building structure attached form through the setting of storing box, second slide rail and second pulley, can effectively play the effect of storing, at the in-process that uses, can deposit the effect of storing to the required instrument of work, avoids unable instrument commonly used to carry out the storing and leads to losing to the effectual result of use that improves the device.
3. This kind of regulation formula super high-rise building structure adheres to formula and climbs frame, through the setting of lag and second fixing bolt, can play the effect of protection, avoids at the in-process that uses, leads to the workman to follow the device easily and slide to the safety in utilization of the device has been improved.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is a schematic front view of the present invention;
FIG. 3 is a connection diagram of the storage box and the second slide rail of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 1.
In the figure: 1. climbing a frame; 2. an electric lifting loop bar; 3. a pedal; 4. a non-slip mat; 5. magic tape; 6. A hauling rope; 7. a first slide rail; 8. a first pulley; 9. a first fixing bolt; 10. a threaded rod; 11. A support plate; 12. a storage box; 13. a second slide rail; 14. a second pulley; 15. buckling; 16. a card slot; 17. a protective sleeve; 18. and a second fixing bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an adjustable super high-rise building structure attached climbing frame comprises a climbing frame 1, a storage box 12, a buckle 15 and a protective sleeve 17, wherein both sides of the climbing frame 1 are provided with electric lifting loop bars 2, the inner sides of the electric lifting loop bars 2 are provided with pedals 3, the inner parts of the pedals 3 are provided with anti-skidding pads 4, both sides of the anti-skidding pads 4 are provided with magic tapes 5, one side of the outer wall of the magic tape 5 is provided with a traction rope 6, both sides of the traction rope 6 are provided with first sliding rails 7, the inner parts of the first sliding rails 7 are provided with first pulleys 8, both the outer lower parts of the first pulleys 8 are provided with first fixing bolts 9, both the lower parts of the first fixing bolts 9 are provided with threaded rods 10, and the lower parts of the threaded rods 10 are provided with supporting plates 11, the storage boxes 12 are both sides of the electric lifting loop bars 2, and both sides of the storage boxes 12 are provided with second sliding rails 13, the inside of second slide rail 13 all is provided with second pulley 14, and the outside top of second pulley 14 is provided with buckle 15, and the opposite side of buckle 15 is provided with draw-in groove 16 simultaneously, and lag 17 all sets up in the both sides of climbing frame 1, and the both sides of lag 17 all are provided with second fixing bolt 18.
Further, footboard 3 pastes 5 and 4 swing joint of slipmat through the magic, and the magic pastes 5 and is cylindrical structure, through the setting of electric lift loop bar 2, first fixing bolt 9 and backup pad 11, can play the effect of effective lift, and at the in-process that uses, the electric lift loop bar 2 of setting can carry out effectual lift to the device to the result of use of the device has been improved.
Further, haulage rope 6, first slide rail 7 and first pulley 8 constitute sliding construction, and first pulley 8 is equidistant distribution setting inside first slide rail 7, pastes 5's setting through footboard 3, slipmat 4 and magic, can carry out effective skid-proof effect to the device, and at the in-process of using, can carry out skid-proof effect to the workman according to the user demand, leads to the device to use inconvenient, thereby has improved the safety in utilization of the device to the workman.
Further, backup pad 11, electric lift loop bar 2 and first fixing bolt 9 with constitute elevation structure, and electric lift loop bar 2 and backup pad 11 are the vertical distribution, through haulage rope 6, the setting of first slide rail 7 and first pulley 8, can play the effectual effect of pulling the protection, at the in-process of using, haulage rope 6 set up and can carry out effectual guard action to the workman, when avoiding the workman to scramble, can't protect it, lead to the workman to drop carelessly from the device, thereby the security of the device has been improved.
Further, the backup pad 11 passes through threaded rod 10 and 2 threaded connection of electric lift loop bar, and threaded rod 10 sets up with 11 axis symmetry in the backup pad, passes through threaded rod 10 and the setting of electric lift loop bar 2 through backup pad 11, can carry out effectual fixed effect to the device, and in the in-process of using can avoid needs fixed according to the user demand, can't fix, has improved the device's result of use.
Further, storing box 12, second slide rail 13 constitutes sliding construction with second pulley 14, and second pulley 14 is equidistant distribution setting inside second slide rail 13, through storing box 12, the setting of second slide rail 13 and second pulley 14, can effectually play the effect of storing, in-process when using, can be according to the user demand, carry out effectual storing effect to the device, avoid when needs storing, can't carry out the storing, lead to the device to use inconvenient, thereby the result of use of the device has been improved.
Further, lag 17 through second fixing bolt 18 with climb 1 threaded connection of frame, and lag 17 is in order to climb 1 axis symmetry setting in the frame, through lag 17 and the setting of second fixing bolt 18, can play some effectual guard action to the device, avoid at the in-process that uses, the workman drops easily, at the in-process that uses, the lag 17 of setting can carry out effectual protection to the workman to the safety in utilization of the device has been improved.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the climbing frame is used, firstly, a power supply is connected, the climbing frame 1 is placed on a designated position, the threaded rod 10 penetrates through the fixed supporting plate 11 and the ground to be connected, the whole device is fixed, when higher floors are met, the clamping and fixing are carried out through the buckle 15 and the clamping groove 16, the effective splicing length of the climbing frame 1 is processed, then the electric lifting sleeve rod 2 is used for driving the climbing frame 1 to lift the device, the anti-skidding function can be carried out on the trampling position of a worker due to the arrangement of the anti-skidding pad 4, then the worker uses the first pulley 8 inside the first sliding rail 7 which is vertically slid by the traction rope 6 to effectively draw the climbing of the worker in the climbing process, so that the worker is protected, the worker is prevented from carelessly stepping on and falling off in the climbing process, the damage is caused, secondly, the worker is prevented from shaking in the climbing process, the worker is protected more comprehensively through the protecting sleeve 17 which is fixed by the second fixing bolt 18, when the workman climbed assigned position then, through the setting of storing box 12, can be when the workman is worked to the inside second pulley 14 of storing box 12 horizontal pulling second slide rail 13, the instrument of conveniently taking of pull, wherein the model of electric lift loop bar 2 is: YS-NZ100-12A, which is a use process of the adjustable attached climbing frame of the super high-rise building structure.
To sum up, this kind of regulation formula super high-rise building structure attached form climbs frame 1 through footboard 3, slipmat 4 and magic subsides 5's setting, can effectively play skid-proof effect, at the in-process that uses, can according to the user demand, easy landing when the workman tramples, and the slipmat 4 of setting can play effectual antiskid to the result of use of the device has been improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a regulation formula super high-rise building structure adheres to formula and climbs frame, includes and climbs frame (1), storing box (12), buckle (15) and lag (17), its characterized in that: the climbing frame is characterized in that electric lifting sleeve rods (2) are arranged on two sides of the climbing frame (1), pedals (3) are arranged on the inner sides of the electric lifting sleeve rods (2), non-slip mats (4) are arranged inside the pedals (3), magic tapes (5) are arranged on two sides of the non-slip mats (4), a traction rope (6) is arranged on one side of the outer wall of each magic tape (5), first sliding rails (7) are arranged on two sides of the traction rope (6), first pulleys (8) are arranged inside the first sliding rails (7), first fixing bolts (9) are arranged below the outer sides of the first pulleys (8), threaded rods (10) are arranged below the first fixing bolts (9), supporting plates (11) are arranged below the threaded rods (10), storage boxes (12) are arranged on two sides of the electric lifting sleeve rods (2), and second sliding rails (13) are arranged on two sides of the storage boxes (12), the inside of second slide rail (13) all is provided with second pulley (14), and is provided with buckle (15) outside top of second pulley (14), and the opposite side of buckle (15) is provided with draw-in groove (16) simultaneously, lag (17) all set up in the both sides of climbing frame (1), and the both sides of lag (17) all are provided with second fixing bolt (18).
2. The adjustable super high-rise building structure attachment type climbing frame according to claim 1, wherein: footboard (3) pass through magic subsides (5) and slipmat (4) swing joint, and magic subsides (5) are cylindrical structure.
3. The adjustable super high-rise building structure attachment type climbing frame according to claim 1, wherein: haulage rope (6), first slide rail (7) and first pulley (8) constitute sliding construction, and first pulley (8) are equidistant distribution setting inside first slide rail (7).
4. The adjustable super high-rise building structure attachment type climbing frame according to claim 1, wherein: the supporting plate (11), the electric lifting sleeve rod (2) and the first fixing bolt (9) form a lifting structure, and the electric lifting sleeve rod (2) and the supporting plate (11) are vertically distributed.
5. The adjustable super high-rise building structure attachment type climbing frame according to claim 1, wherein: the supporting plate (11) is in threaded connection with the electric lifting sleeve rod (2) through a threaded rod (10), and the threaded rod (10) is symmetrically arranged along the axis of the supporting plate (11).
6. The adjustable super high-rise building structure attachment type climbing frame according to claim 1, wherein: the storage box (12), the second sliding rail (13) and the second pulley (14) form a sliding structure, and the second pulley (14) is arranged inside the second sliding rail (13) at equal intervals.
7. The adjustable super high-rise building structure attachment type climbing frame according to claim 1, wherein: the protective sleeve (17) is in threaded connection with the climbing frame (1) through a second fixing bolt (18), and the protective sleeve (17) is symmetrically arranged along the axial line of the climbing frame (1).
CN202022114507.3U 2020-09-23 2020-09-23 Adjustable attached climbing frame for super high-rise building structure Expired - Fee Related CN213898075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022114507.3U CN213898075U (en) 2020-09-23 2020-09-23 Adjustable attached climbing frame for super high-rise building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022114507.3U CN213898075U (en) 2020-09-23 2020-09-23 Adjustable attached climbing frame for super high-rise building structure

Publications (1)

Publication Number Publication Date
CN213898075U true CN213898075U (en) 2021-08-06

Family

ID=77110795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022114507.3U Expired - Fee Related CN213898075U (en) 2020-09-23 2020-09-23 Adjustable attached climbing frame for super high-rise building structure

Country Status (1)

Country Link
CN (1) CN213898075U (en)

Similar Documents

Publication Publication Date Title
CN108808544B (en) Strong electric field inlet and outlet device
CN213898075U (en) Adjustable attached climbing frame for super high-rise building structure
CN112411979A (en) Frame of climbing that board is automatic to receive and release turns over
CN210032533U (en) Construction equipment scaffold
CN214697639U (en) Engineering ladder for electric power overhaul
CN204691653U (en) A kind of electric power cable maintenance ladder
CN210530715U (en) Crawling ladder for electric power laying
CN218057118U (en) Stair climbing transfer box device
CN204184814U (en) A kind of portable double grounding jumper transport trolley with operation tool
CN214935749U (en) Electric power overhauls uses construction platform
CN207827621U (en) Movable type super high-rise construction elevator guide rail frame attachment device
CN206188166U (en) Building booster unit is climbed to public corridor
CN107398978A (en) A kind of making wood twig process equipment for being easy to regulation to use
CN207785698U (en) A kind of training vertical safe anti-falling line of steel tower climbing
CN201981998U (en) Anti-skid ladder for electricians
CN211473298U (en) Electric power supporting device for electric power installation
CN207156046U (en) A kind of making wood twig process equipment for being easy to regulation to use
CN108678650B (en) Modular protection frame is used in thermal power station construction
CN218493529U (en) Crossing structure for power transmission and transformation engineering
CN213015320U (en) Aluminum climbing frame with anti-falling structure
CN212002150U (en) Scaffold frame for construction with safeguard function
DE29917412U1 (en) Ladder scaffolding with a single ladder
CN215254411U (en) Scaffold with warning function
CN215167771U (en) Novel concrete placement workstation is built in room
CN214217233U (en) Electric flat car hoisting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210806