CN213715301U - Multifunctional electric energy meter installation device - Google Patents
Multifunctional electric energy meter installation device Download PDFInfo
- Publication number
- CN213715301U CN213715301U CN202022801104.6U CN202022801104U CN213715301U CN 213715301 U CN213715301 U CN 213715301U CN 202022801104 U CN202022801104 U CN 202022801104U CN 213715301 U CN213715301 U CN 213715301U
- Authority
- CN
- China
- Prior art keywords
- mounting
- box
- electric energy
- energy meter
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 55
- 239000005341 toughened glass Substances 0.000 claims abstract description 12
- 239000011521 glass Substances 0.000 claims description 17
- 239000004816 latex Substances 0.000 claims description 11
- 229920000126 latex Polymers 0.000 claims description 11
- 238000007789 sealing Methods 0.000 claims description 11
- 229920001971 elastomer Polymers 0.000 claims description 4
- 238000000576 coating method Methods 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims 1
- 238000003466 welding Methods 0.000 abstract description 4
- 239000000428 dust Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000002146 bilateral effect Effects 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 239000007769 metal material Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 241000668842 Lepidosaphes gloverii Species 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Measuring Volume Flow (AREA)
Abstract
The utility model discloses a multi-functional electric energy meter installation device, including the mounting box, a pair of hinge is installed to mounting box opening bottom one side, the equal fixed mounting in hinge one side has the lid, mounting box cross-section external diameter size coincide with lid cross-section external diameter size each other, mounting box top one side is located central point and puts the welding and have first mounting hole, the mounting box has second mounting hole and third mounting hole keeping away from hinge bottom both corners welding, the mounting box top is keeping away from first mounting hole one side fixed mounting and is having the spring bolt, lid top fixed mounting has the hasp, the opening has been seted up on lid outer wall surface, and install the first toughened glass window of mutual coincide in the opening, the inside bottom of lid is provided with supplementary installation cavity. The utility model has the advantages of simple and reasonable structure, the modern design, easy operation to can effectively improve installation effectiveness and protection device, have higher practical value.
Description
Technical Field
The utility model relates to an electric energy meter technical field specifically is a multi-functional electric energy meter installation device.
Background
An electric energy meter is an instrument for measuring electric energy, also called watt-hour meter, fire meter, kilowatt-hour meter, and refers to instruments for measuring various electric quantities. When using a power meter, it is noted that the power meter can be directly connected to the circuit for measurement at low voltage (not more than 500 volts) and low current (tens of amperes).
Most electric energy meter installation is gone on through artifical manual measurement at present, its position is correct after accomplishing in order to guarantee the electric energy meter installation, it is pleasing to the eye, so need spend a large amount of time to measuring the wall of installing, however because of some uncertain factors, the electric energy meter of installation also can incline after the measurement, it is not pleasing to the eye, in the installation of electric energy meter, the interval and the position of punching, the straightness that hangs down of electric energy meter is judged by constructor naked eye entirely, it accords with relevant installation regulation to be difficult to guarantee the result, very big reduction its practicality. Most electric energy meter installation auxiliary device all relies on the scale to measure the installation, though the scale can measure the installation angle of electric energy meter, nevertheless also have some and be not conform to the regulation because of the misoperation installation back, because of the height of scale and end all very long, so caused the problem of being difficult to carry, reduced its practicality. Therefore, the multifunctional electric energy meter mounting device is improved.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a multi-functional electric energy meter installation device, including the mounting box, a pair of hinge is installed to mounting box opening bottom one side, the equal fixed mounting in hinge one side has the lid, mounting box cross-section external diameter size coincide with lid cross-section external diameter size each other, mounting box top one side is located central point and puts the welding and have first mounting hole, the mounting box has second mounting hole and third mounting hole keeping away from hinge bottom both corners welding, the mounting box top is keeping away from first mounting hole one side fixed mounting and is having the spring bolt, lid top fixed mounting has the hasp, the opening has been seted up on lid outer wall surface, and installs the first toughened glass window that coincide each other in the opening, the inside bottom of lid is provided with supplementary installation cavity.
As an optimal technical scheme of the utility model, be provided with the glass pipe in the supplementary installation cavity, the intraductal gas bubble that is provided with of glass, supplementary installation cavity one side is provided with the scale mark.
As an optimal technical scheme of the utility model, the opening has been seted up to supplementary installation cavity one side, and installs the second toughened glass window that coincide each other in the opening, and second toughened glass window external diameter slightly is greater than glass pipe cross-sectional dimension.
As a preferred technical scheme of the utility model, the inside one side four corners of mounting box all is provided with spacing fixture block, mounting box inner wall bilateral symmetry is provided with three pairs of rubber fixture block.
As the utility model discloses a preferred technical scheme, the inside bottom of mounting box is provided with mounting plate, a plurality of through-holes of mounting plate align to grid, and the diameter of through-hole is 1 ~ 2 cm.
As an optimal technical scheme of the utility model, the mounting box opening all is provided with the latex sealing layer all around, and latex sealing layer and lid opening coincide each other all around.
As an optimal technical scheme of the utility model, the mounting box is the metal material with the lid, and the surface scribbles anti rust coating.
The utility model has the advantages that:
1. according to the multifunctional electric energy meter mounting device, the glass tube is arranged in the auxiliary mounting cavity, the air bubble is arranged in the glass tube, and the scale marks are arranged on one side of the auxiliary mounting cavity, so that whether an object is horizontal or not is judged by moving the air bubble in the glass tube, when the level ruler is inclined, the air bubble can move towards the raised end, and therefore which end of the surface of the object is high and which end is low is judged, the problem that a worker needs to carry the scale too long, the scale is not easy to carry and forget to carry is solved, and the mounting practicability of the device is improved;
2. according to the multifunctional electric energy meter mounting device, the first mounting hole is welded at the center position on one side of the top end of the mounting box, the second mounting hole and the third mounting hole are welded at two corners of the mounting box far away from the bottom end of the hinge, so that the mounting box is fixed during mounting, a worker can mount the first mounting hole firstly and adjust the first mounting hole through the second mounting hole and the third mounting hole, and the mounting of the device is quicker and more standard;
3. this kind of multi-functional electric energy meter installation device, through be provided with mounting plate in the inside bottom of mounting box, a plurality of through-holes of mounting plate align to grid, and the diameter of through-hole is 1 ~ 2cm, has made things convenient for staff's installation wiring, through all being provided with the latex sealing layer all around the mounting box opening, and the latex sealing layer coincide each other all around with the lid opening, can prevent dust effectively, dampproofing, waterproof, the life of extension electric energy meter to the security performance of electric energy meter has been improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a perspective view of a multifunctional electric energy meter mounting device of the present invention;
fig. 2 is a front view of the multifunctional electric energy meter mounting device of the present invention;
fig. 3 is a bottom view of the multifunctional electric energy meter mounting device of the present invention;
fig. 4 is a front sectional view of the multifunctional electric energy meter mounting device of the present invention;
fig. 5 is a cross-sectional view of the utility model discloses a multifunctional electric energy meter installation device.
In the figure: 1. mounting a box; 2. a box cover; 3. a first tempered glass window; 4. a first mounting hole; 5. a second mounting hole; 6. a third mounting hole; 7. a hinge; 8. an auxiliary mounting cavity; 9. scale lines; 10. a second tempered glass window; 11. a glass tube; 12. bubble preparation; 13. a latch bolt; 14. locking; 15. a limiting clamping block; 16. a rubber clamping block; 17. mounting a bottom plate; 18. and (4) a latex sealing layer.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example (b): as shown in fig. 1-5, the utility model relates to a multifunctional electric energy meter installation device, which comprises an installation box 1, a pair of hinges 7 are arranged at one side of the bottom end of the opening of the mounting box 1, a box cover 2 is fixedly arranged at one side of each hinge 7, the outer diameter of the section of the mounting box 1 is matched with the outer diameter of the section of the box cover 2, a first mounting hole 4 is welded at the central position of one side of the top end of the mounting box 1, a second mounting hole 5 and a third mounting hole 6 are welded at two corners of the mounting box 1 far away from the bottom end of the hinge 7, a bolt 13 is fixedly arranged at one side of the top end of the mounting box 1 far away from the first mounting hole 4, a lock catch 14 is fixedly arranged at the top end of the box cover 2, an opening is arranged on the outer wall surface of the box cover 2, and the opening is internally provided with a first toughened glass window 3 which is inosculated with each other, and the bottom end in the box cover 2 is provided with an auxiliary installation cavity 8.
Wherein, be provided with glass pipe 11 in the supplementary installation cavity 8, be provided with air bubble 12 in the glass pipe 11, 8 one sides in supplementary installation cavity are provided with scale mark 9, have realized that the removal of the intraductal air bubble of glass judges whether horizontally of object, and when the level bar took place to incline, the bubble will remove to the one end that risees to judge which one end of object surface is high, which end is low, has solved the staff and should carry the scale overlength.
Wherein, an opening is arranged on one side of the auxiliary installation cavity 8, a second toughened glass window 10 which is inosculated with each other is arranged in the opening, and the external diameter size of the second toughened glass window 10 is slightly larger than the section size of the glass tube 11.
Wherein, the inside one side four corners of mounting box 1 all is provided with spacing fixture block 15, mounting box 1 inner wall bilateral symmetry is provided with three pairs of rubber fixture block 16.
Wherein, the inside bottom of mounting box 1 is provided with mounting plate 17, a plurality of through-holes of mounting plate 17 align to grid, and the diameter of through-hole is 1 ~ 2cm, has made things convenient for staff's installation wiring.
The periphery of the opening of the mounting box 1 is provided with the latex sealing layer 18, and the peripheries of the latex sealing layer 18 and the opening of the box cover 2 are mutually matched, so that the dust, moisture and water can be effectively prevented, the service life of the electric energy meter is prolonged, and the safety performance of the electric energy meter is improved.
Wherein, mounting box 1 and lid 2 are the metal material, and the surface scribbles anti rust coating.
The working principle is as follows: the multifunctional electric energy meter installation device is characterized in that a glass tube 11 is arranged in an auxiliary installation cavity 8, an air bubble 12 is arranged in the glass tube 11, a scale mark 9 is arranged on one side of the auxiliary installation cavity 8, the movement of the air bubble 12 in the glass tube 11 is realized to judge whether an object is horizontal, when a leveling rod inclines, the air bubble moves to one raised end, so that which end of the surface of the object is high and which end is low is judged, the problem that a worker cannot easily carry and forget to carry due to too long scale when carrying the leveling rod is solved, the installation practicability of the device is improved, a first installation hole 4 is welded at the central position on one side of the top end of an installation box 1, a second installation hole 5 and a third installation hole 6 are welded on two corners far away from the bottom end of a hinge of the installation box, the fixation of the installation box is realized, the worker can install the first installation hole 4 firstly, the adjustment is carried out through the second installation hole 5 and the third installation hole 6, make the device installation standard faster, through be provided with mounting plate 17 in 1 inside bottom of mounting box, a plurality of through-holes of mounting plate 17 align to grid, and the diameter of through-hole is 1 ~ 2cm, made things convenient for staff's installation wiring, through all being provided with latex sealing layer 18 around 1 opening in mounting box, and latex sealing layer 18 and 2 openings of lid coincide each other all around, can prevent dust effectively, dampproofing, it is waterproof, the life of extension electric energy meter, and the security performance of electric energy meter has been improved.
Finally, it should be noted that: in the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. A multifunctional electric energy meter installation device comprises an installation box (1) and is characterized in that a pair of hinges (7) is installed on one side of the bottom of an opening of the installation box (1), a box cover (2) is fixedly installed on one side of each hinge (7), the outer diameter of the cross section of the installation box (1) is matched with the outer diameter of the cross section of the box cover (2), a first installation hole (4) is welded on one side of the top end of the installation box (1) at the central position, a second installation hole (5) and a third installation hole (6) are welded on two corners far away from the bottom of each hinge (7), a lock tongue (13) is fixedly installed on one side far away from the first installation hole (4) at the top end of the installation box (1), a lock catch (14) is fixedly installed on the top end of the box cover (2), an opening is formed in the outer wall surface of the box cover (2), and a first toughened glass window, an auxiliary mounting cavity (8) is formed in the bottom end inside the box cover (2).
2. The mounting device for the multifunctional electric energy meter is characterized in that a glass tube (11) is arranged in the auxiliary mounting cavity (8), an air bubble (12) is arranged in the glass tube (11), and a scale mark (9) is arranged on one side of the auxiliary mounting cavity (8).
3. The mounting device of the multifunctional electric energy meter according to claim 1, wherein one side of the auxiliary mounting cavity (8) is provided with an opening, the opening is internally provided with a second toughened glass window (10) which is matched with the opening, and the outer diameter of the second toughened glass window (10) is slightly larger than the cross section of the glass tube (11).
4. The mounting device for the multifunctional electric energy meter according to claim 1, wherein four corners of one side inside the mounting box (1) are provided with limiting clamping blocks (15), and two sides of the inner wall of the mounting box (1) are symmetrically provided with three pairs of rubber clamping blocks (16).
5. The mounting device for the multifunctional electric energy meter is characterized in that a mounting bottom plate (17) is arranged at the bottom end inside the mounting box (1), a plurality of through holes are uniformly arranged on the mounting bottom plate (17), and the diameter of each through hole is 1-2 cm.
6. The mounting device for the multifunctional electric energy meter as claimed in claim 1, wherein the periphery of the opening of the mounting box (1) is provided with the latex sealing layer (18), and the latex sealing layer (18) is matched with the periphery of the opening of the box cover (2).
7. The multifunctional electric energy meter mounting device according to claim 1, wherein the mounting box (1) and the box cover (2) are both made of metal, and the surfaces of the mounting box and the box cover are coated with antirust coatings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022801104.6U CN213715301U (en) | 2020-11-28 | 2020-11-28 | Multifunctional electric energy meter installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022801104.6U CN213715301U (en) | 2020-11-28 | 2020-11-28 | Multifunctional electric energy meter installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213715301U true CN213715301U (en) | 2021-07-16 |
Family
ID=76785141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022801104.6U Expired - Fee Related CN213715301U (en) | 2020-11-28 | 2020-11-28 | Multifunctional electric energy meter installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213715301U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116027086A (en) * | 2023-03-31 | 2023-04-28 | 北京煜邦电力技术股份有限公司 | Easy-to-install electric energy meter |
-
2020
- 2020-11-28 CN CN202022801104.6U patent/CN213715301U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116027086A (en) * | 2023-03-31 | 2023-04-28 | 北京煜邦电力技术股份有限公司 | Easy-to-install electric energy meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213715301U (en) | Multifunctional electric energy meter installation device | |
CN110475444B (en) | Shock attenuation formula radiating effect is good instrument box | |
CN210016104U (en) | Waterproof type distribution control cabinet | |
CN209963575U (en) | Building site is with portable block terminal | |
CN210577110U (en) | Armored movable alternating current metal-enclosed switchgear cabinet body | |
CN214793118U (en) | Self-hanging type suspension leveling rod | |
CN210774025U (en) | House wall body slope detection device | |
CN214473560U (en) | Simple mounting bracket for electric energy meter | |
CN209043298U (en) | A kind of Project Supervising detection device | |
CN210608120U (en) | Low-voltage electric energy metering cabinet | |
CN217545236U (en) | Mounting plate for surge protector equipment | |
CN214046218U (en) | Vertical adjustable fixing device of electric energy metering box | |
CN213340136U (en) | Install box at bottom of stable switch | |
CN211829703U (en) | Box-type fixed switchgear cabinet body | |
CN214615302U (en) | Movable distribution box mounting platform | |
CN215180425U (en) | Can carry out rainproof outdoor electric-energy metering box | |
CN220009499U (en) | Fill electric pile convenient to installation | |
CN216530026U (en) | Distribution controller and mounting structure thereof | |
CN211855279U (en) | Dustproof electronic theodolite | |
CN211342087U (en) | Safety device is used in electrical engineering construction | |
CN221201866U (en) | Distribution box | |
CN219345988U (en) | Fixing device for multi-diameter measurement centering rod | |
CN219201741U (en) | Ammeter case convenient to installation | |
CN212304530U (en) | Sealed waterproof cable bridge | |
CN221302121U (en) | Dipperstick for civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210716 |