CN207314679U - A kind of construction drainage standpipe adjustable hoop device - Google Patents

A kind of construction drainage standpipe adjustable hoop device Download PDF

Info

Publication number
CN207314679U
CN207314679U CN201721260569.7U CN201721260569U CN207314679U CN 207314679 U CN207314679 U CN 207314679U CN 201721260569 U CN201721260569 U CN 201721260569U CN 207314679 U CN207314679 U CN 207314679U
Authority
CN
China
Prior art keywords
angle steel
construction
angle
steel
drainage standpipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721260569.7U
Other languages
Chinese (zh)
Inventor
王财泾
李洪洲
王天义
王建林
吴启东
浦仕亮
罗云龙
罗加鹏
杨林美
徐武青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Tenth Construction Co Ltd
Original Assignee
Yunnan Construction Investment Tenth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Tenth Construction Co Ltd filed Critical Yunnan Construction Investment Tenth Construction Co Ltd
Priority to CN201721260569.7U priority Critical patent/CN207314679U/en
Application granted granted Critical
Publication of CN207314679U publication Critical patent/CN207314679U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a kind of construction drainage standpipe adjustable hoop device, it is desirable to provide one kind installs quick construction drainage standpipe adjustable hoop device.It includes angle bar frame, U-shaped card and expansion bolt;When the angle bar frame includes installation and wall connecting the first angle steel, and the second angle steel that is perpendicular with the first angle steel and being fixedly connected with the first angle steel;Mounting hole is offered on first angle steel, the expansion bolt is arranged in the mounting hole of the first angle steel;On second angle steel, along its length set two respectively for U-shaped card both ends pass through and in strip sliding slot.The utility model can effectively avoid since main structure construction deviation and worker influence caused by construction level, reduce soil stack installation difficulty, and construction is more convenient, has prevented the poor phenomenon of standpipe entirety perception, ensure that construction quality.

Description

A kind of construction drainage standpipe adjustable hoop device
Technical field
Construction drainage installation utensil technical field is the utility model is related to, it is adjustable more particularly, to a kind of construction drainage standpipe Formula anchor ear device.
Background technology
At present, common construction method, which is fixedly mounted, in building trade soil stack is:Be by angle bar frame punching with it is U-shaped Card is fastened on building structure wall, since wall is there are perpendicularity deviation and operation horizontal in civil engineering building structure Influence so that the standpipe of final molding can produce offset, and particularly high-rise, high-rise building, shift phenomenon is obvious, and verticality is inclined Difference causes soil stack crooked.It is easy to cause and does over again after soil stack installation, construction quality and appearance is difficult to ensure that.
Utility model content
The purpose of this utility model is intended to overcome the shortcomings of the prior art, there is provided a kind of simple, practical, economy, Construction drainage standpipe adjustable hoop device easily operated, easy to adjust.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of construction drainage standpipe adjustable hoop device, including angle bar frame, U-shaped card and expansion bolt;The angle When steel bracket includes installation and wall connecting the first angle steel, it is and perpendicular with the first angle steel and be fixedly connected with the first angle steel The second angle steel;Mounting hole is offered on first angle steel, the expansion bolt is arranged in the mounting hole of the first angle steel;Institute State on the second angle steel, set two to be passed through respectively for U-shaped card both ends and in the sliding slot of strip along its length.
Preferably, second angle steel is fixedly connected on the middle part of the first angle steel, and T-shaped structure is formed with the first angle steel.
Preferably, second angle steel is fixedly connected on one end of the first angle steel, and L-shaped structure is formed with the first angle steel.
Preferably, first angle steel with the second angle steel by being welded to connect.
Preferably, the shape of the second angle steel upper hopper chute is rectangular or kidney-shaped.
Preferably, the length of the second angle steel upper hopper chute is 20mm ~ 100mm.
Compared with prior art, the utility model has the following advantages that:
(1)It is excellent that the utility model has that simple in structure, practical, economical, easily operated, easy to adjust, perception effect is good etc. Point, in construction drainage standpipe installation process, it can save people, material, machine cost to greatest extent, effective to shorten project work Phase, enhances construction quality, promotes environmental protection and civilized construction.
(2)The utility model can not only meet that the installation under various execution conditions is fixed, and processing technology is simple and practicable, Installation accuracy is high, simple and easy, is fixed on by bolt hole on building structure wall, and the hole of the adjusting offset of anchor ear is adjusted The installation of soil stack is saved, it is crooked after will not causing standpipe installation is complete.
(3)The utility model solves wall offset, traditional anchor ear cannot meet to install matter by opening sliding slot on stent The problem of amount.The defects of existing soil stack is on process form is overcome, effectively prevent since agent structure is applied Work deviation and worker influence caused by construction level, reduce soil stack installation difficulty, after solving soil stack fixation The problem of installation can not be adjusted again, ensure that construction quality, and there is vast potential for future development.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is structure diagram when the utility model is used.
The equal proportion that Fig. 3 is Fig. 2 scales top view.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of making the creative labor All other embodiments obtained, shall fall within the protection scope of the present invention.
Construction drainage standpipe adjustable hoop device shown in Fig. 1-3, including angle bar frame 1, U-shaped card 2 and expanding screw Bolt 3;When the angle bar frame 1 includes installation and wall connecting the first angle steel 4, it is and perpendicular with the first angle steel 4 and with the The second angle steel 5 that one angle steel 4 is fixedly connected;Mounting hole is offered on first angle steel 4(Not shown in figure), the expanding screw Bolt 3 is arranged in the mounting hole of the first angle steel 4;On second angle steel 5, along its length set two supply U-shaped card 2 respectively Both ends pass through and in the sliding slots 6 of strip.
Wherein, second angle steel 5 is fixedly connected on the middle part of the first angle steel 4, and T-shaped structure is formed with the first angle steel 4.It is aobvious So, second angle steel 5 is also fixedly attached to one end of the first angle steel 4, and L-shaped structure is formed with the first angle steel 4.
First angle steel 4 is with the second angle steel 5 preferably by being welded to connect, it is clear that can also be bolted or riveting Connect.
The shape of second angle steel, 5 upper hopper chute 6 can the suitable shapes such as rectangular or kidney-shaped, in order to which U-shaped card 2 is pacified The adjustment of holding position.
The length of second angle steel, 5 upper hopper chute 6 is preferably 20mm ~ 100mm.
The expansion bolt 3 of the present embodiment is two, can rationally be increased according to load-bearing requirements in actual use.
Make and installation process is as follows:(1)According to the actual arrangement of construction site building structure and wall offset, carry out Live actual measurement, determines adjustable dimension, shape and the anchor ear mounting means of adjustable hoop device;(2)Determine adjustable After formula anchor ear device size and shape, the sketch of adjustable hoop device is made;(3)Sketch is transferred to factory, factory is processing During process the mounting hole of fixed anchor ear device, and fixed drainpipe and the sliding slot of offset dimensions can be adjusted;(4)Embrace After hoop device processes, positioned according to live drainpipe reserved opening unwrapping wire, adjustable hoop device, which is fixedly mounted, to be fixed Drainpipe.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on, should be included in the utility model Protection domain within.

Claims (6)

1. a kind of construction drainage standpipe adjustable hoop device, including angle bar frame, U-shaped card and expansion bolt;Its feature exists In:The angle bar frame include installation when and wall connecting the first angle steel, and it is perpendicular with the first angle steel and with first jiao The second angle steel that steel is fixedly connected;Mounting hole is offered on first angle steel, the expansion bolt is arranged in the first angle steel In mounting hole;On second angle steel, along its length set two respectively for U-shaped card both ends pass through and in strip cunning Groove.
2. construction drainage standpipe adjustable hoop device according to claim 1, it is characterised in that:Second angle steel is fixed The middle part of the first angle steel is connected to, T-shaped structure is formed with the first angle steel.
3. construction drainage standpipe adjustable hoop device according to claim 1, it is characterised in that:Second angle steel is fixed One end of the first angle steel is connected to, L-shaped structure is formed with the first angle steel.
4. according to any construction drainage standpipe adjustable hoop devices of claim 1-3, it is characterised in that:Described first jiao Steel is with the second angle steel by being welded to connect.
5. according to any construction drainage standpipe adjustable hoop devices of claim 1-3, it is characterised in that:Described second jiao The shape of steel upper hopper chute is rectangular or kidney-shaped.
6. according to any construction drainage standpipe adjustable hoop devices of claim 1-3, it is characterised in that:Described second jiao The length of steel upper hopper chute is 20mm ~ 100mm.
CN201721260569.7U 2017-09-28 2017-09-28 A kind of construction drainage standpipe adjustable hoop device Active CN207314679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721260569.7U CN207314679U (en) 2017-09-28 2017-09-28 A kind of construction drainage standpipe adjustable hoop device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721260569.7U CN207314679U (en) 2017-09-28 2017-09-28 A kind of construction drainage standpipe adjustable hoop device

Publications (1)

Publication Number Publication Date
CN207314679U true CN207314679U (en) 2018-05-04

Family

ID=62428200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721260569.7U Active CN207314679U (en) 2017-09-28 2017-09-28 A kind of construction drainage standpipe adjustable hoop device

Country Status (1)

Country Link
CN (1) CN207314679U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112377679A (en) * 2020-11-05 2021-02-19 浙江花园建设集团有限公司 Adjustable vertical pipe integral support and construction method thereof
CN113175568A (en) * 2021-05-07 2021-07-27 广州文冲船厂有限责任公司 Connecting assembly and connecting method for segmented folding pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112377679A (en) * 2020-11-05 2021-02-19 浙江花园建设集团有限公司 Adjustable vertical pipe integral support and construction method thereof
CN113175568A (en) * 2021-05-07 2021-07-27 广州文冲船厂有限责任公司 Connecting assembly and connecting method for segmented folding pipe

Similar Documents

Publication Publication Date Title
CN207314679U (en) A kind of construction drainage standpipe adjustable hoop device
CN206521678U (en) Template fixed support device
CN208396317U (en) A kind of quick apparatus for leveling of basement bottom board concrete
CN204781970U (en) Template fixing device with adjustable
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN205421311U (en) Rag bolt fixes a position mounting tool
CN204592560U (en) A kind of adjustable cable crane span structure support supported for curved wall
CN206428565U (en) A kind of concrete set shaped steel formwork support system
CN207260574U (en) Template fixing system of building waterproof structure
CN203701066U (en) Soil pressure meter position-adjustable fixed installation device
CN205242675U (en) Prefabricated assembled shear force wall horizontal bolt joint construction
CN205012527U (en) Novel curtain coupling assembling
CN204024087U (en) The accurate preburied positioning device of a kind of steel work lattice column pedestal anchor bolt
CN203904785U (en) Multifunctional pressing rod of track slab of CRTS III plate type ballastless track
CN207535060U (en) For the built-in fitting fixing device of prefabricated board die
CN203238657U (en) Tool type anchor bolt mounting positioner
CN204706792U (en) Distribution box
CN204040052U (en) A kind of outer posture fixed mount being applicable to framework foundation built-in bolt and fixing
CN204269122U (en) Prefabricated components installation verticality measurement device
CN205024733U (en) Fixing device for advanced water stop
CN204531420U (en) Concreting plate device
CN203514778U (en) Wall guide wall template erecting device with adjustable height
CN201713933U (en) Trench cover plate
CN208517964U (en) Adjustable foundation bolt installs positioning mold
CN206034653U (en) Connecting piece and side fascia installation node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant