CN213684191U - Quick erection bracing frame is used in colliery relief of disaster - Google Patents

Quick erection bracing frame is used in colliery relief of disaster Download PDF

Info

Publication number
CN213684191U
CN213684191U CN202022930814.9U CN202022930814U CN213684191U CN 213684191 U CN213684191 U CN 213684191U CN 202022930814 U CN202022930814 U CN 202022930814U CN 213684191 U CN213684191 U CN 213684191U
Authority
CN
China
Prior art keywords
fixedly connected
base
support rod
fixing
quick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022930814.9U
Other languages
Chinese (zh)
Inventor
温有富
温有财
张治东
温有权
翟小虎
张辉
刘东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022930814.9U priority Critical patent/CN213684191U/en
Application granted granted Critical
Publication of CN213684191U publication Critical patent/CN213684191U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to an emergency rescue technical field especially relates to a colliery relief work is with quick erection bracing frame, which comprises a wheel, the center department fixedly connected with pivot of wheel, the both ends swivelling joint of pivot has the base, and the convenient to use of wheel and base removes, the vertical vaulting pole of top fixedly connected with of base, the bottom fixedly connected with fixation clamp of vertical vaulting pole, the inboard butt of fixation clamp has the I-steel, the top fixedly connected with fixing base of vertical vaulting pole, the left side fixedly connected with draw-in groove of fixing base, the left side swivelling joint of fixing base has horizontal vaulting pole, adjusts the completion colliery relief work of vertical vaulting pole and horizontal vaulting pole and uses quick erection bracing frame's quick construction. The to-be-solved technical problem of the utility model is that the support frame removes inconveniently, and the installation flow is loaded down with trivial details, and the installation effectiveness is low. In order to solve the technical problem, the utility model provides a colliery relief of disaster is with quick erection bracing frame.

