CN213869278U - Building construction site division board convenient to used repeatedly - Google Patents

Building construction site division board convenient to used repeatedly Download PDF

Info

Publication number
CN213869278U
CN213869278U CN202022457563.7U CN202022457563U CN213869278U CN 213869278 U CN213869278 U CN 213869278U CN 202022457563 U CN202022457563 U CN 202022457563U CN 213869278 U CN213869278 U CN 213869278U
Authority
CN
China
Prior art keywords
frame body
baffle
construction site
bolt
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022457563.7U
Other languages
Chinese (zh)
Inventor
徐武旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tengding Construction Engineering Co ltd
Original Assignee
Sichuan Tengding Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Tengding Construction Engineering Co ltd filed Critical Sichuan Tengding Construction Engineering Co ltd
Priority to CN202022457563.7U priority Critical patent/CN213869278U/en
Application granted granted Critical
Publication of CN213869278U publication Critical patent/CN213869278U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the relevant technique of construction and specifically relates to a building construction site division board convenient to used repeatedly, including first support body, the side surface in first support body is provided with the reflector panel, and the reflector panel is connected with first support body through first fixing bolt, first draw-in groove has all been seted up to the side surface in first support body, and first draw-in groove and the cooperation installation of first fixture block, first fixture block one side is provided with first baffle, and just first baffle is connected with the second baffle through first rotatory bolt, first support body below is provided with the lifter, and is provided with the lift cover below the lifter. This building construction site division board convenient to used repeatedly can play effectual distance to the isolation range to the device and hold the function through setting up folding, in the use, can carry out effectual distance to keeping apart to the device according to the user demand and hold the processing to the effectual use efficiency that has promoted the device.

Description

Building construction site division board convenient to used repeatedly
Technical Field
The utility model relates to a construction related technical field specifically is a construction site division board convenient to used repeatedly.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place, and comprises basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, and the construction operation place is called a building construction site or a construction site, and is also called a construction site.
However, in the process of using the partition board used in the construction site at present, the partition board cannot be folded, so that the partition board cannot fully grasp the isolation distance, and the use efficacy of the device is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a building construction site division board convenient to used repeatedly possesses folding function, can fold the division board effectively, is convenient for carry out the assurance of isolation distance more comprehensively, has solved the building construction site division board of using at present, at the in-process that uses, can not carry out folding function to the division board to lead to that the division board can not be abundant hold isolation distance.
(II) technical scheme
For realizing that above-mentioned division board possesses folding function, can fold the division board effectively, be convenient for more comprehensive the assurance of carrying out isolation distance, the utility model provides a following technical scheme: a building construction site isolation plate convenient for repeated use comprises a first frame body, wherein a reflector plate is arranged on the inner side surface of the first frame body and is connected with the first frame body through a first fixing bolt, first clamping grooves are formed in the inner side surface of the first frame body and are matched with first clamping blocks to be installed, a first baffle plate is arranged on one side of each first clamping block and is connected with a second baffle plate through a first rotating bolt, a lifting rod is arranged below the first frame body, a lifting sleeve is arranged below the lifting rod, a second clamping groove is formed in the outer side surface of the first frame body and is matched with the second clamping block to be installed, a second frame body is arranged on one side of each second clamping block, a protective door is arranged on the inner side of the second frame body and is connected with the second frame body through a second rotating bolt, a supporting rod is arranged on the outer side surface of the second frame body, and the support rod is connected with the second frame body through a second fixing bolt.
Preferably, the reflector panel passes through first fixing bolt and first support body threaded connection, and the size of reflector panel is less than the size of first support body.
Preferably, the first baffle is connected with the first frame body through a first clamping groove in a clamping manner, and the first clamping groove is of a concave structure.
Preferably, the first baffle, the first rotating bolt and the second baffle form a rotating structure, and the first rotating bolt is arranged on the outer wall of the first baffle at equal intervals.
Preferably, the lifting sleeve and the first frame body form a lifting structure through the lifting rod, and the size of the lifting sleeve is larger than that of the lifting rod.
Preferably, the guard gate, the second swivel bolt and the second support body form a swivel structure, and the second swivel bolt is arranged symmetrically with the central axis of the guard gate.
Preferably, the support rod is in threaded connection with the second frame body through a second fixing bolt, and the second fixing bolt is symmetrically arranged with respect to the central axis of the second frame body.
(III) advantageous effects
Compared with the prior art, the utility model provides a building construction site division board convenient to used repeatedly possesses following beneficial effect:
1. this building construction site division board convenient to used repeatedly can play effectual distance to the isolation range to the device and hold the function through setting up folding, in the use, can carry out effectual distance to keeping apart to the device according to the user demand and hold the processing to the effectual use efficiency that has promoted the device.
2. This building construction site division board convenient to used repeatedly can play effectual altitude mixture control function to the device through setting up to go up and down, in the use, can carry out effectual adjustment altitude mixture control to the device according to the user demand to the effectual use efficiency that has promoted the device.
3. This building construction site division board convenient to used repeatedly can play effectual warning function at night to the device through setting up the reflector panel, in the use, can carry out effectual warning processing at night to the device according to the user demand to the effectual use efficiency that has promoted the device.
Drawings
FIG. 1 is a schematic view of the front cross-section structure of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic view of the structure of the present invention in which the clamping block and the clamping groove are engaged with each other;
fig. 4 is an enlarged schematic view of a portion a in fig. 1.
In the figure: 1. a first frame body; 2. a reflector; 3. a first fixing bolt; 4. a first card slot; 5. a first clamping block; 6. a first baffle plate; 7. a first swivel bolt; 8. a second baffle; 9. a lifting rod; 10. a lifting sleeve; 11. a second card slot; 12. a second fixture block; 13. a second frame body; 14. a protective door; 15. a second swivel bolt; 16. a support bar; 17. and a second fixing bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a conveniently reusable partition board for construction sites comprises a first frame body 1, a reflector 2 is disposed on the inner side surface of the first frame body 1, the reflector 2 is connected with the first frame body 1 through a first fixing bolt 3, first slots 4 are disposed on the inner side surface of the first frame body 1, the first slots 4 are installed in cooperation with first fixture blocks 5, a first baffle 6 is disposed on one side of each first fixture block 5, the first baffle 6 is connected with a second baffle 8 through a first rotating bolt 7, a lifting rod 9 is disposed below the first frame body 1, a lifting sleeve 10 is disposed below the lifting rod 9, second slots 11 are disposed on the outer side surface of the first frame body 1, the second slots 11 are installed in cooperation with second fixture blocks 12, a second frame body 13 is disposed on one side of each second fixture block 12, a protective door 14 is disposed on the inner side of the second frame body 13, and the protective door 14 is connected with the second frame body 13 through a second rotating bolt 15, a support rod 16 is disposed on an outer side surface of the second frame body 13, and the support rod 16 is connected to the second frame body 13 through a second fixing bolt 17.
Further, reflector panel 2 is through first fixing bolt 3 and 1 threaded connection of first support body, and the size of reflector panel 2 is less than the size of first support body 1, can play effectual warning function night to the device through setting up reflector panel 2, in the use, can carry out effectual warning processing night to the device according to the user demand to the effectual use efficiency who promotes the device.
