CN213868830U - Building installation construction platform - Google Patents
Building installation construction platform Download PDFInfo
- Publication number
- CN213868830U CN213868830U CN202022549483.4U CN202022549483U CN213868830U CN 213868830 U CN213868830 U CN 213868830U CN 202022549483 U CN202022549483 U CN 202022549483U CN 213868830 U CN213868830 U CN 213868830U
- Authority
- CN
- China
- Prior art keywords
- base
- connecting rod
- installation
- welded
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 59
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 230000000295 complement effect Effects 0.000 claims abstract description 3
- 238000003466 welding Methods 0.000 claims 1
- 230000002411 adverse Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 230000002349 favourable effect Effects 0.000 abstract description 3
- 230000033001 locomotion Effects 0.000 description 8
- 230000009286 beneficial effect Effects 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model discloses a building installation construction platform relates to building technical field. The utility model provides a building installation construction platform, includes the base, the bottom of base is rotated and is installed the universal wheel, and one side outer wall welded mounting of base has the handle, and the top of base is provided with the footstock, and the top of base is provided with adjustment mechanism, and the top welded mounting of footstock has the platform, and the inside of platform is provided with complementary unit. The utility model discloses simple structure can highly adjust the platform, it is convenient to have brought for the building installation to a certain extent, use through the cooperation of connecting rod and handrail, be favorable to increasing operator's security, increased the stability that the device used to a certain extent, simultaneously, can shelter from the user when the installation, avoid bad weather to cause adverse effect to the user, increased user's comfort level effectively, accord with market demand, better than traditional mode, convenient to popularize and use.
Description
Technical Field
The utility model relates to a building technical field specifically is a building installation construction platform.
Background
The building installation refers to the general term of building, repairing, installation and other engineering operations, including cooling and heating, sanitary ventilation, lighting and various pipeline facilities connected with the building, and also including foundations, pillars, operation platforms, various furnaces and metal structure engineering of various devices, and the business income obtained from building, installation, repairing and other engineering operations should be calculated according to tax regulations to pay business tax.
The construction installation can cooperate mounting platform to carry out the auxiliary operation usually, and the construction platform functional singleness that the tradition used is unfavorable for improving user's experience and feels, has reduced user's comfort level to a certain extent, is unfavorable for using widely.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building installation construction platform to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building installation construction platform, includes the base, the bottom of base is rotated and is installed the universal wheel, and one side outer wall welded mounting of base has the handle, and the top of base is provided with the footstock, and the top of base is provided with adjustment mechanism, and the top welded mounting of footstock has the platform, and the inside of platform is provided with complementary unit.
Preferably, the adjusting mechanism comprises a first slide bar, a first slide block, a second slide bar, a second slide block, a first connecting rod, a second connecting rod, a hydraulic cylinder, a fixed seat and a connecting block, wherein a slide groove is formed in the base, an opening is formed in the top of the base, the first slide bar is welded and installed on the adjacent inner wall of the base, the first slide block is slidably installed in the base, the first slide bar transversely penetrates through the first slide block and is matched and slidably connected with the first slide block, the first slide block longitudinally penetrates through the opening, a slide groove is formed in the top seat, an opening is formed in the top of the top seat, the second slide bar is welded and installed on the adjacent side wall of the top seat, the second slide block is slidably installed in the top seat, the second slide bar longitudinally penetrates through the opening, the second slide bar transversely penetrates through the second slide block and is matched and slidably connected with the second slide block, and the bottom of the top seat is hinged with the first connecting rod through the connecting block, the free end of the first connecting rod is hinged with the first sliding block, the top of the base is provided with a second connecting rod through a connecting piece in a hinged mode, the free end of the second connecting rod is hinged with the second sliding block, and the number of the first connecting rod and the number of the second connecting rod are two.
Preferably, the bottom welded mounting of second connecting rod has the fixing base, and the spout has been seted up to the inside of fixing base, and the opening has been seted up to the bottom of fixing base, and the inside slidable mounting of fixing base has the connecting block, and welded mounting has the pneumatic cylinder on the base, and the free end of pneumatic cylinder vertically runs through the opening and is connected with the connecting block is articulated.
Preferably, the inside welded mounting of one side of platform has the connecting rod, and the quantity of connecting rod is three groups and for vertical setting, and the handrail, handrail and connecting rod one-to-one are installed to the bottom welded mounting of connecting rod.
Preferably, the outer walls of the two sides of the platform are both welded with illuminating lamps.
Preferably, the auxiliary mechanism includes installation pole, electric putter, baffle, mount pad and installation piece, and the inboard bottom welded mounting of platform has the installation pole, and the articulated baffle of installing in top of installation pole, the bottom welded mounting of baffle have the mount pad, and the spout has been seted up to the inside of mount pad, and the opening has been seted up to the bottom of mount pad, and the inside slidable mounting of mount pad has the installation piece, and the articulated electric putter that installs of one side outer wall of installation pole, electric putter's free end vertically runs through the opening and is connected with the mount pad is articulated.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model provides a building installation construction platform, through first slide bar, first slider, the second slide bar, the second slider, first connecting rod, the second connecting rod, the pneumatic cylinder, the cooperation of fixing base and connecting block is used, can highly adjust the platform, it is convenient to have brought for the building installation to a certain extent, cooperation through connecting rod and handrail is used, be favorable to increasing operator's security, the stability that the device used has been increased to a certain extent, use through the cooperation of light, during operation at night, can provide the illumination, be favorable to the building installation to use.
(2) The utility model provides a building installation construction platform, use through the cooperation of installation pole, electric putter, baffle, mount pad and installation piece, can carry out angle modulation, can shelter from the user when the installation, avoid bad weather to cause adverse effect to the user, can increase user's experience and feel, user's comfort level has been increased effectively, and simultaneously, when not using, can receive and release the baffle, accord with market demand, and easy operation, it is convenient to use.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an enlarged view of part A of the present invention;
FIG. 3 is an enlarged view of the portion B of the present invention;
FIG. 4 is an enlarged view of the section C of the present invention;
fig. 5 is a front view of the present invention.
In the figure: the device comprises a base 1, a universal wheel 2, a top seat 3, an adjusting mechanism 4, a first sliding rod 401, a first sliding block 402, a second sliding rod 403, a second sliding block 404, a first connecting rod 405, a second connecting rod 406, a hydraulic cylinder 407, a fixed seat 408, a connecting block 409, a handle 5, a platform 6, a connecting rod 7, a lighting lamp 8, an auxiliary mechanism 9, an installation rod 901, an electric push rod 902, a baffle 903, an installation seat 904, an installation block 905 and an armrest 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a building installation construction platform comprises a base 1, universal wheels 2 are rotatably installed at the bottom of the base 1, a handle 5 is installed on the outer wall of one side of the base 1 in a welded mode, a top seat 3 is arranged above the base 1, an adjusting mechanism 4 is arranged above the base 1, the adjusting mechanism 4 comprises a first sliding rod 401, a first sliding block 402, a second sliding rod 403, a second sliding block 404, a first connecting rod 405, a second connecting rod 406, a hydraulic cylinder 407, a fixed seat 408 and a connecting block 409, a sliding groove is formed in the base 1, an opening is formed in the top of the base 1, the first sliding rod 401 is installed on the adjacent inner wall of the base 1 in a welded mode, the first sliding block 402 is installed in the base 1 in a sliding mode, the first sliding rod 401 transversely penetrates through the first sliding block 402 and is matched with the first sliding block 402 in a sliding connection mode, the first sliding block 402 longitudinally penetrates through the opening, a sliding groove is formed in the top seat 3, an opening is formed in the top of the top seat 3, a second slide bar 403 is welded and installed on the adjacent side wall of the top seat 3, a second slide block 404 is installed inside the top seat 3 in a sliding mode, the second slide block 404 longitudinally penetrates through an opening, the second slide bar 403 transversely penetrates through the second slide block 404 and is matched with and arranged in a sliding mode, first connecting rods 405 are installed at the bottom of the top seat 3 in a hinged mode through connecting pieces, the free ends of the first connecting rods 405 are connected with the first slide block 402 in a hinged mode, a second connecting rod 406 is installed at the top of the base 1 in a hinged mode through connecting pieces, the free end of the second connecting rod 406 is connected with the second slide block 404 in a hinged mode, two groups of the first connecting rods 405 and the second connecting rods 406 are installed, a fixed seat 408 is welded and installed at the bottom end of the second connecting rod 406, a sliding groove is formed inside the fixed seat 408, an opening is formed in the bottom of the fixed seat 408, a connecting block 409 is installed inside the fixed seat 408 in a sliding mode, a hydraulic cylinder 407 is welded and installed on the base 1, a free end of the hydraulic cylinder 407 longitudinally penetrates through an opening and is connected with the connecting block 409 in a hinged mode, platform 6 is installed in the top welded mounting of footstock 3, drive hydraulic cylinder 407, pneumatic cylinder 407 longitudinal motion, cooperation through second slide bar 403 and second slider 404 is used, pneumatic cylinder 407 longitudinal motion drives second connecting rod 406 longitudinal motion, second connecting rod 406 longitudinal motion drives first connecting rod 405 longitudinal motion, thereby drive footstock 3 longitudinal motion, can highly adjust platform 6, it is convenient to have brought the building installation to a certain extent, one side inner weld of platform 6 installs connecting rod 7, the quantity of connecting rod 7 is the multiunit and for vertical setting.
The bottom end of the connecting rod 7 is welded with a handrail 10, the handrail 10 corresponds to the connecting rod 7 one by one, the matching use of the connecting rod 7 and the handrail 10 is beneficial to increasing the safety of an operator, the stability of the device use is increased to a certain extent, the outer walls of the two sides of the platform 6 are welded with illuminating lamps 8, the matching use of the illuminating lamps 8 is utilized, the lighting can be provided when the platform works at night, the building installation and the use are facilitated, an auxiliary mechanism 9 is arranged in the platform 6, the auxiliary mechanism 9 comprises an installation rod 901, an electric push rod 902, a baffle 903, an installation seat 904 and an installation block 905, the installation rod 901 is welded and installed at the bottom of the inner side of the platform 6, the baffle 903 is hinged and installed at the top of the installation rod 901, the installation seat 904 is welded and installed at the bottom of the baffle 903, a chute is formed in the installation seat 904, an opening is formed in the bottom of the installation seat 904, and the installation block 905 is installed in the installation seat 904 in a sliding manner, install the articulated electric putter 902 that installs of one side outer wall of pole 901, electric putter 902's the vertical through opening of free end and with the articulated connection of installation piece 905, drive electric putter 902, electric putter 902 drives baffle 903 longitudinal movement, use through the cooperation of mount pad 904 and installation piece 905, thereby baffle 903 longitudinal movement carries out angle modulation, can shelter from the user when the installation, avoid bad weather to cause unfavorable influence to the user, can increase user's experience and feel, user's comfort level has been increased effectively, and simultaneously, when not using, can receive and release baffle 903, accord with the market demand, and is simple in operation, and convenient for use.
When the device is used, the hydraulic cylinder 407 is driven, the hydraulic cylinder 407 longitudinally moves, the second slide bar 403 and the second slide block 404 are used in a matched mode, the hydraulic cylinder 407 longitudinally moves to drive the second connecting rod 406 to longitudinally move, the second connecting rod 406 longitudinally moves to drive the first connecting rod 405 to longitudinally move, so that the top seat 3 is driven to longitudinally move, the height of the platform 6 can be adjusted, the connecting rod 7 and the handrail 10 are used in a matched mode, the safety of an operator is improved, the electric push rod 902 is driven, the electric push rod 902 drives the baffle 903 to longitudinally move, the installation seat 904 and the installation block 905 are used in a matched mode, the baffle 903 longitudinally moves to adjust the angle, the user can be shielded in the installation process, adverse effects of bad weather on the user are avoided, the experience feeling of the user can be improved, the comfort level of the user is effectively improved, and meanwhile, when the, the baffle 903 can be folded and unfolded, market requirements are met, and the use is convenient and fast.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building installation construction platform, includes base (1), its characterized in that: the bottom of base (1) is rotated and is installed universal wheel (2), and one side outer wall welded mounting of base (1) has handle (5), and the top of base (1) is provided with footstock (3), and the top of base (1) is provided with adjustment mechanism (4), and the top welded mounting of footstock (3) has platform (6), and the inside of platform (6) is provided with complementary unit (9).
2. A building installation and construction platform according to claim 1, wherein: the adjusting mechanism (4) comprises a first slide bar (401), a first sliding block (402), a second slide bar (403), a second sliding block (404), a first connecting rod (405), a second connecting rod (406), a hydraulic cylinder (407), a fixed seat (408) and a connecting block (409), a sliding groove is formed in the base (1), an opening is formed in the top of the base (1), the first slide bar (401) is welded and installed on the adjacent inner wall of the base (1), the first sliding block (402) is slidably installed in the base (1), the first slide bar (401) transversely penetrates through the first sliding block (402) and is matched with and slidably connected with the first sliding block (402), the first sliding block (402) longitudinally penetrates through the opening, the sliding groove is formed in the top seat (3), the opening is formed in the top seat (3), the second slide bar (403) is welded and installed on the adjacent side wall of the top seat (3), the second sliding block (404) is slidably installed in the top seat (3), the second slider (404) vertically penetrates through the opening, the second slide bar (403) transversely penetrates through the second slider (404) and is matched with the second slider (404) in a sliding connection mode, a first connecting rod (405) is installed at the bottom of the top seat (3) through a connecting piece in a hinged mode, the free end of the first connecting rod (405) is connected with the first slider (402) in a hinged mode, a second connecting rod (406) is installed at the top of the base (1) through a connecting piece in a hinged mode, the free end of the second connecting rod (406) is connected with the second slider (404) in a hinged mode, and the number of the first connecting rod (405) and the second connecting rod (406) is two.
3. A building installation and construction platform according to claim 2, wherein: fixing base (408) are installed in the bottom welding of second connecting rod (406), and the spout has been seted up to the inside of fixing base (408), and the opening has been seted up to the bottom of fixing base (408), and the inside slidable mounting of fixing base (408) has connecting block (409), and welded mounting has pneumatic cylinder (407) on base (1), and the free end of pneumatic cylinder (407) vertically runs through the opening and articulates with connecting block (409) and is connected.
4. A building installation and construction platform according to claim 1, wherein: connecting rods (7) are welded inside one side of the platform (6), the number of the connecting rods (7) is three groups and is vertical, handrails (10) are welded at the bottom ends of the connecting rods (7), and the handrails (10) correspond to the connecting rods (7) one to one.
5. A building installation and construction platform according to claim 1, wherein: and illuminating lamps (8) are welded on the outer walls of the two sides of the platform (6).
6. A building installation and construction platform according to claim 1, wherein: auxiliary mechanism (9) are including installation pole (901), electric putter (902), baffle (903), mount pad (904) and installation piece (905), inboard bottom welded mounting of platform (6) has installation pole (901), the articulated baffle (903) of installing the top of pole (901), mount pad (904) are installed to the bottom welded mounting of baffle (903), the spout has been seted up to the inside of mount pad (904), the opening has been seted up to the bottom of mount pad (904), the inside slidable mounting of mount pad (904) has installation piece (905), electric putter (902) are installed to one side outer wall of installation pole (901) is articulated, the vertical through opening of free end of electric putter (902) and with installation piece (905) articulated connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022549483.4U CN213868830U (en) | 2020-11-06 | 2020-11-06 | Building installation construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022549483.4U CN213868830U (en) | 2020-11-06 | 2020-11-06 | Building installation construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213868830U true CN213868830U (en) | 2021-08-03 |
Family
ID=77054846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022549483.4U Expired - Fee Related CN213868830U (en) | 2020-11-06 | 2020-11-06 | Building installation construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213868830U (en) |
-
2020
- 2020-11-06 CN CN202022549483.4U patent/CN213868830U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213868830U (en) | Building installation construction platform | |
CN106877234A (en) | A kind of electric power first-aid support cable architecture | |
CN212565423U (en) | Temporary lighting device for rail transit construction | |
CN107972764B (en) | Electric bicycle parking system | |
CN214281288U (en) | Roof photovoltaic support | |
CN212104074U (en) | Pile driving device for building | |
CN111411890B (en) | Piling device for industrial and civil buildings | |
CN208401402U (en) | Power transmission lines overhauling operation bracket | |
CN112443793A (en) | Multifunctional LED street lamp convenient to disassemble and maintain | |
CN207588766U (en) | The solar energy mounting bracket of solar energy beacon | |
CN211399587U (en) | Device is polished to bus shelter ceiling side | |
CN208169859U (en) | A kind of mounting bracket of flexible LED display screen mould group | |
CN206569075U (en) | Double track inspection car | |
CN212667357U (en) | Diversion sealing cover for railway rolling stock | |
CN217135427U (en) | Photovoltaic panel assembly structure | |
CN216976739U (en) | Illumination control device for tunnel excavation | |
CN216693301U (en) | Wireless communication wisdom lamp pole based on wisdom city platform | |
CN217998847U (en) | Fitment handrail frame convenient to use | |
CN208363541U (en) | Balanced building trowelling machine | |
CN219214817U (en) | Armrest lifting assembly of scooter for old people | |
CN220924098U (en) | Novel mining self-moving equipment train unit car | |
CN211223431U (en) | Adjustable subway is held up with level | |
CN218324155U (en) | Double-layer four-connecting-rod parking system | |
CN212270931U (en) | Piling device capable of automatically marking | |
CN208566338U (en) | A kind of street lamp with hinged ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210803 |
|
CF01 | Termination of patent right due to non-payment of annual fee |