CN210482351U - Civil building pile - Google Patents

Civil building pile Download PDF

Info

Publication number
CN210482351U
CN210482351U CN201921347807.7U CN201921347807U CN210482351U CN 210482351 U CN210482351 U CN 210482351U CN 201921347807 U CN201921347807 U CN 201921347807U CN 210482351 U CN210482351 U CN 210482351U
Authority
CN
China
Prior art keywords
sleeve
pile body
fixed
pile
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921347807.7U
Other languages
Chinese (zh)
Inventor
黎磊落
汤祖铭
梁日森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghong Construction Co ltd
Original Assignee
Zhonghong Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonghong Construction Co ltd filed Critical Zhonghong Construction Co ltd
Priority to CN201921347807.7U priority Critical patent/CN210482351U/en
Application granted granted Critical
Publication of CN210482351U publication Critical patent/CN210482351U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a civil building pile, which comprises a pile body, wherein a first sleeve is sleeved on the surface of the pile body, a first reinforcing plate is fixed on the surface of the first sleeve, a first clamping block is fixed on the top end of the first sleeve, a first clamping groove is formed in the bottom end of the first sleeve, a second sleeve is sleeved on the surface of the pile body, a second reinforcing plate is fixed on the surface of the second sleeve, a second clamping groove is formed in the bottom end of the second sleeve, a second clamping block is fixed on the top end of the second sleeve, the second clamping block is inserted into the first clamping groove, fastening nails are connected on the surfaces of the first sleeve and the second sleeve, the first sleeve and the second sleeve are arranged on the surface of the pile body, the first reinforcing plate and the second reinforcing plate are staggered up and down, the stability of the pile body is improved, the first sleeve and the second sleeve are clamped up and down through the clamping block and the clamping groove, the installation and the disassembly are convenient, water is injected into a water pipe and a water diversion pipe, when the pile is, the water is brought out by the sliding balls, so that hard soil is moistened, the piling speed is accelerated, and the piling difficulty is reduced.

Description

Civil building pile
Technical Field
The utility model relates to a building pile technical field specifically is a building construction stake of soil.
Background
The civil construction pile is a tool for construction, is mainly used for driving into soil to carry out the basic fixing device that its upper building supported, therefore the wide application is in the building engineering field, and civil construction pile needs to be driven smoothly when the pile is driven, and civil construction pile needs to stabilize.
Present building pile, building pile are driven into after the underground, and the steadiness is not enough, and when piling on harder soil, it is harder, the piling difficulty.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building pile for building to solve the not enough problem of building pile steadiness that provides in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a civil building pile, includes the pile body, first sleeve has been cup jointed on the surface of pile body, first telescopic fixed surface has first gusset plate, first telescopic top is fixed with first fixture block, first draw-in groove has been opened to first telescopic bottom, the second sleeve has been cup jointed on the surface of pile body, the telescopic fixed surface of second has the second gusset plate, second draw-in groove has been opened to the telescopic bottom of second, the telescopic top of second is fixed with the second fixture block, first draw-in groove is inserted to the second fixture block, first sleeve and the telescopic surface connection of second have the fastening nail.
Preferably, the bottom mounting of pile body has the cone, the inside of pile body is provided with the water pipe, the cone is inserted to the bottom of water pipe, the bottom of water pipe is connected with the distributive pipe, open the side of cone has the recess, distributive pipe and recess intercommunication, the internally mounted of recess has the slide ball, the side of cone is connected with the slide ball cover, open the surface of slide ball cover has the slide ball hole, the slide ball hole is passed on the top of slide ball.
Preferably, a positioning plate is fixed at the top end of the pile body, a positioning cone is fixed at the bottom end of the positioning plate, and the top end of the pile body penetrates through the positioning plate.
Preferably, the first reinforcing plate is perpendicular to the first sleeve, the second reinforcing plate is perpendicular to the second sleeve, the first reinforcing plate and the second reinforcing plate are staggered, and the height of the second clamping block is not larger than the depth of the first clamping groove.
Preferably, the diameter of conical head is not less than the diameter of pile body, the distributive pipe communicates each other and becomes the acute angle distribution with the water pipe, the recess is the hemisphere groove, the ball cover is the arc cover, the diameter in ball hole is not more than the diameter of ball.
Preferably, the pile body is perpendicular to the positioning plate, and the positioning cone is perpendicular to the positioning plate.
Compared with the prior art, the beneficial effects of the utility model are that: this building construction pile, 1, the first sleeve of pile body surface mounting and second sleeve, fixed first gusset plate and second gusset plate, and first gusset plate and second gusset plate misplace from top to bottom, increase the steadiness of pile body, and first sleeve and second sleeve pass through fixture block and draw-in groove joint from top to bottom, and the installation is dismantled conveniently.
2. Water is injected into the water pipe and the water distribution pipe, when the pile is driven on the hard soil, the sliding ball and the hard soil are rubbed and rotated to bring water out, so that the hard soil is wetted, the pile driving speed is increased, and the pile driving difficulty is reduced.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a sectional view taken along direction a of fig. 1 according to the present invention;
FIG. 3 is an enlarged view of FIG. 1 at B according to the present invention;
fig. 4 is a schematic structural view of the second sleeve portion of fig. 1 according to the present invention;
fig. 5 is a top view of fig. 4 of the present invention;
fig. 6 is a bottom view of fig. 4 according to the present invention.
In the figure: 1. a conical head; 2. a water diversion pipe; 3. a water pipe; 4. a sliding ball; 5. a pile body; 6. a second card slot; 7. a second reinforcing plate; 8. a second sleeve; 9. a second fixture block; 10. a first card slot; 11. a first reinforcing plate; 12. a first sleeve; 13. a first clamping block; 14. positioning a cone; 15. positioning a plate; 16. fastening nails; 17. a groove; 18. a ball cover; 19. a sliding ball hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 4, fig. 5 and fig. 6, the present invention provides a technical solution: a civil building pile comprises a pile body 5, wherein a first sleeve 12 is sleeved on the surface of the pile body 5, four first reinforcing plates 11 are fixed on the surface of the first sleeve 12, the four first reinforcing plates 11 are in a cross shape, the first reinforcing plates 11 are perpendicular to the first sleeve 12, a first clamping block 13 is fixed at the top end of the first sleeve 12, the first clamping block 13 is a rectangular block, a first clamping groove 10 is formed in the bottom end of the first sleeve 12, the first clamping groove 10 is a rectangular groove, a second sleeve 8 is sleeved on the surface of the pile body 5, the second sleeve 8 is positioned below the first sleeve 12, four second reinforcing plates 7 are fixed on the surface of the second sleeve 8, the second reinforcing plates 7 are perpendicular to the second sleeve 8, a second clamping groove 6 is formed in the bottom end of the second sleeve 8, the second clamping groove 6 is equal in size to the first clamping groove 10, a second clamping block 9 is fixed at the top end of the second sleeve 8, the second clamping block 9 is equal in size to the first clamping block 13, the height of second fixture block 9 is not more than the degree of depth of first draw-in groove 10, second fixture block 9 inserts the inside of first draw-in groove 10, first gusset plate 11 and second gusset plate 7 are misplaced each other, second sleeve 8 passes through second fixture block 9 and first draw-in groove 10 joint with first sleeve 12, the surface of first sleeve 12 and second sleeve 8 all is connected with binding nail 16, binding nail 16 passes through that first sleeve 12 and second sleeve 8 surface reserve, and insert the through-hole that pile body 5 surface reserve, first sleeve 12 and second sleeve 8 pass through binding nail 16 and are connected with pile body 5, dislocation about first gusset plate 11 and the second gusset plate 7, the stake increases the steadiness of body 5, and first sleeve 12 and second sleeve 8 joint from top to bottom, the installation is dismantled conveniently.
Referring to fig. 1 and 2, a conical head 1 is fixed at the bottom end of a pile body 5, a water pipe 3 is arranged inside the pile body 5, the bottom end of the water pipe 3 is inserted into the conical head 1, a water diversion pipe 2 is connected to the bottom end of the water pipe 3, a groove 17 is formed in the side surface of the conical head 1, the groove 17 is a hemispherical groove, the water diversion pipe 2 is communicated with the groove 17, a sliding ball 4 is installed inside the groove 17, the sliding ball 4 rolls inside the groove 17, a sliding ball cover 18 is connected to the side surface of the conical head 1, the sliding ball cover 18 is an arc cover, the sliding ball cover 18 is positioned outside the groove and covers the groove 17 to prevent soil from entering the water diversion pipe 2, a sliding ball hole 19 is formed in the surface of the sliding ball cover 18, the diameter of the sliding ball hole 19 is not larger than that of the sliding ball 4, the top end of the sliding ball 4 penetrates through the sliding ball hole 19, water is injected into the water pipe 3 and the water diversion pipe 2, when a hard soil is driven, the, accelerate pile driving speed, reduce the pile degree of difficulty.
Referring to fig. 1, a positioning plate 15 is fixed at the top end of the pile body 5, the pile body 5 is perpendicular to the positioning plate 15, a positioning cone 14 is fixed at the bottom end of the positioning plate 15, the positioning cone 14 is perpendicular to the positioning plate 15, the top end of the pile body 5 penetrates through the positioning plate 15, and the stability of the positioning plate 15 and the ground is strengthened.
The utility model discloses when concrete implementation: the surface of a pile body 5 is sleeved with a first sleeve 12, the surface of the first sleeve 12 is fixed with a first reinforcing plate 11, the surface of the pile body 5 is sleeved with a second sleeve 8, a second clamping block 9 at the top end of the second sleeve 8 is inserted into a first clamping groove 10, the first sleeve 12 is clamped with the second sleeve 8, the first reinforcing plate 11 and the second reinforcing plate 7 are staggered up and down, the first sleeve 12 and the second sleeve 8 are connected with the pile body 5 through a fastening nail 16, the bottom end of the pile body 5 is fixed with a conical head 1, a sliding ball 4 is arranged in a groove 17 on the side surface of the conical head 1, a sliding ball cover 18 covers the outer side of the sliding ball 4, the top end of the sliding ball 4 penetrates through a sliding ball hole 19, a water pipe 3 penetrates through the inside of the pile body 5 and is inserted into the inside of the conical head 1, a water diversion pipe 2 is communicated with the bottom end of the water pipe 3, the water diversion pipe 2 is communicated with the groove 17, the top end of the pile body 5 is fixed, conical head 1 and ground contact, simultaneously, water pipe 3 and 2 inside water of filling up of distributive pipe, joint about first sleeve 12 and the second sleeve 8, dislocation about first gusset plate 11 and the second gusset plate 7, increase the steadiness of pile body, smooth ball 4 and hard soil ground friction, and at the inside rotation of recess 17, simultaneously, smooth ball cover 18 blocks earth and gets into distributive pipe 2, smooth ball 4 takes out water when rotatory, moist conical head 1 near hard soil, do benefit to and accelerate the speed of piling, reduce the pile degree of difficulty.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building construction stake, includes pile body (5), its characterized in that: the surface of pile body (5) has cup jointed first sleeve (12), the fixed surface of first sleeve (12) has first gusset plate (11), the top of first sleeve (12) is fixed with first fixture block (13), first draw-in groove (10) have been opened to the bottom of first sleeve (12), the surface of pile body (5) has cup jointed second sleeve (8), the fixed surface of second sleeve (8) has second gusset plate (7), the bottom of second sleeve (8) has been opened second draw-in groove (6), the top of second sleeve (8) is fixed with second fixture block (9), second fixture block (9) insert first draw-in groove (10), the surface connection of first sleeve (12) and second sleeve (8) has fastening nail (16).
2. A civil building pile according to claim 1, characterised in that: the bottom mounting of pile body (5) has cone (1), the inside of pile body (5) is provided with water pipe (3), cone (1) is inserted to the bottom of water pipe (3), the bottom of water pipe (3) is connected with distributive pipe (2), open the side of cone (1) has recess (17), distributive pipe (2) and recess (17) intercommunication, the internally mounted of recess (17) has smooth ball (4), the side of cone (1) is connected with smooth ball cover (18), open the surface of smooth ball cover (18) has smooth ball hole (19), smooth ball hole (19) are passed on the top of smooth ball (4).
3. A civil building pile according to claim 1, characterised in that: the top end of the pile body (5) is fixed with a positioning plate (15), the bottom end of the positioning plate (15) is fixed with a positioning cone (14), and the top end of the pile body (5) penetrates through the positioning plate (15).
4. A civil building pile according to claim 1, characterised in that: the first reinforcing plate (11) is perpendicular to the first sleeve (12), the second reinforcing plate (7) is perpendicular to the second sleeve (8), the first reinforcing plate (11) and the second reinforcing plate (7) are staggered with each other, and the height of the second clamping block (9) is not larger than the depth of the first clamping groove (10).
5. A civil building pile according to claim 2, characterised in that: the diameter of cone head (1) is not less than the diameter of pile body (5), distributive pipe (2) and water pipe (3) communicate each other and become the acute angle and distribute, recess (17) are the hemisphere groove, smooth ball cover (18) are the arc cover, the diameter of smooth ball hole (19) is not more than the diameter of smooth ball (4).
6. A civil building pile according to claim 3, characterised in that: the pile body (5) is perpendicular to the positioning plate (15), and the positioning cone (14) is perpendicular to the positioning plate (15).
CN201921347807.7U 2019-08-20 2019-08-20 Civil building pile Active CN210482351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921347807.7U CN210482351U (en) 2019-08-20 2019-08-20 Civil building pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921347807.7U CN210482351U (en) 2019-08-20 2019-08-20 Civil building pile

Publications (1)

Publication Number Publication Date
CN210482351U true CN210482351U (en) 2020-05-08

Family

ID=70536460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921347807.7U Active CN210482351U (en) 2019-08-20 2019-08-20 Civil building pile

Country Status (1)

Country Link
CN (1) CN210482351U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112442980A (en) * 2020-11-13 2021-03-05 王修亮 Equipment and method for reinforcing fine sand foundation of passenger special line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112442980A (en) * 2020-11-13 2021-03-05 王修亮 Equipment and method for reinforcing fine sand foundation of passenger special line

Similar Documents

Publication Publication Date Title
CN210482351U (en) Civil building pile
CN206477327U (en) One kind building stake
CN209958526U (en) Hollow precast concrete inner wallboard structure
CN217420214U (en) Easily-piled tenon-added aerated concrete block
CN110629746A (en) A steel pipe composite pile for collapsible loess
CN206128310U (en) Beam -column joint connecting structure
CN214219634U (en) Socket joint steel pipe pile and pile sending cap structure thereof
CN213061566U (en) Environment-friendly concrete pavement
CN210178279U (en) High-pressure rotary jet grouting drill bit
CN211036877U (en) Hydraulic engineering bank protection reinforcing apparatus
CN213979537U (en) Cement brick template with riveted structure
CN213269065U (en) A building bearing diagonal structure for construction
CN210887110U (en) Ecological bank protection dyke that stability is high
CN108049524B (en) Wall reinforcement structure
CN209194546U (en) A kind of Foundation Supported with Composite Soil Nailing
CN205990624U (en) A kind of civil engineering built pile
CN216741353U (en) Stabilize fixed case of effectual rig
CN206736936U (en) A kind of cellular slope protection block
CN217231810U (en) Small-size stake for civil engineering
CN204457437U (en) Rich cobble companion rock foundation down-the-hole drill
CN215252839U (en) Port channel port inner wall construction anchoring device
CN208456064U (en) A kind of floor tile leveling unit
CN215716071U (en) Concrete built-in fitting for building that steadiness is good
CN213626540U (en) Ceramic tile leveling device
CN214424043U (en) Floor mortar scraper blade for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant