CN213737923U - Hydraulic and hydroelectric engineering is with device of sunkening cord - Google Patents

Hydraulic and hydroelectric engineering is with device of sunkening cord Download PDF

Info

Publication number
CN213737923U
CN213737923U CN202022253278.3U CN202022253278U CN213737923U CN 213737923 U CN213737923 U CN 213737923U CN 202022253278 U CN202022253278 U CN 202022253278U CN 213737923 U CN213737923 U CN 213737923U
Authority
CN
China
Prior art keywords
fixedly connected
soil
roller
baffle
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022253278.3U
Other languages
Chinese (zh)
Inventor
王夏然
王永琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022253278.3U priority Critical patent/CN213737923U/en
Application granted granted Critical
Publication of CN213737923U publication Critical patent/CN213737923U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a bury line technical field, especially a hydraulic and hydroelectric engineering is with burying line device, including the connecting bar, the bottom fixedly connected with connecting plate of connecting bar, the equal fixedly connected with engaging lug in middle part of connecting plate both sides, the middle part of engaging lug one end is rotated and is connected with cable unwrapping wire roller. The utility model has the advantages that: through having set up the locating plate, the centre of a circle department sliding connection of locating plate one side has the tight pole in top, the first baffle of bottom fixedly connected with of tight pole in top, the middle part fixedly connected with wheel carrier of first baffle bottom surface, the center department of wheel carrier inner wall rotates and is connected with the tight gyro wheel in top, the tight spring in top is located between first baffle and the locating plate, the position of the tight gyro wheel in top is corresponding with the position at cable unwrapping wire roller middle part, the position of the tight gyro wheel in top is less than the position of cable unwrapping wire roller, make the user promote the tight gyro wheel in top and compress tightly the cable under the tight spring promotion in top, thereby make the cable compress tightly the bottom surface to the wire casing inner wall, wire arranging effect and winding efficiency are improved.

Description

Hydraulic and hydroelectric engineering is with device of sunkening cord
Technical Field
The utility model relates to a bury line technical field, especially a hydraulic and hydroelectric engineering is with burying line device.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. In recent years, the construction scale of the hydraulic engineering in China is continuously enlarged, the structural form of the hydraulic building is more and more complex, and the measurement and pay-off in the construction project directly influence the quality of the whole construction project, so the research and development of the hydraulic construction pipe-burying pay-off device are concerned.
However, the existing wire embedding device for the hydraulic and hydroelectric power engineering has the following problems in use:
the existing wire burying device for the hydraulic and hydroelectric engineering is simple in structure and only has the structure of a paying-off roller, but the cable cannot be compressed to the bottom of a wire groove after entering the wire groove, meanwhile, soil cannot be sealed at once, the cable is pressed, and the effect of burying the cable in the efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a hydraulic and hydroelectric engineering is with device of sunkening cord, effectively solved prior art's not enough.
The purpose of the utility model is realized through the following technical scheme: a wire burying device for water conservancy and hydropower engineering comprises a connecting rod, wherein the bottom of the connecting rod is fixedly connected with a connecting plate, the middle parts of two sides of the connecting plate are fixedly connected with connecting lugs, and the middle part of one end of each connecting lug is rotatably connected with a cable pay-off roller;
one side, close to the connecting plate, of the outer wall of the connecting lug is fixedly connected with a connecting leg, one side of the connecting leg is fixedly connected with a soil sealing plate, the center of the bottom of the soil sealing plate is fixedly connected with a bulldozing brush, and one side of the bottom of the soil sealing plate is rotatably connected with a roller;
the top fixedly connected with locating plate of connecting plate one side, the centre of a circle department sliding connection of locating plate one side has the puller rod, the first baffle of bottom fixedly connected with of puller rod, the middle part fixedly connected with wheel carrier of first baffle bottom surface, the center department of wheel carrier inner wall rotates and is connected with the puller gyro wheel, the outer wall of puller rod has cup jointed the puller spring, the top fixedly connected with second baffle of puller rod, the centre of a circle department fixedly connected with haulage rope of second baffle top surface, the one end fixedly connected with link of second baffle is kept away from to the haulage rope.
Optionally, the handles are fixedly connected to the two sides of the top end of the connecting rod, the hanging rod is fixedly connected to one side of the middle portion of the connecting rod, the hanging rod is located at the corresponding position of the hanging ring, and the diameter of the hanging rod is smaller than that of the inner wall of the hanging ring.
Optionally, the puller spring is located between the top surface of the first baffle and the bottom surface of the positioning plate, the diameter of the first baffle is larger than that of the puller spring, the length of the puller spring after being reset is equal to that of the puller spring, and the position of the second baffle is located at the top of the positioning plate, so that the puller rod is prevented from being pulled out of the positioning plate.
Optionally, the middle part of the jacking roller is provided with a guide groove, the position of the jacking roller corresponds to the position of the middle part of the cable paying-off roller, and the position of the jacking roller is lower than the position of the cable paying-off roller.
Optionally, the soil sealing plate is right triangle, the soil sealing plate is total two, two the middle part that the soil sealing plate used the tight gyro wheel in top is symmetric distribution, two the top of soil sealing plate is to tight gyro wheel slope and be eight style of calligraphy distributions.
Optionally, the bulldozing brush is located on the bevel edge of the soil sealing plate, the distribution length of the bulldozing brush is equal to the length of the bevel edge of the soil sealing plate, and the bottom of the bulldozing brush is lower than the bottom of the roller.
The utility model has the advantages of it is following:
1. the wire burying device for the water conservancy and hydropower engineering is provided with a positioning plate, a tightening rod is slidably connected at the center of one side of the positioning plate, a first baffle is fixedly connected at the bottom end of the tightening rod, a wheel carrier is fixedly connected at the middle part of the bottom surface of the first baffle, a tightening roller is rotatably connected at the center of the inner wall of the wheel carrier, a tightening spring is positioned between the top surface of the first baffle and the bottom surface of the positioning plate, the diameter of the first baffle is larger than that of the tightening spring, the reset length of the tightening spring is equal to that of the tightening spring, a guide groove is formed in the middle part of the tightening roller, the position of the tightening roller corresponds to the position of the middle part of a cable pay-off roller, the position of the tightening roller is lower than that of the cable pay-off roller, a user can push the tightening roller to press a cable under the pushing of the tightening spring, so that the cable is pressed to the bottom surface of the inner wall of a wire groove, and the wire arranging effect is improved, the wire arranging efficiency is improved.
2. The thread burying device for the hydraulic and hydroelectric engineering is characterized in that the connecting legs are arranged, one side of each connecting leg is fixedly connected with the soil sealing plate, the center of the bottom of each soil sealing plate is fixedly connected with the bulldozing brushes, one side of the bottom of each soil sealing plate is rotatably connected with the roller, each soil sealing plate is in a right-angled triangle shape, the two soil sealing plates are symmetrically distributed by taking the middle of the jacking roller as a symmetrical center, the tops of the two soil sealing plates are inclined towards the jacking roller and are distributed in a splayed shape, the bulldozing brushes are positioned on the bevel edges of the soil sealing plates, the distribution length of the bulldozing brushes is equal to the length of the bevel edges of the soil sealing plates, the bottom of the bulldozing brushes is lower than the bottom of the roller, and a user can push the thread burying device for the hydraulic and hydroelectric engineering to move forward and arrange threads, the soil sealing plate can push soil dug out of two sides of the wire groove to the middle part, so that the soil is pushed into the wire groove, the cable can be compressed, and the wire burying efficiency is improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic front view of the structure of the present invention;
fig. 3 is a schematic side view of the present invention.
In the figure: 1-connecting rod, 2-connecting plate, 3-connecting lug, 4-cable pay-off roller, 5-connecting leg, 6-earth sealing plate, 7-roller, 8-bulldozing brush, 9-positioning plate, 10-tightening rod, 11-first baffle, 12-wheel carrier, 13-tightening roller, 14-second baffle, 15-tightening spring, 16-traction rope, 17-hanging ring, 18-hanging rod and 19-handle.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1 to 3, the wire burying device for the water conservancy and hydropower engineering comprises a connecting rod 1, wherein the bottom of the connecting rod 1 is fixedly connected with a connecting plate 2, the middle parts of two sides of the connecting plate 2 are fixedly connected with connecting lugs 3, and the middle part of one end of each connecting lug 3 is rotatably connected with a cable paying-off roller 4;
one side of the outer wall of the connecting lug 3, which is close to the connecting plate 2, is fixedly connected with a connecting leg 5, one side of the connecting leg 5 is fixedly connected with a soil sealing plate 6, the center of the bottom of the soil sealing plate 6 is fixedly connected with a bulldozing brush 8, and one side of the bottom of the soil sealing plate 6 is rotatably connected with a roller 7;
top fixedly connected with locating plate 9 of 2 sides of connecting plate, the centre of a circle department sliding connection of locating plate 9 one side has tightening rod 10, the first baffle 11 of the bottom fixedly connected with of tightening rod 10, the middle part fixedly connected with wheel carrier 12 of first baffle 11 bottom surface, the center department of wheel carrier 12 inner wall rotates and is connected with the tight gyro wheel 13 in top, the outer wall of tightening rod 10 has cup jointed the tight spring 15 in top, the top fixedly connected with second baffle 14 of tightening rod 10, the centre of a circle department fixedly connected with haulage rope 16 of the 14 top surfaces of second baffle, the one end fixedly connected with link 17 of second baffle 14 is kept away from to haulage rope 16.
As an optional technical solution of the utility model:
the handle 19 is fixedly connected to the two sides of the top end of the connecting rod 1, the hanging rod 18 is fixedly connected to one side of the middle portion of the connecting rod 1, the position of the hanging rod 18 corresponds to the position of the hanging ring 17, and the diameter of the hanging rod 18 is smaller than that of the inner wall of the hanging ring 17, so that when the connecting rod is not used, the hanging rod 18 is hung through the hanging ring 17, and the jacking roller 13 is lifted.
As an optional technical solution of the utility model:
the top tension spring 15 is located between the bottom surface of first baffle 11 top surface and locating plate 9, and the diameter of first baffle 11 is greater than the diameter of top tension spring 15, and the length after top tension spring 15 resets equals with the length of top tension rod 10 to make top tension spring 15 can push up tight top tension rod 10, make top tension roller 13 compress tightly the cable.
As an optional technical solution of the utility model:
the guiding groove has been seted up at the middle part of top tight gyro wheel 13, and the position at top tight gyro wheel 13 is corresponding with the position at cable unwrapping wire roller 4 middle part, and the position of top tight gyro wheel 13 is less than the position of cable unwrapping wire roller 4, makes the user promote to push up tight gyro wheel 13 and compresses tightly the cable under the promotion of top tight spring 15 to make the cable compress tightly the bottom surface to the wire casing inner wall, when improving the winding displacement effect, improved winding displacement efficiency.
As an optional technical solution of the utility model:
the closure plate 6 is right angled triangle, closure plate 6 is total two, two closure plates 6 use the middle part of the tight gyro wheel 13 in top as the symmetric center symmetric distribution, the top of two closure plates 6 is splayed distribution to tight gyro wheel 13 slope, when making the user go forward the winding displacement through promoting this hydraulic and hydroelectric engineering with the device of sunkening cord, closure plate 6 can push away the soil of digging out the wire casing both sides toward the middle part, make soil push the wire casing, can compress tightly the cable, improve the efficiency of sunkening cord.
As an optional technical solution of the utility model:
bulldoze brush 8 is located the hypotenuse of mound board 6, and the length that the distribution length of bulldoze brush 8 equals with the length of the 6 hypotenuses of mound board, and the position of 8 bottoms of bulldoze brush is less than the position of 7 bottoms of gyro wheel to when making bulldoze brush 8 advance, can closely contact with ground, can effectually promote soil.
The working process of the utility model is as follows: when a user uses the cable pay-off device, the positioning plate 9 is arranged, the center of the circle on one side of the positioning plate 9 is slidably connected with the puller rod 10, the bottom end of the puller rod 10 is fixedly connected with the first baffle plate 11, the middle part of the bottom surface of the first baffle plate 11 is fixedly connected with the wheel carrier 12, the center of the inner wall of the wheel carrier 12 is rotatably connected with the puller roller 13, the puller spring 15 is positioned between the top surface of the first baffle plate 11 and the bottom surface of the positioning plate 9, the diameter of the first baffle plate 11 is larger than that of the puller spring 15, the reset length of the puller spring 15 is equal to that of the puller rod 10, the middle part of the puller roller 13 is provided with a guide groove, the position of the puller roller 13 corresponds to that of the middle part of the cable pay-off roller 4, the position of the puller roller 13 is lower than that of the cable pay-off roller 4, the user can push the puller roller 13 to press the cable under the push of the puller spring 15, so as to press the cable to the bottom surface of the inner wall of the cable pay-off device, the wire arranging efficiency is improved while the wire arranging effect is improved, the connecting legs 5 are arranged, one side of each connecting leg 5 is fixedly connected with an earth sealing plate 6, the center of the bottom of each earth sealing plate 6 is fixedly connected with a bulldozing brush 8, one side of the bottom of each earth sealing plate 6 is rotatably connected with a roller 7, each earth sealing plate 6 is in a right-angled triangle shape, the total number of the earth sealing plates 6 is two, the two earth sealing plates 6 are symmetrically distributed by taking the middle of a jacking roller 13 as a symmetric center, the tops of the two earth sealing plates 6 are inclined towards the jacking roller 13 and distributed in a splayed shape, the brush 8 is positioned on the inclined edge of each earth sealing plate 6, the distribution length of the bulldozing brush 8 is equal to the length of the inclined edge of each earth sealing plate 6, the position of the bottom of each bulldozing brush 8 is lower than the position of the bottom of the roller 7, a user can push forward wire arranging of the wire embedding device for hydraulic engineering, and the earth sealing plates 6 can push the soil dug from the two sides of the wire grooves towards the middle part, soil is pushed into the wire groove, so that the cable can be compressed, and the wire burying efficiency is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic and hydroelectric engineering is with device of sunkening cord which characterized in that: the cable pay-off device comprises a connecting bar (1), wherein the bottom of the connecting bar (1) is fixedly connected with a connecting plate (2), the middle parts of two sides of the connecting plate (2) are fixedly connected with connecting lugs (3), and the middle part of one end of each connecting lug (3) is rotatably connected with a cable pay-off roller (4);
one side, close to the connecting plate (2), of the outer wall of the connecting lug (3) is fixedly connected with a connecting leg (5), one side of the connecting leg (5) is fixedly connected with a soil sealing plate (6), the center of the bottom of the soil sealing plate (6) is fixedly connected with a soil pushing brush (8), and one side of the bottom of the soil sealing plate (6) is rotatably connected with a roller (7);
top fixedly connected with locating plate (9) of connecting plate (2) side, the centre of a circle department sliding connection of locating plate (9) one side has tightening rod (10), the first baffle of bottom fixedly connected with (11) of tightening rod (10), middle part fixedly connected with wheel carrier (12) of first baffle (11) bottom surface, the center department of wheel carrier (12) inner wall rotates and is connected with tight gyro wheel (13) in top, the outer wall of tightening rod (10) has cup jointed tight spring (15) in top, the top fixedly connected with second baffle (14) of tightening rod (10), the centre of a circle department fixedly connected with haulage rope (16) of second baffle (14) top surface, the one end fixedly connected with link (17) of second baffle (14) are kept away from in haulage rope (16).
2. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the handle is fixedly connected with the two sides of the top end of the connecting rod (1), a hanging rod (18) is fixedly connected with one side of the middle portion of the connecting rod (1), the hanging rod (18) is corresponding to the hanging ring (17), and the diameter of the hanging rod (18) is smaller than that of the inner wall of the hanging ring (17).
3. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the jacking spring (15) is located between the top surface of the first baffle plate (11) and the bottom surface of the positioning plate (9), the diameter of the first baffle plate (11) is larger than that of the jacking spring (15), and the length of the jacking spring (15) after reset is equal to that of the jacking rod (10).
4. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the middle part of the jacking roller (13) is provided with a guide groove, the position of the jacking roller (13) corresponds to the position of the middle part of the cable pay-off roller (4), and the position of the jacking roller (13) is lower than that of the cable pay-off roller (4).
5. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the soil sealing plate (6) is a right-angled triangle, the soil sealing plate (6) is total two, two the middle part of the soil sealing plate (6) which uses the jacking roller (13) is symmetrically distributed as the symmetric center, and the top of the soil sealing plate (6) is inclined towards the jacking roller (13) and is distributed in a splayed shape.
6. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the soil-shifting brushes (8) are positioned on the bevel edge of the soil-sealing plate (6), the distribution length of the soil-shifting brushes (8) is equal to the length of the bevel edge of the soil-sealing plate (6), and the bottom of the soil-shifting brushes (8) is lower than the bottom of the rollers (7).
CN202022253278.3U 2020-10-12 2020-10-12 Hydraulic and hydroelectric engineering is with device of sunkening cord Expired - Fee Related CN213737923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022253278.3U CN213737923U (en) 2020-10-12 2020-10-12 Hydraulic and hydroelectric engineering is with device of sunkening cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022253278.3U CN213737923U (en) 2020-10-12 2020-10-12 Hydraulic and hydroelectric engineering is with device of sunkening cord

Publications (1)

Publication Number Publication Date
CN213737923U true CN213737923U (en) 2021-07-20

Family

ID=76848499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022253278.3U Expired - Fee Related CN213737923U (en) 2020-10-12 2020-10-12 Hydraulic and hydroelectric engineering is with device of sunkening cord

Country Status (1)

Country Link
CN (1) CN213737923U (en)

Similar Documents

Publication Publication Date Title
CN205726979U (en) Tree planting digging apparatus
CN213737923U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN212482983U (en) Hydraulic engineering river administers and uses silt sampling device
CN212270942U (en) Geotechnical engineering submersible concrete pouring sealing telescopic pipe
CN217930886U (en) Hydrogeology sampling device
CN206956747U (en) Arc double-row steel pipe pile cofferdam
CN202013130U (en) Underground weighting connector of a ground source heat pump air-conditioner
CN105239571A (en) Tree-root-shaped telegraph pole inclined pull line fixator
CN205117751U (en) High -efficient immersible pump for coal mine
CN211792855U (en) Submerged plant planting tool
CN204067596U (en) The outdoor ground connection hammer drill of a kind of electric power
CN212533940U (en) Slope protection net for hydraulic engineering
CN208633091U (en) A kind of power construction electric pole foundation pit trimming device
CN210978734U (en) Supporting device for laying water conservancy and hydropower pipelines
CN113756844A (en) Subway construction grouting equipment behind wall
CN213460132U (en) Graphene composite grounding wire
CN208029375U (en) One kind being used for shaddock sapling cultivation drawing out soil equipment
CN211901814U (en) A protection mechanism for water conservancy pipeline
CN206611775U (en) A kind of lotus rhizome excavates device
CN111549840A (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN214169526U (en) Wind-resistant pier device for construction
CN204303420U (en) A kind of immersible pump holds lotus trailing cable
CN216598752U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN211317800U (en) Portable novel geotome
CN212571918U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210720