CN213812520U - Cement scale capable of being installed quickly - Google Patents

Cement scale capable of being installed quickly Download PDF

Info

Publication number
CN213812520U
CN213812520U CN202022502570.4U CN202022502570U CN213812520U CN 213812520 U CN213812520 U CN 213812520U CN 202022502570 U CN202022502570 U CN 202022502570U CN 213812520 U CN213812520 U CN 213812520U
Authority
CN
China
Prior art keywords
hole
steel
section steel
channel
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022502570.4U
Other languages
Chinese (zh)
Inventor
应俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Aopuma Weighing Co ltd
Original Assignee
Ningbo Aopuma Weighing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Aopuma Weighing Co ltd filed Critical Ningbo Aopuma Weighing Co ltd
Priority to CN202022502570.4U priority Critical patent/CN213812520U/en
Application granted granted Critical
Publication of CN213812520U publication Critical patent/CN213812520U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a weighing apparatus field especially relates to a cement scale that can install fast, including the balance body, crossbeam, the balance body includes channel-section steel, screw-thread steel, the channel-section steel divide into long channel-section steel and short channel-section steel, long channel-section steel with it has the screw hole to open on the long flute steel outer wall of short channel-section steel overlap joint, long channel-section steel passes through with short channel-section steel overlap joint the screw of installation is connected on the screw hole, open on the short channel-section steel surface has first through-hole, through adopting above-mentioned setting, can realize the quick installation of cement scale, simple to operate.

Description

Cement scale capable of being installed quickly
Technical Field
The utility model relates to a weighing apparatus field especially relates to a but cement scale of quick installation.
Background
The cement weigher is a cement weigher, also called steel-concrete weigher, a weighing platform is built by steel structures and concrete, the difference between the cement weigher and the all-steel weigher is the difference of a weigher body structure, and the all-steel weigher is made of steel materials; the cement scale has the advantages of good lightning protection effect, strong plastic deformation resistance, longer service life and the like, and is widely applied at home and abroad; in the production process of the cement scale, if the cement scale is directly poured after being produced, the transportation is inconvenient and the operation cost is increased due to the overweight of the cement scale; in order to solve the problems, the method adopted at present is modular production, wherein a cement scale is divided into separate modules, transported to a designated place and then assembled and poured; and current cement balance because the reason of cement balance self structure, when carrying out the cement balance equipment, can't carry out fast assembly to influence packaging efficiency.
SUMMERY OF THE UTILITY MODEL
To the current situation of above-mentioned prior art, the utility model provides a but cement scale of quick installation.
The utility model provides a technical scheme that above-mentioned technical problem adopted does:
the utility model provides a cement scale that can install fast, includes the balance body, crossbeam, the balance body includes channel-section steel, screw-thread steel, the channel-section steel divide into long channel-section steel and short channel-section steel, long channel-section steel with it has the screw hole to open on the long flute steel outer wall of short channel-section steel overlap joint department, long channel-section steel and short channel-section steel overlap joint department pass through the screw of installation is connected on the screw hole, open on the short channel-section steel surface has first through-hole.
Through adopting above-mentioned technical scheme, open the screw hole that has on the elongated slot steel outer wall of elongated slot steel and short channel steel overlap joint department, can transport the cement scale, unpack apart each position of the balance body alone, convenient transportation, and can increase disposable transportation volume, then when sending to and install after the appointed place, be connected long channel steel and short channel steel through the screw, because this cement scale balance body structure is the same, consequently need not to arrange, can realize quick installation, simple to operate.
Further set up as, the crossbeam includes curb plate, end plate, intermediate lamella, strengthening rib, apron mount pad, sensor mount pad, the curb plate with the end plate is welded connection, the curb plate with the intermediate lamella is welded connection, open on the curb plate surface has the second through-hole, first through-hole with the second through-hole passes through bolted connection, thereby the balance body with the crossbeam is connected.
Through adopting above-mentioned technical scheme, in the transportation, can place the crossbeam alone, occupation of land space is little to can increase the transportation volume, reduce cost transports when installing to appointed place, through the bolt, can carry out the balance body fast and be connected with the crossbeam.
The thread steel is divided into long thread steel and short thread steel, a first thread steel hole is formed in the inner wall of the long channel steel, and the short thread steel is inserted into the first thread steel hole; the inner wall of the short channel steel is provided with a second deformed steel bar hole, the long deformed steel bar is inserted into the second deformed steel bar hole, and the deformed steel bars are arranged in an upper layer and a lower layer.
By adopting the technical scheme, the deformed steel bar can be directly connected with the channel steel in an inserting mode, the deformed steel bar can be independently disassembled in the transportation process, and when the deformed steel bar is transported to a specified place to be installed, the deformed steel bar can be quickly installed through the deformed steel bar holes formed in the inner wall of the channel steel; the deformed steel bar is an upper layer and a lower layer, can strengthen the overall structure strength of the channel steel, and can well form a foundation for subsequent cement pouring.
Further, the reinforcing ribs are divided into first reinforcing ribs and second reinforcing ribs, the reinforcing ribs are connected with the side plates, and the reinforcing ribs are provided with first grooves.
Through adopting above-mentioned technical scheme, the setting of strengthening rib for the overall structure intensity of crossbeam becomes stronger, and opens the first recess that has on the strengthening rib, can make things convenient for the joint that the crossbeam apron is right in first recess department, makes motorbus when weighing, and the crossbeam is pushed down to automobile body gravity, and the crossbeam can be better atress, prevents that the crossbeam warp, increases life.
The cable fixing device is further provided with a first reinforcing rib provided with a first cable mounting hole, and a second reinforcing rib provided with a second cable mounting hole.
Through adopting above-mentioned technical scheme, first cable mounting hole aperture is less than second cable mounting hole aperture, at matched with cable installation in-process, can reduce the clearance of installing mutually between the two to avoid rocking of cable and the cable that causes drops, also can prevent to put the below ground worm and mouse and bore into.
Further, a semicircular groove is formed in the first reinforcing rib supporting portion, a bolt penetrates through the sensor mounting seat, and two ends of the bolt are clamped by the semicircular groove.
Through adopting above-mentioned technical scheme, the sensor mount pad has further strengthened the ability of its location through the bolt to through the effect of half slot, make bolt both ends atress push down, thereby make the sensor mount pad fixed more firm, this bolt and sensor mount pad are connected out both ends and are respectively opened there is the arc groove, when setting up in arc groove makes sensor installation and sensor mount pad go up, leave the movement clearance, thereby can improve the response precision of sensor.
The cover plate mounting seat is further arranged at the bearing ends of the end plates and the middle plate respectively, and cover plate holes are formed in the cover plate mounting seat.
Further, a second groove is formed in the cover plate mounting seat.
Through adopting above-mentioned technical scheme, open the second recess that has on the apron mount pad and reserved installation space for matched with apron, can make the good joint of apron in the second recess, the joint is accomplished the back, through the apron hole on the apron mount pad, makes the apron better fix on the crossbeam.
Compared with the prior art, the utility model has the advantages of:
by adopting the technical scheme, as the cement scale is of a detachable structure, all components of the cement scale can be detached independently in the transportation process, so that the transportation efficiency is improved, the one-time conveying capacity is increased, and the economic benefit is improved; and when installing, because cement balance structural design characteristics can carry out fast assembly with the cement balance to in the later stage use, if the cement balance damages, also need not to change whole cement balance, only need to correspond the part of damage change can, thereby improve life, reduce use cost.
Drawings
FIG. 1 is a schematic view of the overall structure of a cement scale capable of being quickly installed according to the present invention;
FIG. 2 is a schematic structural view of the scale body of the present invention;
FIG. 3 is a schematic view of the structure of the middle cross beam of the present invention;
FIG. 4 is a front view of a first reinforcing rib of the middle cross beam of the present invention;
FIG. 5 is a schematic structural view of a sensor mounting seat of the middle cross beam according to the present invention;
fig. 6 is the utility model discloses a cement scale after-assembling schematic diagram that can install fast.
Which comprises the following steps: 1. a scale body; 2. a cross beam; 11. channel steel; 12. deformed steel bar; 111. long channel steel; 112. short channel steel; 1111. a screw hole; 1112. a screw; 1113. a first deformed steel bar hole; 1121. a first through hole; 1122. a bolt; 1123. a second deformed steel bar hole; 121. long thread steel; 122. short deformed steel bar; 21. a side plate; 22. an end plate; 23. a middle plate; 24. reinforcing ribs; 25. a cover plate mounting seat; 26. a sensor mount; 211. a second through hole; 241. a first reinforcing rib; 242. a second reinforcing rib; 243. a first groove; 2411. a first cable mounting hole; 2412. a semicircular groove; 2421. a second cable mounting hole; 251. cover plate holes; 252. a second groove; 261. and (4) a bolt.
Detailed Description
As shown in fig. 1 to 6, the utility model discloses a cement scale capable of being quickly installed, which comprises a scale body 1 and a beam 2, wherein the scale body 1 comprises a channel steel 11 and a deformed steel bar 12, the channel steel 11 is divided into a long channel steel 111 and a short channel steel 112, the outer wall of the long channel steel 111 at the joint of the long channel steel 111 and the short channel steel 112 is provided with a screw hole 1111, the joint of the long channel steel 111 and the short channel steel 112 is connected through a screw 1112 installed on the screw hole 1111, the surface of the short channel steel 112 is provided with a first through hole 1121, the outer wall of the long channel steel 111 at the joint of the long channel steel 111 and the short channel steel 112 is provided with a screw hole 1111, when the cement scale is transported, each part of the scale body 1 can be independently disassembled, thereby facilitating transportation and increasing the disposable transportation amount, and then the cement scale body is transported to a designated place for installation, the long channel steel 111 and the short channel steel 112 are connected through the screw 1112, because the structure of the cement scale body 1 is the same, therefore, the cement scale body does not need to be installed, can realize quick installation, simple to operate.
Crossbeam 2 includes curb plate 21, end plate 22, intermediate lamella 23, strengthening rib 24, apron mount pad 25, sensor mount pad 26, curb plate 21 is welded connection with end plate 22, curb plate 21 is welded connection with intermediate lamella 23, curb plate 21 is opened on the surface has second through-hole 211, first through-hole 1121 is connected under bolt 1122 with second through-hole 211, be connected balance body 1 with crossbeam 2, in the transportation, can place crossbeam 2 alone, the occupation of land space is little, and can increase the transportation volume, therefore, the cost is reduced, when transporting to appointed place and installing, through bolt 1122, can carry out being connected of balance body 1 and crossbeam 2 fast.
The deformed steel bar 12 is divided into a long deformed steel bar 121 and a short deformed steel bar 122, a first deformed steel bar hole 1113 is formed in the inner wall of the long deformed steel bar 111, and the short deformed steel bar 122 is inserted into the first deformed steel bar hole 1113; the inner wall of the short channel steel 112 is provided with a second deformed steel bar hole 1123, the long deformed steel bar 121 is inserted into the second deformed steel bar hole 1123, the deformed steel bars 12 are divided into an upper layer and a lower layer, the deformed steel bars 12 can be directly connected with the channel steel 11 in an inserting mode, the deformed steel bars 12 can be independently disassembled in the transportation process, and when the deformed steel bars are transported to a specified place to be installed, the deformed steel bars 12 are quickly installed through the deformed steel bar holes formed in the inner wall of the channel steel 11; the deformed steel bars 12 are arranged in an upper layer and a lower layer, can strengthen the overall structural strength of the channel steel 11, and can be used for well constructing a foundation for subsequent cement pouring.
The strengthening rib 24 divide into first strengthening rib 241 and second strengthening rib 242, strengthening rib 24 is connected with curb plate 21, first recess 243 has all been opened to strengthening rib 24, strengthening rib 24's setting, make the overall structure intensity of crossbeam 2 become stronger, and open the first recess 243 that has on strengthening rib 24, can make things convenient for the just good joint of crossbeam 2 apron in first recess 243 department, make motorbus when weighing, crossbeam 2 is pushed down to automobile body gravity, the better atress of crossbeam 2 ability, prevent that crossbeam 2 from warping, and service life is prolonged.
The first reinforcing rib 241 is provided with a first cable mounting hole 2411, the second reinforcing rib 242 is provided with a second cable mounting hole 2421, the first cable mounting hole 2411 is smaller than the second cable mounting hole 2421, and in the matched cable mounting process, the gap between the first reinforcing rib and the second reinforcing rib can be reduced, so that the cable falling caused by the shaking of the cable can be avoided, and insects and rats placed under the ground can be prevented from entering the ground.
First strengthening rib 241 supporting part is opened there is half slot 2412, bolt 261 has been worn to sensor mount pad 26, half slot 2412 blocks bolt 261 both ends, sensor mount pad 26 has further strengthened the ability of its location through bolt 261, and the effect through half slot 2412, make bolt 261 both ends atress push down, thereby make sensor mount pad 26 fixed more firm, this bolt 261 is connected out both ends with sensor mount pad 26 and has respectively opened the arc groove, when setting up of arc groove makes on sensor installation and the sensor mount pad 26, leave the movement clearance, thereby can improve the response precision of sensor.
The cover plate mounting seat 25 is respectively installed at the bearing ends of the end plate 22 and the intermediate plate 23, a cover plate hole 251 is formed in the cover plate mounting seat 25, a second groove 252 is formed in the cover plate mounting seat 25, an installation space is reserved for a matched cover plate by the second groove 252 formed in the cover plate mounting seat 25, the cover plate can be well clamped in the second groove 252, and after the clamping is completed, the cover plate hole 251 in the cover plate mounting seat 25 enables the cover plate to be better fixed on the cross beam 2.
The implementation principle of the embodiment is as follows: the cement scale is produced in a modularization mode, the cement scale which is split into parts is transported to a designated place and then assembled, a steel groove is formed by long channel steel 111 and short channel steel 112 through a screw hole 1111 formed at the joint of the long channel steel 111 and the short channel steel 112, the assembly is carried out under the connection of the screw 1112, after the assembly is finished, corresponding long deformed steel bars 121 and short deformed steel bars 122 are inserted into the deformed steel bars in a # -shape through a first deformed steel bar hole 1113 and a second deformed steel bar hole 1123 which are already formed on the inner walls of the long channel steel 111 and the short channel steel 112, the deformed steel bars 12 are distributed into two layers in a vertical distribution mode, the whole strength of the channel steel 11 can be improved, the holes of the deformed steel bars 12 are punched by laser, the efficiency is effectively improved during production, the assembled scale bodies 1 are grouped in pairs and mutually overlapped, the sequence does not need to be considered due to the consistent structure, and the cross beam 2 is installed after the overlapping is finished, the cross beams 2 are assembled into an integral structure, and the number of the cross beams 2 is two, and the cross beams are integrally formed; the inner side plate 21, the end plate 22 and the middle plate 23 of the beam 2 are all welded, the side plate 21 of the beam 2 is provided with a second through hole 211 which is corresponding to a first through hole 1121 which is formed on the short channel steel 112 of the channel steel 11 of the scale body 1 in pairs, under the connection of bolts 1122, the scale body 1 of each two phase group is connected with the beam 2 which is of an integral structure, thereby completing the basic assembly of the cement scale, the length of the cement scale can be longitudinally lengthened according to the requirement, the beam 2 is internally and uniformly provided with reinforcing ribs 24 which are divided into a first reinforcing rib 241 and a second reinforcing rib 242 which are connected with the side plate 21 of the beam 2 in a welding way, the integral structure is slightly different, the first reinforcing rib supporting part 241 is provided with a circular groove, a sensor mounting seat 26 is placed between the two first reinforcing ribs 241, the sensor mounting seat 26 is connected with the ground through a screw hole which is formed on the base under the effect of an expansion screw, the middle of the sensor mounting seat 26 is penetrated with a bolt 261 which can play a limiting role, the bolt 261 presses down two ends of the bolt 261 by the force of the cross beam 2 under the action of the first reinforcing rib 241 circular groove to enable the bolt 261 to be firmer, the joint of the bolt 261 and the sensor mounting seat 26 is provided with an arc groove, the arc groove is arranged for a movement space reserved for mounting a sensor of the sensor mounting seat 26, the precision of the bolt is enabled to be more accurate, the first reinforcing rib 241 and the second reinforcing rib 242 are respectively provided with a first cable mounting hole 2411 and a second cable mounting hole 2421, the aperture of the first cable mounting hole 2411 is smaller than that of the second cable mounting hole 2421, in the process of installing the matched cables, the gap between the first reinforcing rib 241 and the second reinforcing rib can be reduced, so that the cable falling caused by the shaking of the cables can be avoided, the underground mouse can be prevented from being drilled into the junction box, after the arrangement and installation of the cables, the sensors and the junction boxes are completed, the cover plate is fastened through a cover plate hole 251 on the cover plate mounting seat 25, second recess 252 and first recess 243 have been opened respectively to apron mount pad 25 and 24 bearing surfaces of strengthening rib for the headspace, so that the apron is connected to in the recess, thereby play firm and stable in the apron installation, also can play and improve the holistic structural strength of crossbeam 2, accomplish above-mentioned installation back, carry out cement at last and pour, have good lightning protection effect, anti plastic deformation ability reinforce, advantages such as life is more permanent.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those skilled in the art that various changes in the embodiments and modifications thereof may be made, and equivalents may be substituted for elements thereof; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (8)

1. The utility model provides a but cement balance of quick installation which characterized in that: including the balance body (1), crossbeam (2), the balance body (1) includes channel-section steel (11), screw-thread steel (12), channel-section steel (11) divide into long channel-section steel (111) and short channel-section steel (112), long channel-section steel (111) with it has screw hole (1111) to open on long channel-section steel (111) outer wall of short channel-section steel (112) overlap joint department, long channel-section steel (111) and short channel-section steel (112) overlap joint department pass through screw (1112) of installation are connected on screw hole (1111), it has first through-hole (1121) to open on short channel-section steel (112) surface.
2. The cement scale capable of being quickly installed according to claim 1, wherein the beam (2) comprises a side plate (21), an end plate (22), a middle plate (23), a reinforcing rib (24), a cover plate installation seat (25) and a sensor installation seat (26), the side plate (21) and the end plate (22) are in welded connection, the side plate (21) and the middle plate (23) are in welded connection, a second through hole (211) is formed in the surface of the side plate (21), the first through hole (1121) and the second through hole (211) are connected through a bolt (1122), and therefore the scale body (1) is connected with the beam (2).
3. The cement scale capable of being quickly installed according to claim 1, wherein the deformed steel bars (12) are divided into long deformed steel bars (121) and short deformed steel bars (122), a first deformed steel bar hole (1113) is formed in the inner wall of each long channel steel (111), and the short deformed steel bars (122) are inserted into the first deformed steel bar hole (1113); the inner wall of the short channel steel (112) is provided with a second deformed steel bar hole (1123), the long deformed steel bar (121) is inserted into the second deformed steel bar hole (1123), and the deformed steel bar (12) is divided into an upper layer and a lower layer.
4. The cement scale capable of being quickly installed according to claim 2, wherein the reinforcing ribs (24) are divided into a first reinforcing rib (241) and a second reinforcing rib (242), the reinforcing ribs (24) are connected with the side plate (21), and the reinforcing ribs (24) are all provided with first grooves (243).
5. A quick-mountable cement scale according to claim 4, wherein the first reinforcing bar (241) is provided with a first cable mounting hole (2411), and the second reinforcing bar (242) is provided with a second cable mounting hole (2421).
6. The cement scale capable of being quickly installed according to claim 5, wherein the supporting portion of the first reinforcing rib (241) is provided with a semicircular groove (2412), the sensor mounting seat (26) is penetrated with a bolt (261), and the semicircular groove (2412) is used for clamping two ends of the bolt (261).
7. A quick-mountable cement scale according to claim 2, wherein said cover plate mounting seat (25) is mounted on the bearing ends of said end plate (22) and said intermediate plate (23), respectively, said cover plate mounting seat (25) having a cover plate hole (251) formed therein.
8. A quick-mountable cement scale according to claim 7, wherein the cover plate mounting seat (25) is provided with a second recess (252).
CN202022502570.4U 2020-11-03 2020-11-03 Cement scale capable of being installed quickly Active CN213812520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022502570.4U CN213812520U (en) 2020-11-03 2020-11-03 Cement scale capable of being installed quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022502570.4U CN213812520U (en) 2020-11-03 2020-11-03 Cement scale capable of being installed quickly

Publications (1)

Publication Number Publication Date
CN213812520U true CN213812520U (en) 2021-07-27

Family

ID=76963980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022502570.4U Active CN213812520U (en) 2020-11-03 2020-11-03 Cement scale capable of being installed quickly

Country Status (1)

Country Link
CN (1) CN213812520U (en)

Similar Documents

Publication Publication Date Title
JP4558785B2 (en) How to set up a tower
KR100933265B1 (en) Steel pipe girder bridge reinforced by r.c
KR100770574B1 (en) Rhamen bridge having prestressed steel-reinforced concrete composite girder and construction method there of
KR20120034187A (en) Constrution methoed for prestressed composite truss girder using steel truss member
KR101889481B1 (en) Girder bridge having crossing support-unit
KR101228587B1 (en) A web member for improving the connection structure of the node connecting of composite truss girder
JP2020026731A (en) Construction method of rail foundation and rail foundation block
CN208533372U (en) A kind of General reinforced cage binding moulding bed
CN213812520U (en) Cement scale capable of being installed quickly
KR20160148416A (en) Steel-Concrete Composite Rahmen Bridge
KR100946716B1 (en) Long Span PSC Girder Type Rahmen Bridge and its Construction Method Using Moment Re-distribution
KR20120050940A (en) Constrution method of prestressed composite truss girder with internal hinge structure
CN102485628A (en) Passenger transporting device without metal truss structure as well as installation method and installation tool thereof
CN112681514A (en) Assembly type node sleeve and installation method thereof
KR100547488B1 (en) Negative moment reducing apparatus installed in the steel box girder so as to decrease magnitude of negative moment occurred at the continuous supporting points in a steel box continuous bridge, and construction method of a steel box continuous bridge using the apparatus
CN214219959U (en) Special-shaped column node connection structure for assembly type building
KR20140050906A (en) Upper structure of multiplex box girder type bridge and constructing method for the same
KR200341057Y1 (en) Negative moment reducing apparatus installed in the steel box girder so as to decrease magnitude of negative moment occurred at the continuous supporting points in a steel box continuous bridge
CN107700438B (en) Assembled steel pipe concrete radial gate support gate pier structure
KR20050091252A (en) Construction method for bridge using a jig apparatus
CN210918419U (en) Node connection structure of buckling restrained brace and prefabricated assembled structure beam column
EP0356451A1 (en) Bearing means
CN218540358U (en) Wind brace and cross beam
CN114150805B (en) Cast-in-situ hollow floor slab inner mold box and construction method thereof
CN214136619U (en) Prestress movable splicing pedestal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant