CN209162997U - Sewage inspection well structure for pipe gallery - Google Patents

Sewage inspection well structure for pipe gallery Download PDF

Info

Publication number
CN209162997U
CN209162997U CN201821755573.5U CN201821755573U CN209162997U CN 209162997 U CN209162997 U CN 209162997U CN 201821755573 U CN201821755573 U CN 201821755573U CN 209162997 U CN209162997 U CN 209162997U
Authority
CN
China
Prior art keywords
pipe
inspection
sewage
vessel
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821755573.5U
Other languages
Chinese (zh)
Inventor
刘生宝
蓝明菊
刘芬
魏震
陈翠忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shihezi University
Original Assignee
Shihezi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shihezi University filed Critical Shihezi University
Priority to CN201821755573.5U priority Critical patent/CN209162997U/en
Application granted granted Critical
Publication of CN209162997U publication Critical patent/CN209162997U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses the sewage inspection well structures for pipe gallery, it is related to inspection shaft technical field, it solves to need that multiple sewage inspection wells are installed on pipe gallery to be just able to achieve and the sewage in each trunk sewer is checked, lead to the installation of sewage inspection well and manages problem complicated for operation, its key points of the technical solution are that: piping lane main body top, which is run through to be equipped with, checks well body, the inspection well body top is rotatably connected to inspection vessel, checks that vessel bottom end is equipped with the rotation chamber for checking the grafting of well body top;It is equipped with multiple inspections inside the inspection shaft body to manage, checks that tube bottom end is connect by connecting tube with sewage pipe after checking well body bottom, checks that tube top end and inspection vessel bottom end contradict;It is described to check that vessel bottom check that pipe end sealing be plugged with sealing piston with the inspection hole for checking pipe hanging through at least one is equipped with, have the effect of that the installation for making sewage inspection well and management are easy to operate.

Description

Sewage inspection well structure for pipe gallery
Technical field
The utility model relates to inspection shaft technical fields, more specifically, it relates to be used for the sewage inspection of pipe gallery Well construction.
Background technique
Underground urban duct integrates corridor, abbreviation pipe gallery.A tunnel space is built in Urban Underground, it will be electric Power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring System implements unified planning, Uniting, unified construction and management, is the important infrastructure and " life for ensureing city operations Line ".
Now retrieving notification number is CN206143900U, and the day for announcing is the Chinese patent on May 3rd, 2017, and the program is public A kind of sewage inspection well structure suitable in pipe gallery is opened, including snorkel, sewage inspection well, access hole and sewage are done Pipe, the access hole are fixed on any side of sewage inspection well external peripheral surface and are connected with sewage inspection well, the ventilation Pipe is fixed on the upper end of sewage inspection well and is connected with sewage inspection well, the trunk sewer through sewage inspection well and It is arranged in a mutually vertical manner with sewage inspection well.
A sewage inspection well is arranged in sewage inspection well structure in above-mentioned reference document on each trunk sewer, When being equipped with multiple trunk sewers in pipe gallery, needs to install multiple sewage inspection wells on pipe gallery and be just able to achieve pair Sewage in each trunk sewer is checked, causes the installation of sewage inspection well and management complicated for operation.
Utility model content
The purpose of the utility model is to provide the sewage inspection well structures for pipe gallery, and having makes sewage inspection well The installation effect easy to operate with management.
The above-mentioned technical purpose of the utility model has the technical scheme that the dirt for pipe gallery Water checks well construction, including piping lane main body and it is multiple be placed in the intracorporal sewage pipe of piping lane master, piping lane main body top is through setting There is inspection well body, the inspection well body top is rotatably connected to inspection vessel, checks that vessel bottom end is equipped with for checking well body top Hold the rotation chamber of grafting;It is equipped with multiple inspections inside the inspection shaft body to manage, checks that tube bottom end leads to after checking well body bottom It crosses connecting tube to connect with sewage pipe, check tube top end and checks that vessel bottom end contradicts;The inspection vessel bottom, which is run through, to be equipped with extremely Few one can check that pipe end sealing is plugged with sealing piston with the inspection hole for checking pipe hanging.
By using above-mentioned technical proposal, run-out check vessel are aligned inspection hole with pipe is checked;By sealing piston from inspection After looking into hole taking-up, makes to check that the sewage in pipe flows into and check in vessel;Convenient for checking the sewage in multiple sewage pipes, make The installation of sewage inspection well and management are easy to operate.
The utility model is further arranged to: the inspection vessel inner bottom surface is fixedly connected with air funnel, air funnel bottom end Walk-through test vessel bottom;Each is described to check that pipe connection is equipped with and protrudes into snorkel in air funnel, the snorkel with Check that the junction of pipe is located at the subjacent of sealing piston.
By using above-mentioned technical proposal, using air funnel and snorkel, convenient for the gas in sewage pipe is discharged.
The utility model is further arranged to: the air funnel top is covered with rain visor, the rain visor be equipped with The venthole of snorkel connection.
By using above-mentioned technical proposal, using rain visor, reduces extraneous rainwater and enter that inspection shaft is intracorporal to be happened.
The utility model is further arranged to: described to check that vessel bottom end is equipped with the sliding slot for checking pipe sliding.
By using above-mentioned technical proposal, using sliding slot, during run-out check vessel, make to check tube top end in cunning Opposite sliding in slot prevents from checking pipe inclination and influencing to check the case where pipe is aligned with inspection hole.
The utility model is further arranged to: described to check that tube bottom end is socketed with the sealing being tightly connected with connecting tube Set.
By using above-mentioned technical proposal, using sealing shroud, so that checking that pipe is simple with sewage pipe attended operation.
The utility model is further arranged to: the inspection vessel bottom end is connected with bolt, and the inspection shaft is external Wall is equipped with the jack for bolt grafting.
By using above-mentioned technical proposal, using bolt and jack grafting, convenient for that will check that vessel are fixed.
The utility model is further arranged to: the inspection well body bottom is equipped with access hole.
The intracorporal sundries of inspection shaft is convenient to clean using access hole by using above-mentioned technical proposal.
In conclusion the utility model has the following beneficial effects: convenient for checking the sewage in multiple sewage pipes, Keep the installation of sewage inspection well and management easy to operate;Using air funnel and snorkel, convenient for the gas in sewage pipe is discharged; Using sliding slot, during run-out check vessel, make to check tube top end in sliding opposite in sliding slot, prevent from checking pipe inclination and It influences to check the case where pipe is aligned with inspection hole.
Detailed description of the invention
Fig. 1 is the overall structure diagram in the utility model embodiment;
Fig. 2 is the attachment structure schematic diagram that the inspection well body in the utility model embodiment is cutd open with inspection vessel;
Fig. 3 be in the utility model embodiment check vessel split after structural schematic diagram.
In figure: 1, piping lane main body;11, bracket;12, sewage pipe;13, connecting tube;14, mounting rack;2, well body is checked;21, Access hole;22, pipe is checked;23, sealing shroud;24, sealing piston;25, snorkel;26, jack;3, vessel are checked;31, bolt; 32, chamber is rotated;33, inspection hole;34, air funnel;35, rain visor;36, venthole;37, sliding slot.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing 1-3.
Embodiment: for the sewage inspection well structure of pipe gallery, as shown in Figures 1 and 2, including piping lane main body 1, bracket 11 and sewage pipe 12, bracket 11 be fixedly connected with 1 inner wall of piping lane main body, bracket 11 is for placing sewage pipe 12 or other pipelines. 1 inner wall of piping lane main body is also fixedly connected with mounting rack 14, and 14 upper surface of mounting rack is fixedly connected with through 1 top of piping lane main body It checks well body 2, checks that 2 top of well body is rotatably connected to and check vessel 3, check that 3 bottom end of vessel is equipped with for checking 2 top of well body The rotation chamber 32 of grafting.It checks and is set inside well body 2 there are four pipe 22 is checked, check 22 bottom end of pipe after checking 2 bottom of well body It is connect by connecting tube 13 with sewage pipe 12, check 22 top of pipe and checks that 3 bottom end of vessel contradicts.Check that 3 bottom of vessel is run through It can check that 22 end sealing of pipe is plugged with sealing piston 24 with the inspection hole 33 for checking 22 hanging of pipe equipped with one.Rotation It checks vessel 3, is aligned inspection hole 33 with pipe 22 is checked;By sealing piston 24 after the taking-up of inspection hole 33, make to check in pipe 22 Sewage flow into check vessel 3 in.Convenient for checking the sewage in multiple sewage pipes 12, make the installation of sewage inspection well with It manages easy to operate.
As shown in Figure 2 and Figure 3, check that 3 inner bottom surface of vessel is fixedly connected with air funnel 34,34 bottom end walk-through test of air funnel Each inspection pipe 22 of 3 bottom of vessel is connected to the snorkel 25 for being equipped with and protruding into air funnel 34, snorkel 25 and inspection pipe 22 Junction be located at the subjacent of sealing piston 24.Using air funnel 34 and snorkel 25, convenient for by the gas in sewage pipe 12 Body discharge.
As shown in Figure 2 and Figure 3,34 top of air funnel is covered with rain visor 35, and rain visor 35 is equipped with to be connected with snorkel 25 Logical venthole 36.Using rain visor 35, reduces extraneous rainwater and enter the situation generation checked in well body 2.
As shown in Figure 2 and Figure 3, check that 3 bottom end of vessel is equipped with the sliding slot 37 slided for checking pipe 22.Using sliding slot 37, During run-out check vessel 3, make to check that 22 top of pipe in sliding opposite in sliding slot 37, prevents from checking that pipe 22 tilts and shadow It rings and checks the case where pipe 22 is aligned with inspection hole 33.
As shown in Figures 1 and 2, check that 22 bottom end of pipe is socketed with the sealing shroud 23 being tightly connected with connecting tube 13.It utilizes Sealing shroud 23, so that checking that pipe 22 and 12 attended operation of sewage pipe are simple.
As shown in Fig. 2, checking that 3 bottom end of vessel is connected with bolt 31, check that 2 outer wall of well body is equipped with for 31 grafting of bolt Jack 26.Using bolt 31 and 26 grafting of jack, convenient for that will check that vessel 3 are fixed.
As shown in Fig. 2, checking that 2 bottom of well body is equipped with access hole 21.Using access hole 21, it is convenient to clean and checks in well body 2 Sundries.
The course of work: run-out check vessel 3 are aligned inspection hole 33 with pipe 22 is checked;By sealing piston 24 from inspection hole After 33 take out, makes to check that the sewage in pipe 22 flows into and check in vessel 3.Convenient for being examined to the sewage in multiple sewage pipes 12 It looks into, keeps the installation of sewage inspection well and management easy to operate.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (7)

1. the sewage inspection well structure of pipe gallery is used for, including piping lane main body (1) and multiple dirts being placed in piping lane main body (1) Water pipe (12), it is characterized in that: piping lane main body (1) top, which is run through to be equipped with, checks well body (2), inspection well body (2) top It is rotatably connected to and checks vessel (3), check that vessel (3) bottom end is equipped with the rotation chamber (32) for checking well body (2) top grafting; Equipped with multiple inspections pipe (22) inside the inspection well body (2), checks and pass through after pipe (22) bottom end passes through inspection well body (2) bottom Connecting tube (13) is connect with sewage pipe (12), is checked pipe (22) top and is checked that vessel (3) bottom end contradicts;The inspection vessel (3) bottom, which is run through, can check pipe (22) end sealing with the inspection hole (33) for checking pipe (22) hanging equipped at least one It is plugged with sealing piston (24).
2. the sewage inspection well structure according to claim 1 for pipe gallery, it is characterized in that: the inspection vessel (3) inner bottom surface is fixedly connected with air funnel (34), air funnel (34) bottom end walk-through test vessel (3) bottom;Each described inspection It checks (22) connection and is equipped with the snorkel (25) protruded into air funnel (34), the snorkel (25) and the company for checking pipe (22) Connect the subjacent that place is located at sealing piston (24).
3. the sewage inspection well structure according to claim 2 for pipe gallery, it is characterized in that: the air funnel (34) Top is covered with rain visor (35), and the rain visor (35) is equipped with the venthole (36) being connected to snorkel (25).
4. the sewage inspection well structure for pipe gallery according to claim 1 to 3, it is characterized in that: described Check that vessel (3) bottom end is equipped with the sliding slot (37) for checking pipe (22) sliding.
5. the sewage inspection well structure for pipe gallery according to claim 1 to 3, it is characterized in that: described Check that pipe (22) bottom end is socketed with the sealing shroud (23) being tightly connected with connecting tube (13).
6. the sewage inspection well structure for pipe gallery according to claim 1 to 3, it is characterized in that: described Check that vessel (3) bottom end is connected with bolt (31), it is described to check that well body (2) outer wall is equipped with the jack for bolt (31) grafting (26)。
7. the sewage inspection well structure for pipe gallery according to claim 1 to 3, it is characterized in that: described Check that well body (2) bottom is equipped with access hole (21).
CN201821755573.5U 2018-10-29 2018-10-29 Sewage inspection well structure for pipe gallery Expired - Fee Related CN209162997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821755573.5U CN209162997U (en) 2018-10-29 2018-10-29 Sewage inspection well structure for pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821755573.5U CN209162997U (en) 2018-10-29 2018-10-29 Sewage inspection well structure for pipe gallery

Publications (1)

Publication Number Publication Date
CN209162997U true CN209162997U (en) 2019-07-26

Family

ID=67335523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821755573.5U Expired - Fee Related CN209162997U (en) 2018-10-29 2018-10-29 Sewage inspection well structure for pipe gallery

Country Status (1)

Country Link
CN (1) CN209162997U (en)

Similar Documents

Publication Publication Date Title
CN210342154U (en) Anti-backflow emergency drainage device for underground building
CN206090784U (en) Utility tunnel's sewer manhole group
CN203878609U (en) Comprehensive pipe corridor structure
CN206070586U (en) Sewage accesses the inspection well construction of pipe gallery
CN209162997U (en) Sewage inspection well structure for pipe gallery
CN207053151U (en) A kind of pipe gallery cable line outlet arrangement
CN204608904U (en) Washing machine floor drain
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN208652387U (en) A kind of smart city street lamp
CN206396862U (en) A kind of clear and coherent sewage inspection well of the pipe gallery combination of inner and outside
CN208949919U (en) A kind of inspection socket tube coupling that city integrated piping lane internal drainage pipeline uses
CN105198073B (en) Integrated effluent disposal system
CN203514353U (en) Glass fiber reinforced plastics inspection well
CN209509021U (en) Underground pipe gallery
CN208535565U (en) Compressed air system drain assembly and compressed air system
CN208718043U (en) One kind is anti-to block straight-through check well
CN203049619U (en) Intelligent inspection well
CN205713922U (en) Catch pit port cat ladder
CN209636936U (en) A kind of inspection shaft for pipe gallery internal drainage
CN206706959U (en) A kind of integrated prefabricated valve well
CN107228695B (en) Integrated gas roots flowmeter box
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN109610521A (en) A kind of drainage system and method improving piping lane space utilization
CN204282404U (en) A kind of plastic drainage inspection well arm and pit shaft Hermetical connecting structure
CN103924632A (en) Composite water intake technology and device with large-caliber radial well and siphon well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726

Termination date: 20201029

CF01 Termination of patent right due to non-payment of annual fee