CN213742156U - Operation platform for building - Google Patents

Operation platform for building Download PDF

Info

Publication number
CN213742156U
CN213742156U CN202021830500.5U CN202021830500U CN213742156U CN 213742156 U CN213742156 U CN 213742156U CN 202021830500 U CN202021830500 U CN 202021830500U CN 213742156 U CN213742156 U CN 213742156U
Authority
CN
China
Prior art keywords
operation panel
crossbeam
apron
pull board
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021830500.5U
Other languages
Chinese (zh)
Inventor
于兴梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Honghai Architectural Engineering Co ltd
Original Assignee
Tianjin Honghai Architectural Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Honghai Architectural Engineering Co ltd filed Critical Tianjin Honghai Architectural Engineering Co ltd
Priority to CN202021830500.5U priority Critical patent/CN213742156U/en
Application granted granted Critical
Publication of CN213742156U publication Critical patent/CN213742156U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to an operation platform is used to building, it includes strutting arrangement, the strutting arrangement top has set firmly the operation panel, the climbing ladder has set firmly in the strutting arrangement, the through-hole has been seted up to operation panel central point position, the operation panel bisymmetry lateral wall slides respectively and pegs graft and has first pull board and second pull board, operation panel one end is kept away from to first pull board upper surface has set firmly first perpendicular fence, operation panel one end is kept away from to second pull board upper surface has set firmly the second and erects the fence, be provided with protective component between first perpendicular fence and the second perpendicular fence, this application has the effect of guaranteeing staff's safety.

