CN213742267U - Concrete construction operation panel - Google Patents

Concrete construction operation panel Download PDF

Info

Publication number
CN213742267U
CN213742267U CN202022140600.1U CN202022140600U CN213742267U CN 213742267 U CN213742267 U CN 213742267U CN 202022140600 U CN202022140600 U CN 202022140600U CN 213742267 U CN213742267 U CN 213742267U
Authority
CN
China
Prior art keywords
steel pipe
footboard
pedal
rubber pad
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022140600.1U
Other languages
Chinese (zh)
Inventor
王艳
曾刚
杜君
刘忠绘
李清涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022140600.1U priority Critical patent/CN213742267U/en
Application granted granted Critical
Publication of CN213742267U publication Critical patent/CN213742267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a concrete construction operation panel, including template steel pipe, footboard and second ejector pin, the sleeve pipe has been cup jointed in the outside of template steel pipe, the bolt has been run through to the inside in hole groove, the left side skin weld of template steel pipe has first ejector pin, the terminal welding of first montant has the horizontal pole, the footboard is located the top of horizontal pole, the upper surface of footboard covers there is the rubber pad, the right side welding of horizontal pole has the second montant, the second ejector pin is located the sheathed tube right side, the below of electronic slide rail is connected with electronic slider. The utility model discloses a location operation between constant head tank and the locating piece can avoid the footboard to produce relative displacement between use and horizontal pole to improve the stability of footboard, ensured the device's safety in utilization, the rubber pad is the smooth footboard upper surface that is fixed in, the setting of rubber pad and bump is used for improving the antiskid nature of footboard, avoids the staff to fall down on the footboard.

Description

Concrete construction operation panel
Technical Field
The utility model relates to a concrete construction technical field specifically is a concrete construction operation panel.
Background
Concrete construction generally refers to a series of operations such as reinforcing steel bar manufacturing and binding, template placing and fixing, mixing, transporting, pouring, maintaining and the like by using raw materials meeting quality requirements according to specified proportions, meanwhile, overall process quality control and inspection are performed on all links, an operation table is usually arranged in the concrete construction process, and workers can stand on the operation table to complete concrete pouring.
The existing concrete construction operation platform has the following defects:
1. the existing concrete construction platform adopts a wooden pedal for workers to use, the wooden pedal is easy to rot after long-term use, moss on the surface of the wooden pedal is easy to slip, and the workers can easily fall down when walking on the pedal;
2. when building structure was made to current concrete, need build the scaffold frame, the wooden scaffold frame structure of building is simple and convenient, damages easily and is unfavorable for long-time the use, adopts the scaffold frame not high enough as concrete construction platform security.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete construction operation panel to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete construction operation console comprises a template steel pipe, a pedal and a second ejector rod, wherein a sleeve is sleeved on the outer side of the template steel pipe, a hole groove is formed in the surface of the sleeve, a bolt penetrates through the hole groove, a first ejector rod is welded on the left side surface of the template steel pipe, a first vertical rod is welded below the first ejector rod, a cross rod is welded at the tail end of the first vertical rod, a positioning block is integrally arranged on the surface of the cross rod, the pedal is located above the cross rod, a positioning groove is formed in the lower surface of the pedal, a rubber pad covers the upper surface of the pedal, salient points are distributed on the upper surface of the rubber pad in an arrayed mode, a second vertical rod is welded on the right side of the cross rod, a guardrail is welded on the right side of the second vertical rod, the second ejector rod is located on the right side of the sleeve, an electric sliding rail is fixedly mounted on the lower surface of the second ejector rod, and an electric sliding block is connected below the electric sliding rail, and a balancing weight is arranged below the electric sliding block.
Preferably, the template steel pipe is in threaded connection with the sleeve through a hole and a groove and a bolt, and the template steel pipe is perpendicular to the first ejector rod.
Preferably, the first ejector rods are connected with the cross rods through first vertical rods, the number of the first ejector rods is equal to that of the cross rods, and the first ejector rods are parallel to the cross rods.
Preferably, the cross rod is connected with the pedal through a positioning block and a positioning groove, and the outer surface of the positioning block is attached to the inner surface of the positioning groove.
Preferably, round holes are formed in four corners of the rubber pad, screws penetrate through the round holes, the lower surface of the rubber pad is attached to the upper surface of the pedal, and the rubber pad is in threaded connection with the pedal through the round holes and the screws.
Preferably, the second ejector rod forms a sliding structure with the counterweight block through the electric sliding rail and the electric sliding block, and the template steel pipe is perpendicular to the second ejector rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses well horizontal pole is connected with the footboard through locating piece and constant head tank, and the device passes through the location operation between constant head tank and the locating piece, can avoid the footboard to produce relative displacement between in the use and the horizontal pole to improve the stability of footboard, ensured the device's safety in utilization.
2. The utility model discloses well rubber pad passes through round hole and screw and footboard threaded connection, through the screw with the rubber pad levelly and smoothly be fixed in the footboard upper surface, the setting of rubber pad and bump is used for improving the antiskid nature of footboard, avoids the staff to fall down on the footboard, and the rubber pad covers in the footboard surface, can protect wooden footboard, avoids the footboard to be corroded by the rainwater, prolongs the life of footboard.
3. The utility model discloses the position of well balancing weight is adjusted through electronic slider, and the device avoids the device focus skew through mutually supporting between electronic slide rail, electronic slider and the balancing weight to adjust the device's equilibrium, is favorable to improving the device's overall stability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a three-dimensional structure of the rubber pad of the present invention;
FIG. 3 is a schematic top view of the cross bar of the present invention;
fig. 4 is a schematic side view of a second vertical rod of the present invention;
fig. 5 is an enlarged schematic structural diagram of a in fig. 1 according to the present invention.
In the figure: 1. template steel pipes; 2. a sleeve; 3. a hole groove; 4. a bolt; 5. a first ejector rod; 6. a first vertical bar; 7. a cross bar; 8. positioning blocks; 9. positioning a groove; 10. a pedal; 11. a rubber pad; 12. salient points; 13. a circular hole; 14. a screw; 15. a second vertical bar; 16. a guardrail; 17. a second ejector rod; 18. an electric slide rail; 19. an electric slider; 20. and a balancing weight.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: a concrete construction operation platform comprises a template steel pipe 1, a pedal 10 and a second ejector rod 17, wherein the outer side of the template steel pipe 1 is sleeved with a sleeve 2, the surface of the sleeve 2 is provided with a hole groove 3, a bolt 4 penetrates through the hole groove 3, the left side surface of the template steel pipe 1 is welded with a first ejector rod 5, a first vertical rod 6 is welded below the first ejector rod 5, the tail end of the first vertical rod 6 is welded with a cross rod 7, the surface of the cross rod 7 is integrally provided with a positioning block 8, the pedal 10 is positioned above the cross rod 7, the lower surface of the pedal 10 is internally provided with a positioning groove 9, the upper surface of the pedal 10 is covered with a rubber pad 11, salient points 12 are distributed on the upper surface of the rubber pad 11 in an arrayed manner, the right side of the cross rod 7 is welded with a second vertical rod 15, the right side of the second vertical rod 15 is welded with a guardrail 16, the second ejector rod 17 is positioned on the right side of the sleeve 2, and an electric sliding rail 18 is fixedly arranged on the lower surface of the second ejector rod 17, an electric sliding block 19 is connected below the electric sliding rail 18, and a balancing weight 20 is installed below the electric sliding block 19.
Further, the template steel pipe 1 is in threaded connection with the sleeve 2 through a hole groove 3 and a bolt 4, the template steel pipe 1 is vertical to the first ejector rod 5, when the device is used, firstly, the sleeve 2 is sleeved on the outer side of the template steel pipe 1, then the bolt 4 is screwed into the hole groove 3 clockwise until the tail end of the bolt 4 enters the template steel pipe 1, the front and back surfaces of the sleeve 2 are both provided with the hole grooves 3, the sleeve 2 is tightly fixed on the outer side of the template steel pipe 1 through a bolt 4, the first ejector rod 5 is connected with the cross rod 7 through a first vertical rod 6, the number of the first top rods 5 is equal to that of the cross rods 7, the first top rods 5 are parallel to the cross rods 7, the concrete construction operation platform utilizes the existing template steel pipe 1 in a building template system as a supporting element of a first ejector rod 5, a first vertical rod 6 and a cross rod 7, so that the position of the cross rod 7 is fixed and firm;
furthermore, the cross rod 7 is connected with the pedal 10 through the positioning block 8 and the positioning groove 9, the outer surface of the positioning block 8 is attached to the inner surface of the positioning groove 9, after the position of the cross rod 7 is fixed, the positioning groove 9 on the lower surface of the pedal 10 can be aligned to the positioning block 8 to be pressed down, so that the pedal 10 stably covers the upper surface of the cross rod 7, and the device can prevent the pedal 10 from generating relative displacement with the cross rod 7 in the using process through the positioning operation between the positioning groove 9 and the positioning block 8;
furthermore, round holes 13 are formed in four corners of the rubber pad 11, screws 14 penetrate through the round holes 13, the lower surface of the rubber pad 11 is attached to the upper surface of the pedal 10, the rubber pad 11 is in threaded connection with the pedal 10 through the round holes 13 and the screws 14, after the pedal 10 is installed, the rubber pad 11 can be covered on the upper surface of the pedal 10, the screws 14 are screwed into the round holes 13 clockwise, the rubber pad 11 is flatly fixed on the upper surface of the pedal 10 through the screws 14, the rubber pad 11 and the salient points 12 are arranged to improve the skid resistance of the pedal 10, and workers are prevented from falling down on the pedal 10;
further, second ejector pin 17 passes through and constitutes sliding construction between electronic slide rail 18 and electronic slider 19 and the balancing weight 20, and mutually perpendicular between template steel pipe 1 and the second ejector pin 17, electronic slider 19 can follow electronic slide rail 18 direction and carry out translation from side to side, balancing weight 20 removes along with it when electronic slider 19 translation, adjust the position of balancing weight 20 according to actual conditions, the device passes through electronic slide rail 18, the equilibrium of the device is adjusted in the mutually supporting between electronic slider 19 and the balancing weight 20, avoid the device focus skew, be favorable to improving the overall stability of the device.
The working principle is as follows: when the device is used, firstly, a sleeve 2 is sleeved on the outer side of a template steel pipe 1, then a bolt 4 is screwed into a hole groove 3 clockwise until the tail end of the bolt 4 enters the template steel pipe 1, the front and back surfaces of the sleeve 2 are provided with the hole grooves 3, the sleeve 2 is tightly fixed on the outer side of the template steel pipe 1 through the bolt 4, the concrete construction operating platform utilizes the existing template steel pipe 1 in a building template system as a supporting element of a first ejector rod 5, a first vertical rod 6 and a cross rod 7, after the position of the cross rod 7 is fixed, a positioning groove 9 on the lower surface of a pedal 10 can be aligned to a positioning block 8 to be pressed down, so that the pedal 10 stably covers the upper surface of the cross rod 7, a worker can stand on the pedal 10 to perform a series of operations such as concrete pouring, after the pedal 10 is installed, a rubber pad 11 can cover the upper surface of the pedal 10, and then a screw 14 is screwed into a round hole 13 clockwise, the rubber pad 11 is flatly fixed on the upper surface of the pedal 10 through the screw 14, and the arrangement of the rubber pad 11 avoids the phenomenon that a worker slips on the pedal 10.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a concrete construction operation panel, includes template steel pipe (1), footboard (10) and second ejector pin (17), its characterized in that: the template steel pipe is characterized in that a sleeve (2) is sleeved on the outer side of the template steel pipe (1), a hole groove (3) is formed in the surface of the sleeve (2), a bolt (4) penetrates through the hole groove (3), a first ejector rod (5) is welded on the left side surface of the template steel pipe (1), a first vertical rod (6) is welded below the first ejector rod (5), a cross rod (7) is welded at the tail end of the first vertical rod (6), a positioning block (8) is integrally arranged on the surface of the cross rod (7), the pedal (10) is located above the cross rod (7), a positioning groove (9) is formed in the lower surface of the pedal (10), a rubber pad (11) covers the upper surface of the pedal (10), salient points (12) are distributed on the upper surface of the rubber pad (11), a second vertical rod (15) is welded on the right side of the cross rod (7), and a guardrail (16) is welded on the right side of the second vertical rod (15), second ejector pin (17) are located the right side of sleeve pipe (2), and the lower fixed surface of second ejector pin (17) installs electronic slide rail (18), the below of electronic slide rail (18) is connected with electronic slider (19), and the below of electronic slider (19) installs balancing weight (20).
2. A concrete construction console according to claim 1, wherein: the template steel pipe (1) is in threaded connection with the sleeve (2) through the hole groove (3) and the bolt (4), and the template steel pipe (1) is perpendicular to the first ejector rod (5).
3. A concrete construction console according to claim 1, wherein: first ejector pin (5) are connected with horizontal pole (7) through first montant (6), and the quantity of first ejector pin (5) equals with the quantity of horizontal pole (7), are parallel to each other between first ejector pin (5) and horizontal pole (7) moreover.
4. A concrete construction console according to claim 1, wherein: the cross rod (7) is connected with the pedal (10) through the positioning block (8) and the positioning groove (9), and the outer surface of the positioning block (8) is attached to the inner surface of the positioning groove (9).
5. A concrete construction console according to claim 1, wherein: round holes (13) are formed in four corners of the rubber pad (11), screws (14) penetrate through the round holes (13), the lower surface of the rubber pad (11) is attached to the upper surface of the pedal (10), and the rubber pad (11) is in threaded connection with the pedal (10) through the round holes (13) and the screws (14).
6. A concrete construction console according to claim 1, wherein: and the second ejector rod (17) forms a sliding structure with the counterweight block (20) through an electric sliding rail (18) and an electric sliding block (19), and the template steel pipe (1) is vertical to the second ejector rod (17).
CN202022140600.1U 2020-09-26 2020-09-26 Concrete construction operation panel Expired - Fee Related CN213742267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022140600.1U CN213742267U (en) 2020-09-26 2020-09-26 Concrete construction operation panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022140600.1U CN213742267U (en) 2020-09-26 2020-09-26 Concrete construction operation panel

Publications (1)

Publication Number Publication Date
CN213742267U true CN213742267U (en) 2021-07-20

Family

ID=76846209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022140600.1U Expired - Fee Related CN213742267U (en) 2020-09-26 2020-09-26 Concrete construction operation panel

Country Status (1)

Country Link
CN (1) CN213742267U (en)

Similar Documents

Publication Publication Date Title
CN210029819U (en) Cantilever crane stand reinforcing apparatus
CN213742267U (en) Concrete construction operation panel
CN207908282U (en) A kind of mechanical property of masonry experimental rig and masonry test structure
CN213174693U (en) Connect stable concatenation formula scaffold frame
CN111350337A (en) Bearing frame for building construction
CN216369976U (en) Automatic electroslag pressure welding auxiliary device to rib
CN211736288U (en) Special work bench for building stairs
CN211949708U (en) Railing is prevented to building engineering instrument formula stair
CN210857752U (en) Structure falls board and hangs split heads muscle for mould
CN210440910U (en) Hydraulic engineering is with surveying device convenient to carry
CN209780180U (en) Insulating scaffold for power transmission line construction
CN208455656U (en) A kind of anchor ear support device
CN203484704U (en) Simple movable-arm-type drilling device
CN218518011U (en) Clamping tool for machining upper bracket part of tower crane
CN213683172U (en) External scaffold steel plate net fixing device
CN215677046U (en) Wall post template straightness measuring tool that hangs down
CN206158145U (en) Elevartor shaft formwork construction trolley frame
CN210756153U (en) Stainless steel railing welding position device
CN217537879U (en) Template fixed bolster for building engineering
CN214191105U (en) Waste material pool
CN214834552U (en) Supporting platform with protective structure for construction
CN217106164U (en) Aluminum formwork verticality control device
CN217733863U (en) Concrete anticollision barrier reinforcing bar positioner
CN217379742U (en) Simple triangular support for scaffold
CN213275206U (en) Concrete detection device that shocks resistance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210720