CN213805400U - Anchor rod construction device for constructional engineering - Google Patents

Anchor rod construction device for constructional engineering Download PDF

Info

Publication number
CN213805400U
CN213805400U CN202022666894.1U CN202022666894U CN213805400U CN 213805400 U CN213805400 U CN 213805400U CN 202022666894 U CN202022666894 U CN 202022666894U CN 213805400 U CN213805400 U CN 213805400U
Authority
CN
China
Prior art keywords
connecting plate
rod
plate
push rod
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022666894.1U
Other languages
Chinese (zh)
Inventor
焦东林
汪文兵
臧学东
李迅
张强
杨培培
曹卫林
胡亚兰
刘关强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Wankai Construction Engineering Co ltd
Original Assignee
Anhui Wankai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Wankai Construction Engineering Co ltd filed Critical Anhui Wankai Construction Engineering Co ltd
Priority to CN202022666894.1U priority Critical patent/CN213805400U/en
Application granted granted Critical
Publication of CN213805400U publication Critical patent/CN213805400U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application relates to an anchor rod construction device for constructional engineering, which relates to the technical field of constructional engineering and comprises a slurry inlet pipe, a first connecting plate and a second connecting plate, wherein the second connecting plate is arranged on the slurry inlet pipe; when the clamping rod is locked on the first connecting plate, the pipe orifice of the grout inlet pipe is aligned with and abutted to the anchor rod. This application has through setting up first connecting plate, second connecting plate, joint pole and locking structure, has played the effect that will advance thick liquid pipe and stock high-speed joint.

Description

Anchor rod construction device for constructional engineering
Technical Field
The application relates to the technical field of constructional engineering, in particular to an anchor rod construction device for constructional engineering.
Background
With the acceleration of urbanization processes in various regions and the restriction of urban land areas, the height of buildings is continuously increased, the rising of the height of the buildings puts higher requirements on the foundation, and the foundation pit supporting technology which is often required to be used in the process of building the foundation also becomes the pipe fitting technology of the construction engineering in the coming months.
Current patent publication number is CN 211665755U's chinese patent, has proposed an anchor rod construction equipment that building engineering used, including stock, grout outlet, built-in chamber, movable rod and spread groove, the bottom of stock is provided with the spread groove, the top of the inside spread groove of stock is provided with built-in chamber, fixedly connected with fixed establishment on the stock outer wall on spread groove top, fixed establishment's inside has set gradually fixing base, first articulated groove, first hinge bar, sliding seat, the articulated groove of second and second hinge bar. The utility model discloses a with the sliding seat on the stock outer wall to the fixing base direction, first hinge bar and second hinge bar can rotate around first hinge groove and second hinge groove respectively, make first hinge bar and second hinge bar hinged end to the one side removal of keeping away from the stock, realized the function that this mechanism is convenient for to fix to the steadiness of this stock construction equipment that building engineering used when using has been improved.
In view of the above-mentioned related technologies, the inventor believes that there is a defect that in the construction process, the anchor rod is not convenient for the quick connection of the grout inlet pipe and cannot meet the use requirements of users.
SUMMERY OF THE UTILITY MODEL
In order to improve the convenient degree when advancing thick liquid pipe and stock and being connected, this application provides an anchor rod construction equipment that building engineering used.
The application provides a stock construction equipment that building engineering used adopts following technical scheme:
the anchor rod construction device for the building engineering comprises a slurry inlet pipe, a first connecting plate and a second connecting plate arranged on the slurry inlet pipe, wherein the first connecting plate and the second connecting plate are both annular plates, the first connecting plate is detachably connected with an anchor rod, the second connecting plate is coaxially and fixedly connected to the periphery side of the arc surface of the first connecting plate, a clamping rod is arranged on the end surface, close to the first connecting plate, of the second connecting plate, the clamping rod is connected with the first connecting plate in an inserting mode, and a locking mechanism for locking the clamping rod on the first connecting plate is arranged on the clamping rod; when the clamping rod is locked on the first connecting plate, the pipe orifice of the grout inlet pipe is aligned with and abutted to the anchor rod.
Through adopting above-mentioned technical scheme, when the slip casting to the stock, will advance the stock that the thick liquid pipe was aimed at, operating personnel can be conveniently with joint rod and first connecting plate plug-in connection, and rethread locking structure will joint rod locking on first connecting plate, can realize advancing the high-speed joint of thick liquid pipe and stock, through setting up first connecting plate, second connecting plate, joint rod and locking structure, has realized advancing the purpose of thick liquid pipe and stock high-speed joint.
Optionally, a threaded rod pointing to the axis of the first connecting plate is arranged on the first connecting plate in a threaded manner, and the inner diameter of the first connecting plate is matched with the outer diameter of the anchor rod; when the first connecting plate is coaxially sleeved on the anchor rod, the threaded rod is abutted to the anchor rod.
By adopting the technical scheme, when the anchor rod needs to be grouted, the first connecting plate is coaxially sleeved on the anchor rod, the threaded rod is rotated to enable the threaded rod to move in the direction pointing to the axis of the first connecting plate, and when the threaded rod is tightly propped against the outer peripheral wall of the anchor rod, the first connecting plate is locked on the anchor rod; after grouting is completed, the threaded rod is rotated reversely, the first connecting plate is taken down, and repeated utilization of the first connecting plate is achieved.
Optionally, the locking mechanism includes a clamping disc and an anti-rotation component;
a first annular groove coaxial with the first connecting plate is formed in the first connecting plate, a second annular groove coaxial with the first connecting plate is formed in the end face, close to the second connecting plate, of the first connecting plate, the groove width of the first annular groove is larger than that of the second annular groove and is communicated with the second annular groove, the clamping disc is fixedly connected to the end portion, far away from the second connecting plate, of the clamping rod, the clamping disc is matched and slidably connected with the first annular groove, and the clamping rod is matched and slidably connected with the second annular groove;
the anti-rotation component is arranged on the second connecting plate and used for preventing the clamping rod from sliding in the second annular groove.
Through adopting above-mentioned technical scheme, when joint pole and first connecting plate sliding connection, the joint dish also passes through first annular and first connecting plate sliding connection simultaneously, because the groove width of first annular is greater than the groove width of second annular, joint pole and joint dish have restricted the displacement of second connecting plate along second connecting plate axis direction this moment, avoiding the joint pole to slide in the second annular through preventing changeing the subassembly, thereby the rotation of second connecting plate has been restricted, finally realized with the joint pole locking on first connecting plate, quick installation between first connecting plate and the second connecting plate has also been realized.
Optionally, the first connecting plate is close to have seted up on the terminal surface of second connecting plate and prevented changeing the hole, prevent changeing the hole with first annular reaches the second annular all communicates, the joint dish with prevent changeing the hole adaptation.
Through adopting above-mentioned technical scheme, during joint dish and joint pole accessible prevent that the hole inserts first annular and second annular respectively, with joint dish and joint pole through preventing that the hole inserts first annular and second annular respectively after, rotate the second connecting plate and can realize that the joint of first connecting plate and first connecting plate is connected through joint dish and joint pole, prevent rotating the hole through setting up, the joint dish and the joint pole that have realized are connected with first annular and second annular.
Optionally, the anti-rotation assembly comprises a push rod, a mounting plate and a top fastening piece;
the mounting plate is arranged on one side, away from the first connecting plate, of the second connecting plate, the mounting plate is fixedly connected with the outer peripheral wall of the pulp inlet pipe, the push rod penetrates through the second connecting plate and the mounting plate in a sliding mode, and the push rod is matched with the anti-rotation hole; when the clamping disc is connected with the first connecting plate in a sliding mode through the first annular groove, the push rod is connected with the first connecting plate in an inserting mode through the anti-rotating hole;
the tightening piece is arranged on the push rod and used for keeping the inserting connection state of the push rod and the anti-rotation hole.
Through adopting above-mentioned technical scheme, when joint dish and joint pole through first annular and second annular restriction second connecting plate displacement in self axis direction, insert the push rod and prevent changeing the hole, because the diameter that prevents changeing the hole is greater than the groove width of second annular, when the push rod inserts and prevents changeing the hole, prevented the relative motion of first connecting plate and joint pole promptly, keeping the plug-in connection state of push rod and commentaries on classics of preventing changeing the hole through the puller, realized linking up the purpose of connecting plate and second connecting plate quick installation with first.
Optionally, the tightening member includes an elastic member and a pressing plate;
the elastic piece is sleeved on the outer peripheral side of the push rod and located between the second connecting plate and the mounting plate, the push rod penetrates through the pressing plate and is fixedly connected with the pressing plate, one end of the elastic piece is fixedly connected with the mounting plate, the other end of the elastic piece is fixedly connected with the pressing plate, and when the push rod passes through the anti-rotation hole and is connected with the connecting plate in an inserting mode, the elastic piece is in an original state.
Through adopting above-mentioned technical scheme, when joint dish and joint pole prevent the rotation hole through inserting, the terminal surface of push rod and the terminal surface butt of first connecting plate, the elastic component is in compression state, rotates the second connecting plate and makes joint dish and joint pole and first connecting plate joint be connected to and prevent the rotation hole and when the push rod is aimed at, the deformation of elastic component pushes away the pressure plate and drives the push rod and insert and prevent the rotation hole to keep and prevent the plug-in connection in rotation hole under the effect of elastic component.
Optionally, the second connecting plate is located at the end of the slurry inlet pipe and protrudes from the end face of the slurry inlet pipe close to the end face of the first connecting plate.
Through adopting above-mentioned technical scheme, can aim at advancing thick liquid pipe and stock conveniently in the recess that the protruding thick liquid pipe terminal surface formed of the tip embedding second connecting plate of stock, further promoted the speed of advancing thick liquid pipe and stock connection.
Optionally, a sealing gasket is arranged on the inner side wall of the second connecting plate protruding out of the end face of the slurry inlet pipe.
By adopting the technical scheme, the sealing gasket enables the connection between the slurry inlet pipe and the anchor rod to be more compact, and the possibility of slurry leakage is reduced as much as possible.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the purpose of quickly connecting the slurry inlet pipe with the anchor rod is achieved by arranging the first connecting plate, the second connecting plate, the clamping and connecting rod and the locking structure;
2. rotating the threaded rod to enable the threaded rod to move in a direction pointing to the axis of the first connecting plate, and when the threaded rod is tightly pressed against the outer peripheral wall of the anchor rod, locking the first connecting plate on the anchor rod; after grouting is finished, the threaded rod is rotated reversely, the first connecting plate is taken down, and repeated utilization of the first connecting plate is achieved;
3. the end part of the anchor rod is embedded into the groove formed by the protruding end surface of the slurry inlet pipe of the second connecting plate, so that the slurry inlet pipe can be conveniently aligned to the anchor rod, and the speed of connecting the slurry inlet pipe and the anchor rod is further increased.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic cross-sectional view taken along line A-A of FIG. 1;
fig. 3 is a schematic sectional view taken along line B-B in fig. 1.
Reference numerals: 1. a pulp inlet pipe; 2. a first connecting plate; 3. a second connecting plate; 4. a clamping and connecting rod; 5. a threaded rod; 6. a clamping disc; 7. a first ring groove; 8. a second ring groove; 9. an anti-rotation hole; 10. a push rod; 11. mounting a plate; 12. an elastic member; 13. pressing a plate; 14. a gasket seal.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses stock construction equipment that building engineering used. Referring to fig. 1 and 2, anchor rod construction equipment that building engineering used is including advancing thick liquid pipe 1, advances to advance coaxial rigid coupling on thick liquid pipe 1 and has second connecting plate 3, and coaxial cover on the anchor rod is equipped with annular first connecting plate 2, and the threaded rod 5 of directional first connecting plate 2 axis is worn to be equipped with by the screw thread on the first connecting plate 2 board, and when the anchor rod was located to first connecting plate 2 coaxial cover, threaded rod 5 supported tightly with the anchor rod. The second connecting plate 3 is located at the end of the slurry inlet pipe 1 and is close to the end face of the first connecting plate 2 and protrudes out of the end face of the slurry inlet pipe 1, and a sealing gasket 14 (not shown in the figure) is fixedly connected to the inner side edge of the end face of the slurry inlet pipe 1, which protrudes out of the second connecting plate 3.
Second connecting plate 3 is close to on the terminal surface of first connecting plate 2 the rigid coupling have joint pole 4, and the quantity of joint pole 4 specifically sets up to two in the embodiment of this application, refer to fig. 2 and 3, is provided with on the joint pole 4 and locks the locking mechanism on first connecting plate 2 with joint pole 4, and locking mechanism includes joint dish 6, and joint dish 6 is its coaxial rigid coupling of former plate form on the terminal surface that second connecting plate 3 was kept away from in joint pole 4. Set up in first connecting plate 2 with first connecting plate 2 coaxial first annular 7, first connecting plate 2 is close to and has seted up on the terminal surface of second connecting plate 3 with first connecting plate 2 coaxial second annular 8, the groove width of first annular 7 is greater than the groove width of second annular 8 and communicates with second annular 8, first connecting plate 2 has been close to and has seted up on the terminal surface of second connecting plate 3 and has prevented changeing hole 9, the quantity and the position that prevent changeing hole 9 all correspond with joint pole 4, prevent changeing hole 9 and first annular 7 and second annular 8 and all communicate, joint dish 6 with prevent changeing the equal adaptation of hole 9 and first annular 7, joint pole 4 and the adaptation of second annular 8.
The clamping disc 6 and the clamping rod 4 can be inserted into the first annular groove 7 and the second annular groove 8 respectively through the anti-rotation holes 9, after the clamping disc 6 and the clamping rod 4 are inserted into the first annular groove 7 and the second annular groove 8 respectively through the anti-rotation holes 9, the second connecting plate 3 is rotated, and the first connecting plate 2 can be connected with the first connecting plate 2 in a clamped mode through the clamping disc 6 and the clamping rod 4.
In order to prevent the clamping rod 4 and the second annular groove 8 from sliding, and further realize the installation between the first connecting plate 2 and the second connecting plate 3, and finally realize the quick connection between the grout inlet pipe 1 and the anchor rod, referring to fig. 2 and 3, an anti-rotation component is arranged on the second connection, the anti-rotation component comprises a push rod 10 and a mounting plate 11, the mounting plate 11 is arranged on one side of the second connecting plate 3 away from the first connecting plate 2 and is fixedly connected with the additional peripheral wall of the grout inlet pipe 1, two push rods 10 are arranged and are all slidably arranged on the second connecting plate 3 and the mounting plate 11, the push rod 10 is matched with the anti-rotation hole 9, when the clamping disc 6 and the clamping rod 4 limit the second connecting plate 3 to move in the self axis direction through the first ring groove 7 and the second ring groove 8, the push rod 10 is inserted into the anti-rotating hole 9, because the diameter of the anti-rotation hole 9 is larger than the groove width of the second annular groove 8, when the push rod 10 is inserted into the anti-rotation hole 9, the relative movement of the first connecting plate 2 and the clamping rod 4 is prevented. The two push rods 10 and the two clamping rods 4 equally divide the ring surface of the second connecting plate 3, and the included angle between the push rods 10 and the clamping rods 4 is 90 degrees.
In order to maintain the inserting connection state of the push rod 10 and the anti-rotation hole 9, referring to fig. 2 and fig. 3, a pushing member is arranged on the push rod 10, the pushing member comprises an elastic member 12 and a pressing plate 13, the elastic member 12 is sleeved on the outer periphery of the push rod 10 and is positioned between the second connecting plate 3 and the mounting plate 11, the push rod 10 penetrates through the pressing plate 13 and is fixedly connected with the pressing plate 13, one end of the elastic member 12 is fixedly connected with the mounting plate 11, the other end is fixedly connected with the pressing plate 13, when joint dish 6 and joint pole 4 prevent changeing hole 9 through inserting, the terminal surface butt of push rod 10 and first connecting plate 2, elastic component 12 is in compression state, rotate second connecting plate 3 and make joint dish 6 and joint pole 4 and 2 joint of first connecting plate be connected to with the push rod 10 when preventing changeing hole 9 and aligning, the deformation force of elastic component 12 impels pressure plate 13 to drive push rod 10 and insert and prevent changeing hole 9 to keep and prevent the grafting of changeing hole 9 and being connected under the effect of elastic component 12.
The implementation principle of the anchor rod construction device for the building engineering is as follows: when the slip casting to the stock, will advance the stock that thick liquid pipe 1 was aimed at, operating personnel can be conveniently with joint pole 4 and first connecting plate 2 grafting connection, and the rethread locking structure locks joint pole 4 on first connecting plate 2, can realize advancing the high-speed joint of thick liquid pipe 1 and stock, through setting up first connecting plate 2, second connecting plate 3, joint pole 4 and locking structure, has realized advancing the purpose of thick liquid pipe 1 and stock high-speed joint.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an anchor rod construction equipment that building engineering used, is including advancing thick liquid pipe (1), its characterized in that: the mortar filling pipe comprises a first connecting plate (2) and a second connecting plate (3) arranged on a mortar inlet pipe (1), wherein the first connecting plate (2) and the second connecting plate (3) are both annular plates, the first connecting plate (2) is detachably connected with an anchor rod, the second connecting plate (3) is coaxially and fixedly connected to the periphery side of the arc surface of the first connecting plate (2), a clamping rod (4) is arranged on the end surface, close to the first connecting plate (2), of the second connecting plate (3), the clamping rod (4) is in inserted connection with the first connecting plate (2), and a locking mechanism for locking the clamping rod (4) on the first connecting plate (2) is arranged on the clamping rod (4); when the clamping rod (4) is locked on the first connecting plate (2), the pipe orifice of the grout inlet pipe (1) is aligned with and abutted against the anchor rod.
2. A rock bolt working apparatus for construction work according to claim 1, wherein: a threaded rod (5) pointing to the axis of the first connecting plate (2) penetrates through the first connecting plate (2) in a threaded mode, and the inner diameter of the first connecting plate (2) is matched with the outer diameter of the anchor rod; when the first connecting plate (2) is coaxially sleeved on the anchor rod, the threaded rod (5) is abutted to the anchor rod.
3. A rock bolt working apparatus for construction work according to claim 2, wherein: the locking mechanism comprises a clamping disc (6) and an anti-rotation component;
a first annular groove (7) coaxial with the first connecting plate (2) is formed in the first connecting plate (2), a second annular groove (8) coaxial with the first connecting plate (2) is formed in the end face, close to the second connecting plate (3), of the first connecting plate (2), the groove width of the first annular groove (7) is larger than that of the second annular groove (8) and is communicated with the second annular groove (8), the clamping disc (6) is fixedly connected to the end portion, far away from the second connecting plate (3), of the clamping rod (4), the clamping disc (6) is matched and connected with the first annular groove (7) in a sliding mode, and the clamping rod (4) is matched and connected with the second annular groove (8) in a sliding mode;
prevent changeing the subassembly set up in on second connecting plate (3), be used for preventing joint rod (4) in slide in second annular (8).
4. A rock bolt working apparatus for construction work according to claim 3, wherein: first connecting plate (2) are close to seted up on the terminal surface of second connecting plate (3) and prevented changeing hole (9), prevent changeing hole (9) with first annular (7) and second annular (8) all communicate, joint dish (6) with prevent changeing hole (9) adaptation.
5. A rock bolt construction device for building engineering according to claim 4, wherein: the anti-rotation component comprises a push rod (10), a mounting plate (11) and a tightening piece;
the mounting plate (11) is arranged on one side, away from the first connecting plate (2), of the second connecting plate (3), the mounting plate (11) is fixedly connected with the outer peripheral wall of the pulp inlet pipe (1), the push rod (10) penetrates through the second connecting plate (3) and the mounting plate (11) in a sliding mode, and the push rod (10) is matched with the anti-rotation hole (9); when the clamping disc (6) is in sliding connection with the first connecting plate (2) through the first annular groove (7), the push rod (10) is in plug-in connection with the first connecting plate (2) through the anti-rotation hole (9);
the top tightening piece is arranged on the push rod (10) and used for keeping the plug-in connection state of the push rod (10) and the anti-rotation hole (9).
6. An anchor rod constructing device for construction engineering according to claim 5, wherein: the top fastening piece comprises an elastic piece (12) and a pressure plate (13);
elastic component (12) cover is located the periphery side of push rod (10) and be located second connecting plate (3) with between mounting panel (11), push rod (10) run through clamp plate (13) and with clamp plate (13) rigid coupling, the one end of elastic component (12) with mounting panel (11) rigid coupling, the other end with clamp plate (13) rigid coupling, work as push rod (10) pass through prevent that rotation hole (9) with when connecting plate plug-in connection, elastic component (12) are in original condition.
7. A rock bolt working apparatus for construction work according to claim 6, wherein: the second connecting plate (3) is located at the end of the pulp inlet pipe (1) and close to the end face of the first connecting plate (2) to protrude out of the end face of the pulp inlet pipe (1).
8. A rockbolt working apparatus for construction work according to claim 7, wherein: a sealing gasket (14) is arranged on the inner side wall of the second connecting plate (3) protruding out of the end surface of the pulp inlet pipe (1).
CN202022666894.1U 2020-11-17 2020-11-17 Anchor rod construction device for constructional engineering Active CN213805400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022666894.1U CN213805400U (en) 2020-11-17 2020-11-17 Anchor rod construction device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022666894.1U CN213805400U (en) 2020-11-17 2020-11-17 Anchor rod construction device for constructional engineering

Publications (1)

Publication Number Publication Date
CN213805400U true CN213805400U (en) 2021-07-27

Family

ID=76935634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022666894.1U Active CN213805400U (en) 2020-11-17 2020-11-17 Anchor rod construction device for constructional engineering

Country Status (1)

Country Link
CN (1) CN213805400U (en)

Similar Documents

Publication Publication Date Title
CN112627358B (en) Mechanical lock for building element connection
CN213805400U (en) Anchor rod construction device for constructional engineering
CN112942671B (en) Assembled component and connection structure thereof
CN213926241U (en) Portable tubular pile connector
CN210482351U (en) Civil building pile
CN216340318U (en) Mounting structure of stone curtain wall
CN215408714U (en) Anchor rod grout stopping device and grouting anchor rod
CN221223570U (en) Blasting tube fixing device for blasting engineering
CN215950579U (en) A mounting structure that is used for super high-rise muddy earth pumping pipe
JP3247485U (en) Underground gas storage well fixing device
CN216892244U (en) River course shore protection for hydraulic engineering convenient to it is fixed
CN219241372U (en) Pipe sleeve for grouting steel pipe column
CN220365352U (en) Large-area fine stone concrete terrace crack control device
CN215053070U (en) Foundation pit supporting structure
CN221481202U (en) Grouting sleeve butt joint structure based on MIC (many integrated core) building
CN220058046U (en) Foundation pit water-stop supporting device for foundation construction
CN214660267U (en) Anchor rod for mining engineering
CN214786012U (en) High-efficient plugging device of wall post template
CN215617585U (en) Building engineering preprocessing pipeline based on BIM technology
CN221742149U (en) Hydraulic engineering construction is with supporting safety arrangement
CN214169070U (en) Pre-buried type biliquid slip casting leaking stoppage structure of foundation ditch
CN211665755U (en) Anchor rod construction device for constructional engineering
CN211873567U (en) Waterproofing membrane metal layering binding off structure
CN213063042U (en) Grouting auxiliary equipment for under-pressure leaking stoppage
CN219509275U (en) Plugging device for civil air defense engineering temporary wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant