CN213741017U - Steel pipe pile foundation - Google Patents

Steel pipe pile foundation Download PDF

Info

Publication number
CN213741017U
CN213741017U CN202021324585.XU CN202021324585U CN213741017U CN 213741017 U CN213741017 U CN 213741017U CN 202021324585 U CN202021324585 U CN 202021324585U CN 213741017 U CN213741017 U CN 213741017U
Authority
CN
China
Prior art keywords
pipe pile
steel
steel pipe
fixture block
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021324585.XU
Other languages
Chinese (zh)
Inventor
陈浩波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Liudu Design & Research Institute Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021324585.XU priority Critical patent/CN213741017U/en
Application granted granted Critical
Publication of CN213741017U publication Critical patent/CN213741017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a steel-pipe pile technical field just discloses a steel-pipe pile basis, including the steel-pipe pile, the last fixed surface of steel-pipe pile is connected with the fixed plate, the screw hole has been seted up in the four corners of fixed plate, the lateral wall fixedly connected with rotating vane of steel-pipe pile, a plurality of rectangle recesses have been seted up to the lateral wall symmetry of steel-pipe pile, the rectangle recess runs through steel-pipe pile lateral wall setting, the inside wall rotation of rectangle recess is connected with the fixture block, the one end fixedly connected with fixed block of fixture block, the fixed block extend the lateral wall of steel-pipe pile. This kind of steel pipe pile foundation through setting up parts such as rotating vane, fixture block, fixed block, effectually fixes the steel-pipe pile, receives the pulling force at rotating vane's in-process and steel-pipe pile simultaneously for the fixed block of fixture block and fixture block one end receives during earth extrusion embedding earth, makes further to increase the fixed effect between steel-pipe pile and the earth.

Description

Steel pipe pile foundation
Technical Field
The utility model relates to a steel-pipe pile technical field specifically is a steel-pipe pile basis.
Background
The steel pipe pile construction is to adopt a fishing method to put the steel pipe pile in place, then use a vibration hammer to drive the steel pipe pile to a proper depth, and ensure the central position and the verticality of the steel pipe pile in the construction, wherein the verticality is controlled to be 1%.
The prior protective guard on the expressway is used for directly pressing a steel pipe pile to the ground through a vibration hammer, but the soil of partial installation positions is soft, so that the stability of the steel pipe pile is insufficient after the steel pipe pile is pressed into the soil, the steel pipe pile is loosened and easy to pull out, and meanwhile, when the steel pipe pile is replaced, the broken steel pipe pile needs to be dug out, or a new position is replaced to re-drive the steel pipe pile, so that the phenomenon of difficult replacement is caused.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a steel-pipe pile basis possesses the fixed effect that increases the steel-pipe pile and is convenient for change the advantage of rail guard, has solved the problem that the background art provided.
(II) technical scheme
For the fixed effect that realizes above-mentioned increase steel-pipe pile and the purpose of being convenient for change the rail guard, the utility model provides a following technical scheme: the utility model provides a steel-pipe pile basis, includes the steel-pipe pile, the last fixed surface of steel-pipe pile is connected with the fixed plate, threaded hole is seted up in the four corners of fixed plate, the lateral wall fixedly connected with rotating vane of steel-pipe pile, a plurality of rectangle recesses have been seted up to the lateral wall symmetry of steel-pipe pile, the rectangle recess runs through the setting of steel-pipe pile lateral wall, the inside wall of rectangle recess rotates connects the pivot, the lateral wall fixedly connected with fixture block of pivot, the one end fixedly connected with fixed block of fixture block, the fixed block extends the lateral wall of steel-pipe pile.
Preferably, the rotating blade adopts a rotating structure of a ground anchor.
Preferably, the bottom surface of the rectangular groove is fixedly connected with a limiting block, and one side of the limiting block is provided with an arc surface.
Preferably, the bearing is embedded in the rectangular groove, and the rotating shaft is inserted in the bearing and rotatably arranged.
Preferably, the steel pipe pile and the fixing plate are connected through bolts.
(III) advantageous effects
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this kind of steel pipe pile foundation through setting up parts such as rotating vane, fixture block, fixed block, effectually fixes the steel-pipe pile, receives the pulling force at rotating vane's in-process and steel-pipe pile simultaneously for the fixed block of fixture block and fixture block one end receives during earth extrusion embedding earth, makes further to increase the fixed effect between steel-pipe pile and the earth.
2. This kind of steel-pipe pile basis is through the bolted connection between steel-pipe pile and the rail guard for the staff is simple and convenient more when changing the rail guard, has avoided digging out the steel-pipe pile, or has changed new position, causes phenomenons such as more inconvenient.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front view of the cutting structure of the present invention;
FIG. 3 is a front view sectional partial structure diagram of the present invention;
fig. 4 is an enlarged schematic view of the utility model at a in fig. 3.
In the figure: 1. steel pipe piles; 2. a fixing plate; 3. a threaded hole; 4. a rotating blade; 5. a rectangular groove; 6. A clamping block; 7. a limiting block; 8. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, a steel pipe pile foundation includes a steel pipe pile 1, a fixing plate 2 is fixedly connected to an upper surface of the steel pipe pile 1, the steel pipe pile 1 is connected to the fixing plate 2 through bolts, and after a protective guard is damaged, workers can replace the protective guard conveniently, so that the phenomenon that the steel pipe pile 1 needs to be dug out or replaced by a new position, which is more inconvenient, is avoided.
Threaded hole 3 is seted up in the four corners of fixed plate 2, and the lateral wall fixedly connected with rotating vane 4 of steel-pipe pile 1, rotating vane 4 adopt the revolution mechanic of earth anchor, are convenient for get into earth with rotating vane 4 is rotatory inside, improve fixed effect between rotating vane 4 and the earth simultaneously.
A plurality of rectangle recesses 5 have been seted up to steel-pipe pile 1's lateral wall symmetry, and rectangle recess 5 runs through the setting of steel-pipe pile 1 lateral wall, and rectangle recess 5's bottom surface fixedly connected with stopper 7, and one side of stopper 7 sets up to the arc surface, opens the card at fixture block 6 and fixed block 8 and advances earth after, and stopper 7 is spacing to fixture block 6, has avoided fixture block 6 and fixed block 8 to open the back completely, influences fixed effect.
The inside wall of rectangular groove 5 rotates and is connected with pivot 9, and the inside of rectangular groove 5 is inlayed and is equipped with the bearing, and the pivot is inserted and is established the inside rotation setting of bearing, reduces pivoted frictional force between fixture block and the rectangular groove, avoids fixture block and fixed block to receive earth extrusion back, because of the rotation frictional force between fixture block and the rectangular groove is too big, causes the unable open phenomenon of fixture block.
The lateral wall fixedly connected with fixture block 6 of pivot 9, the one end fixedly connected with fixed block 8 of fixture block 6, fixed block 8 extends the lateral wall of steel-pipe pile 1.
The working principle is as follows: when a worker installs the steel pipe pile 1, the steel pipe pile 1 is driven into the soil through a vibration hammer, the steel pipe pile 1 is driven into the position of the rotating blade 4, then the rotating blade 4 is rotated into the soil through the rotating steel pipe pile 1, so that the steel pipe pile is effectively fixed, meanwhile, the fixing block 8 at one end of the fixture block 6 is opened towards two sides and clamped into the soil under the action of the rotating steel pipe pile 1, so that the fixing effect between the steel pipe pile 1 and the soil is further increased, when the steel pipe pile 1 is pulled upwards by external force, the fixing block 8 at one end of the fixture block 6 is extruded by the soil, the fixture block 6 is continuously pulled towards two sides and clamped into the soil, the steel pipe pile 1 is stably inserted into the soil through the obstruction of the soil to the fixture block 6 and the fixing block 8, when the worker needs to replace the guard rail, the bolt between the guard and the steel pipe pile 1 can be removed, can change for the staff is simple and convenient more when changing the rail guard, has avoided needing to dig out steel-pipe pile 1, or has changed new position, causes phenomenons such as more inconvenient.

Claims (5)

1. A steel pipe pile foundation comprises a steel pipe pile (1);
the method is characterized in that:
the steel-pipe pile is characterized in that the upper surface of the steel-pipe pile (1) is fixedly connected with a fixing plate (2), threaded holes (3) are formed in four corners of the fixing plate (2), outer side wall fixedly connected with rotating blades (4) of the steel-pipe pile (1), a plurality of rectangular grooves (5) are symmetrically formed in the outer side wall of the steel-pipe pile (1), the rectangular grooves (5) penetrate through the side wall of the steel-pipe pile (1) and are arranged, the inner side wall of each rectangular groove (5) is rotatably connected with a rotating shaft (9), outer side wall fixedly connected with clamping blocks (6) of the rotating shafts (9), one end fixedly connected with fixing blocks (8) of the clamping blocks (6), and the fixing blocks (8) extend out of the outer side wall of the steel-pipe pile (1).
2. The steel pipe pile foundation according to claim 1, characterized in that: the rotating blades (4) adopt a rotating structure of a ground anchor.
3. The steel pipe pile foundation according to claim 1, characterized in that: the bottom surface fixedly connected with stopper (7) of rectangle recess (5), one side of stopper (7) sets up to the arc surface.
4. The steel pipe pile foundation according to claim 1, characterized in that: the bearing is embedded in the rectangular groove (5), and the rotating shaft (9) is inserted in the bearing and rotatably arranged.
5. The steel pipe pile foundation according to claim 1, characterized in that: the steel pipe pile (1) is connected with the fixing plate (2) through bolts.
CN202021324585.XU 2020-07-08 2020-07-08 Steel pipe pile foundation Active CN213741017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021324585.XU CN213741017U (en) 2020-07-08 2020-07-08 Steel pipe pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021324585.XU CN213741017U (en) 2020-07-08 2020-07-08 Steel pipe pile foundation

Publications (1)

Publication Number Publication Date
CN213741017U true CN213741017U (en) 2021-07-20

Family

ID=76814782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021324585.XU Active CN213741017U (en) 2020-07-08 2020-07-08 Steel pipe pile foundation

Country Status (1)

Country Link
CN (1) CN213741017U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005648A (en) * 2022-12-29 2023-04-25 中国水利水电第四工程局有限公司 Steel pipe pile with reinforcing mechanism for cofferdam engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005648A (en) * 2022-12-29 2023-04-25 中国水利水电第四工程局有限公司 Steel pipe pile with reinforcing mechanism for cofferdam engineering

Similar Documents

Publication Publication Date Title
CN206902793U (en) A kind of furrow making dveice for ditcher
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
CN213741017U (en) Steel pipe pile foundation
CN207075209U (en) A kind of cutter for Tree Planting Earthdrill
CN108005083B (en) Anchor cable processing method within the scope of a kind of foundation pit enclosure structure
CN217480285U (en) Construction equipment is seted up to building escape canal
CN115341855A (en) Drill bit for construction of rotary pile digging machine and construction method thereof
CN214301912U (en) Bucket for digging groove
CN212477725U (en) Pile machine of split combined type full-pile casing
CN210247465U (en) Drill bit of pit digging machine suitable for desert forestation
CN210737545U (en) Electric reciprocating larsen steel sheet pile inter-pile soil removing device
CN211312501U (en) Gardens civil engineering is with boring a device of irritating
CN106735522A (en) A kind of built-in tube cutting machine of well casing
CN218374109U (en) Bucket structure
CN216532529U (en) Real estate landscape greening construction equipment
CN213205682U (en) Cutter head for slurry balance push bench
CN205648375U (en) Axial spiral tilting furrow opener
CN219196103U (en) Portable ditching device
CN215601840U (en) Digging device for landscaping
CN212405121U (en) Construction device for rotary digging screw pile
CN210917338U (en) Drill bit for deep mixing pile
CN214143685U (en) Ground anchor device for geotechnical engineering
CN216130095U (en) Luoyang shovel for artificial ditch exploration
CN212389260U (en) Foundation pile drilling and digging sleeve for constructional engineering
CN218779508U (en) Long steel protective cylinder for combined construction of vibration hammer and rotary drilling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230403

Address after: Room 1031, Building 3, Guotai Modern City, Yangshe Town, Zhangjiagang City, Suzhou City, Jiangsu Province, 215637

Patentee after: Xu Jiandong

Patentee after: Ling Yuejin

Patentee after: Bian Lin

Address before: 310000 Building 9, No.1 Chuangye Road, Puyan street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: Chen Haobo

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230607

Address after: 215637 B1003, No. 28, Huachang Road, Yangshe Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: Suzhou Liudu Design & Research Institute Co.,Ltd.

Address before: Room 1031, Building 3, Guotai Modern City, Yangshe Town, Zhangjiagang City, Suzhou City, Jiangsu Province, 215637

Patentee before: Xu Jiandong

Patentee before: Ling Yuejin

Patentee before: Bian Lin

TR01 Transfer of patent right