Description

Operation platform for building
Technical Field
The application relates to the technical field of construction equipment, in particular to an operation platform for building use.
Background
Need a safe firm operation holding surface when decorating building outside or building indoor, for satisfying construction requirements needs use operation platform for building, operation platform for building's setting can make things convenient for the staff to construct to building eminence or all around.
The existing Chinese patent with reference to the publication No. CN209163396U discloses a climbing type building construction operation platform outside a building, which comprises a fixed base, wherein support columns are fixedly arranged at four corners of the upper surface of the fixed base, a cross beam is fixedly arranged between every two adjacent support columns, an operation table is fixedly arranged at the top end of each support column, a through hole is formed in the center of the operation table, a climbing ladder is fixedly arranged in the through hole and positioned in a cavity defined by the support columns, slots are formed in two symmetrical side walls of the operation table, pull plates are slidably inserted in the slots, a limit plate is fixedly arranged on the side wall of each pull plate far away from the operation platform, vertical fences are fixedly arranged on the upper surface of the limit plate, when in use, a worker ascends to the upper surface of the operation table from the bottom of the building operation platform through the climbing ladder to perform construction operation, when the area of the operation table needs to be increased, the pull plates are stretched to one side far away from the operation table, and are stretched towards two sides, the effect of adjusting the area of the operating platform is achieved.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: the building construction operation platform is used outside a building, the safety of workers is guaranteed through high-altitude operation, and when the workers work on the operation platform, effective protection cannot be provided, and the safety of the workers cannot be guaranteed.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems existing in the technical scheme, the application provides an operation platform for building use.
The application provides an operation platform is used to building adopts following technical scheme: the utility model provides an operation platform is used to building, including strutting arrangement, the strutting arrangement top has set firmly the operation panel, the support arrangement internal setting has the climbing ladder, the through-hole has been seted up to operation panel central point, the climbing ladder top is passed the through-hole and is reachd the operation panel upper surface, the operation panel bisymmetry lateral wall slides respectively and pegs graft and has been had first pull board and second pull board, operation panel one end is kept away from to first pull board upper surface has set firmly first perpendicular fence, operation panel one end is kept away from to second pull board upper surface has set firmly the second and has erect the fence, be provided with protective component between first perpendicular fence and the second perpendicular fence, protective component includes the sleeve pipe, fixedly connected with straight-bar between sleeve pipe and the operation panel, sleeve pipe internal sliding peg graft has first crossbeam and second crossbeam, the remaining one end of first crossbeam and first perpendicular fence fixed connection, the remaining one end of second crossbeam and second perpendicular fence fixed connection.
Through adopting above-mentioned technical scheme, strutting arrangement provides stable work platform for the staff with the operation panel is fixed, the area of operation panel has been increased in the setting of first pull board and second pull board, make things convenient for the staff to carry out the construction operation to great scope, the setting up of climbing ladder makes things convenient for the staff to arrive the operation panel from ground, protection component's setting can be to playing the effect of stopping, staff's safety has been guaranteed, when the staff need take first pull board and second pull board out in by the workstation, first crossbeam and second crossbeam can slide in the sleeve pipe, along with the increase of first vertical bar and second vertical bar to the operation panel distance, first crossbeam and second crossbeam follow the sleeve pipe and slide out the same distance, can also protect the staff when satisfying the demand of operation panel increase, the effect of guaranteeing staff's safety has been reached.
Preferably, the first cross beam is located above the second cross beam, the adjusting assembly is arranged between the first cross beam and the second cross beam and comprises a first rack and a second rack, the first rack is fixedly connected to the lower surface of the first cross beam, the second rack is fixedly arranged on the lower surface of the second cross beam, a gear is meshed between the first rack and the second rack, the outer wall of the straight rod is fixedly provided with a motor, and an output shaft of the motor penetrates through the sleeve and is fixedly connected with the gear.
By adopting the technical scheme, the motor is opened when the adjusting component is used, the motor drives the gear to rotate, the gear drives the first rack and the second rack to rotate, when the first drawing plate and the second drawing plate are required to be drawn out from the operating platform, the motor output shaft is instantaneously rotated, when the first drawing plate and the second drawing plate are required to be inserted into the operating platform, the motor output shaft rotates anticlockwise, the adjusting component is arranged to facilitate the adjustment of the area of the operating platform by a worker, and the purpose of facilitating the operation of the worker is achieved.
Preferably, the two ends of the sleeve are in threaded connection with locking bolts, and the locking bolts penetrate through the outer wall of the sleeve and are respectively abutted against the outer walls of the first cross beam and the second cross beam.
Through adopting above-mentioned technical scheme, after the regulation of adjusting first pull board and second pull board after the completion, screw up the locking bolt, the relative position between first crossbeam, second crossbeam and the sleeve pipe is fixed to the locking bolt, has guaranteed the stability of operation panel, has reached the effect of guaranteeing that the staff is healthy.
Preferably, a plurality of first stop levers are fixedly connected between the sleeve and the operating platform.
Through adopting above-mentioned technical scheme, the setting of first shelves pole provides the safety guarantee for the staff in vertical direction, guarantees that the staff can not follow the workstation under the landing in the space between protective component and the operation panel, has reached the effect of protection staff safety.
Preferably, a plurality of second stop rods are fixedly arranged on the side walls of the first vertical fence and the second vertical fence, and the second stop rods and the first stop rods are not on the same plane.
Through adopting above-mentioned technical scheme, when first pull board and second pull board were taken out from the operation panel, the setting of second shelves pole can prevent that the staff from erecting the space between fence and the first shelves pole and falling the operation panel from first, has reached the effect of guaranteeing staff's safety.
Preferably, the through hole is provided with and shelters from the subassembly, shelters from the subassembly and includes first apron and second apron, and first apron is located to be close to first pull board one side and articulated with the operation panel, and the second apron is for and be close to second pull board one side and articulated with the operation panel, and first apron and second apron lateral wall have all set firmly the baffle, and the baffle inlays to be established in the operation panel.
Through adopting above-mentioned technical scheme, when the staff passes through the climbing ladder to the operation platform upper surface, upwards promote first apron and second apron, first apron and the upset that makes progress of second apron, when the staff rises to the operation panel, restore first apron and second apron, the baffle can prevent first apron and second apron upset downwards, prevents that the staff from falling down the operation panel in the through-hole, has reached the effect of guaranteeing staff's safety.
Preferably, the lower surface of the operating platform is fixedly provided with a reinforcing rib, and the reinforcing rib is positioned below the baffle.
Through adopting above-mentioned technical scheme, the intensity of operation panel has been strengthened in setting up of strengthening rib, has guaranteed the stability of first apron and second apron when the baffle is taken on the operation panel, has guaranteed staff's safety.
Preferably, the upper surfaces of the first cover plate and the second cover plate are respectively embedded with a buckle, and the buckles are respectively positioned on one side close to the climbing ladder.
Through adopting above-mentioned technical scheme, when the staff need get back to the ground from the operation panel, the setting up of attacker conveniently mentions first apron and second apron, makes things convenient for the staff to use, inlays to establish and can guarantee that the staff can not stumble by the attacker when moving on the operation panel at first apron and second apron upper surface, has guaranteed the security when having improved the practicality.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the arrangement of the protective component can prevent a worker from sliding down from a gap between the first vertical column and the second vertical column, the protective component has a telescopic function and can meet the sliding characteristic of the first drawing plate and the second drawing plate, the arrangement of the adjusting component can facilitate the first drawing plate and the second drawing plate to be drawn out from the operating platform, and the worker can conveniently adjust the area of the operating platform;
2. the locking bolts can fix the opposite positions between the first cross beam and the sleeve and between the second cross beam and the sleeve, the stability of the operating table is ensured on the first drawing plate and the second drawing plate, and the safety of workers is ensured;
3. the setting of first apron and second apron can prevent that the staff from falling down the operation panel in the through-hole, and the setting of attacker can make things convenient for the staff to lift first apron and second apron, and the setting of strengthening rib has increased the stability of first apron and second apron, has guaranteed staff's safety.
Drawings
FIG. 1 is an overall schematic diagram of an embodiment of the present application;
FIG. 2 is a partial cross-sectional view of the adjustment assembly;
figure 3 is a schematic view of a part of the reinforcing bar showing the reinforcing bar.
In the figure, 1, a support device; 11. climbing a ladder; 2. an operation table; 21. a through hole; 22. a first drawing plate; 221. a first vertical column; 23. a second drawing plate; 231. a second vertical column; 24. reinforcing ribs; 3. a guard assembly; 31. a sleeve; 331. a first shift lever; 32. a straight rod; 33. a first cross member; 34. a second cross member; 4. an adjustment assembly; 41. a first rack; 42. a second rack; 43. a gear; 44. a motor; 5. locking the bolt; 6. a second shift lever; 7. a shielding component; 71. a first cover plate; 72. a second cover plate; 73. a baffle plate; 74. and (6) buckling a handle.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses operation platform is used to building.
Referring to fig. 1, the operation platform for building use comprises a supporting device 1, the supporting device 1 is fixedly connected with the ground, an operation table 2 is fixedly arranged on the upper surface of the supporting device 1, a through hole 21 is formed on the upper surface of the operation table 2, a climbing ladder 11 is arranged in the supporting device 1, the climbing ladder 11 passes through the through hole 21 and is fixedly connected with the supporting device 1, a first drawing plate 22 and a second drawing plate 23 are slidably inserted into two symmetrical side walls of the operation table 2, a first vertical column 221 and a second vertical column 231 are fixedly arranged on one sides of the first drawing plate 22 and the second drawing plate 23 away from the operation table 2, a protection component 3 is arranged between the first vertical column 221 and the second vertical column 231, the protection component 3 comprises a sleeve 31, a first cross beam 33 and a second cross beam 34, an adjusting component 4 is arranged between the first cross beam 33 and the second cross beam 34, when in use, a worker passes through the through hole 21 and goes up to the upper surface of the operation table 2 through the climbing ladder 11, first crossbeam 33 and second crossbeam 34 slide to peg graft and can prevent that the staff from following first perpendicular fence 221 and the second from erecting workstation 2 down in the space between the fence 231, when needs take first pull board 22 and second pull board 23 out from the workstation 2, adjusting component 4's setting can conveniently be taken first pull board 22 and second pull board 23 out, can also make things convenient for the staff to operate when having reached the effect of guaranteeing staff's safety.
Referring to fig. 1, a straight rod 32 is fixedly connected between a sleeve 31 and the upper surface of an operating table 2, a first cross beam 33 and a second cross beam 34 are inserted in the sleeve 31 in a sliding manner, the remaining end of the first cross beam 33 is fixedly connected with a first vertical column 221, the remaining end of the second cross beam 34 is fixedly connected with a second vertical column 231, the first cross beam 33 is located above the second cross beam 34, when the first drawing plate 22 and the second drawing plate 23 are drawn out of the operating table 2, the first cross beam 33 and the second cross beam 34 slide in the sleeve 31, and along with the increase of the distance from the first drawing plate 22 to the operating table 2, the length of the first cross beam 33 and the length of the second cross beam 34 outside the sleeve 31 are longer, so that the effect of ensuring the safety of working personnel is achieved.
Referring to fig. 2, the adjusting assembly 4 includes a first rack 41 and a second rack 42, the first rack 41 is fixedly connected to the lower surface of the first beam 33, the second rack 42 is fixedly connected to the upper surface of the second beam 34, a gear 43 is engaged and connected between the first rack 41 and the second rack 42, a motor 44 is fixedly connected to the outer wall of the casing 31, an output shaft of the motor 44 is fixedly connected to the gear 43, when the first drawing plate 22 and the second drawing plate 23 need to be drawn out from the operation table 2, the motor 44 is started, the output shaft of the motor 44 rotates clockwise, when the first drawing plate 22 and the second drawing plate 23 are required to be inserted into the operating platform 2, the motor 44 is started, the output shaft of the motor 44 rotates anticlockwise, the gear 43 drives the first rack 41 and the second rack 42, the first rack 41 drives the first drawing plate 22, and the second rack 42 drives the second drawing plate 23 to be inserted into the operating platform 2.
Referring to fig. 1, threaded connection has locking bolt 5 at sleeve 31 both ends, and locking bolt 5 runs through sleeve 31 respectively with first crossbeam 33 and the outer wall butt of second crossbeam 34, when taking first pull board 22 and second pull board 23 out the back, screws up locking bolt 5, reaches the effect of fixed relative position between first crossbeam 33, second crossbeam 34 and the sleeve 31, has guaranteed whole building operation platform's stability, has reached the effect of guaranteeing staff's safety.
Referring to fig. 1, a first gear rod 331 is fixedly connected between the sleeve 31 and the operating platform 2, a second gear rod 6 is fixedly arranged on outer walls of the first vertical rail 221 and the second vertical rail 231, the first gear rod 331 can prevent a worker from sliding down from a gap between the protective component 3 and the operating platform 2, and the second gear rod 6 can prevent the worker from sliding down from the gap between the first vertical rail 221, the second vertical rail 231 and the first gear rod 331 when the first drawing plate 22 and the second drawing plate 23 are drawn out from the operating platform 2.
Referring to fig. 1, a shielding assembly 7 is arranged at the through hole 21, the shielding assembly 7 comprises a first cover plate 71 and a second cover plate 72, the first cover plate 71 and the second cover plate 72 are hinged to the operating platform 2, a baffle 73 is fixedly connected to the side walls of the first cover plate 71 and the second cover plate 72, the baffle 73 is embedded in the upper surface of the operating platform 2, a buckle 74 is embedded in the upper surfaces of the first cover plate 71 and the second cover plate 72, and the first cover plate 71 and the second cover plate 72 can be opened from the upper surface of the operating platform by a worker due to the arrangement of the buckle 74.
Referring to fig. 3, the reinforcing ribs 24 are fixedly connected to the lower surface of the operating platform 2, the reinforcing ribs 24 are located below the baffle 73, the strength of the operating platform 2 can be increased due to the arrangement of the reinforcing ribs 24, the stability of the baffle 73 embedded on the operating platform 2 is guaranteed, and the safety of a worker is guaranteed.
The implementation principle of the embodiment is as follows: when the device is used, a worker climbs the operating platform 2 through the climbing body, when the device ascends to the first cover plate 71 and the second cover plate 72, the first cover plate 71 and the second cover plate 72 are pushed upwards to smoothly reach the upper surface of the operating platform 2, when the area of the operating platform 2 needs to be adjusted by the worker, the motor 44 is started, the output shaft of the motor 44 instantaneously rotates, the first pull plate 22 and the second pull plate 23 are drawn out of the operating platform 2, meanwhile, the length of the first beam 33 and the length of the second beam 34 outside the sleeve 31 are long, the effect of protecting the worker is achieved, when the first pull plate 22 and the second pull plate 23 need to slide into the operating platform 2, the motor 44 is started, the output shaft of the motor 44 rotates anticlockwise, the first pull plate 22 and the second pull plate 23 are driven to return to the original positions, when the worker needs to return to the ground from the operating platform 2, the hand is pulled to pull the buckle 74, the first cover plate 71 and the second cover plate 72, the working platform returns to the ground smoothly along the climbing ladder 11 from the through hole 21, the area of the operating platform 2 can be adjusted conveniently by the workers due to the arrangement of the adjusting component 4, and the safety of the workers is guaranteed due to the arrangement of the protective component 3, the first gear rod 331 and the second gear rod 6.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an operation platform is used to building, including strutting arrangement (1), strutting arrangement (1) top has set firmly operation panel (2), strutting arrangement (1) internal set has climbing ladder (11), through-hole (21) have been seted up to operation panel (2) central point, climbing ladder (11) top is passed through-hole (21) and is reachd operation panel (2) upper surface, operation panel (2) two symmetric side wall slides respectively and pegs graft and have first pull board (22) and second pull board (23), operation panel (2) one end is kept away from to first pull board (22) upper surface has set firmly first vertical fence (221), operation panel (2) one end is kept away from to second pull board (23) upper surface has set firmly second vertical fence (231), its characterized in that: be provided with between first perpendicular fence (221) and the second perpendicular fence (231) protective component (3), protective component (3) are including sleeve pipe (31), fixedly connected with straight-bar (32) between sleeve pipe (31) and operation panel (2), and sleeve pipe (31) internal slip is pegged graft and is had first crossbeam (33) and second crossbeam (34), and first crossbeam (33) surplus one end and first perpendicular fence (221) fixed connection, second crossbeam (34) surplus one end and second perpendicular fence (231) fixed connection.
2. The construction work platform of claim 1, wherein: first crossbeam (33) are located second crossbeam (34) top, set up adjusting part (4) between first crossbeam (33) and second crossbeam (34), adjusting part (4) include first rack (41) and second rack (42), first rack (41) fixed connection is at first crossbeam (33) lower surface, second rack (42) set firmly at second crossbeam (34) lower surface, meshing has gear (43) between first rack (41) and second rack (42), straight-bar (32) outer wall has set firmly motor (44), motor (44) output shaft runs through sleeve pipe (31) and gear (43) fixed connection.
3. The construction work platform of claim 1, wherein: and two ends of the sleeve (31) are in threaded connection with locking bolts (5), and the locking bolts (5) penetrate through the outer wall of the sleeve (31) and are respectively abutted against the outer walls of the first cross beam (33) and the second cross beam (34).
4. The construction work platform of claim 1, wherein: a plurality of first stop levers (331) are fixedly connected between the sleeve (31) and the operating platform (2).
5. An architectural use operating platform according to claim 4, wherein: the side walls of the first vertical rail (221) and the second vertical rail (231) are fixedly provided with a plurality of second stop levers (6), and the second stop levers (6) and the first stop levers (331) are not on the same plane.
6. The construction work platform of claim 1, wherein: through-hole (21) department is provided with shelters from subassembly (7), shelters from subassembly (7) and includes first apron (71) and second apron (72), and first apron (71) are located and are close to first pull board (22) one side and articulate with operation panel (2), and second apron (72) are located and are close to second pull board (23) one side and articulate with operation panel (2), and first apron (71) and second apron (72) lateral wall all set firmly baffle (73), and baffle (73) are inlayed and are established in operation panel (2).
7. The construction work platform of claim 1, wherein: the lower surface of the operating platform (2) is fixedly provided with a reinforcing rib (24), and the reinforcing rib (24) is positioned below the baffle (73).
8. An architectural use operating platform according to claim 6, wherein: the upper surfaces of the first cover plate (71) and the second cover plate (72) are embedded with buckles (74), and the buckles (74) are located on one side close to the climbing ladder (11).
CN202021830500.5U 2020-08-27 2020-08-27 Operation platform for building Expired - Fee Related CN213742156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021830500.5U CN213742156U (en) 2020-08-27 2020-08-27 Operation platform for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021830500.5U CN213742156U (en) 2020-08-27 2020-08-27 Operation platform for building

Publications (1)

Publication Number Publication Date
CN213742156U true CN213742156U (en) 2021-07-20

Family

ID=76841104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021830500.5U Expired - Fee Related CN213742156U (en) 2020-08-27 2020-08-27 Operation platform for building

Country Status (1)

Country Link
CN (1) CN213742156U (en)

Similar Documents

Publication Publication Date Title
DE2622840A1 (en) CLIMBING SCAFFOLDING WITH APPROPRIATE FORMWORK
DE202013009466U1 (en) Ladder with variable strut extension
EP3926125B1 (en) Fall prevention device
BR112020025436A2 (en) TELESCOPIC LADDER, TELESCOPIC LADDER, LOAD LIFTING SYSTEM AND KIT
CN213742156U (en) Operation platform for building
DE19500705C2 (en) Ladder-based work platform
DE19738809A1 (en) Stairs construction ladder replacement on building sites
CN211228285U (en) Rail guard is used in planning of building city
US3490559A (en) Knockdown scaffolding
EP1019610A1 (en) Ladder with side auxiliary platform support
DE2407103A1 (en) Ladder scaffolding supporting working-platform - with triangle-grouped cantilevered supports with hooked traverses on base bar
DE829790C (en) Formwork, preferably made of sheet steel, for making walls and ceilings
DE2338377A1 (en) CONSTRUCTION ELEVATOR
CN218780289U (en) Height-adjustable portable folding step
CN219298706U (en) Lifting scaffold
CN218714883U (en) But height-adjusting's stable form engineering construction scaffold
CN212224595U (en) Building external climbing type building construction operation platform
SU697671A1 (en) Erecting cradle
CN220768987U (en) Building construction platform capable of expanding working space
CN214696733U (en) Assembled building safety construction platform
CN221346323U (en) Climbing formwork truss
CN209637680U (en) A kind of suspension type slide ladder
CN218292730U (en) Movable overhead working protection frame with safety supporting structure
CN212388939U (en) Building support frame for high-rise building
PT1365087E (en) Safety barrier apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210720

CF01 Termination of patent right due to non-payment of annual fee