CN213734917U - Novel high-efficient fluting excavator of many dipper - Google Patents

Novel high-efficient fluting excavator of many dipper Download PDF

Info

Publication number
CN213734917U
CN213734917U CN202022785301.3U CN202022785301U CN213734917U CN 213734917 U CN213734917 U CN 213734917U CN 202022785301 U CN202022785301 U CN 202022785301U CN 213734917 U CN213734917 U CN 213734917U
Authority
CN
China
Prior art keywords
excavator
bucket
fixing bolt
water tank
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022785301.3U
Other languages
Chinese (zh)
Inventor
易英
邓朝宁
张智
邓文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Guifu Dekang Technology Co ltd
Original Assignee
Chengdu Guifu Dekang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Guifu Dekang Technology Co ltd filed Critical Chengdu Guifu Dekang Technology Co ltd
Priority to CN202022785301.3U priority Critical patent/CN213734917U/en
Application granted granted Critical
Publication of CN213734917U publication Critical patent/CN213734917U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Abstract

The utility model relates to a relevant technical field of excavator, and a novel high-efficient fluting excavator of many dipper is disclosed, including the control chamber, the control chamber below is provided with the rotary disk, and rotary disk one side is provided with the base, the outside top of base is provided with the access door, and all is provided with the rotation bolt in access door both sides, the outside below of rotation bolt is provided with the water tank, and the water tank both sides all are provided with first fixing bolt, and first fixing bolt one side is provided with the water pump simultaneously, the outside top heating panel of water pump, and the heating panel both sides all are provided with second fixing bolt. This novel high-efficient fluting excavator of many dipper, through setting up water tank and first fixing bolt, can play abluent effect to the excavator, after the excavator finishes using, through twisting first fixing bolt and install the water tank in the excavator, open the water pump switch, clear up the work to the excavator, prevent that the dirt is not cleared up for a long time, lead to being difficult to dispel.