Further, first baffle 6 is connected with 1 block of first support body through first draw-in groove 4, and first draw-in groove 4 is "concave" shape structure, dismantles through setting up and to play effectual dismantlement cleaning function to the device, in the use, can carry out effectual dismantlement clearance processing to the device according to the user demand to the effectual use efficiency who promotes the device.
Further, first baffle 6, first rotatory bolt 7 and second baffle 8 constitute revolution mechanic, and first rotatory bolt 7 is equidistant setting at 6 outer walls of first baffle, can play effectual distance to the isolation zone to the device and hold the function through setting up first rotatory bolt 7, in the use, can carry out effectual distance to keeping apart to the device according to the user demand and hold the processing to effectual use efficiency who promotes the device.
Further, the lifting sleeve 10 forms a lifting structure with the first frame body 1 through the lifting rod 9, the size of the lifting sleeve 10 is larger than that of the lifting rod 9, an effective height adjusting function can be achieved on the device through the lifting rod 9, in the using process, effective height adjusting processing can be conducted on the device according to using requirements, and therefore the using effect of the device is effectively improved.
Further, the protective door 14, the second rotary bolt 15 and the second frame body 13 form a rotary structure, the second rotary bolt 15 is symmetrically arranged along the central axis of the protective door 14, the protective door 14 can be arranged to effectively facilitate the entering and exiting functions of workers in construction, and the protective door 14 can be used for effectively and conveniently handling the entering and exiting of the workers according to the use requirements, so that the use efficiency of the device is effectively improved.
Further, the support rod 16 is in threaded connection with the second support body 13 through the second fixing bolt 17, the second fixing bolt 17 is symmetrically arranged with the central axis of the second support body 13, the support rod 16 can be used for effectively fixing the device, and in the using process, the device can be effectively fixed according to using requirements, so that the using effect of the device is effectively improved.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
For the building construction site isolation plate convenient for reuse, firstly, when the device needs to be used, the device is moved to a proper position, when the building construction site needs to be isolated, the first frame body 1 is installed on the second frame body 13, the second clamping block 12 is clamped into the inner side of the second clamping groove 11 by pressing forcibly, the first frame body 1 and the second frame body 13 are spliced and are convenient to disassemble, so that the device can be reused, when the isolation height needs to be increased, the lifting rod 9 is pulled upwards to be adjusted to a proper position, so that the use efficiency of the device is better improved, when the isolation distance is shorter, the first baffle plate 6 is rotatably folded through the first rotating bolt 7 and the second baffle plate 8, so that the isolation distance can be better adjusted, when the night happens, the light reflection plate 2 is respectively installed on the outer wall surfaces of the first frame body 1 and the second frame body 13 through the first fixing bolt 3, so that remind the effect night, when meetting the weather when bad, erection bracing pole 16, bracing piece 16 are connected with the support body through second fixing bolt 17 to in order to prevent that the support body from collapsing, when needs wash, outside pulling first baffle 6 and second baffle 8 make first fixture block 5 first draw-in groove 4 that drops, in order to clear up first baffle 6 and second baffle 8.
To sum up, this building construction site division board convenient to used repeatedly, through the setting of lifter 9, can carry out better regulation to the height of division board to prevent that the phenomenon that highly is not enough from taking place, promoted the device's practical function, and the setting of reflector panel 2 reminds the effect to people when using night, and accessible light shines and plays the reflex action, thereby reaches the effect of reminding.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a building construction site division board convenient to used repeatedly, includes first support body (1), its characterized in that: the light-reflecting plate (2) is arranged on the inner side surface of the first frame body (1), the light-reflecting plate (2) is connected with the first frame body (1) through a first fixing bolt, first clamping grooves (4) are formed in the inner side surface of the first frame body (1), the first clamping grooves (4) are installed in a matched mode with first clamping blocks (5), a first baffle (6) is arranged on one side of each first clamping block (5), the first baffle (6) is connected with a second baffle (8) through a first rotating bolt (7), a lifting rod (9) is arranged below the first frame body (1), a lifting sleeve (10) is arranged below the lifting rod (9), second clamping grooves (11) are formed in the outer side surface of the first frame body (1), the second clamping grooves (11) are installed in a matched mode with second clamping blocks (12), a second frame body (13) is arranged on one side of each second clamping block (12), and the inner side of the second frame body (13) is provided with a protective door (14), the protective door (14) is connected with the second frame body (13) through a second rotating bolt (15), the outer side surface of the second frame body (13) is provided with a support rod (16), and the support rod (16) is connected with the second frame body (13) through a second fixing bolt (17).
2. A construction site partition convenient for reuse according to claim 1, wherein: the reflector (2) is in threaded connection with the first frame body (1) through the first fixing bolt (3), and the size of the reflector (2) is smaller than that of the first frame body (1).
3. A construction site partition convenient for reuse according to claim 1, wherein: first baffle (6) are connected through first draw-in groove (4) and first support body (1) block, and just first draw-in groove (4) are "concave" shape structure.
4. A construction site partition convenient for reuse according to claim 1, wherein: the first baffle (6), the first rotating bolt (7) and the second baffle (8) form a rotating structure, and the first rotating bolt (7) is arranged on the outer wall of the first baffle (6) at equal intervals.
5. A construction site partition convenient for reuse according to claim 1, wherein: the lifting sleeve (10) and the first frame body (1) form a lifting structure through the lifting rod (9), and the size of the lifting sleeve (10) is larger than that of the lifting rod (9).
6. A construction site partition convenient for reuse according to claim 1, wherein: guard gate (14), second swivel bolt (15) and second support body (13) constitute revolution mechanic, and second swivel bolt (15) set up with the axis symmetry of guard gate (14).
7. A construction site partition convenient for reuse according to claim 1, wherein: the bracing piece (16) pass through second fixing bolt (17) and second support body (13) threaded connection, and second fixing bolt (17) set up with the axis symmetry of second support body (13).
CN202022457563.7U 2020-10-28 2020-10-28 Building construction site division board convenient to used repeatedly Active CN213869278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022457563.7U CN213869278U (en) 2020-10-28 2020-10-28 Building construction site division board convenient to used repeatedly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022457563.7U CN213869278U (en) 2020-10-28 2020-10-28 Building construction site division board convenient to used repeatedly

Publications (1)

Publication Number Publication Date
CN213869278U true CN213869278U (en) 2021-08-03

Family

ID=77075853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022457563.7U Active CN213869278U (en) 2020-10-28 2020-10-28 Building construction site division board convenient to used repeatedly

Country Status (1)

Country Link
CN (1) CN213869278U (en)

Similar Documents

Publication Publication Date Title
CN106223650A (en) Dismounting Combined multifunctional energy-conservation tea booth
CN109930735A (en) A kind of adjustable bulk board furred ceiling of assembled
CN213869278U (en) Building construction site division board convenient to used repeatedly
CN210141495U (en) Simple movable multifunctional lighting trolley
CN113463930A (en) Indoor building decoration ceiling equipment and use method thereof
CN206538967U (en) Plug-in type wall decoration structure
CN206538924U (en) Plug-in type ceiling decoration structure
CN211902781U (en) Curtain wall lamp mounting structure
CN204715603U (en) A kind of parallel wide keel smallpox
CN112663978B (en) Protection device for building site convenient to accomodate and carry
CN218862009U (en) Anti-skid thick plate ceramic tile easy to splice
CN206538901U (en) A kind of assembling type partition wall
CN207363081U (en) Integrated prefabricated air port furred ceiling
CN205894632U (en) Spiral arm over -and -under type mobile scaffold
CN215160060U (en) Vertical sightseeing elevator convenient to maintain
CN220978912U (en) Early warning device of face limit protection in construction
CN213953210U (en) Rail for construction
CN218265727U (en) Induction type sun-shading shutter
CN205243395U (en) Multi -functional integral window
CN215211880U (en) Sunshine room boundary beam section bar and sunshine room
CN215717740U (en) Building engineering safety control rail
CN213509933U (en) Foundation ditch protection network that construction used
CN216076202U (en) Indoor scaffold for building with regulatory function
CN105421975B (en) A kind of multifunctional integral window
CN212027276U (en) Multifunctional building construction safety protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant