CN213736746U - Combined mud tank - Google Patents

Combined mud tank Download PDF

Info

Publication number
CN213736746U
CN213736746U CN202022686341.2U CN202022686341U CN213736746U CN 213736746 U CN213736746 U CN 213736746U CN 202022686341 U CN202022686341 U CN 202022686341U CN 213736746 U CN213736746 U CN 213736746U
Authority
CN
China
Prior art keywords
mud
mud case
pipeline
guard plate
guide bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022686341.2U
Other languages
Chinese (zh)
Inventor
臧可心
靳培英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langfang Liangsheng Machinery Equipment Co ltd
Original Assignee
Langfang Liangsheng Machinery Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Langfang Liangsheng Machinery Equipment Co ltd filed Critical Langfang Liangsheng Machinery Equipment Co ltd
Priority to CN202022686341.2U priority Critical patent/CN213736746U/en
Application granted granted Critical
Publication of CN213736746U publication Critical patent/CN213736746U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a combination formula mud case, including the guard plate, the guard plate inner wall evenly is fixed with the guide bar of co-altitude not, and the guard plate is provided with 2, the guard plate sets up to "Contraband" type structure, and both ends are fixed with the dead lever about the guard plate, be equipped with the screw thread through-hole on the dead lever, and the screw interlude has the bolt in the screw thread through-hole, the guide bar lower extreme is fixed with the backup pad, and the guide bar of different positions alternates respectively in the phase-match spout that first mud case and second mud case both sides set up, second mud case top contacts with first mud case bottom. This combination formula mud case is equipped with the guard plate, and the guard plate supports the location through not high guide bar and backup pad to first mud case and second mud case, lets the simple operation of dismouting of first mud case and second mud case high-efficient, has improved its availability factor, has effectively solved the mud case and has taken place because of the great condition of dismouting difficulty of size.

Description

Combined mud tank
Technical Field
The utility model relates to a mud tank technical field specifically is combination formula mud tank.
Background
How to store the sludge is a common problem in municipal pile foundation engineering. Municipal pile foundation engineering is mostly in downtown areas, construction sites are narrow and small, traffic dredging difficulty is large, and the surrounding environment is complex. And the requirements on the work of safe and civilized construction of a construction site, sludge transportation and the like are higher and higher in response to the call for pollution and haze treatment, dust raising treatment and blue-day protection advocated by the nation. The traditional on-site pit digging, fixed-point stacking and airing mode cannot meet the form requirement.
The existing and disclosed environmental-friendly slurry tank for investigation and construction with the patent number of CN201921314574.0 solves the problem that the slurry tank is unstable to install due to the fact that the slurry tank meets the complex environment of the relief height of the terrain, but the slurry tank of the device has large size and is difficult and tedious to install, so that the prior art has the defects that the prior art needs to be improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a combination formula mud case to solve the inconvenient problem of mud case use that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: modular mud case, including the guard plate, the guard plate inner wall evenly is fixed with the guide bar of co-altitude not, and the guard plate is provided with 2, the guard plate sets up to "Contraband" type structure, and both ends are fixed with the dead lever about the guard plate, be equipped with the screw thread through-hole on the dead lever, and the screw interlude has the bolt in the screw thread through-hole, the guide bar lower extreme is fixed with the backup pad, and the guide bar of different positions alternates respectively in the phase-match spout that first mud case and second mud case both sides set up, second mud case top contacts with first mud case bottom.
Preferably, an opening is formed at the side end of the first mud tank, and the bottom end surface of the opening wall is an inclined surface.
Preferably, the lower ends of the first mud box and the second mud box are provided with through holes, and the through holes are communicated with the second pipeline through a first pipeline.
Preferably, the protection plate is fixed with a support rod and an internal thread sleeve, and a threaded rod is inserted into the internal thread sleeve in a spiral mode.
Preferably, the first pipeline and the second pipeline are combined into a T-shaped structure, the matched movable columns are inserted into the second pipeline in a penetrating mode, and discharge holes are formed in the lower ends of the movable columns and the lower end of the second pipeline.
Preferably, the side end of the second pipeline is provided with a through hole, a cross rod of an operating rod is inserted into the through hole, one end of the cross rod is connected with the side end of the movable column, and the operating rod is of a transverse T-shaped structure.
Compared with the prior art, the beneficial effects of the utility model are that: this combination formula mud case is equipped with the guard plate, and the guard plate supports the location through not high guide bar and backup pad to first mud case and second mud case, lets the simple operation of dismouting of first mud case and second mud case high-efficient, has improved its availability factor, has effectively solved the mud case and has taken place because of the great condition of dismouting difficulty of size.
Drawings
FIG. 1 is a view showing a combined structure of the combined mud tank of the present invention;
FIG. 2 is a side view of the combined mud tank of the present invention showing the first mud tank and the second mud tank separated from each other;
fig. 3 is an enlarged view of the position a in fig. 2 of the combined mud tank of the utility model.
In the figure: 1. first mud box, 2, second mud box, 3, guard plate, 4, guide bar, 5, dead lever, 6, bolt, 7, first pipeline, 8, action bars, 9, second pipeline, 10, bracing piece, 11, backup pad, 12, internal thread sleeve, 13, threaded rod, 14, activity post.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a combined mud tank comprises a first mud tank 1, a second mud tank 2, a protection plate 3, guide rods 4, fixing rods 5, bolts 6, a first pipeline 7, an operating rod 8, a second pipeline 9, a support rod 10, a support plate 11, an internal thread sleeve 12, a threaded rod 13 and a movable column 14, wherein the guide rods 4 with different heights are uniformly fixed on the inner wall of the protection plate 3, 2 protection plates 3 are arranged, the support rod 10 and the internal thread sleeve 12 are fixed on the protection plate 3, the threaded rod 13 is spirally inserted in the internal thread sleeve 12, the threaded rod 13 acts on the protection plate 3 through the internal thread sleeve 12 to form a height adjusting structure with the protection plate 3, the structure can enable the protection plate 3 to be suitable for placing operation of different rugged grounds by adjusting the supporting height of the protection plate 3, the placing state of the protection plate 3 is more stable, the protection plate 3 is set to be of an Contraband type structure, the fixing rods 5 are fixed at the left end and the right end of the protection plate 3, the fixed rod 5 is provided with a threaded through hole, a bolt 6 is spirally inserted in the threaded through hole, the lower end of the guide rod 4 is fixed with a support plate 11, the guide rods 4 at different positions are respectively inserted in matched chutes arranged at two sides of the first slurry box 1 and the second slurry box 2, the side end of the first slurry box 1 is provided with an opening, the bottom end surface of the opening wall is provided with an inclined plane, the inclined plane is arranged to ensure that the operation of slurry in the first slurry box 1 flows into the second slurry box 2 to be smoother, the sputtering of the slurry in the flowing process is avoided, the lower ends of the first slurry box 1 and the second slurry box 2 are provided with through holes, the through holes are communicated with the second pipeline 9 through the first pipeline 7, the first pipeline 7 and the second pipeline 9 are combined into a T-shaped structure, a matched movable column 14 is inserted in the second pipeline 9, and the lower ends of the movable column 14 and the second pipeline 9 are provided with discharge holes, the rotatory bin outlet that can let second pipeline 9 of activity post open with seal the flexible operation, the row's of messenger's mud material operation is more smooth and easy, 9 sides of second pipeline are equipped with the interlude hole, and the interlude has the horizontal pole of action bars 8 in the interlude hole, and horizontal pole one end is connected with the 14 sides of activity post, action bars 8 sets up to horizontal "T" type structure, the structure setting of action bars 8 makes it conveniently stressed, the simple laborsaving of activity simple operation of messenger activity post 14, 2 tops of second mud case contact with 1 bottom of first mud case.
The working principle is as follows: when the combined type slurry tank is used, firstly, the fixed rods 5 are connected through the bolts 6 to connect the 2 protection plates 3, the protection plates 3 are erected to enable the support rods 10 to be in contact with the ground, the operation threaded rods 13 rotate in the inner threaded sleeves 12 to enable the support heights of the protection plates 3 to be adjusted to be suitable for fixing the protection plates on the rugged ground, then, the first slurry tank 1 and the second slurry tank 2 are operated to move to enable the chutes of the first slurry tank 1 and the second slurry tank 2 to be sleeved in the guide rods 4, the bottom ends of the first slurry tank 1 and the second slurry tank 2 are also in contact with the support plates 11 to be supported and fixed in the process, then, slurry can be discharged into the first slurry tank 1, redundant slurry flows to the second slurry tank 2 from the opening of the first slurry tank 1, finally, when the slurry needs to be taken out, the movable columns 14 are operated to rotate through the operation rods 8, the movable columns 14 rotate to enable the discharge holes of the movable columns to be parallel to the discharge holes of the second pipelines 9, the slurry flows out of the first pipe 7 and the second pipe 9, which is the use of the combined sludge tank.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. Modular mud case, including guard plate (3), guard plate (3) inner wall is evenly fixed with guide bar (4) of co-altitude not, and guard plate (3) are provided with 2, its characterized in that: protection plate (3) set up to "Contraband" type structure, and both ends are fixed with dead lever (5) about protection plate (3), be equipped with the screw thread through-hole on dead lever (5), and the spiral alternates there is bolt (6) in the screw thread through-hole, guide bar (4) lower extreme is fixed with backup pad (11), and guide bar (4) of different positions alternate respectively in the phase-match spout that first mud case (1) and second mud case (2) both sides set up, second mud case (2) top contacts with first mud case (1) bottom.
2. The modular mud tank of claim 1, wherein: an opening is arranged at the side end of the first mud box (1), and the bottom end surface of the opening wall is an inclined surface.
3. The modular mud tank of claim 1, wherein: the lower ends of the first mud box (1) and the second mud box (2) are provided with through holes, and the through holes are communicated with the second pipeline (9) through a first pipeline (7).
4. The modular mud tank of claim 1, wherein: the protective plate (3) is fixed with a support rod (10) and an internal thread sleeve (12), and a threaded rod (13) is inserted into the internal thread sleeve (12) in a spiral mode.
5. The modular mud tank of claim 3, wherein: the first pipeline (7) and the second pipeline (9) are combined into a T-shaped structure, the second pipeline (9) is internally inserted with a matched movable column (14), and the lower ends of the movable column (14) and the second pipeline (9) are provided with discharge holes.
6. The modular mud tank of claim 3, wherein: the side end of the second pipeline (9) is provided with a through hole, a cross rod of the operating rod (8) is inserted into the through hole, one end of the cross rod is connected with the side end of the movable column (14), and the operating rod (8) is of a transverse T-shaped structure.
CN202022686341.2U 2020-11-19 2020-11-19 Combined mud tank Active CN213736746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022686341.2U CN213736746U (en) 2020-11-19 2020-11-19 Combined mud tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022686341.2U CN213736746U (en) 2020-11-19 2020-11-19 Combined mud tank

Publications (1)

Publication Number Publication Date
CN213736746U true CN213736746U (en) 2021-07-20

Family

ID=76826951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022686341.2U Active CN213736746U (en) 2020-11-19 2020-11-19 Combined mud tank

Country Status (1)

Country Link
CN (1) CN213736746U (en)

Similar Documents

Publication Publication Date Title
CN213736746U (en) Combined mud tank
CN210684727U (en) Construction safety supporting construction
CN208346714U (en) A kind of safeguard structure of hydraulic and hydroelectric engineering side slope
CN211773706U (en) Foundation pit supporting device
CN114718167A (en) Municipal drainage system
CN210454874U (en) Pipe fitting placer is used in civil engineering construction
CN210262920U (en) Multi-functional water conservancy slope protection net
CN210766795U (en) Support device for municipal deep foundation pit construction
CN211573432U (en) Anti-pollution base for workover pipe arranging operation
CN217556976U (en) Water conservancy construction cofferdam device
CN211469523U (en) Pile foundation mud outward transport filling device
CN218841542U (en) Foundation pit dewatering maintenance device
CN215210559U (en) Anti-scouring large-span continuous beam stress support
CN219930944U (en) Cast-in-place pile conduit integrated operation platform
CN220847602U (en) Supporting device for foundation pit of GIL open cut tunnel
CN209797309U (en) Bracket for temporary hoisting of municipal pipeline
CN213926321U (en) Highway bridge construction cofferdam device
CN215596573U (en) Laying structure of water supply and drainage engineering pipeline
CN216948151U (en) Hydraulic engineering is with multi-functional trash equipment that blocks
CN211538727U (en) Lump stone secondary washing unit
CN220790835U (en) Multifunctional comprehensive enclosure supporting structure
CN217810790U (en) Water conservancy flood control baffle
CN221030197U (en) Double-spliced steel support node device
CN219011244U (en) Supporting structure for construction of water supply and drainage pipelines
CN215313784U (en) Angle-controllable steel slag raw slag screening mesh screen

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant