CN213766337U - Concrete protection pier construction steel form with rapid Assembly function - Google Patents
Concrete protection pier construction steel form with rapid Assembly function Download PDFInfo
- Publication number
- CN213766337U CN213766337U CN202021975281.XU CN202021975281U CN213766337U CN 213766337 U CN213766337 U CN 213766337U CN 202021975281 U CN202021975281 U CN 202021975281U CN 213766337 U CN213766337 U CN 213766337U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel plate
- plate
- steel sheet
- pull rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to the technical field of concrete protection piers, in particular to a concrete protection pier construction steel template with a rapid assembly function, which comprises a first steel plate, wherein the top end and the bottom end of the first steel plate are fixedly connected with a channel steel, the front end and the back end of the first steel plate are fixedly connected with limiting plates, a second steel plate is arranged between the first steel plate and the second steel plate, the first steel plate is attached to the limiting plates, the inner side of the first steel plate runs through a threaded pull rod, and the threaded pull rod runs through the second steel plate, in the utility model, through the arranged channel steel, the limiting plates, the first steel plate, a threaded twisting buckle and a gasket, workers can conveniently realize the rapid assembly of the steel template, and simultaneously, the rapid alignment between the first steel plate and the second steel plate can be realized through the limiting plates, the assembly efficiency is also improved, the defects of the wood template are effectively avoided through the steel template, the field construction is convenient, and after the steel template is used, the construction efficiency of the concrete protection pier is improved by more than 5 times compared with the original construction efficiency.
Description
Technical Field
The utility model relates to a concrete protection mound technical field specifically is a concrete protection mound construction steel form with rapid Assembly function.
Background
Originally, construction concrete protection mound uses the plank sheathing, it is numerous and diverse to have the mode stabilizing measure, it is high to master formwork technical level requirement, easily run the mould, the shaping regularity is difficult to guarantee, the cutting of field construction plank sheathing can only be gone on by artifical use hand saw, the formwork erection is efficient, the template loss is big, but reuse rate is low, need personnel whether have the mould phenomenon to run to the template at any time among the concrete placement process and inspect, shortcomings such as construction organization difficulty, therefore, propose a concrete protection mound construction steel form with rapid Assembly function to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete protection mound construction steel form with rapid Assembly function to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a concrete protection mound construction steel form with rapid Assembly function, includes first steel sheet, the top and the equal fixedly connected with channel-section steel in bottom of first steel sheet, the equal fixedly connected with limiting plate in both ends around the first steel sheet, be provided with the second steel sheet between first steel sheet and the second steel sheet, and second steel sheet and limiting plate laminating, the inboard of first steel sheet runs through with the screw thread pull rod, and the screw thread pull rod runs through the second steel sheet, the outside of screw thread pull rod is provided with the gasket, the outside screwed connection of screw thread pull rod has screw thread turn round screw to detain.
Preferably, the inner sides of the first steel plate and the second steel plate are both provided with connecting holes, and the threaded pull rod penetrates through the first steel plate and the second steel plate through the connecting holes.
Preferably, one end of the channel steel is fixedly connected with a clamping seat, an inserting plate is clamped on the inner side of the clamping seat, and a protection plate is fixedly connected to the top end of the inserting plate.
Preferably, the protection plate is arranged above the threaded pull rod.
Preferably, a square pouring space is formed between the first steel plate and the second steel plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, through the channel-section steel that sets up, limiting plate, first steel sheet, second steel sheet, screw thread pull rod, screw thread turn round screw thread and gasket, the staff of being convenient for realizes the fast assembly to the steel form, can realize the fast alignment between first steel sheet and the second steel sheet through the limiting plate simultaneously, has also improved the efficiency of equipment, has effectively avoided the shortcoming of plank sheathing through the steel form, and open-air construction is convenient, through using behind the steel form, concrete protection mound efficiency of construction has more than 5 times than original improvement.
2. The utility model discloses in, through guard plate, cassette and the picture peg that sets up, can prevent through the guard plate that concrete placement in-process from spilling the higher authority of screw thread pull rod, lead to the problem of being convenient for dismantle between screw thread is turned round to screw thread pull rod and screw, the installation of the guard plate of being convenient for through the interact of cassette and picture peg is dismantled, the staff's of being convenient for use simultaneously.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is a schematic view of the side view mounting structure of the plug board of the present invention.
In the figure: the steel plate comprises 1-channel steel, 2-first steel plate, 3-second steel plate, 4-threaded pull rod, 5-threaded twist screw, 6-protective plate, 7-clamping seat, 8-inserting plate, 9-gasket and 10-limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
the utility model provides a concrete protection mound construction steel form with rapid Assembly function, includes first steel sheet 2, the top and the equal fixedly connected with channel-section steel 1 in bottom of first steel sheet 2, the equal fixedly connected with limiting plate 10 in both ends around the first steel sheet 2, be provided with second steel sheet 3 between first steel sheet 2 and the second steel sheet 3, and second steel sheet 3 and the laminating of limiting plate 10, the inboard of first steel sheet 2 runs through with threaded pull rod 4, and threaded pull rod 4 runs through second steel sheet 3, the outside of threaded pull rod 4 is provided with gasket 9, threaded pull rod 4's the outside screwed connection of screw thread turn round the screw thread 5, and the screw thread turn round 5 and threaded pull rod 4 fixed connection together through gasket 9 is convenient for the screw thread through gasket 9.
Connecting holes have all been seted up to the inboard of first steel sheet 2 and second steel sheet 3, and screw thread pull rod 4 runs through first steel sheet 2 and second steel sheet 3 through the connecting hole, be convenient for first steel sheet 2 and second steel sheet between 3 fixed, the one end fixedly connected with cassette 7 of channel-section steel 1, the inboard block of cassette 7 has picture peg 8, picture peg 8's top fixedly connected with guard plate 6 is convenient for realize the dismantlement to guard plate 6, guard plate 6 is in screw thread pull rod 4's top, can realize sheltering from the concrete through guard plate 6, constitute a square pouring space between first steel sheet 2 and the second steel sheet 3, the pouring of the staff of being convenient for.
The working process is as follows: in the utility model, when the worker assembles the steel membrane plate, the worker firstly stands the first steel plate 2 with the channel steel 1 and the limiting plate 10, then the second steel plate 3 is placed between the first steel plates 2 at the left and right sides, one end of the second steel plate 3 is attached to the limit plate 10, then the worker makes the threaded pull rod 4 pass through the first steel plate 2, the second steel plate 3 and the connecting hole at the inner side of the first steel plate 2 in sequence, then the gasket 9 and the thread button 5 are fixed at two ends of the thread pull rod 4, the first steel plate 2 and the second steel plate 3 can be fixedly connected together through the thread button 5 until the first steel plate 2 and the second steel plate 3 are completely fixed, then the staff inserts the inboard of picture peg 8 in cassette 7 through guard plate 6, makes guard plate 6 be in the top of screw pull rod 4, shelters from the concrete through guard plate 6.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a concrete protection mound construction steel form with rapid Assembly function, includes first steel sheet (2), its characterized in that: the top and the equal fixedly connected with channel-section steel (1) in bottom of first steel sheet (2), the equal fixedly connected with limiting plate (10) in both ends around first steel sheet (2), be provided with second steel sheet (3) between first steel sheet (2) and second steel sheet (3), and second steel sheet (3) and limiting plate (10) laminating, the inboard of first steel sheet (2) runs through with screw pull rod (4), and screw pull rod (4) run through second steel sheet (3), the outside of screw pull rod (4) is provided with gasket (9), the outside screwed connection of screw pull rod (4) has screw thread turn round screw thread (5).
2. The concrete protection pier construction steel template with the rapid assembly function according to claim 1, wherein: the connecting holes are formed in the inner sides of the first steel plate (2) and the second steel plate (3), and the threaded pull rod (4) penetrates through the first steel plate (2) and the second steel plate (3) through the connecting holes.
3. The concrete protection pier construction steel template with the rapid assembly function according to claim 1, wherein: the one end fixedly connected with cassette (7) of channel-section steel (1), the inboard block of cassette (7) has picture peg (8), the top fixedly connected with guard plate (6) of picture peg (8).
4. The concrete protection pier construction steel template with the rapid assembly function according to claim 3, wherein: the protection plate (6) is positioned above the threaded pull rod (4).
5. The concrete protection pier construction steel template with the rapid assembly function according to claim 1, wherein: a square pouring space is formed between the first steel plate (2) and the second steel plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021975281.XU CN213766337U (en) | 2020-09-11 | 2020-09-11 | Concrete protection pier construction steel form with rapid Assembly function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021975281.XU CN213766337U (en) | 2020-09-11 | 2020-09-11 | Concrete protection pier construction steel form with rapid Assembly function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213766337U true CN213766337U (en) | 2021-07-23 |
Family
ID=76904491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021975281.XU Active CN213766337U (en) | 2020-09-11 | 2020-09-11 | Concrete protection pier construction steel form with rapid Assembly function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213766337U (en) |
-
2020
- 2020-09-11 CN CN202021975281.XU patent/CN213766337U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210659276U (en) | Template positioning device for thickness of shear wall and concrete protective layer | |
CN212026786U (en) | Fastener device suitable for detachable steel bar truss building carrier plate | |
CN213766337U (en) | Concrete protection pier construction steel form with rapid Assembly function | |
CN208870375U (en) | A kind of pulling-on piece formula aluminum alloy mould plate system | |
CN213654239U (en) | Building engineering construction template device | |
CN211421834U (en) | Composite wood formwork with good compression resistance | |
CN212201254U (en) | Concrete form for hydraulic engineering | |
CN211850383U (en) | Steel bar connecting sleeve | |
CN219909940U (en) | Detachable superimposed sheet slab band reinforcing system | |
CN217814352U (en) | Aluminum profile capable of being spliced quickly | |
CN217758965U (en) | Combined steel formwork structure for advanced water stop of basement exterior wall | |
CN216810604U (en) | Panel for building engineering | |
CN211313363U (en) | Aluminum formwork assembly for building | |
CN217480945U (en) | Buckling restrained brace assembled steel construction damping device | |
CN211967890U (en) | Template for cement prefabricated tire diaphragm plate | |
CN211850798U (en) | Clear water die carrier | |
CN214273013U (en) | Building construction foundation ditch guardrail | |
CN220868004U (en) | Cover plate culvert wall body and table cap template connecting structure | |
CN216713810U (en) | Novel plastic mold plate structure with lock hole | |
CN217949748U (en) | Novel beam steel template connecting and positioning mechanism | |
CN214995919U (en) | Aluminum profile aluminum template convenient to disassemble and used for building | |
CN218664949U (en) | Portable hoisting device for H-shaped steel component | |
CN216839849U (en) | Reinforced concrete frame | |
CN219175835U (en) | Small-space easy-to-detach aluminum die | |
CN216641050U (en) | Steel shell composite cement board non-bearing wall without removing form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |