CN213804961U - Building bridge protection network with breakage-proof stone drops - Google Patents

Building bridge protection network with breakage-proof stone drops Download PDF

Info

Publication number
CN213804961U
CN213804961U CN202022072601.7U CN202022072601U CN213804961U CN 213804961 U CN213804961 U CN 213804961U CN 202022072601 U CN202022072601 U CN 202022072601U CN 213804961 U CN213804961 U CN 213804961U
Authority
CN
China
Prior art keywords
mounting panel
installation frame
protector
bridge
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022072601.7U
Other languages
Chinese (zh)
Inventor
灏逛腹
尹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Binzhou Chengxiang Chemical Fiber Rope Net Co ltd
Original Assignee
Shandong Binzhou Chengxiang Chemical Fiber Rope Net Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Binzhou Chengxiang Chemical Fiber Rope Net Co ltd filed Critical Shandong Binzhou Chengxiang Chemical Fiber Rope Net Co ltd
Priority to CN202022072601.7U priority Critical patent/CN213804961U/en
Application granted granted Critical
Publication of CN213804961U publication Critical patent/CN213804961U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a building bridge technical field, specifically speaking relates to a building bridge protection network with breakage-proof stone drops. It includes protector and installs the collecting box on protector, protector includes the mounting panel, set up a plurality ofly on the mounting panel with bolt size assorted screw hole, the downthehole bolt of installing of screw hole, mounting panel one end is connected with the installation frame, installation frame internally mounted has the protection network, protector and collecting box through setting up, make the device can install in the bridge both sides in the use, prevent the effect that the rubble from rolling off from the bridge both ends, potential safety hazard when having reduced bridge construction, and make the device can drive boxboard and installation frame rotation through the rope that stimulates on the first becket in the use, the rubble on rotation in-process protection network surface falls into the collecting box, thereby be convenient for clear up the rubble of device top, avoid the rubble to pile up and lead to the device to damage.

Description

Building bridge protection network with breakage-proof stone drops
Technical Field
The utility model relates to a building bridge technical field, specifically speaking relates to a building bridge protection network with breakage-proof stone drops.
Background
The bridge is generally a structure which is erected on rivers, lakes and seas and allows vehicles, pedestrians and the like to smoothly pass through. In order to adapt to the modern high-speed developed traffic industry, bridges are also extended to be constructed to span mountain stream, unfavorable geology or meet other traffic needs, so that the buildings are convenient to pass. The bridge generally comprises an upper structure, a lower structure, a support and an auxiliary structure, wherein the upper structure is also called a bridge span structure and is a main structure for spanning obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting positions of the bridge span structure and the bridge pier or the bridge abutment; the auxiliary structures refer to bridge head butt straps, conical revetments, diversion works and the like, broken stones are generated in the building process of the bridge, potential safety hazards are easily generated when the broken stones fall downwards from two sides of a bridge floor, and accordingly, a building bridge protective net capable of preventing the broken stones from falling is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building bridge protection network with breakage-proof stone drops to solve the problem that proposes in the above-mentioned background art.
In order to achieve the purpose, the utility model provides a building bridge protection network with breakage-proof stone drops, include protector and install the collecting box on protector, protector includes the mounting panel, set up a plurality of and bolt size assorted screw holes on the mounting panel, the threaded hole installs the bolt, mounting panel one end is connected with the installation frame, installation frame internally mounted has the protection network.
As a further improvement of the technical scheme, the mounting shaft is integrally formed at one end of the mounting plate, the mounting hole matched with the size of the mounting shaft is formed in one end of the mounting frame, and the mounting frame is rotatably connected with the mounting plate through the mounting shaft.
As a further improvement of the technical scheme, the bottom end of the mounting plate is integrally formed with a limiting plate.
As a further improvement of the technical scheme, the installation frame top is provided with a first rope ring, the installation frame top integrated into one piece has a connecting column, the connecting column top is connected with the first rope ring, and a rope is connected between the first rope ring.
As a further improvement of the technical scheme, the mounting plate is provided with a chute, the collecting box comprises a box body, the box body is mounted on the top end of the mounting plate, one end of the box body is integrally formed with a sliding block matched with the chute in size, the box body is connected with the mounting plate in a sliding mode, and one end, far away from the mounting plate, of the box body is hinged to a box plate through a hinge shaft.
As a further improvement of the technical scheme, a second rope ring is integrally formed at one end of the box plate, a second rope ring is integrally formed inside the box body, a second rope ring is integrally formed at the top end of the mounting plate, and a rope is connected between the second rope rings.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in this building bridge protection network with breakage-proof stone drops, through the protector that sets up for the device can install in the bridge both sides in the use, prevents that the rubble from the effect that the bridge both ends roll, has reduced the potential safety hazard when the bridge construction.
2. In this building bridge protection network with breakage-proof stone drops, through protector and the collecting box that sets up for the device can drive boxboard and installation frame rotation through the rope on the first becket bridle of pulling in the use, and the rubble that rotates the in-process protection net surface falls into the collecting box, thereby is convenient for the rubble of cleaning device top, avoids the rubble to pile up and leads to the device to damage.
Drawings
FIG. 1 is a schematic view of the entire structure of embodiment 1;
FIG. 2 is a schematic view of the entire structure of embodiment 1;
FIG. 3 is a disassembled view of the guard structure of embodiment 1;
FIG. 4 is a disassembled view of the collecting box structure of embodiment 1.
The various reference numbers in the figures mean: 1. a guard; 10. mounting a plate; 11. a protective net; 12. a chute; 13. a bolt; 14. installing a shaft; 15. a limiting plate; 16. mounting holes; 17. a first loop; 18. a mounting frame; 19. connecting columns;
2. a collection box; 20. a box body; 21. a slider; 22. hinging a shaft; 23. a boxboard; 24. a second loop; 25. a rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Example 1
Please refer to fig. 1-4, the utility model provides a building bridge protection network with breakage-proof stone drops, including protector 1 and install collecting box 2 on protector 1, protector 1 includes mounting panel 10, set up a plurality of screw holes with 13 size phase-matchs of bolt on the mounting panel 10, install bolt 13 in the screw hole, mounting panel 10 one end is connected with installation frame 18, installation frame 18 internally mounted has protection network 11, when making the rubble on the bridge floor drop from the bridge floor both ends, drop on protection network 11 surface, thereby prevented the rubble from the effect that the bridge both ends roll and fall, the potential safety hazard in the bridge construction has been reduced.
In addition, an installation shaft 14 is integrally formed at one end of the installation plate 10, an installation hole 16 matched with the installation shaft 14 in size is formed at one end of the installation frame 18, and the installation frame 18 is rotatably connected with the installation plate 10 through the installation shaft 14, so that the installation frame 18 can rotate to clean the broken stones on the protection net 11.
Furthermore, the limiting plate 15 is integrally formed at the bottom end of the mounting plate 10, so that the influence of the too large rotation angle of the mounting frame 18 on the use of the device is avoided.
Further, installation frame 18 top is provided with first becket 17, and mounting panel 10 top integrated into one piece has spliced pole 19, and spliced pole 19 top is connected with first becket 17, is connected with rope 25 between the first becket 17, and the installation frame 18 of being convenient for rotates.
Besides, the mounting plate 10 is provided with a chute 12, the collection box 2 comprises a box body 20, the box body 20 is mounted on the top of the mounting plate 10, one end of the box body 20 is integrally formed with a sliding block 21 matched with the size of the chute 12, the box body 20 is slidably connected with the mounting plate 10, and one end, far away from the mounting plate 10, of the box body 20 is hinged to a box plate 23 through a hinge shaft 22, so that crushed stones on the protection net 11 can be collected conveniently.
Furthermore, the one end integrated into one piece of boxboard 23 has second becket bridle 24, and the inside integrated into one piece of box 20 has second becket bridle 24, and mounting panel 10 top integrated into one piece has second becket bridle 24, is connected with rope 25 between the second becket bridle 24, is convenient for mention box 20, clears up the rubble inside box 20.
When the utility model is used, the mounting plates 10 are firstly fixed at the two ends of the bridge floor through the bolts 13, when the gravels on the bridge floor fall from the two ends of the bridge floor, the gravels fall on the surface of the protective screen 11, thereby preventing the broken stones from rolling off from the two ends of the bridge, reducing the potential safety hazard during the construction of the bridge, and when the broken stones on the bridge floor need to be cleaned, the rope 25 on the first rope loop 17 is pulled, the rope 25 pulls the first rope loop 17 to drive the installation frame 18 to rotate around the installation shaft 14, the installation frame 18 drives the protection net 11 and the box plate 23 to rotate in the rotating process, so that the surface of the protection net 11 is inclined, crushed stones on the surface of the protection net 11 roll down along the protection net 11 to enter the box body 20, then the rope 25 on the second rope ring 24 is pulled, so that the box body 20 slides upwards to separate the box body 20 from the mounting plate 10, thereby facilitating the cleaning of the gravels above the device and avoiding the damage of the device caused by the accumulation of the gravels.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A construction bridge protection net with broken stone of preventing drops includes: protector (1) and install collecting box (2) on protector (1), its characterized in that, protector (1) includes mounting panel (10), set up a plurality of and bolt (13) size assorted screw holes on mounting panel (10), threaded hole installs bolt (13), mounting panel (10) one end is connected with installation frame (18), installation frame (18) internally mounted has protection network (11).
2. The construction bridge protection net with gravel falling prevention function according to claim 1, characterized in that: mounting panel (10) one end integrated into one piece has installation axle (14), installation frame (18) one end seted up with installation axle (14) size assorted mounting hole (16), installation frame (18) are connected through installation axle (14) rotation with mounting panel (10).
3. The construction bridge protection net with function of preventing broken stones from falling off according to claim 2, characterized in that: the bottom end of the mounting plate (10) is integrally formed with a limiting plate (15).
4. The construction bridge protection net with function of preventing broken stones from falling off according to claim 2, characterized in that: installation frame (18) top is provided with first becket (17), mounting panel (10) top integrated into one piece has spliced pole (19), spliced pole (19) top is connected with first becket (17), be connected with rope (25) between first becket (17).
5. The construction bridge protection net with gravel falling prevention function according to claim 1, characterized in that: the collecting box is characterized in that a sliding groove (12) is formed in the mounting plate (10), the collecting box (2) comprises a box body (20), the box body (20) is mounted on the top end of the mounting plate (10), a sliding block (21) matched with the sliding groove (12) in size is integrally formed at one end of the box body (20), the box body (20) is connected with the mounting plate (10) in a sliding mode, and one end, far away from the mounting plate (10), of the box body (20) is hinged to a box plate (23) through a hinge shaft (22).
6. The construction bridge protection net with gravel falling prevention function according to claim 5, characterized in that: boxboard (23) one end integrated into one piece has second becket bridle (24), the inside integrated into one piece of box (20) has second becket bridle (24), mounting panel (10) top integrated into one piece has second becket bridle (24), be connected with rope (25) between second becket bridle (24).
CN202022072601.7U 2020-09-21 2020-09-21 Building bridge protection network with breakage-proof stone drops Active CN213804961U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022072601.7U CN213804961U (en) 2020-09-21 2020-09-21 Building bridge protection network with breakage-proof stone drops

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022072601.7U CN213804961U (en) 2020-09-21 2020-09-21 Building bridge protection network with breakage-proof stone drops

Publications (1)

Publication Number Publication Date
CN213804961U true CN213804961U (en) 2021-07-27

Family

ID=76954115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022072601.7U Active CN213804961U (en) 2020-09-21 2020-09-21 Building bridge protection network with breakage-proof stone drops

Country Status (1)

Country Link
CN (1) CN213804961U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116824910A (en) * 2023-04-11 2023-09-29 成都零一通途科技有限公司 Road-based curve coming early warning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116824910A (en) * 2023-04-11 2023-09-29 成都零一通途科技有限公司 Road-based curve coming early warning device
CN116824910B (en) * 2023-04-11 2023-11-03 成都零一通途科技有限公司 Road-based curve coming early warning device

Similar Documents

Publication Publication Date Title
CN112983515B (en) Supporting device for tunnel portal construction and construction method thereof
CN213804961U (en) Building bridge protection network with breakage-proof stone drops
CN107185801A (en) A kind of handstone impurity removing equipment poured into a mould for Bridge guardrail
CN113187236A (en) Dustproof device for building construction
CN101514543B (en) Mobile trolley used for erecting and removing surface of construction catwalk of suspension bridge
CN108532661B (en) Soil milling operation device
CN111013699A (en) Building rubbish breaker for building engineering
CN214786195U (en) Rail guard is used in high-rise construction of building engineering
CN115086599A (en) Monitoring device and monitoring method for high-level debris flow drainage channel crossing disaster area highway
CN210346725U (en) Geological disaster site with rust and corrosion prevention function
CN213476613U (en) Highway bridge drainage structures
KR20050023378A (en) Institution of injury protect for bridge
CN220150353U (en) Rock-soil slope reinforcing device
CN214993489U (en) Protector is used in hydraulic engineering construction
CN206492616U (en) A kind of equipment on hydraulic flotation machine
CN216109870U (en) Civil construction engineering construction access way protective device structure
CN212153126U (en) Bridge construction is with preventing structure of falling
CN212477599U (en) Hydraulic engineering protection network device
CN210067638U (en) Fender is enclosed with portable to building engineering construction
CN217840951U (en) Civil engineering construction tool
CN109881667A (en) Construction platform for pouring cast-in-place pile concrete and construction method thereof
CN211202284U (en) Multistage circulation cover is prevented blockking up by sewage elevator pump
CN216786816U (en) Bridge is with preventing stifled drainage device
CN221346395U (en) Detachable guard rail
CN215714613U (en) Drainage structures for public road bridge roof beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant