CN213868906U - Template device for windowsill joint and through joint grouting - Google Patents
Template device for windowsill joint and through joint grouting Download PDFInfo
- Publication number
- CN213868906U CN213868906U CN202021193424.1U CN202021193424U CN213868906U CN 213868906 U CN213868906 U CN 213868906U CN 202021193424 U CN202021193424 U CN 202021193424U CN 213868906 U CN213868906 U CN 213868906U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel nail
- bolt hole
- hole
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a template device that is used for windowsill seam and link up seam grout, include: the steel nail fixing device comprises an outer steel template, steel nails arranged opposite to the outer steel template and fastening screws used for fixing the outer steel template; the outer steel formwork is provided with a bolt hole, a fastening screw penetrates through the bolt hole, and the bolt hole at least comprises a first bolt hole and a second bolt hole which is symmetrically arranged with the first bolt hole and around the outer steel formwork; the fastening screws at least comprise first fastening screws fixed in the first bolt holes and second fastening screws fixed in the second bolt holes; the steel nail at least comprises a first steel nail and a second steel nail which is arranged opposite to the first steel nail. According to the utility model discloses, simple structure is practical, and this template is convenient when installation or dismantlement, has improved work efficiency greatly, and the in-process that is using moreover is firm safety.
Description
Technical Field
The utility model relates to a grout template device's technical field, in particular to a template device that is used for windowsill seam and link up seam grout.
Background
Often can need cast-in-place on engineering or construction facilities, need carry out equipment foundation with grout and grout, it can all need formwork first, template design rationality, can influence the quality that the later stage grout formed, and the template device of now being in milk all has certain special nature, to being used for different places and occasion, the device of the template that uses is different, especially need design the template of grout to windowsill seam and some other through seams, but the template is dismantled or is fixed relatively troublesome now, bring certain degree of difficulty for the construction.
SUMMERY OF THE UTILITY MODEL
To the weak point that exists among the prior art, the utility model aims at providing a template device that is used for windowsill seam and link up seam grout, simple structure is practical, and this template is convenient when installation or dismantlement, has improved work efficiency greatly, and the in-process that uses moreover is firm safe. In order to realize the basis the utility model discloses an above-mentioned purpose and other advantages provide a template device that is used for windowsill seam and link up seam grout, include:
the steel nail fixing device comprises an outer steel template, steel nails arranged opposite to the outer steel template and fastening screws used for fixing the outer steel template;
the outer steel formwork is provided with a bolt hole, a fastening screw penetrates through the bolt hole, the bolt hole at least comprises a first bolt hole and a second bolt hole which is symmetrically arranged with the first bolt hole relative to the outer steel formwork, and the first bolt hole and the second bolt hole have the same structure;
the fastening screws at least comprise first fastening screws fixed in the first bolt holes and second fastening screws fixed in the second bolt holes;
the steel nail at least comprises a first steel nail and a second steel nail opposite to the first steel nail, wherein a first fastening screw penetrates through the first steel nail, and a second fastening screw penetrates through the second steel nail.
Preferably, a first vertical through hole and a fixing groove perpendicular to the first vertical through hole are formed in the first bolt hole, the length of the first vertical through hole is a first length value, and the length of the fixing groove is a second length value.
Preferably, the first steel nail comprises a steel nail rod, an alloy needle fixed on one end face of the steel nail rod and a hammering block fixed on the other end face of the steel nail rod.
Preferably, a screw hole is formed in the surface, away from the outer side steel formwork, of the steel nail rod, the screw hole extends along the length direction of the steel nail rod, washboard locating grooves are formed in two side edges of the screw hole, and mounting grooves are formed in the washboard locating grooves.
Preferably, the first bolt hole comprises a bolt rod and a fixed block fixed at one end of the bolt rod, a threaded section is arranged on the surface of one end, far away from the fixed block, of the bolt rod, and a limiting part is connected to the threaded section in a threaded manner.
Compared with the prior art, the utility model, its beneficial effect is: the outside steel form is fixed through the steel nail, and the steel nail is fixed in on the wall through beating, then on being fixed in the outside steel form through fastening screw one end, on the other end is fixed in the steel nail, this fixed mode can fine fixed outside steel form, and convenient dismantlement and installation moreover to workman's installation quick and safety, improve workman's work efficiency greatly.
Drawings
Fig. 1 is a front view of a formwork apparatus for sill joint and through joint grouting according to the present invention;
fig. 2 is a schematic three-dimensional structure diagram of a formwork apparatus for sill joint and through joint grouting according to the present invention;
fig. 3 is a front view of an outside steel form of the form work apparatus for sill joint and through joint grouting according to the present invention;
fig. 4 is a front view of a first steel nail of the formwork apparatus for sill joint and through joint grouting according to the present invention;
fig. 5 is a left side view of a first steel nail pressing of the formwork apparatus for sill joint and through joint grouting according to the present invention;
fig. 6 is a front view of a first fastening screw of the formwork apparatus for sill joint and through joint grouting according to the present invention.
In the figure: 10. steel nails; 20. fastening screws; 30. an outer steel form; 11. a first steel nail; 12. a second steel nail; 21. a first fastening screw; 22. a second fastening screw; 31. a first bolt hole; 32. a second bolt hole; 111. a steel nail rod; 112. hammering the block; 113. an alloy needle; 114. a washboard locating slot; 115. a screw hole; 116. mounting grooves; 211. a bolt shank; 212. a limiting member; 213. a threaded segment; 214. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, a formwork apparatus for sill joint and through joint grouting, comprising:
the steel nail device comprises an outer steel template 30, steel nails 10 arranged opposite to the outer steel template 30 and fastening screws 20 for fixing the outer steel template 30, wherein when the template device is installed, the steel nails 10 are firstly fixed, then the outer steel template 30 is arranged in parallel relative to the steel nails 10, then the fastening screws 20 firstly pass through the steel nails 10 and then pass through the outer steel template 30, one end of each fastening screw 20 is fixed on the outer steel template 30, the other end of each fastening screw is fixed on the steel nail 10 through a limiting device, so that the outer steel template 30 is fixed, bolt holes are formed in the outer steel template 30, the fastening screws 20 pass through the bolt holes, the bolt holes at least comprise first bolt holes 31 and second bolt holes 32 symmetrically arranged with respect to the outer steel template 30 and corresponding to the first bolt holes 31, the first bolt holes 31 and the second bolt holes 32 have the same structure, and each bolt hole can pass through one fastening screw 20, because of stability, at least two fastening screws 20 fixed on the outer steel form 30 can fix the outer steel form 30, or according to specific conditions on site, a plurality of bolt holes are formed in the outer steel form 30, the outer steel form 30 is fixed by the plurality of fastening screws 20, the fastening screws 20 at least comprise a first fastening screw 21 fixed in a first bolt hole 31 and a second fastening screw 22 fixed in a second bolt hole 32, the first fastening screw 21 and the second fastening screw 22 are arranged in parallel, so that the outer steel form 30 is stressed uniformly and cannot be easily loosened during fixing, the steel nail 10 at least comprises a first steel nail 11 and a second steel nail 12 arranged opposite to the first steel nail 11, the first fastening screw 21 penetrates through the first steel nail 11, and the second fastening screw 22 penetrates through the second steel nail 12, each steel nail 10 corresponds to each bolt hole one by one, and the fastening screw 20 is ensured to keep a horizontal state when being fixed, so that the outer steel template 30 and the steel nail 10 are parallel to each other.
Referring to fig. 3, a first vertical through hole and a fixing groove perpendicular to the first vertical through hole are formed in the first bolt hole 31, the length of the first vertical through hole is a first length value, and the length of the fixing groove is a second length value.
Referring to fig. 4-5, the first steel nail 11 includes a steel nail rod 111, an alloy needle 113 fixed on one end surface of the steel nail rod 111, and a hammering block 112 fixed on the other end surface of the steel nail rod 111, when the first steel nail 11 is installed, the alloy needle 113 is placed on a wall surface, and then the hammering block 112 is knocked by a hammer, so that the alloy needle 113 enters the wall surface, and the first steel nail 11 is fixed, a screw hole 115 is formed in a surface of the steel template 30, which is far away from the outer side of the steel nail rod 111, the screw hole 115 extends along the length direction of the steel nail rod 111, so that a fastening screw 20 can conveniently pass through the screw hole, washboard positioning grooves 114 are formed in two side edges of the screw hole 115, the washboard positioning grooves 114 are used for preventing the fastening screw 20 from moving along the vertical direction, mounting grooves 116 are formed in the washboard positioning grooves 114, and the mounting grooves 116 are used for mounting the fastening screw 20.
Referring to fig. 3 or 6, the first bolt hole 31 includes a bolt shaft 211 and a fixing block 214 fixed to one end of the bolt shaft 211, a threaded section 213 is disposed on a surface of the bolt shaft 211, which is far from the fixing block 214, a limiting member 212 is threadedly connected to the threaded section 213, and the first length value and the second length value are both greater than the length of the fixing block 214, so that the fastening screw 20 can pass through the outer steel form 30 and the steel nail 10.
The working principle is as follows: the first steel nail 11 is firstly placed on the wall surface, then the hammering block 112 on the first steel nail 11 is beaten, so that the alloy needle 113 is inserted into the wall surface, so that the first steel nails 11 are fixed on the wall surface, the second steel nails 12 are installed like the first steel nails 11, the outer steel moulding plate 30 and the first steel nails 11 are placed on the wall surface in parallel relatively, the first fastening screw 21 is then inserted through the first steel nail 11 and onto the outer steel form 30, and then the first fastening screw 21 is rotated again, so that the fixing block 214 is matched with the fixing groove of the outer steel form 30, one end of the first fastening screw 21 is fixed on the outer steel form 30, the other end of the first fastening screw 21 is threadedly connected with a limiting member 212 through a threaded section 213, so that the end of the first tightening screw 21 remains fixed and does not move in the vertical direction, and finally the second tightening screw 22 is mounted in the same way as the first tightening screw 21.
The number of devices and the scale of the processes described herein are intended to simplify the description of the present invention, and applications, modifications and variations of the present invention will be apparent to those skilled in the art.
While the embodiments of the invention have been disclosed above, it is not limited to the applications listed in the description and the embodiments, which are fully applicable in all kinds of fields of application suitable for this invention, and further modifications may be readily made by those skilled in the art, and the invention is therefore not limited to the specific details and illustrations shown and described herein, without departing from the general concept defined by the claims and their equivalents.
Claims (5)
1. The utility model provides a template device that is used for windowsill seam and link up seam grout which characterized in that includes:
the steel nail fixing device comprises an outer side steel template (30), steel nails (10) arranged opposite to the outer side steel template (30) and fastening screws (20) used for fixing the outer side steel template (30);
the outer steel formwork (30) is provided with a bolt hole, a fastening screw (20) penetrates through the bolt hole, the bolt hole at least comprises a first bolt hole (31) and a second bolt hole (32) which is symmetrically arranged with the first bolt hole (31) relative to the outer steel formwork (30), and the first bolt hole (31) and the second bolt hole (32) are identical in structure;
the fastening screws (20) at least comprise first fastening screws (21) fixed in the first bolt holes (31) and second fastening screws (22) fixed in the second bolt holes (32);
the steel nail (10) at least comprises a first steel nail (11) and a second steel nail (12) which is arranged opposite to the first steel nail (11), a first fastening screw (21) penetrates through the first steel nail (11), and a second fastening screw (22) penetrates through the second steel nail (12).
2. The formwork apparatus for sill joint and through joint grouting according to claim 1, wherein the first bolt hole (31) is opened with a first vertical through hole and a fixing groove perpendicular to the first vertical through hole, the length of the first vertical through hole is a first length value, and the length of the fixing groove is a second length value.
3. A formwork apparatus for sill joint and through-seam grouting according to claim 1, wherein the first steel nail (11) comprises a steel nail rod (111), an alloy needle (113) fixed on one end surface of the steel nail rod (111), and a hammer block (112) fixed on the other end surface of the steel nail rod (111).
4. The formwork apparatus for sill seam and through seam grouting according to claim 3, wherein a screw hole (115) is formed on a surface of the steel nail rod (111) away from the outer steel formwork (30), the screw hole (115) extends along the length direction of the steel nail rod (111), washboard locating grooves (114) are formed on both sides of the screw hole (115), and mounting grooves (116) are formed on the washboard locating grooves (114).
5. The formwork apparatus for sill joint and through-gap grouting according to claim 1, wherein the first bolt hole (31) comprises a bolt shaft (211) and a fixing block (214) fixed to one end of the bolt shaft (211), a threaded section (213) is provided on a surface of one end of the bolt shaft (211) far away from the fixing block (214), and a stopper (212) is threadedly connected to the threaded section (213).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021193424.1U CN213868906U (en) | 2020-06-24 | 2020-06-24 | Template device for windowsill joint and through joint grouting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021193424.1U CN213868906U (en) | 2020-06-24 | 2020-06-24 | Template device for windowsill joint and through joint grouting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213868906U true CN213868906U (en) | 2021-08-03 |
Family
ID=77033178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021193424.1U Active CN213868906U (en) | 2020-06-24 | 2020-06-24 | Template device for windowsill joint and through joint grouting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213868906U (en) |
-
2020
- 2020-06-24 CN CN202021193424.1U patent/CN213868906U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201722929U (en) | Embedded part anchoring device of building template | |
CN103510715A (en) | Method for calibrating concrete prefabricated wallboard installation construction datum and calibrating device | |
CN213868906U (en) | Template device for windowsill joint and through joint grouting | |
CN211285584U (en) | Civil engineering fundamental mode fixing device | |
CN207314679U (en) | A kind of construction drainage standpipe adjustable hoop device | |
CN212027201U (en) | Adjustable guardrail bar fixing device that can have enough to meet need formula | |
CN211286645U (en) | Fastening device for corner template | |
CN211499734U (en) | Novel can dismantle instrument formula scaffold frame even wall spare | |
KR20090010657U (en) | Steel pipe fall prevention safety device | |
CN205743455U (en) | A kind of Novel civil air defense anchoring hook | |
JP2001172984A (en) | Anchor bolt retaining fittings | |
KR200162028Y1 (en) | Tying device for shoring forms | |
CN220133488U (en) | Rear-mounted crab-bolt formula even wall spare | |
CN217630545U (en) | Prefabricated part hinge device | |
CN212200494U (en) | Underground continuous wall with supporting structure | |
CN219431439U (en) | Novel safety belt is fixed device | |
CN213418453U (en) | Building engineering is with linking wall spare structure | |
CN211473391U (en) | Cantilever beam template clamp | |
CN215168003U (en) | Building template with reinforced structure | |
CN216006939U (en) | Steel dado is assembled to manual hole digging pile of wading iron works | |
CN217949741U (en) | Reinforcing apparatus of brickwork corner position constructional column | |
CN217175676U (en) | Elevation adjusting tool for aluminum template | |
CN214121160U (en) | Embedded device of inclinometer | |
CN211666316U (en) | High protection device for construction that stabilizes | |
CN220226199U (en) | Wall connecting piece capable of being recycled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |