CN211469523U - Pile foundation mud outward transport filling device - Google Patents
Pile foundation mud outward transport filling device Download PDFInfo
- Publication number
- CN211469523U CN211469523U CN201921855897.0U CN201921855897U CN211469523U CN 211469523 U CN211469523 U CN 211469523U CN 201921855897 U CN201921855897 U CN 201921855897U CN 211469523 U CN211469523 U CN 211469523U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- filling device
- crossbeam
- funnel
- outward transport
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a pile foundation mud outward transport loading device. Including stand, crossbeam, universal wheel and funnel, four column mouting connect the portal that forms the door opening width and be greater than the mud transport vehicle packing box in the below of crossbeam, the universal wheel of taking walking locking function is installed to the stand bottom, install the funnel on the crossbeam, the export of funnel is down, the export of funnel is greater than the height of mud transport vehicle packing box to the distance on ground. The utility model discloses simple structure, convenient operation.
Description
Technical Field
The utility model relates to a mud outward transport filling device, in particular to pile foundation mud outward transport filling device.
Background
At present, national infrastructure is vigorously developed, urban bridge construction occupies a large area in infrastructure construction, a bridge foundation mostly adopts pile foundations, the diameter of the bridge pile foundations is large, the length of the bridge pile foundations is long, the bridge pile foundations are mostly below the ground water level and are influenced by underground water, the quality of the pile foundations can be guaranteed only by adopting a mud retaining wall in the construction process, and the problems of hole collapse and the like do not occur. Meanwhile, the national environmental protection supervision and inspection force is increased, the pollution and haze treatment situations are severe, the civil engineering is a key object of attention in the pollution and haze treatment work, and the situation is particularly prominent in cities. Therefore, under the severe condition of pollution and haze control in China, when the work of pollution and haze control in an engineering construction site is done in a city, the smooth outward transportation of the engineering pile foundation slurry is ensured, the construction of the pile foundation in a limited site is powerfully promoted, and the progress of the engineering is guaranteed to be a difficult problem in the construction of urban bridges.
Disclosure of Invention
In order to solve the problem, the utility model provides a simple structure, convenient operation, can avoid pile foundation mud to pollute the construction site at the loading in-process, make the scene and prevent pollution and subtract haze work, can ensure again that pile foundation mud outward transportation loads fast, impel the mud outward transportation loading device of on-the-spot pile foundation construction progress.
The utility model provides a technical scheme of foretell technical problem is: the utility model provides a pile foundation mud outward transport filling device, includes stand, crossbeam, universal wheel and funnel, and four column mouting connect the portal that forms the door opening width and be greater than the mud transport vehicle packing box in the below of crossbeam, the universal wheel of area walking locking function is installed to the stand bottom, install the funnel on the crossbeam, the export of funnel is down, the export of funnel is greater than the height of mud transport vehicle packing box to the distance on ground.
Furthermore, the upright columns on two sides of the portal frame are supported by three cross rods which are arranged in parallel at equal intervals.
Furthermore, the cross bar is made of a steel pipe with the diameter of 100mm, and the length of the cross bar is 2 m.
Further, the upright post is a circular spiral steel pipe with the diameter of 150mm, the height of the upright post is 5m,
furthermore, a diagonal bracing support is welded between the upright post and the cross beam.
Furthermore, the inclined strut is a steel pipe with the diameter of 100mm, the length of each inclined strut is 1.5m, and one inclined strut is arranged at each transverse angular point between the upright post and the cross beam.
Furthermore, the beam comprises a beam outer frame and a beam grid welded in the beam outer frame.
Furthermore, the funnel is made of a 5mm steel plate, the size of an inlet is 1m multiplied by 1m, and the diameter of an outlet is 30 cm.
Owing to adopt above-mentioned technical scheme, through the universal wheel of device stand below, mud outward transport filling device can freely remove under the human action, need not transport through machinery, the removal efficiency of device has been improved, solve the heavy difficult problem of removal of device, mud funnel lays in mud haulage vehicle top through the device crossbeam, pin the universal wheel, fixed mud outward transport filling device, prevent its removal, when pile foundation mud outward transport is loaded, remove mud haulage vehicle top with mud outward transport filling device, lay, adopt the excavator to load mud in the funnel, mud gets into mud haulage vehicle through the funnel, accomplish pile foundation mud outward transport and loads.
To sum up, this device easy operation, construction convenience, loading efficiency is high, reduces mud and spills, and the guarantee building site is clean, reduces environmental pollution, does to manage pollution really and subtracts haze work, accomplishes green construction conscientiously, and pile foundation mud outward transport loading device preparation is accomplished the back, can have enough to meet the need the use many times, improves the efficiency of construction for the construction progress.
Drawings
Fig. 1 is a schematic side elevation view of the device of the present invention.
Fig. 2 is a schematic view of the vertical surface of the device of the present invention.
Fig. 3 is a schematic view of the cross beam of the device of the present invention.
In the attached drawings, the device comprises 1, upright posts, 2, cross bars, 3, single-row frame bodies, 4, cross beam outer frames, 5, cross beam grids, 6, cross beams, 7, cross beam square holes, 8, inclined struts, 9, universal wheels, 10 and funnels.
Detailed Description
The invention will be described in further detail with reference to the following drawings and detailed description:
as shown in fig. 1, the utility model comprises a column 1, a cross bar 2, a single-row frame body 3, a cross beam outer frame 4, a cross beam grille 5, a cross beam 6, a cross beam square hole 7, an inclined strut 8, a universal wheel 9 and a funnel 10. The upright posts 1 are made of circular spiral steel pipes with the diameter of 150mm, the height is 5m, and the total number is four; the cross bar 2 is made of a steel pipe with the diameter of 100mm, and the length of each cross bar is 2m, and the number of the cross bars is six; the single-row frame body 3 is formed by welding three cross rods 2 which are arranged in parallel at equal intervals and two upright posts 1 on the same plane; the beam outer frame 4 is made by assembling and welding 10# channel steel, and the size is 3.6m multiplied by 2 m; the beam grating 5 is formed by welding phi 100mm steel pipes, and the size of a square hole of the beam grating 5 is 200mm multiplied by 200 mm; the beam 6 is formed by welding a beam outer frame 4 and a beam grid 5; the size of the cross beam square hole 7 is 1m multiplied by 1m, the cross beam square hole is positioned in the center of the cross beam 6 and used for placing the funnel 10, the cross beam 6 is placed above the upright post 1 and is welded and fixed, and the two single-row frame bodies 3 are connected to form a frame body of the device; the inclined struts 8 are made of steel pipes with the diameter of 100mm, the length of each inclined strut is 1.5m, the number of the inclined struts is four, the cross beams 6 are connected with the upright posts 1, each transverse angular point is provided with one transverse angular point, splayed struts are formed and are welded and fixed, and the integral rigidity of the device frame body is enhanced; the universal wheel 9 is arranged below the upright post 1, so that the device can move conveniently; the funnel 10 is made of a steel plate with the thickness of 5mm, the size of an upper opening is 1m multiplied by 1m, the diameter of a lower opening is 300mm, the height is 1m, and the funnel is placed above the cross beam 6 and used for filling slurry.
The utility model discloses a concrete implementation process does: through arranging by three horizontal poles 2 parallel equidistant at the coplanar welding with two stands 1 and form single-row support body 3, crossbeam frame 4 forms crossbeam 6 with the welding of crossbeam grid 5, crossbeam 6 lays in 1 top of stand, welded fastening, with two single-row support body 3 connections, and adopt bracing 8 to connect crossbeam 6 and stand 1, every horizontal angular point sets up one, form the splayed and prop, welded fastening, constitute the device support body, install universal wheel 9 simultaneously in 1 below of stand, lay funnel 10 in 6 tops of crossbeam, pile foundation mud outward transport filling device preparation is accomplished. When the mud is transported and filled outside, the mud transporting and filling device is moved to the upper part of the mud transporting vehicle and is placed, the digging machine is adopted to fill the mud into the hopper, and the mud enters the mud transporting vehicle through the hopper to finish the transporting and filling of the mud outside the pile foundation. Its easy operation, construction convenience, filling efficiency is high, reduces mud and shed, and the guarantee building site is clean, reduces environmental pollution, does the dirt of treating conscientiously and subtracts haze work, accomplishes green construction conscientiously, and can have enough to meet the need the use many times, improves the efficiency of construction for the construction progress.
Claims (8)
1. The utility model provides a pile foundation mud outward transport filling device which characterized in that: including stand, crossbeam, universal wheel and funnel, four column mouting connect the portal that forms the door opening width and be greater than the mud transport vehicle packing box in the below of crossbeam, the universal wheel of taking walking locking function is installed to the stand bottom, install the funnel on the crossbeam, the export of funnel is down, the export of funnel is greater than the height of mud transport vehicle packing box to the distance on ground.
2. The pile foundation mud outward transport filling device of claim 1, characterized in that: the upright posts on two sides of the portal frame are supported by three cross rods which are arranged in parallel at equal intervals.
3. The pile foundation mud outward transport filling device of claim 2, characterized in that: the cross bar is made of a steel pipe with the diameter of 100mm, and the length of the cross bar is 2 m.
4. The pile foundation mud outward transport filling device of claim 1, characterized in that: the upright column is a circular spiral steel pipe with the diameter phi of 150mm, and the height of the upright column is 5 m.
5. The pile foundation mud outward transport filling device of claim 1, characterized in that: and an inclined strut support is welded between the upright post and the cross beam.
6. The pile foundation mud outward transport filling device of claim 5, characterized in that: the inclined struts are steel pipes with the diameter of 100mm, the length of each inclined strut is 1.5m, and each transverse angular point between the upright post and the cross beam is provided with one inclined strut.
7. The pile foundation mud outward transport filling device of claim 1, characterized in that: the crossbeam includes the crossbeam frame and welds the crossbeam grid in the crossbeam frame.
8. The pile foundation mud outward transport filling device of claim 6, characterized in that: the funnel is made by 5mm steel sheet, and the import size is 1m, and export diameter 30 cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921855897.0U CN211469523U (en) | 2019-10-31 | 2019-10-31 | Pile foundation mud outward transport filling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921855897.0U CN211469523U (en) | 2019-10-31 | 2019-10-31 | Pile foundation mud outward transport filling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211469523U true CN211469523U (en) | 2020-09-11 |
Family
ID=72374875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921855897.0U Active CN211469523U (en) | 2019-10-31 | 2019-10-31 | Pile foundation mud outward transport filling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211469523U (en) |
-
2019
- 2019-10-31 CN CN201921855897.0U patent/CN211469523U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437567B (en) | Method for supporting existing building underground added storey through original pile foundations | |
CN205776347U (en) | Novel cover for subway station digs against making structural system | |
CN105155549A (en) | Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof | |
CN203795458U (en) | Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement | |
CN107435335A (en) | Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam | |
CN111441343A (en) | Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application | |
CN113958112A (en) | Comprehensive scaffold construction method | |
CN203834487U (en) | Section steel inner brace and Lassen pile support for excavation of dumbbell-shaped deep and large foundation pit | |
CN211340800U (en) | Super dark foundation ditch earthwork excavation platform structure | |
CN211469523U (en) | Pile foundation mud outward transport filling device | |
CN212866793U (en) | Assembled construction elevator stops layer platform | |
CN203755171U (en) | Bridge back-pulling bearing construction support | |
CN110725309A (en) | Pile casing structure for treating necking problem at top of foundation pile and construction method | |
CN115748735A (en) | Foundation pit support system with umbrella-shaped ring beam support and construction method | |
CN213572357U (en) | Basement board reinforcing structure under one-column one-pile working condition of top-down construction method | |
CN108193695A (en) | A kind of enclosure structure of foundation pit of subway station support and construction method | |
CN206143801U (en) | Photovoltaic case contravariant basis that adapts to multiple ambient condition | |
CN215107098U (en) | Theatre main stage truck crane hoisting platform | |
CN215367379U (en) | Lattice type tower crane foundation | |
CN212452254U (en) | Manhole drainage cover plate device for box girder bottom plate | |
CN210887229U (en) | Irregular foundation pit assembled steel strutting arrangement | |
CN113774925A (en) | Construction method of horizontal internal support conversion structure of deep foundation pit fender post | |
CN210712576U (en) | Multi-hoop truss supporting bailey bracket for cast-in-situ large-span box girder | |
CN207862947U (en) | A kind of enclosure structure of foundation pit of subway station support | |
CN114319809A (en) | Construction method of ultrahigh operation platform disc buckle type operation scaffold system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |