CN213868855U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN213868855U
CN213868855U CN202022792169.9U CN202022792169U CN213868855U CN 213868855 U CN213868855 U CN 213868855U CN 202022792169 U CN202022792169 U CN 202022792169U CN 213868855 U CN213868855 U CN 213868855U
Authority
CN
China
Prior art keywords
frame
sliding plate
standing
scaffold
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022792169.9U
Other languages
Chinese (zh)
Inventor
武志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhongxin Hengling Engineering Project Management Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022792169.9U priority Critical patent/CN213868855U/en
Application granted granted Critical
Publication of CN213868855U publication Critical patent/CN213868855U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model is suitable for a construction is with supplementary technical field, discloses a scaffold frame for construction, including standing the frame, the inside vertical sliding tray of having seted up in frame bottom left side of standing, the inside slidable mounting that runs through of sliding tray has the sliding plate, sliding plate bottom fixed surface installs fixed frame, the inside vertical first connection screw of having seted up in sliding plate right side top, the inside movable mounting that runs through of first connection screw has connecting bolt. The utility model discloses owing to stand the inside sliding tray that has seted up of frame to remove the sliding plate at the frame surface of standing together with the fixed frame of its bottom, and then drive the horizontal position of placing the frame of adjusting its top, guarantee that operating personnel can place the frame and can remove the change position thereupon after the frame arbitrary position of standing, guarantee that operating personnel can be quick use the construction tool who places the frame inside, comparatively practical is fit for extensively promoting and using.

Description

Scaffold for building construction
Technical Field
The utility model is suitable for a construction is with supplementary technical field, in particular to scaffold frame for construction.
Background
At present, a scaffold is a temporary building tool which is erected for workers to operate and solve vertical and horizontal transportation on a construction site, is mainly used for an outer wall, an interior decoration or a place with higher floor height and cannot be directly constructed, is mainly used for maintenance of safety nets of construction personnel for up and down activities or peripheral safety nets, high-altitude installation components and the like, and is made of materials such as bamboo, wood, steel pipes or synthetic materials.
However, there are still some disadvantages in the scaffolds used today: after the scaffold is built, corresponding construction personnel can stand on the top of the scaffold, and the construction personnel need to bend down to use corresponding construction tools after standing on the top of the scaffold, so that the operation is complex, the subsequent construction process is influenced, and when the operation personnel is positioned on the surface of the scaffold, the operation personnel needs to walk back and forth on the surface of the scaffold to use the corresponding operation tools. Therefore, we propose a scaffold for building construction.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a scaffold frame for construction can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a scaffold frame for construction, includes the frame of standing, the inside vertical sliding tray of having seted up in frame bottom left side of standing, the inside slidable mounting that runs through of sliding tray has the sliding plate, fixed frame is installed to sliding plate bottom fixed surface, the inside vertical first connection screw of having seted up in sliding plate right side top, the inside movable mounting that runs through of first connection screw has connecting bolt, stand frame bottom middle part equidistance is vertical has seted up a plurality of second and has connected the screw, the connecting bolt bottom is twisted through the screw and is connected inside the screw is connected to the second.
Preferably, four top corners of the bottom end of the standing frame are vertically and fixedly provided with supporting rods, and every two supporting rods are fixedly provided with cross connecting rods between the surfaces of the middle ends.
Preferably, a movable groove is vertically formed in the middle end of the sliding plate, a hydraulic pushing cylinder is fixedly mounted on the surface of the bottom end of the inner side wall of the fixed frame, a transmission shaft of the hydraulic pushing cylinder penetrates through the movable groove, and a placing frame is fixedly mounted on the surface of the top end of the transmission shaft of the hydraulic pushing cylinder.
Preferably, the first connecting screw hole has the same aperture as the second connecting screw hole.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a scaffold frame for construction, because the sliding tray has been seted up inside the frame of standing, and move the sliding plate on the frame surface of standing together with the fixed frame of its bottom, and then the horizontal position of placing the frame of its top is adjusted in the drive, guarantee that operating personnel can be after the frame arbitrary position of standing, it can remove the relocation thereupon to place the frame, guarantee that operating personnel can be quick use the construction tool who places the frame inside, and at the sliding plate right side and stand the frame inside first connection screw and the second connection screw of having seted up respectively, can be after the position of having adjusted the sliding plate, place connecting bolt simultaneously and inject the inside position to the sliding plate of connecting screw and second, guarantee to place the stability of frame when using.
2. The utility model discloses a scaffold frame for construction, because there is hydraulic pressure to promote the jar at fixed frame internally mounted, can drive through the operation that hydraulic pressure promoted the jar and place the frame and carry out vertical removal, guarantee to place the frame and can be close to operating personnel, and then make things convenient for operating personnel to use the inside operating tool of frame of placing, and place fixed frame in the sliding plate bottom, can be when promoting the sliding plate, drive fixed frame and its inside hydraulic pressure and promote the jar and carry out horizontal migration, guarantee the rationality of whole device.
Drawings
Fig. 1 is a schematic view of an overall side-view cross-sectional structure of the scaffold for building construction of the present invention;
fig. 2 is the utility model relates to a scaffold for construction's whole structural schematic that overlooks.
Reference numerals: 1. standing the frame; 2. a sliding groove; 3. a sliding plate; 4. a fixing frame; 5. a hydraulic push cylinder; 6. placing the frame; 7. a movable groove; 8. a first connection screw hole; 9. a connecting bolt; 10. a second connection screw hole; 11. a support bar; 12. cross-connecting rods.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
As shown in fig. 1-2, a scaffold for building construction, includes standing frame 1, sliding tray 2 has vertically been seted up to standing frame 1 bottom left side inside, sliding tray 2 is inside to run through slidable mounting has sliding plate 3, 3 bottom fixed surface of sliding plate install fixed frame 4, 3 right side tops of sliding plate inside vertically has seted up first connecting screw 8, the inside movable mounting that runs through of first connecting screw 8 has connecting bolt 9, standing frame 1 bottom middle part equidistance is vertically seted up a plurality of second connecting screw 10, connecting bolt 9 bottom is screwed inside second connecting screw 10 through the screw.
In this embodiment, as shown in fig. 1 and 2, the sliding groove 2 is disposed inside the standing frame 1, the sliding plate 3 and the fixing frame 4 at the bottom of the sliding plate are moved on the surface of the standing frame 1, and further the horizontal position of the placing frame 6 at the top of the sliding plate is driven to be adjusted, it is ensured that the placing frame 6 can be moved and changed in position after the operator can stand at any position of the standing frame 1, it is ensured that the operator can quickly use the construction tool inside the placing frame 6, and the sliding plate 3 is respectively provided with the first connecting screw hole 8 and the second connecting screw hole 10 at the right side and inside the standing frame 1, after the position of the sliding plate 3 is adjusted, the connecting bolt 9 is simultaneously disposed inside the first connecting screw hole 8 and the second connecting screw hole 10 to limit the position of the sliding plate 3, and the stability of the placing frame 6 during use is ensured.
Wherein, the equal vertical fixed mounting in four apex angle departments in 1 bottom of standing frame has bracing piece 11, per two fixed mounting has cross connection pole 12 between the end surface in the bracing piece 11.
In this embodiment, as shown in fig. 1, it is ensured that the standing frame 1 can be stably placed for use.
The middle end of the sliding plate 3 is vertically provided with a movable groove 7, the bottom end of the inner side wall of the fixed frame 4 is fixedly provided with a hydraulic pushing cylinder 5, a transmission shaft of the hydraulic pushing cylinder 5 penetrates through the movable groove 7, and the top end of the transmission shaft of the hydraulic pushing cylinder 5 is fixedly provided with a placing frame 6.
As shown in fig. 1 and 2, in this embodiment, because there is hydraulic pushing cylinder 5 in fixed frame 4 internally mounted, can drive through the operation of hydraulic pushing cylinder 5 and place frame 6 and carry out vertical movement, guarantee to place frame 6 and can be close to operating personnel, and then make things convenient for operating personnel to use the inside operating tool of placing frame 6, and place fixed frame 4 in sliding plate 3 bottom, can be when promoting sliding plate 3, drive fixed frame 4 and its inside hydraulic pushing cylinder 5 and carry out horizontal migration, guarantee the rationality of whole device.
Wherein, the aperture of the first connecting screw hole 8 is the same as the aperture of the second connecting screw hole 10.
In this embodiment, as shown in fig. 1, it is ensured that the connecting bolts 9 can be placed inside the connecting screw holes to position the sliding plate 3.
It should be noted that the utility model relates to a scaffold for building construction, the components are all universal standard components or components known by technicians in this neighborhood, the structure and principle of the scaffold are all known by technicians in this technical manual or known by conventional experimental methods, when working, the tool to be used is placed inside the placing frame 6, the connecting bolt 9 is drawn out by rotation to push the sliding plate 3 to drive the adjusting placing frame 6 to move horizontally, then the limit bolt 9 is placed inside the corresponding first connecting screw hole 8 and second connecting screw hole 10 to limit the position of the sliding plate 3, the hydraulic pushing cylinder 5 is opened through the external control switch to adjust the height of the placing frame 6, the tool convenient for the operator is ensured to be taken and used, compared with the traditional auxiliary technology for building construction, the device is provided with the sliding groove 2 inside the standing frame 1, and move sliding plate 3 and the fixed frame 4 of its bottom on frame 1 surface of standing, and then drive the horizontal position of placing frame 6 of adjusting its top, guarantee that operating personnel can be behind frame 1 arbitrary position of standing, place frame 6 and can move the change position thereupon, guarantee that operating personnel can be quick use the construction tool who places frame 6 inside, and first connection screw 8 and second connection screw 10 have been seted up respectively in sliding plate 3 right side and stand frame 1 inside, can be after adjusting the position of sliding plate 3, place connecting bolt 9 simultaneously and connect the screw 10 inside and prescribe a limit to the position of sliding plate 3 at first connection screw 8 and second, guarantee to place the stability of frame 6 when using.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. The utility model provides a scaffold frame for construction, includes standing frame (1), its characterized in that: the standing frame is characterized in that a sliding groove (2) is vertically formed in the left side of the bottom end of the standing frame (1), a sliding plate (3) is slidably mounted in the sliding groove (2) in a penetrating mode, a fixed frame (4) is fixedly mounted at the bottom end of the sliding plate (3), a first connecting screw hole (8) is vertically formed in the top end of the right side of the sliding plate (3), a connecting bolt (9) is movably mounted in the first connecting screw hole (8) in a penetrating mode, a plurality of second connecting screw holes (10) are vertically formed in the middle of the bottom end of the standing frame (1) in an equidistant mode, and the bottom end of the connecting bolt (9) is screwed in the second connecting screw holes (10) through threads.
2. A scaffold for construction according to claim 1, wherein: four apex angle departments in standing frame (1) bottom are all vertical fixed mounting have bracing piece (11), per two fixed mounting has cross connecting rod (12) between the end surface in bracing piece (11).
3. A scaffold for construction according to claim 1, wherein: the hydraulic push device is characterized in that a movable groove (7) is vertically formed in the middle end of the sliding plate (3), a hydraulic push cylinder (5) is fixedly mounted at the bottom end of the inner side wall of the fixed frame (4), a transmission shaft of the hydraulic push cylinder (5) penetrates through the movable groove (7), and a placement frame (6) is fixedly mounted at the top end of the transmission shaft of the hydraulic push cylinder (5).
4. A scaffold for construction according to claim 1, wherein: the aperture of the first connecting screw hole (8) is the same as that of the second connecting screw hole (10).
CN202022792169.9U 2020-11-26 2020-11-26 Scaffold for building construction Active CN213868855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022792169.9U CN213868855U (en) 2020-11-26 2020-11-26 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022792169.9U CN213868855U (en) 2020-11-26 2020-11-26 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN213868855U true CN213868855U (en) 2021-08-03

Family

ID=77064016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022792169.9U Active CN213868855U (en) 2020-11-26 2020-11-26 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN213868855U (en)

Similar Documents

Publication Publication Date Title
CN213868855U (en) Scaffold for building construction
CN217151174U (en) Construction is with convenient to detach's supplementary installation device of scaffold frame
CN215926629U (en) Scaffold frame that building engineering used
CN213204906U (en) Safety scaffold for building engineering construction
CN215167811U (en) Multifunctional scaffold for constructional engineering
CN115637839A (en) Quick assembly disassembly structure for building scaffold
CN214169856U (en) Safety platform for building scaffold
CN214090818U (en) Home decoration leveling device
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet
CN210316535U (en) Construction hydraulic pressure template climbing device
CN216130539U (en) High building scaffold of security
CN203248090U (en) Adjustable supporting frame used for top drilling
CN218714943U (en) Hanging basket capable of adjusting height of guardrail
CN206839615U (en) A kind of boring device of top plate
CN212957541U (en) Fitment instrument with couple
CN204418696U (en) Vertical reinforcement spreading lifting assistor
CN214402648U (en) Cantilever device of wall-attached scaffold for building construction
CN216380487U (en) Telescopic scaffold suitable for indoor use
CN219653539U (en) Support frame is used in construction of multi-functional bridge of convenient regulation
CN221363371U (en) Framework welding machine for building curtain wall construction
CN218990858U (en) Portable hanging flower basket device
CN219779505U (en) High-voltage compensation cabinet
CN220100550U (en) Steel construction installation scaffold
CN215854775U (en) Anti-climbing device for tower crane
CN216042535U (en) Climbing frame for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230915

Address after: No. 409 Yongkang West Road, Chongyang Street, Chongzhou City, Chengdu City, Sichuan Province, 611200, China

Patentee after: Sichuan Zhongxin Hengling Engineering Project Management Co.,Ltd.

Address before: No. 111, Wujia Xiazhuang village, Longgang Town, Linqu County, Weifang City, Shandong Province, 262618

Patentee before: Wu Zhiqiang

TR01 Transfer of patent right