Description

Novel high-efficient fluting excavator of many dipper
Technical Field
The utility model relates to an excavator correlation technique field specifically is a novel high-efficient fluting excavator of many dipper.
Background
An excavator, also known as a digging machine, also known as an excavator, is an earth moving machine which uses a bucket to dig materials higher or lower than a bearing surface and loads the materials into a transport vehicle or unloads the materials to a stockyard, a movable arm and a bucket rod refer to a working device of the excavator, generally also called a big arm and a small arm, mainly used for controlling the actions of digging, loading and the like of a bucket, and an arm connected with a frame is long, so the movable arm is commonly called as a big arm, the movable arm is called as a term, and an arm connected with the bucket is small, so the movable arm is commonly called as a small arm, and the bucket rod is commonly called as a big arm and a small arm.
However, most of the existing slotting excavators have poor cleaning effects, when the slotting work of the excavator is completed, soil and dust on a construction site can be spread over the excavator, and the excavator is not cleaned in time for a long time, so that the dirt is difficult to remove.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a novel high-efficient fluting excavator of many dipper possesses the advantage such as being convenient for wash, has solved the fluting excavator of using at present, and most cleaning performance is not good, and when the fluting work of excavator was accomplished, the earth dust on the building site can distribute over excavator itself, does not carry out timely clearance for a long time, can make these dirt be difficult to the problem of dispelling.
(II) technical scheme
In order to realize the above-mentioned abluent mesh of being convenient for that possesses, the utility model provides a following technical scheme: a novel multi-bucket-rod efficient slotting excavator comprises an operation chamber, wherein a rotating disc is arranged below the operation chamber, a base is arranged on one side of the rotating disc, an access door is arranged above the outer portion of the base, rotating bolts are arranged on two sides of the access door, a water tank is arranged below the outer portion of each rotating bolt, first fixing bolts are arranged on two sides of the water tank, a water pump is arranged on one side of each first fixing bolt, a heat dissipation plate is arranged above the outer portion of the water pump, second fixing bolts are arranged on two sides of the heat dissipation plate, a warning board is arranged above the outer portion of each second fixing bolt, first clamping grooves are arranged on two sides of the warning board, a first clamping block is arranged on the other side of each first clamping groove, a bucket rod is arranged on one side of each first clamping block, a bucket is arranged on one side of the bucket rod, a second clamping groove is arranged on one side of the bucket, and a second clamping block is arranged on the other side of the second clamping groove, meanwhile, a shovel tip is arranged on one side of the second clamping block.
Preferably, the operation chamber, the rotating disc and the base form a rotating structure, and the rotating disc and the base are distributed in parallel.
Preferably, the access door, the rotary bolt and the operation chamber form a rotary structure, and the size of the operation chamber is larger than that of the access door.
Preferably, the water tank is in threaded connection with the operating room through a first fixing bolt, and the first fixing bolt is symmetrically arranged on the central axis of the water tank.
Preferably, the heat dissipation plate is in threaded connection with the operation chamber through a second fixing bolt, and the second fixing bolt is symmetrically arranged around a central axis of the heat dissipation plate.
Preferably, the warning board is connected with the operation chamber in a clamping mode through a first clamping groove, and the first clamping groove is matched with the first clamping block in size.
Preferably, the shovel tip is connected with the bucket in a clamping manner through a second clamping groove, and the second clamping groove and the second clamping block are distributed in parallel.
Advantageous effects
Compared with the prior art, the utility model provides a novel high-efficient fluting excavator of many dipper possesses following beneficial effect:
1. this novel high-efficient fluting excavator of many dipper, through setting up water tank and first fixing bolt, can play abluent effect to the excavator, after the excavator finishes using, through twisting first fixing bolt and install the water tank in the excavator, open the water pump switch, clear up the work to the excavator, prevent that the dirt is not cleared up for a long time, lead to being difficult to dispel.
2. This novel high-efficient fluting excavator of many dipper through setting up heating panel and second fixing bolt, can play radiating effect to the excavator, works for a long time when the excavator, and inside engine can give off a large amount of heats, installs the heating panel in the excavator through twisting second fixing bolt, makes its long-time inside also can keep ventilating of using, increases the operating time of excavator.
3. This novel high-efficient fluting excavator of many dipper, through setting up warning sign, first draw-in groove and first fixture block, can play the function of warning to the excavator, when excavator during operation night, install the warning sign in the excavator through first draw-in groove and first fixture block, prevent that passerby from failing in time to see operating condition's excavator, make it take place danger.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is a schematic front view of the present invention;
FIG. 3 is a connection diagram of the access door and the rotary bolt of the present invention;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
In the figure: 1. an operation chamber; 2. rotating the disc; 3. a base; 4. an access door; 5. rotating the bolt; 6. a water tank; 7. a first fixing bolt; 8. a water pump; 9. a heat dissipation plate; 10. a second fixing bolt; 11. a warning board; 12. a first card slot; 13. a first clamping block; 14. a bucket rod; 15. a bucket; 16. a second card slot; 17. a second fixture block; 18. and (4) shoveling the tip.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a novel multi-bucket-rod high-efficiency slotting excavator comprises an operation chamber 1, a rotating disk 2 is arranged below the operation chamber 1, a base 3 is arranged on one side of the rotating disk 2, an access door 4 is arranged above the outer portion of the base 3, rotating bolts 5 are arranged on two sides of the access door 4, a water tank 6 is arranged below the outer portion of each rotating bolt 5, first fixing bolts 7 are arranged on two sides of each water tank 6, a water pump 8 is arranged on one side of each first fixing bolt 7, a heat dissipation plate 9 is arranged above the outer portion of each water pump 8, second fixing bolts 10 are arranged on two sides of each heat dissipation plate 9, a warning board 11 is arranged above the outer portion of each second fixing bolt 10, first clamping grooves 12 are arranged on two sides of the warning board 11, a first clamping block 13 is arranged on the other side of each first clamping groove 12, a bucket rod 14 is arranged on one side of each first clamping block 13, and a bucket 15 is arranged on one side of the bucket rod 14, one side of the bucket 15 is provided with a second clamping groove 16, the other side of the second clamping groove 16 is provided with a second clamping block 17, and one side of the second clamping block 17 is provided with a shovel tip 18.
Further, operation panel 1, rotary disk 2 and base 3 constitute revolution mechanic, and rotary disk 2 and base 3 are parallel distribution, through setting up rotary disk 2 and base 3, can play rotatory effect to operation panel 1, can be according to the difference of fluting position, make operation panel 1 rotate about through rotary disk 2 and base 3, reach and slot different positions.
Further, access door 4, swivel bolt 5 constitute revolution mechanic with control chamber 1, and the size of control chamber 1 is greater than the size of access door 4, through setting up access door 4 and swivel bolt 5, can play the effect of overhauing to the excavator, when the inside trouble that breaks down of excavator needs to overhaul, through swivel bolt 5 rotation open access door 4 to its inside maintenance work that carries out, prevent that the inside trouble that breaks down of excavator, make the excavation work unable go on.
Further, water tank 6 is through 1 threaded connection of first fixing bolt 7 with the control chamber, and first fixing bolt 7 sets up with the axis symmetry of water tank 6, through setting up water tank 6 and first fixing bolt 7, can play abluent effect to the excavator, after the excavator finishes using, through twisting first fixing bolt 7 and installing water tank 6 in the excavator, open 8 switches of water pump, clear up the work to the excavator, prevent that the dirt from not clearing up for a long time, lead to being difficult to dispel.
Further, the heat dissipation plate 9 passes through second fixing bolt 10 and operation room 1 threaded connection, and second fixing bolt 10 sets up with the axis symmetry of heat dissipation plate 9, through setting up heat dissipation plate 9 and second fixing bolt 10, can play radiating effect to the excavator, work for a long time when the excavator, inside engine can give off a large amount of heats, install heat dissipation plate 9 in the excavator through twisting second fixing bolt 10, make its inside ventilation that also can keep for a long time using, the operating time of increase excavator.
Further, warning sign 11 is connected with 1 block of control chamber through first draw-in groove 12, and first draw-in groove 12 is identical with the size of first fixture block 13, through setting up warning sign 11, first draw-in groove 12 and first fixture block 13, can play the function of warning to the excavator, when excavator during operation night, install warning sign 11 in the excavator through first draw-in groove 12 and first fixture block 13, prevent that passerby from failing to in time seeing operating condition's excavator, make it take place danger.
Further, the shovel point 18 is connected with the bucket 15 through the second clamping groove 16 in a clamping mode, the second clamping groove 16 and the second clamping block 17 are distributed in parallel, the shovel point 18 can be conveniently replaced through the second clamping groove 16 and the second clamping block 17, the complex replacement process is prevented, and time of workers is wasted.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the excavator is used, an external power supply is connected, then the shovel tip 18 is installed on the bucket 15 through the second clamping groove 16 and the second clamping block 17, when the excavator performs slotting work, the operation chamber 1 can rotate left and right through the rotary disk 2 and the base 3 according to different slotting positions so as to slot different positions, when the excavator has a fault inside and needs to be overhauled, the access door 4 is opened through the rotation of the rotary bolt 5 so as to overhaul the inside of the excavator, the fault inside of the excavator is prevented, so that the excavating work cannot be performed, then, when the excavator works for a long time, an internal engine can emit a large amount of heat, the heat dissipation plate 9 is installed on the excavator through screwing the second fixing bolt 10, so that the inside can be kept ventilated after the excavator is used for a long time, the working time of the excavator is prolonged, and when the excavator works at night, the warning board 11 is installed on the excavator through the first clamping groove 12 and the first clamping block 13, prevent that passerby from failing in time seeing operating condition's excavator, make it take place dangerously, at last, after the excavator finishes using, through twisting first fixing bolt 7 and install water tank 6 in the excavator, open 8 switches of water pump, clear up the work to the excavator, prevent that the dirt is long-time not clear up, lead to being difficult to dispel, wherein 8 switches of water pump are: PW-175EAH, thus completing the use process of the novel multi-bucket-rod efficient slotting excavator.
To sum up, this novel high-efficient fluting excavator of many dipper through setting up water tank 6 and first fixing bolt 7, can play abluent effect to the excavator, and after the excavator finishes using, through twisting first fixing bolt 7 and install water tank 6 in the excavator, open 8 switches of water pump, clear up the work to the excavator, prevent that the dirt is long-time not clear up, lead to being difficult to dispel.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a novel high-efficient fluting excavator of many dipper, includes control chamber (1), its characterized in that: the automatic water supply device is characterized in that a rotating disc (2) is arranged below the operating room (1), a base (3) is arranged on one side of the rotating disc (2), an access door (4) is arranged above the outer portion of the base (3), rotating bolts (5) are arranged on two sides of the access door (4), a water tank (6) is arranged below the outer portion of each rotating bolt (5), first fixing bolts (7) are arranged on two sides of the water tank (6), a water pump (8) is arranged on one side of each first fixing bolt (7), a heat dissipation plate (9) is arranged above the outer portion of each water pump (8), second fixing bolts (10) are arranged on two sides of each heat dissipation plate (9), a warning board (11) is arranged above the outer portion of each second fixing bolt (10), first clamping grooves (12) are arranged on two sides of each warning board (11), first clamping blocks (13) are arranged on the other sides of the first clamping grooves (12), and a bucket rod (14) is arranged on one side of each first clamping block (13), and one side of the bucket rod (14) is provided with a bucket (15), one side of the bucket (15) is provided with a second clamping groove (16), the other side of the second clamping groove (16) is provided with a second clamping block (17), and one side of the second clamping block (17) is provided with a shovel tip (18).
2. The novel multi-bucket-rod efficient slotting excavator according to claim 1, wherein: the operation room (1), the rotating disk (2) and the base (3) form a rotating structure, and the rotating disk (2) and the base (3) are distributed in parallel.
3. The novel multi-bucket-rod efficient slotting excavator according to claim 1, wherein: access door (4), swivel bolt (5) and control chamber (1) constitute revolution mechanic, and the size of control chamber (1) is greater than the size of access door (4).
4. The novel multi-bucket-rod efficient slotting excavator according to claim 1, wherein: the water tank (6) is in threaded connection with the operating chamber (1) through a first fixing bolt (7), and the first fixing bolt (7) is symmetrically arranged on the central axis of the water tank (6).
5. The novel multi-bucket-rod efficient slotting excavator according to claim 1, wherein: the heat dissipation plate (9) is in threaded connection with the operation chamber (1) through a second fixing bolt (10), and the second fixing bolt (10) is symmetrically arranged on the central axis of the heat dissipation plate (9).
6. The novel multi-bucket-rod efficient slotting excavator according to claim 1, wherein: the warning board (11) is connected with the operation chamber (1) in a clamping mode through the first clamping groove (12), and the first clamping groove (12) is matched with the first clamping block (13) in size.
7. The novel multi-bucket-rod efficient slotting excavator according to claim 1, wherein: the shovel tip (18) is clamped and connected with the bucket (15) through a second clamping groove (16), and the second clamping groove (16) and the second clamping block (17) are distributed in parallel.
CN202022785301.3U 2020-11-26 2020-11-26 Novel high-efficient fluting excavator of many dipper Active CN213734917U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022785301.3U CN213734917U (en) 2020-11-26 2020-11-26 Novel high-efficient fluting excavator of many dipper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022785301.3U CN213734917U (en) 2020-11-26 2020-11-26 Novel high-efficient fluting excavator of many dipper

Publications (1)

Publication Number Publication Date
CN213734917U true CN213734917U (en) 2021-07-20

Family

ID=76830580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022785301.3U Active CN213734917U (en) 2020-11-26 2020-11-26 Novel high-efficient fluting excavator of many dipper

Country Status (1)

Country Link
CN (1) CN213734917U (en)

Similar Documents

Publication Publication Date Title
CN103643623B (en) Integral system device is repaired in a kind of bituminous paving plane milling
CN213734917U (en) Novel high-efficient fluting excavator of many dipper
CN213125231U (en) Intelligent display screen switch board
CN210201386U (en) Cable bridge with good heat dissipation performance
CN215801935U (en) A control chamber heat sink for engineering construction excavator
CN111794453A (en) Green energy-saving assembled roof
CN216773999U (en) Electric automation block terminal of building
CN211772699U (en) Highway is troubleshooting device for construction project based on BIM
CN215053375U (en) Thoroughly-cleaned time-saving and labor-saving crushing hammer head for excavator
CN107736852A (en) A kind of household services shovel ash bucket with from formula of sweeping
CN210066877U (en) Breaking hammer with cutting function
CN207646771U (en) Rotatable crawler-mounted excavator
CN208368973U (en) A kind of easy-to-dismount construction site electric power distributing cabinet
CN112367807A (en) Display device of self-propelled industrial machine
CN219080512U (en) Building water supply and drainage anti-blocking device
CN212835555U (en) Civil engineering foundation pit excavating device
CN219637989U (en) Synchronous folding land leveler
CN218521876U (en) Excavator with conveniently-disassembled wind scooper
JP3245314U (en) Fixing mechanism and shovel bucket device
CN214363752U (en) Cooling device of loader and loader
CN217000119U (en) Urban underground pipeline dredging device
CN218204658U (en) Dozer blade for excavator
CN215771945U (en) Dustproof alternating-current low-voltage distribution panel
CN213548233U (en) Land reclamation is with leveling device
CN212064687U (en) E-HOUSE ventilation unit for electric room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant