CN213836664U - Anti-seepage type building foundation pit - Google Patents

Anti-seepage type building foundation pit Download PDF

Info

Publication number
CN213836664U
CN213836664U CN202022725589.5U CN202022725589U CN213836664U CN 213836664 U CN213836664 U CN 213836664U CN 202022725589 U CN202022725589 U CN 202022725589U CN 213836664 U CN213836664 U CN 213836664U
Authority
CN
China
Prior art keywords
foundation pit
type building
layer
building foundation
warning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022725589.5U
Other languages
Chinese (zh)
Inventor
李仁杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202022725589.5U priority Critical patent/CN213836664U/en
Application granted granted Critical
Publication of CN213836664U publication Critical patent/CN213836664U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to the technical field of foundation pit anti-seepage, in particular to an anti-seepage type building foundation pit, which comprises a base body, wherein a foundation pit is arranged in the base body; a first base layer, a metal partition plate, an impermeable layer, a water absorbing layer, a support plate, a second base layer and a connecting layer which are the same as the bottom surface of the foundation pit in size are sequentially arranged in the foundation pit from bottom to top; the periphery of the inner wall of the foundation pit is fixedly connected with a soil nailing wall, the surface of the soil nailing wall is provided with a reinforcing rib, and the bottom of the reinforcing rib is fixedly connected with the top of the connecting layer; the top of base member and the periphery of soil nail wall still are equipped with the stand all around, are equipped with the protection network between the stand, are equipped with the warning light on the top of stand, are equipped with the warning stake in the outside of stand, are equipped with the warning sign on the warning stake, are equipped with reflection of light strip on the surface of warning stake. The utility model provides a prevention of seepage water type building foundation ditch, prevention of seepage water is effectual, and intensity is high, safe and reliable, whole device is rational in infrastructure, convenient to use, and the practicality is strong.

Description

Anti-seepage type building foundation pit
Technical Field
The utility model belongs to the technical field of the foundation ditch prevention of seepage passes through, concretely relates to prevention of seepage water type building foundation ditch.
Background
With the progress of science and technology, more and more use space is demanded by people, the height of a building is promoted to be higher and higher, the building requirement of the building industry is increased, a building foundation pit needs to be built firstly in the building construction process, the foundation pit is mainly used for placing a bearing platform of the building, the higher the height of the building is, the larger the volume of the bearing platform is, and the deeper the depth of the building foundation pit is.
The deeper the foundation pit is, the shorter the distance between the bottom of the foundation pit and the ground is, so that the water seepage phenomenon easily occurs in the foundation pit, if the water seepage of the foundation pit is serious, the whole construction process can be directly influenced, and the later stage can cause great influence on the stability of a building.
Disclosure of Invention
In order to solve the problems existing in the prior art, the utility model provides a prevention of seepage water type building foundation ditch adopts following technical scheme:
an anti-seepage type building foundation pit comprises a base body, wherein a foundation pit is arranged in the base body;
a first base layer, a metal partition plate, an impermeable layer, a water absorption layer, a support plate, a second base layer and a connecting layer which are the same as the bottom surface of the foundation pit in size are sequentially arranged in the foundation pit from bottom to top;
the soil nailing wall is fixedly connected to the periphery of the inner wall of the foundation pit, a plurality of reinforcing ribs are uniformly and fixedly arranged on one side, facing the foundation pit, of the surface of the soil nailing wall, and the bottoms of the reinforcing ribs are fixedly connected with the top of the connecting layer.
Further, the first base layer and the second base layer are both concrete layers.
Furthermore, supporting steel bars are arranged in the concrete layer.
Further, the metal separator is a steel plate.
Further, the reinforcing ribs are steel plates.
Furthermore, the impervious layer is a multi-head deep mixing cement soil impervious layer.
Furthermore, stand columns are further arranged on the top of the base body and around the periphery of the soil nailing wall, and a protective net used for surrounding the periphery of the foundation pit is arranged between the stand columns.
Furthermore, a warning lamp is arranged at the top end of the upright post.
Furthermore, the outside of stand still is equipped with the warning stake is equipped with the warning sign on the warning stake.
Furthermore, a reflective strip is arranged on the surface of the warning pile.
Compared with the prior art, the utility model discloses a characteristics and beneficial effect:
the utility model provides a seepage prevention type building foundation pit, through setting up and using the concrete layer as the first basic unit, can increase the stability of the foundation pit bottom, facilitate carrying on the laying of other layers in the foundation pit; the metal clapboard is arranged above the first base layer, so that a better water seepage prevention effect can be achieved; the water absorption layer is arranged, so that even if the anti-seepage layer does not have a good anti-seepage effect, water can be absorbed; the inner wall of the foundation pit is provided with the soil nailing wall, so that the effect of reinforcing the inner wall of the foundation pit can be achieved; the surface of the soil nailing wall is provided with a plurality of reinforcing ribs which are uniformly distributed, so that the stability of the soil nailing wall can be improved, and the pressure of the soil nailing wall is reduced; supporting steel bars are arranged in concrete layers serving as a first base layer and a second base layer, so that the compressive strength of the first base layer and the second base layer can be improved; the protective net is arranged around the foundation pit, so that the periphery of the foundation pit can be isolated, and people are prevented from falling into the foundation pit; a warning board is arranged to remind passers-by; the warning lamp and the reflecting strip are arranged, so that the passing people can be warned in dark.
The utility model provides a prevention of seepage water type building foundation ditch, prevention of seepage water is effectual, and intensity is high, safe and reliable, whole device is rational in infrastructure, convenient to use, and the practicality is strong.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic view of a three-dimensional structure of a foundation pit of the watertight type building foundation pit provided in the embodiment;
FIG. 2 is a schematic structural diagram of a front view section of the watertight type building foundation pit provided in the embodiment;
fig. 3 is an enlarged schematic view of a portion a in fig. 2.
Reference numerals: 1-substrate, 2-foundation pit, 3-first base layer, 4-metal partition plate, 5-impermeable layer, 6-water absorbing layer, 7-supporting plate, 8-second base layer, 9-connecting layer, 10-soil nailing wall, 11-reinforcing rib, 12-supporting steel bar, 13-upright column, 14-protective net, 15-warning lamp, 16-warning pile, 17-warning board and 18-reflective strip.
Detailed Description
See figures 1 to 3 for examples.
An anti-seepage type building foundation pit comprises a base body 1, wherein a foundation pit 2 is arranged in the base body 1;
a first base layer 3, a metal partition plate 4, an impermeable layer 5, a water absorbing layer 6, a support plate 7, a second base layer 8 and a connecting layer 9 which are the same as the bottom surface of the foundation pit 2 in size are sequentially arranged in the foundation pit 2 from bottom to top.
First basic unit 3 and second basic unit 8 are the concrete layer be equipped with support bar 12 in the concrete layer, the compressive strength of multiplicable concrete layer.
Through setting up the concrete layer as first basic unit 3, the stability of 2 bottoms of multiplicable foundation pits to conveniently lay in foundation pit 2, through setting up layer 6 that absorbs water, even when barrier layer 5 does not play fine prevention of seepage effect, also can absorb moisture.
And soil nailing walls 10 are fixedly connected around the inner wall of the foundation pit 2 and used for reinforcing the strength of the inner wall of the foundation pit 2. The surface of soil nailing wall 10 evenly sets firmly a plurality of strengthening ribs 11 of being made by the steel sheet towards one side of foundation ditch 2, the bottom of strengthening rib 11 with the top fixed connection of articulamentum 9. By providing the reinforcing ribs 11, the stability of the soil nailing wall 10 can be increased, thereby reducing the pressure of the soil nailing wall 10.
The metal separator 4 is a steel plate, and the steel plate is preferably subjected to rust prevention treatment.
The impervious layer 5 is a multi-head deep stirring cemented soil impervious layer.
The top of base member 1 reaches still be equipped with stand 13 around the periphery of soil nailing wall 10 be equipped with between the stand 13 and be used for surrounding foundation ditch 2 protection network 14 all around, protection network 14 can separate the fender around foundation ditch 2 to avoid someone to fall in foundation ditch 2, whole device is rational in infrastructure, convenient to use, the practicality is strong.
And a warning lamp 15 is arranged at the top end of the upright post 13.
The outside of stand 13 still is equipped with warning stake 16 is equipped with warning sign 17 on the warning stake 16, can remind passerby passing by.
The surface of the warning pile 16 is provided with a reflective strip 18. Through the arrangement of the warning lamp 15 and the reflective strip 18, passers-by can be warned in dark, so that the safety is improved.
The utility model discloses a theory of operation and use flow:
during the use, dig a foundation ditch 2 in the base member 1, then install soil nail wall 10 on the wall of foundation ditch 2, thereby support the inner wall of foundation ditch 2, then lay support reinforcement 12 in the bottom of foundation ditch 2, cover the surface at support reinforcement 12 with the concrete that will be first basic unit afterwards, then lay metal partition 4 from bottom to top in proper order, barrier layer 5, water absorption layer 6 and backup pad 7, again lay support reinforcement 12 on backup pad 7, then cover the concrete that is the second basic unit of one deck, at last lay one deck articulamentum 9 on the concrete of second basic unit, later evenly install the strengthening rib 11 made by the steel sheet around the top of articulamentum 9, and fix between strengthening rib 11 made by the steel sheet and soil nail wall 10, thereby increased the stability of soil nail wall 10.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.

Claims (10)

1. An anti-seepage type building foundation pit comprises a base body (1), wherein a foundation pit (2) is arranged in the base body (1);
the method is characterized in that: a first base layer (3), a metal partition plate (4), an anti-seepage layer (5), a water absorption layer (6), a support plate (7), a second base layer (8) and a connecting layer (9) which are the same as the bottom surface of the foundation pit (2) in size are sequentially arranged in the foundation pit (2) from bottom to top;
fixedly connected with soil nail wall (10) around foundation ditch (2) inner wall, a plurality of strengthening ribs (11) evenly set firmly towards one side of foundation ditch (2) on the surface of soil nail wall (10), the bottom of strengthening rib (11) with the top fixed connection of articulamentum (9).
2. The impermeable type building foundation pit according to claim 1, wherein: the first base layer (3) and the second base layer (8) are both concrete layers.
3. The impermeable type building foundation pit according to claim 2, wherein: and supporting steel bars (12) are arranged in the concrete layer.
4. The impermeable type building foundation pit according to claim 1, wherein: the metal separator (4) is a steel plate.
5. The impermeable type building foundation pit according to claim 1, wherein: the reinforcing ribs (11) are steel plates.
6. The impermeable type building foundation pit according to claim 1, wherein: the impervious layer (5) is a multi-head deep-stirring cemented soil impervious layer.
7. The impermeable water type building foundation pit according to any one of claims 1-6, wherein: the top of the base body (1) and the periphery of the soil nailing wall (10) are further provided with stand columns (13), and a protective net (14) used for surrounding the periphery of the foundation pit (2) is arranged between the stand columns (13).
8. The impermeable type building foundation pit according to claim 7, wherein: and a warning lamp (15) is arranged at the top end of the upright post (13).
9. The impermeable type building foundation pit according to claim 7, wherein: the outer side of the upright post (13) is also provided with a warning pile (16), and the warning pile (16) is provided with a warning board (17).
10. The impermeable type building foundation pit according to claim 9, wherein: and a reflective strip (18) is arranged on the surface of the warning pile (16).
CN202022725589.5U 2020-11-23 2020-11-23 Anti-seepage type building foundation pit Expired - Fee Related CN213836664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022725589.5U CN213836664U (en) 2020-11-23 2020-11-23 Anti-seepage type building foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022725589.5U CN213836664U (en) 2020-11-23 2020-11-23 Anti-seepage type building foundation pit

Publications (1)

Publication Number Publication Date
CN213836664U true CN213836664U (en) 2021-07-30

Family

ID=76990068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022725589.5U Expired - Fee Related CN213836664U (en) 2020-11-23 2020-11-23 Anti-seepage type building foundation pit

Country Status (1)

Country Link
CN (1) CN213836664U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116146018A (en) * 2023-04-20 2023-05-23 山西建筑工程集团有限公司 Percolate collecting tank structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116146018A (en) * 2023-04-20 2023-05-23 山西建筑工程集团有限公司 Percolate collecting tank structure and construction method thereof
CN116146018B (en) * 2023-04-20 2023-06-27 山西建筑工程集团有限公司 Percolate collecting tank structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN110374131A (en) A kind of cylinder composite truss formula offshore wind turbine foundation and its construction technology
CN203145038U (en) Latticed column type tower crane foundation
CN213836664U (en) Anti-seepage type building foundation pit
CN103046644B (en) Cold-formed thin-walled steel column and beam structural system for multistoried building
CN111501771B (en) Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering
CN209585054U (en) One kind is quickly met an urgent need diagonal brace for salvage of foundation pits
CN101240549A (en) Single-arm steel hanging box and construction method thereof
CN207130765U (en) A kind of Construction of Civil Engineering retaining wall with greening and discharge structure
CN202644543U (en) Combined recyclable foundation pit supporting inner supporting upright column
CN111535333A (en) Complicated reconstruction foundation pit engineering pile foundation structure and construction method
CN206635780U (en) A kind of soil nailed wall retaining structure
CN216713040U (en) Full-prefabricated pier type portal inclined support pile structure system
CN213709548U (en) Advanced structure system for positive and negative zero beam plates in deep foundation pit building seat area
CN207047868U (en) A kind of pattern foundation pit supporting structure barricade
CN212294679U (en) Combined lattice column-concrete precast pile inclined support structure
CN210163917U (en) A supplementary supporting construction for foundation ditch
CN212175798U (en) Whole strutting arrangement of deep basal pit
CN209509556U (en) Underpin the constructing structure of no basement building underground space increasing layer
CN210917390U (en) Anti-collapse enclosure device
CN210151769U (en) Pile foundation structure for building engineering
CN202644590U (en) Foundation trench anti-floating structure for underground construction
CN206015685U (en) A kind of Collapsible Loess District deep basal pit diaphram wall inner support system
CN211421141U (en) Geotechnical engineering excavation supporting enclosure wall
CN219909089U (en) Anti-floating roof structure and underground warehouse
CN209989829U (en) Connection structure of raft, column and pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210730

CF01 Termination of patent right due to non-payment of annual fee