Description

Quick erection bracing frame is used in colliery relief of disaster
Technical Field
The utility model relates to an emergency rescue device technical field specifically is a colliery relief of disaster is with quick erection bracing frame.
Background
In the coal mining process, the mining tunnel is under the influence of geological activity, the top and the side in tunnel can cause the tunnel to destroy the collapse accident under the effect of shearing dilatation, run into the fragile area of geological structure in the mining and can appear roadway support device and by serious extrusion, can't provide perfect shielding protection, lead to the operating personnel in the tunnel to be buried, when being buried operating personnel and rescue in the tunnel, need build new roadway support fast, get through the life passageway, traditional coal mine roadway support device removes inconveniently, the structure is more, need use a large amount of manpowers will build and strut required part and transport to the tunnel in, the transportation is very inconvenient, drag rescue efficiency slowly seriously, the operation area is little in the tunnel, traditional coal mine roadway support device's installation flow is loaded down with trivial details, the installation effectiveness is low, expand the difficulty in rescue operation.
A prior patent (publication number: CN211174140U) discloses a coal mine roadway support device. The inventor finds that the following problems in the prior art are not solved well in the process of realizing the scheme: 1. the support frame is inconvenient to move; 2. the installation process is complicated, and the installation efficiency is low.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a colliery relief work is with quick erection bracing frame has solved the support frame and has removed inconveniently, has the conveying efficiency low, drags the problem of rescue progress slowly, and the installation flow is loaded down with trivial details, has the problem that the installation effectiveness is low.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a colliery relief of disaster is with quick erection bracing frame, includes the wheel, the center department fixedly connected with pivot of wheel, the both ends swivelling joint of pivot has the base, the top surface fixedly connected with of base hangs the ring down, the vertical vaulting pole of top fixedly connected with of base.
The bottom end of the vertical support rod is connected with a fixing bolt in a threaded mode, the top and the bottom of the side face of the vertical support rod are respectively and fixedly connected with a push handle and a fixing clamp, the inner side of the fixing clamp is abutted to I-shaped steel, and the top end of the vertical support rod is fixedly connected with a fixing seat.
The utility model discloses a wire net, including fixing base, left side fixedly connected with draw-in groove of fixing base, the left side swivelling joint of fixing base has horizontal vaulting pole, the slot has been opened to the front side of fixing base, link on the front side bottom fixedly connected with of fixing base, the inboard fixedly connected with couple of going up the link, the bottom fixedly connected with wire net of couple.
Preferably, the number of the lower hanging rings is two, the bottom ends of the two lower hanging rings are fixedly connected to the left end and the right end of the top surface of the base respectively, hooks are fixedly connected to the inner sides of the two lower hanging rings, and the structures of the two lower hanging rings are the same as those of the upper hanging ring.
Preferably, the number of the fixing bolts is four, and the bottom ends of the four fixing bolts penetrate through the top surface to the inner side of the base.
Further preferably, the bottom end of the horizontal support rod is rotatably connected to the right side of the fixing seat, the top end of the horizontal support rod abuts against the inner side of the clamping groove, the horizontal support rod is made of a hydraulic support rod, and the structure of the horizontal support rod is the same as that of the vertical support rod.
Preferably, the inner side of the slot is provided with anti-slip threads, and the inner side of the slot is abutted against two ends of the I-shaped steel.
Preferably, the number of the hooks is four, the bottom ends of the four hooks are fixedly connected to four corners of the steel wire mesh respectively, and the top ends of the four hooks are fixedly connected to the inner side of the lower hanging ring and the inner side of the upper hanging ring respectively.
(III) advantageous effects
The utility model provides a colliery relief of disaster is with quick erection bracing frame possesses following beneficial effect:
(1) the rapid transportation of the rapid mounting support frame for coal mine disaster relief is completed through the wheels, the rotating shaft, the base, the vertical support rod, the fixing bolt, the pushing handle, the fixing clamp, the I-shaped steel, the fixing seat and the horizontal support rod, wherein the vertical support rod, the I-shaped steel and the horizontal support rod are integrated with the fixing seat through the fixing clamp, so that the whole transportation is facilitated through the wheels, the rotating shaft and the base, the time consumed for the transportation of equipment is reduced, and the rescue site deployment efficiency of the rapid mounting support frame for coal mine disaster relief is improved.
(2) The quick mounting support frame for coal mine disaster relief is quickly built through the base, the lower hanging ring, the vertical support rod, the I-steel, the fixing seat, the clamping groove, the horizontal support rod, the inserting groove, the upper hanging ring, the hook and the steel wire net, when the quick mounting support frame for coal mine disaster relief is transported to a rescue site, the I-steel is drawn out from the fixing clamp to drive the transverse spacing of the quick mounting support frame for coal mine disaster relief, the horizontal support rod is rotated to enable the front end of the horizontal support rod to be abutted against the inner side of the clamping groove, the length of the horizontal support rod is adjusted to determine the longitudinal spacing of the quick mounting support frame for coal mine disaster relief, the installation of the steel wire net is completed through the hook, the height of the vertical support rod is synchronously adjusted, the installation of the quick mounting support frame for coal mine disaster relief is quickly completed, the modularized flow operation is realized, the installation operation is simple, the installation efficiency is high, the transverse spacing and the longitudinal spacing of the rapid mounting support frame for coal mine disaster relief are locked in advance in the mounting process, and finally the vertical height is adjusted, so that shielding protection can be provided for rescue workers after transverse and longitudinal spacing adjustment is completed.
Drawings
Fig. 1 is a front view of the structure of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
fig. 3 is a front view of the transportation state of the vertical stay bar structure of the present invention.
In the figure: the steel wire mesh fixing device comprises wheels 1, a rotating shaft 2, a base 3, a lower hanging ring 4, a vertical support rod 5, a fixing bolt 6, a pushing handle 7, a fixing clamp 8, I-shaped steel 9, a fixing seat 10, a clamping groove 11, a horizontal support rod 12, a slot 13, an upper hanging ring 14, a hook 15 and a steel wire mesh 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a colliery relief work is with quick erection bracing frame, including wheel 1, the fixedly connected with pivot 2 of the center department of wheel 1, the both ends swivelling joint of pivot 2 has base 3, through wheel 1, the quick transportation of a colliery relief work is with quick erection bracing frame is realized to pivot 2 and base 3, the top surface fixedly connected with of base 3 hangs ring 4 down, the quantity of hanging ring 4 has two totally down, the bottom of two hanging ring 4 is fixed connection respectively at the top surface left end and the right-hand member of base 3 down, the equal fixedly connected with couple 15 in inboard of two hanging ring 4 down, the structure of two hanging ring 4 down is the same with the structure of last hanging ring 14, the vertical vaulting pole 5 of top fixedly connected with of base 3, vertical vaulting pole 5 accomplishes the vertical height adjustment of a colliery relief work is with quick erection bracing frame.
The bottom end of the vertical support rod 5 is in threaded connection with a fixing bolt 6, the number of the fixing bolts 6 is four in total, the bottom ends of the four fixing bolts 6 penetrate through the top surface to the inner side of the base 3, the top and the bottom of the side surface of the vertical support rod 5 are respectively and fixedly connected with a push handle 7 and a fixing clamp 8, the inner side of the fixing clamp 8 is abutted with an I-shaped steel 9, the storage and the fixing of the I-shaped steel 9 in a transportation state are completed through the fixing clamp 8, the transverse distance adjustment of the quick mounting support frame for coal mine disaster relief is completed through the use of the I-shaped steel 9, and the top end of the vertical support rod 5 is.
The left side of a fixed seat 10 is fixedly connected with a clamping groove 11, the left side of the fixed seat 10 is rotatably connected with a horizontal stay bar 12, the bottom end of the horizontal stay bar 12 is rotatably connected to the right side of the fixed seat 10, the top end of the horizontal stay bar 12 is abutted against the inner side of the clamping groove 11, the horizontal stay bar 12 is made of a hydraulic stay bar, the structure of the horizontal stay bar 12 is the same as that of a vertical stay bar 5, the vertical spacing adjustment of the quick mounting support frame for coal mine disaster relief is completed through the horizontal stay bar 12, the vertical stay bar 5, an I-shaped steel 9 and the horizontal stay bar 12 are integrated with the fixed seat 10 through a fixing clamp 8, the integral transportation and the quick mounting are convenient, a slot 13 is arranged at the front side of the fixed seat 10, anti-skid grains are arranged at the inner side of the slot 13, the inner side of the slot 13 is abutted against the two ends of the I-shaped steel 9, the, the quantity of couple 15 has four altogether, and four couples 15's bottom difference fixed connection is in the four corners of wire net 16, and four couples 15's top difference fixed connection is in the inboard of link 4 under and the inboard of last link 14, and couple 15's bottom fixed connection has wire net 16.
The working principle is as follows:
when the quick mounting support frame for coal mine disaster relief is used, the quick transportation of the quick mounting support frame for coal mine disaster relief is realized through the wheels 1, the rotating shaft 2 and the base 3, the I-shaped steel 9 is pulled out from the fixing clamp 8, the transverse distance of the quick mounting support frame for coal mine disaster relief is adjusted, the horizontal support rod 12 is rotated, the front end of the horizontal support rod 12 is abutted against the inner side of the clamping groove 11, the length of the horizontal support rod 12 is adjusted, the longitudinal distance of the quick mounting support frame for coal mine disaster relief is determined, the installation of the steel wire mesh 16 is completed through the hook 15, the height of the vertical support rod 5 is synchronously adjusted, and the quick deployment of the quick mounting support frame for coal mine disaster relief is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention.

Claims (6)

1. The utility model provides a colliery relief of disaster is with quick erection bracing frame, includes wheel (1), its characterized in that: a rotating shaft (2) is fixedly connected to the center of the wheel (1), two ends of the rotating shaft (2) are rotatably connected with a base (3), the top surface of the base (3) is fixedly connected with a lower hanging ring (4), and the top end of the base (3) is fixedly connected with a vertical support rod (5);
the bottom end of the vertical support rod (5) is in threaded connection with a fixing bolt (6), the top and the bottom of the side surface of the vertical support rod (5) are respectively and fixedly connected with a push handle (7) and a fixing clamp (8), the inner side of the fixing clamp (8) is abutted with an I-shaped steel (9), and the top end of the vertical support rod (5) is fixedly connected with a fixing seat (10);
the utility model discloses a wire rope fixing device, including fixing base (10), left side fixedly connected with draw-in groove (11) of fixing base (10), the left side swivelling joint of fixing base (10) has horizontal vaulting pole (12), slot (13) have been seted up to the front side of fixing base (10), link (14) are gone up to the front side bottom fixedly connected with of fixing base (10), the inboard fixedly connected with couple (15) of going up link (14), the bottom fixedly connected with wire net (16) of couple (15).
2. The quick-mounting support frame for coal mine disaster relief according to claim 1, wherein: the quantity of lower link (4) is total two, two the bottom difference fixed connection of lower link (4) is at the top surface left end and the right-hand member of base (3), two equal fixedly connected with couple (15) in inboard of lower link (4), two the structure of lower link (4) is the same with the structure of last link (14).
3. The quick-mounting support frame for coal mine disaster relief according to claim 1, wherein: the number of the fixing bolts (6) is four, and the bottom ends of the four fixing bolts (6) penetrate through the top surface to the inner side of the base (3).
4. The quick-mounting support frame for coal mine disaster relief according to claim 1, wherein: the bottom end of the horizontal support rod (12) is rotatably connected to the right side of the fixing seat (10), the top end of the horizontal support rod (12) abuts against the inner side of the clamping groove (11), the horizontal support rod (12) is made of hydraulic support rods, and the structure of the horizontal support rod (12) is the same as that of the vertical support rod (5).
5. The quick-mounting support frame for coal mine disaster relief according to claim 1, wherein: the inner side of the slot (13) is provided with anti-skid grains, and the inner side of the slot (13) is abutted against two ends of the I-shaped steel (9).
6. The quick-mounting support frame for coal mine disaster relief according to claim 1, wherein: the number of the hooks (15) is four in total, the bottom ends of the four hooks (15) are fixedly connected to four corners of the steel wire mesh (16) respectively, and the top ends of the four hooks (15) are fixedly connected to the inner side of the lower hanging ring (4) and the inner side of the upper hanging ring (14) respectively.
CN202022930814.9U 2020-12-09 2020-12-09 Quick erection bracing frame is used in colliery relief of disaster Expired - Fee Related CN213684191U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022930814.9U CN213684191U (en) 2020-12-09 2020-12-09 Quick erection bracing frame is used in colliery relief of disaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022930814.9U CN213684191U (en) 2020-12-09 2020-12-09 Quick erection bracing frame is used in colliery relief of disaster

Publications (1)

Publication Number Publication Date
CN213684191U true CN213684191U (en) 2021-07-13

Family

ID=76738834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022930814.9U Expired - Fee Related CN213684191U (en) 2020-12-09 2020-12-09 Quick erection bracing frame is used in colliery relief of disaster

Country Status (1)

Country Link
CN (1) CN213684191U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552819A (en) * 2024-01-12 2024-02-13 中国安全生产科学研究院 Emergency rescue supporting device for underground inclined opening

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552819A (en) * 2024-01-12 2024-02-13 中国安全生产科学研究院 Emergency rescue supporting device for underground inclined opening

Similar Documents

Publication Publication Date Title
CN213684191U (en) Quick erection bracing frame is used in colliery relief of disaster
CN208137458U (en) Construction discharging platform
CN109630050B (en) Novel working face recovery channel supporting process
CN218716871U (en) Prevent empting leading hydraulic prop convenient to withdraw
CN203905988U (en) Slip type temporary supporting bracket
CN214366139U (en) Roof supporting vehicle for crossheading empty-roof area
CN107559027A (en) A kind of rail mounted carloader
CN215108716U (en) Automatic anchor rod drill carriage
CN209275517U (en) A kind of coal mine unit rack carrying implement
CN203451118U (en) Lifting appliance of transporter
CN208686411U (en) A kind of driving face in coal mine steel belt for mining supports crane
CN217897902U (en) Supporting bracket for mine roadway
CN220785789U (en) Tunnel construction material handling device
CN218862667U (en) Rescue device is strutted in colliery roof fall in pit
CN216613710U (en) Lifting appliance for carrying unit support
CN205500638U (en) Simply hoist transportation equipment
CN217681753U (en) Novel bow member installation and excavation platform truck
CN216613711U (en) Lifting appliance for carrying unit support
CN208153038U (en) A kind of supporting construction on excacation arm
CN216841793U (en) Material transport vehicle for inclined shaft construction
CN216588442U (en) Safety ladder for safety detection of airtight wall
CN202381118U (en) Gun-digged coal lane muck automatically-moving device
CN211900654U (en) Coal mine geological tunneling detection system
CN217897924U (en) Moving device of shield support
CN221319168U (en) Main driving unit disassembly auxiliary device of assembled shell-discarding disassembly shield machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210713

Termination date: 20211209

CF01 Termination of patent right due to non-payment of annual fee