Background
The utility tunnel is an underground city pipeline utility tunnel, namely, a tunnel space is built underground the city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a lifting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the utility tunnel is an important infrastructure and a 'lifeline' for guaranteeing city operation.
The patent with the publication number of CN210482369U discloses a compact utility tunnel of sewage pipe is taken to bottom, including setting up at the below ground's utility model cabin, the bottom fixed mounting in the utility model cabin outside has the sewage pipe, be provided with power cable support and communication cable support on the inner wall in utility model cabin, the inboard bottom fixed mounting in utility model cabin has the feed pipe, the activity of utility model cabin top of utility model cabin branch department is provided with the removable cover who is used for examining the cable and makes things convenient for staff's business turn over utility model cabin, removable cover accomplishes the face and flushes with the road surface, fixed mounting has the buried sleeve who makes things convenient for cable and feed pipe to wear out on the utility model cabin outer wall.
Exist among the above-mentioned technical scheme, the cable is fixed comparatively loaded down with trivial details, needs to use a large amount of screws.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a road piping lane. The first connecting block is rotated to drive the first semicircular arc clamping ring to rotate, and the third connecting block is rotated to drive the second semicircular arc clamping ring to rotate, so that the circular arc clamping ring is opened and closed, and the cable is convenient to install.
The above technical purpose of the present invention can be achieved by the following technical solutions: a roadway piping lane, comprising a subterranean pipeline compartment and a cable fixing device, the subterranean pipeline compartment comprising: waterway pipeline cabin and circuit pipeline cabin, fixed cable fixing device on the boundary wall in circuit pipeline cabin, cable fixing device includes: the fixed support seat is fixed on the side wall of the circuit pipeline cabin, the first support block is fixed on the fixed support seat, the linkage module is fixed on the first support block, a first arc chamfer is arranged on the side wall of the first support block, a first groove is formed in one end, away from the fixed support seat, of the first support block, the upper connection module and the lower connection module are fixed in the first groove, the upper connection module comprises a first rotating rod, a first connecting block, a second connecting block and a first semicircular arc clamping ring, the first rotating rod is fixed in the first groove, the first connecting block is rotatably connected on the first rotating rod, a first arc is formed in one side, facing the first support block, of the first connecting block, and the second connecting block is fixed at one end, away from the first rotating rod, of the first connecting block, a first semicircular arc clamping ring is fixed at one end of the second connecting block, which is far away from the first connecting block, the lower connecting module comprises a second rotating rod, a third connecting block, a fourth connecting block and a second semicircular arc clamping ring, a second rotating rod is fixed in the first slot and is positioned below the first rotating rod, a third connecting block is rotatably connected on the second rotating rod, a second circular arc is arranged on one side of the third connecting block, which faces the first supporting block, a fourth connecting block is fixed at one end of the third connecting block, which is far away from the second rotating rod, a second semi-circular arc clamping ring is fixed at one end of the fourth connecting block, which is far away from the third connecting block, the first semicircular arc clamping ring and the second semicircular arc clamping ring form an arc clamping ring, the second connecting block is provided with a first threaded hole, and a second threaded hole is formed in the fourth connecting block, and a first fixing bolt is inserted into the first threaded hole and the second threaded hole.
Through rotating on first dwang and connecting first connecting block, rotate on the second dwang and connect the third connecting block, make the accessible rotate first connecting block and drive first semicircle snap ring and rotate, it drives the second semicircle snap ring and rotates to rotate the third connecting block, thereby make the circular arc snap ring open and closed, make things convenient for the cable to install, through having inserted first fixing bolt in first screw hole and second threaded hole, when the messenger finishes when the cable installation needs to be fixed, the first fixing bolt of accessible, fix the circular arc snap ring.
Further, the linkage module includes fifth connecting block, first gear, second gear and first dwang, the fifth connecting block is fixed on first supporting block, the cavity has been seted up to the fifth connecting block, first dwang link up in the lateral wall of first supporting block inserts the cavity, the second dwang link up in the lateral wall of first supporting block inserts the cavity, first dwang inserts the cavity and serves fixed first gear, the second dwang inserts the cavity and serves fixed second gear, first gear and second gear meshing, the fixed first dwang of one end that first dwang was kept away from to first gear.
Through first gear and second gear meshing, fixed first dwang and first drive pole on the first gear, fixed second dwang on the second gear, make operator's accessible rotate first drive pole, it is rotatory to drive first gear through first drive pole, first gear drives the second gear and rotates, it rotates to make first gear drive first semicircle snap ring through first dwang, the second gear drives second semicircle snap ring through the second dwang and rotates, thereby make first semicircle snap ring and second semicircle snap ring rotate simultaneously, make the circular arc snap ring open and be closed.
Furthermore, a rotating handle is fixed at one end of the first driving rod, which is far away from the first gear. The rotating handle is fixed on the first driving rod, so that an operator can rotate the first driving rod by rotating the handle, and the rotating handle is more labor-saving and convenient.
Furthermore, a rubber clamping block is fixed on the inner wall of the arc clamping ring, and a second arc chamfer is arranged on the side wall of the rubber clamping block. The rubber clamping block is fixed on the inner wall of the arc clamping ring, and the side wall of the rubber clamping block is provided with the second arc chamfer, so that when the cable is closed in the arc clamping ring, the cable can be buffered through the rubber clamping block, and a certain protection effect is achieved on the cable.
Furthermore, a fixed slot is formed in the inner wall of the arc clamping ring, and a rubber clamping block is clamped in the slot. The inner wall of the arc clamping ring is provided with the fixed open groove, and the rubber clamping block is clamped in the open groove, so that an operator can conveniently replace the rubber clamping block.
Furthermore, a sliding clamping groove is formed in the fixed supporting seat, a first sliding block is fixed on the first supporting block, the first sliding block is inserted into the sliding clamping groove and is in sliding connection, a first connecting hole is formed in the first sliding block, a second connecting hole is formed in the fixed supporting seat, the first connecting hole and the second connecting hole are located on the same vertical line, and a first screw rod is inserted into the first connecting hole and the second connecting hole.
Through rotating first screw rod, drive first sliding block and remove in sliding groove, drive first supporting block through first sliding block and remove, make operator's accessible first screw rod adjust cable fixing device's high position.
Furthermore, drainage grooves are formed in the bottom surfaces of the circuit pipeline cabin and the waterway pipeline cabin. Through having seted up the escape canal groove on the cabin bottom surface in circuit pipeline cabin and water route pipeline cabin, make when the water leakage advances the pipeline under-deck, accessible escape canal groove discharges, prevents that ponding from causing the hidden danger.
To sum up, the utility model discloses following beneficial effect has: make the accessible rotate first connecting block and drive first semicircle snap ring and rotate, rotate the third connecting block and drive second semicircle snap ring and rotate to make the circular arc snap ring open and closed, make things convenient for the cable to install. The first semicircular arc clamping ring and the second semicircular arc clamping ring can rotate simultaneously, and the opening and closing of the circular arc clamping rings are realized. When the cable is required to be fixed after being installed, the arc clamping ring can be fixed through the first fixing bolt. The operator can rotate the first driving rod by rotating the grip, thereby being more labor-saving and convenient. When the cable is closed in the arc clamping ring, the rubber clamping block can be used for buffering, so that the cable is protected to a certain extent. The operator can conveniently replace the rubber clamping block. The operator can adjust the height position of the cable fixing device through the first screw rod. When water leaks into the pipeline cabin, the water can be discharged through the drainage groove, and hidden danger caused by water accumulation is prevented.
Detailed Description
The embodiment of the road pipe gallery of the present invention is further described with reference to fig. 1 to 6.
A road pipe gallery comprising an underground piping compartment 1 and a cable fixing device 2, the underground piping compartment 1 comprising: the water channel pipeline cabin 11 and the circuit pipeline cabin 12, and the water channel 13 is opened on the bottom surface of the circuit pipeline cabin 12 and the water channel pipeline cabin 11.
Fix cable fixing device 2 on the boundary wall of circuit pipeline cabin 12, cable fixing device 2 includes: fixed supporting seat 3, first supporting block 4, go up and connect module 5, connect module 6 and linkage module 7 down. Fixed bolster 3 is fixed on the boundary wall of circuit pipeline cabin 12, sliding clamping groove 31 has been seted up on fixed bolster 3, sliding connection has first sliding block 32 in sliding clamping groove 31, first connecting hole 33 has been seted up on first sliding block 32, second connecting hole 34 has been seted up on fixed bolster 3, first connecting hole 33 and second connecting hole 34 are in same vertical line, insert first screw rod 35 in first connecting hole 33 and the second connecting hole 34, make operator's accessible rotate first screw rod 35 and drive first sliding block 32 and remove in sliding clamping groove 31.
Fixed first supporting block 4 on the first sliding block 32, fixed linkage module 7 on the first supporting block 4, be equipped with first circular arc chamfer 41 on the boundary wall of first supporting block 4, first fluting 42 has been seted up to the one end that fixed support seat 3 was kept away from to first supporting block 4, connect module 5 and lower connection module 6 in the first fluting 42 internal fixation, go up to connect module 5 and include first rotation pole 51, first connecting block 52, second connecting block 53 and first semicircle snap ring 54. First notch 42 internal fixation first rotation pole 51, rotate on the first rotation pole 51 and connect first connecting block 52, first connecting block 52 has seted up first circular arc 521 towards first supporting block 4 one side, first connecting block 52 keeps away from the fixed second connecting block 53 of the one end of first rotation pole 51, the fixed first semicircle snap ring 54 of the one end that first connecting block 52 was kept away from to second connecting block 53.
The lower connecting module 6 comprises a second rotating rod 61, a third connecting block 62, a fourth connecting block 63 and a second semi-arc clamping ring 64. First fluting 42 internal fixation second dwang 61, second dwang 61 is located first dwang 51 below, rotate on the second dwang 61 and connect third connecting block 62, second circular arc 621 has been seted up towards first supporting block 4 one side to third connecting block 62, the fixed fourth connecting block 63 of one end of second dwang 61 is kept away from to third connecting block 62, the fixed second semicircle snap ring 64 of one end that third connecting block 62 was kept away from to fourth connecting block 63, first semicircle snap ring 54 and second semicircle snap ring 64 form circular arc snap ring 8. The inner wall of the circular arc snap ring 8 is provided with a fixing groove 81, a rubber clamping block 82 is clamped in the fixing groove 81, and the side wall of the rubber clamping block 82 is provided with a second circular arc chamfer 83. First screw hole 531 is seted up to second connecting block 53, and second screw hole 631 is seted up to fourth connecting block 63, and first fixing bolt 9 has been inserted in first screw hole 531 and the second screw hole 631.
The linkage module 7 comprises a fifth connecting block 71, a first gear 72, a second gear 73, a first driving rod 74 and a rotating handle 75, wherein the fifth connecting block 71 is fixed on the first supporting block 4. The fifth connecting block 71 is provided with a cavity 711, the first rotating rod 51 and the second rotating rod 61 penetrate through the side wall of the first supporting block 4 and are inserted into the cavity 711, the first gear 72 is fixed at one end of the first rotating rod 51 inserted into the cavity 711, the second gear 73 is fixed at one end of the second rotating rod 61 inserted into the cavity 711, the first gear 72 is meshed with the second gear 73, the first driving rod 74 is fixed at one end of the first gear 72, which is far away from the first connecting rod, and the rotating handle 75 is fixed at one end of the first driving rod 74, which is far away from the first gear 72. Make the operator's accessible rotate first drive pole 74, make first drive pole 74 drive first gear 72 and rotate, first gear 72 gear drives second gear 73 and rotates, drives first rotation pole 51 through first gear 72 and rotates, and second gear 73 drives second rotation pole 61 and rotates to make first semicircle snap ring 54 and second semicircle snap ring 64 rotate simultaneously, realize opening and closing of circular arc snap ring 8.
During the use, rotatory first screw rod 35 drives first sliding block 32 through first screw rod 35 and removes suitable height, and rotatory first drive pole 74 makes circular arc snap ring 8 open through first drive pole 74, in installing the cable into circular arc snap ring 8, and rotatory first drive pole 74 makes circular arc snap ring 8 closed.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.