CN213683098U - Building thickness control device that plasters - Google Patents

Building thickness control device that plasters Download PDF

Info

Publication number
CN213683098U
CN213683098U CN202022261052.8U CN202022261052U CN213683098U CN 213683098 U CN213683098 U CN 213683098U CN 202022261052 U CN202022261052 U CN 202022261052U CN 213683098 U CN213683098 U CN 213683098U
Authority
CN
China
Prior art keywords
plate
bottom plate
sleeve
locating
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022261052.8U
Other languages
Chinese (zh)
Inventor
朱余芝
乔文磊
詹光飞
苏高杰
李晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Fangyuan Construction Engineering Co ltd
Original Assignee
Henan Fangyuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Fangyuan Construction Engineering Co ltd filed Critical Henan Fangyuan Construction Engineering Co ltd
Priority to CN202022261052.8U priority Critical patent/CN213683098U/en
Application granted granted Critical
Publication of CN213683098U publication Critical patent/CN213683098U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to the technical field of building construction, in particular to a building plastering thickness control device, which comprises a bottom plate, wherein a positioning ring is fixedly arranged on the bottom plate, and a positioning nail is sleeved on the positioning ring; the fixed guide bar that is provided with on the bottom plate, it is provided with the locating plate to slide on the guide bar, bottom plate and locating plate are parallel to each other, threaded connection has the screw rod on the locating plate, screw rod one end is rotated and is set up on the bottom plate, the other end runs through the locating plate and fixed being provided with the rolling disc, be provided with the observation subassembly that is used for measuring interval between bottom plate and the locating plate between locating plate and the rolling disc. The method and the device have the effects of facilitating the use of workers and optimizing the construction process.

Description

Building thickness control device that plasters
Technical Field
The application relates to the technical field of building construction, in particular to a building plastering thickness control device.
Background
The inner wall plastering engineering is ubiquitous in site operation, the engineering quantity is large, and general plastering should be carried out all the time to make the bonding firm, if once daub too thickly, easily produce the fracture, even bulge drops, if once daub too thinly, then should not produce effective bonding, and increase the secondary plastering quantity, but the difficult effective control of layering thickness. In addition, according to the conventional construction process, a mortar cake is preferably constructed before plastering on a large surface, wherein the mortar cake is block mortar which is prepared for ensuring the level and the verticality by determining the plastering thickness on the wall surface before plastering. The ash cake production takes a certain period of time, and mortar needs to be independently and automatically mixed, so that resource consumption is generated, and construction management cost and an environmental pollution source are increased.
SUMMERY OF THE UTILITY MODEL
In order to optimize the construction process, the application provides a building plastering thickness control device.
The application provides a building plastering thickness control device adopts following technical scheme:
a building plastering thickness control device comprises a bottom plate, wherein a positioning ring is fixedly arranged on the bottom plate, and a positioning nail is sleeved on the positioning ring; the fixed guide bar that is provided with on the bottom plate, it is provided with the locating plate to slide on the guide bar, bottom plate and locating plate are parallel to each other, threaded connection has the screw rod on the locating plate, screw rod one end is rotated and is set up on the bottom plate, the other end runs through the locating plate and fixed being provided with the rolling disc, be provided with the observation subassembly that is used for measuring interval between bottom plate and the locating plate between locating plate and the rolling disc.
Through adopting above-mentioned technical scheme, when using, the staff need not to mention the preparation ash cake, only needs to fix a position the nail on the wall, fixes the bottom plate on the wall body and can act as the ash cake. The screw rod can be driven to rotate through the rotary rotating disc, and the positioning plate is arranged on the guide rod in a sliding mode due to the threaded connection of the screw rod and the positioning plate, so that when the screw rod rotates, the positioning plate cannot rotate and can only move along the axis of the screw rod, and the adjustment of the distance between the positioning plate and the bottom plate is achieved. The distance between the positioning plate and the wall surface is the thickness required to be plastered.
Preferably, the observation assembly comprises a sleeve fixedly arranged on the positioning plate, a connecting rod arranged in the sleeve in a sliding manner and an elastic piece used for pushing the connecting rod to extend out of the sleeve; the sleeve is provided with an observation hole along the axial direction, and the connecting rod can extend out of the sleeve and abut against the rotating disc.
Through adopting above-mentioned technical scheme, the connecting rod stretches out from the sleeve pipe under the effect of elastic component to support on the rolling disc. The locating plate carries out the in-process that removes under the effect of screw rod, the change of interval between locating plate and the bottom plate, and the connecting rod deviates from the change of interval between rolling disc one end and the locating plate, and these two changes are the same. Therefore, the worker can judge the distance between the positioning plate and the bottom plate by observing the moving distance of the connecting rod in the observation hole.
Preferably, the elastic part is a spring arranged in the sleeve, one end of the spring is fixed with the positioning plate, and the other end of the spring is fixed with the connecting rod.
Through adopting above-mentioned technical scheme, the connecting rod stretches out and supports on the rolling disc from the sleeve pipe under the effect of spring for the connecting rod keeps stable.
Preferably, the sleeve is provided with a scale along the observation hole.
Through adopting above-mentioned technical scheme, the scale that sets up makes the staff can audio-visually obtain the data of distance, has made things convenient for the staff to adjust the locating plate, has reduced the operation degree of difficulty, has made things convenient for the staff to use.
Preferably, a sliding groove is formed in one side, close to the positioning plate, of the rotating disc, the sliding groove is formed in a complete annular shape along the axis of the rotating disc, and one end, away from the sleeve, of the connecting rod is arranged in the sliding groove in a sliding mode.
Through adopting above-mentioned technical scheme, the spout has produced direction and spacing effect to the connecting rod. The connecting rod deviates from the sheathed tube one end and supports in the spout for when the staff rotates the rolling disc, the tip of connecting rod slides in the spout, has guaranteed that the connecting rod is difficult for droing from the rolling disc, has promoted the steadiness when connecting rod uses.
Preferably, a threaded pipe is fixedly arranged on the positioning plate, and the screw rod is in threaded connection with the threaded pipe.
Through adopting above-mentioned technical scheme, the screwed pipe has increased the threaded connection area with the screw rod for the screw rod is more firm when using, is difficult for producing and slides. Simultaneously, the screwed pipe has produced direction and firm effect to the locating plate for the screw rod is when rotatory, and the locating plate is difficult for taking place crooked on the screw rod.
Preferably, a guide pipe is fixedly arranged on the positioning plate, and the guide rod is sleeved in the guide pipe.
Through adopting above-mentioned technical scheme, the guide bar slides and sets up in the stand pipe, has played the effect of support and direction to the locating plate for the locating plate is difficult for taking place crooked when moving under the effect of screw rod.
Preferably, the locating nail is sleeved with a connecting spring, one end of the connecting spring is fixed with the locating ring, and the other end of the connecting spring is fixed with the locating nail.
Through adopting above-mentioned technical scheme, connecting spring links together location nail and holding ring for the location nail can not take place to lose when not using.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the mortar cake fixing device is used, workers do not need to lift and make mortar cakes, only need to nail the positioning nails on the wall, and fix the bottom plate on the wall to serve as the mortar cake. The screw rod can be driven to rotate by rotating the rotating disc, so that the positioning plate cannot rotate and can only move along the axis of the screw rod when the screw rod rotates, the adjustment of the distance between the positioning plate and the bottom plate is realized, and the distance between the positioning plate and the wall surface is the thickness of plastering;
2. the connecting rod stretches out from the sleeve pipe under the effect of elastic component to support on the rolling disc, the locating plate carries out the in-process that removes under the effect of screw rod, the change of interval between locating plate and the bottom plate, the connecting rod deviates from the change of interval between rolling disc one end and the locating plate, these two changes are the same, thereby make the staff can judge the distance between locating plate and the bottom plate through observing the moving distance of connecting rod in the inspection hole, made things convenient for the staff to use.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a partially enlarged schematic view of a portion a in fig. 1.
Fig. 3 is another angle structure diagram of the embodiment of the present application.
Reference numerals: 1. a base plate; 11. a positioning ring; 12. positioning nails; 13. a guide bar; 14. a connecting spring; 2. positioning a plate; 21. a threaded pipe; 22. a guide tube; 3. a screw; 31. rotating the disc; 32. a chute; 41. a sleeve; 411. an observation hole; 42. a connecting rod; 43. a spring.
Detailed Description
The technical solutions in the present application will be described in further detail below with reference to the accompanying drawings.
The embodiment of the application discloses a building plastering thickness control device. Referring to fig. 1, a building plastering thickness control device includes a bottom plate 1, wherein the bottom plate 1 is square. Two ends of the diagonal line of the bottom plate 1 are integrally provided with positioning rings 11, and positioning nails 12 are sleeved on the positioning rings 11. A guide rod 13 is fixedly arranged on the bottom plate 1, and the axis of the guide rod 13 is perpendicular to the plane of the bottom plate 1. The guide rod 13 is provided with a positioning plate 2 in a sliding manner, and the positioning plate 2 is provided with a through hole for the guide rod 13 to pass through. The plane of the bottom plate 1 is parallel to the plane of the positioning plate 2.
Referring to fig. 1, a threaded hole is formed in a positioning plate 2, so that a screw rod 3 is connected to the positioning plate 2 in a threaded manner. One end of the screw 3 is rotatably arranged on the bottom plate 1, and the other end of the screw penetrates through the positioning plate 2 and is fixedly provided with a rotating disc 31. The plane of the rotating disc 31 is parallel to the plane of the positioning plate 2. The staff can make locating plate 2 carry out the lift removal along the axis of screw rod 3 through rotating rolling disc 31 to realized the regulation to the interval between bottom plate 1 and locating plate 2. An observation assembly for measuring the distance between the bottom plate 1 and the positioning plate 2 is arranged between the positioning plate 2 and the rotating disc 31, so that a worker can intuitively obtain the distance between the positioning plate 2 and the bottom plate 1.
Referring to fig. 1 and 2, the observation assembly includes a sleeve 41 fixedly disposed on the positioning plate 2, a link 42 slidably disposed in the sleeve 41, and an elastic member for pushing the link 42 to protrude from the sleeve 41. The axis of the sleeve 41 is perpendicular to the plane of the positioning plate 2, and the open end of the sleeve 41 is arranged towards the rotating disc 31. A viewing hole 411 is formed in the sleeve 41 in the axial direction, and the link 42 can be extended from the open end of the sleeve 41 by an elastic member and abut against the rotating disk 31.
When the worker rotates the rotary disc 31, the positioning plate 2 moves up and down along the screw rod 3. During the movement of the positioning plate 2, the distance between the positioning plate 2 and the bottom plate 1 changes, and the distance between the end of the connecting rod 42 departing from the rotating disc 31 and the positioning plate 2 changes along with the change, and the change amount is the same.
Referring to fig. 2, the elastic member is a spring 43 disposed in the sleeve 41. One end of the spring 43 is fixedly connected with the positioning plate 2, the other end is fixedly connected with the connecting rod 42, and the spring 43 is always in a compressed state, so that the connecting rod 42 is ejected out of the sleeve 41 by the spring 43.
Referring to fig. 1 and 2, scales are provided on the outer wall of the casing 41 along the observation hole 411, so that a worker can visually obtain the distance between the bottom plate 1 and the positioning plate 2. The end of the observation hole 411 far from the positioning plate 2 is a zero-scale end, and when the positioning plate 2 abuts against the bottom plate 1, the end of the connecting rod 42 far from the rotating disc 31 is located at the zero scale of the sleeve 41.
Referring to fig. 1 and 3, in order to make the connecting rod 42 more stable on the rotating disc 31 and not easy to be skewed, a sliding slot 32 is formed on one side of the rotating disc 31 close to the positioning plate 2. The slide groove 32 is opened along the axis of the rotary disk 31 and has a complete ring shape. The end of the connecting rod 42 facing away from the sleeve 41 rests against the bottom of the groove 32, so that when the rotary disk 31 rotates, the end of the connecting rod 42 slides in the groove 32.
Referring to fig. 1, in order to make the screw rod 3 more stable on the positioning plate 2 and not easy to be skewed, a threaded pipe 21 is fixedly disposed on a side of the positioning plate 2 away from the bottom plate 1. The threaded pipe 21 communicates with a threaded hole on the positioning plate 2 so that the screw 3 is threadedly coupled in the threaded pipe 21.
Referring to fig. 1, in order to make the positioning plate 2 move more stably on the guide rods 13 and not easily skew, a guide tube 22 is fixedly disposed on a side of the positioning plate 2 away from the bottom plate 1. The guide rod 13 is slidably disposed in the guide tube 22.
Referring to fig. 1 and 3, a connecting spring 14 is sleeved on the positioning pin 12. One end of the connecting spring 14 is fixedly connected with the positioning ring 11, and the other end is fixedly connected with the positioning nail 12. The connecting spring 14 plays a connecting role for the positioning nail 12, so that the positioning nail 12 is not easy to fall off from the positioning ring 11 under the condition of not using, and the loss of the positioning nail 12 is prevented.
The implementation principle of the embodiment of the application is as follows: in use, the locating peg 12 is driven into the wall so that the base plate 1 lies against the surface of the wall. By rotating the rotating disc 31, the positioning plate 2 is moved in a direction away from the base plate 1. By observing the position of the link 42 on the observation hole 411, the worker adjusts the positioning plate 2 to a proper position. The spacing between locating plate 2 and the wall is the thickness of plastering promptly. After the wall plastering machine is used, the bottom plate 1 is taken down from the wall body and can be used repeatedly, and a mortar cake is not required to be made before wall plastering each time.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a building thickness control device that plasters which characterized in that: the clamping device comprises a bottom plate (1), wherein a positioning ring (11) is fixedly arranged on the bottom plate (1), and a positioning nail (12) is sleeved on the positioning ring (11); the fixed guide bar (13) that is provided with on bottom plate (1), it is provided with locating plate (2) to slide on guide bar (13), bottom plate (1) and locating plate (2) are parallel to each other, threaded connection has screw rod (3) on locating plate (2), screw rod (3) one end is rotated and is set up on bottom plate (1), the other end runs through locating plate (2) and fixed being provided with rolling disc (31), be provided with the observation subassembly that is used for measuring interval between bottom plate (1) and locating plate (2) between locating plate (2) and rolling disc (31).
2. A construction plastering thickness controlling apparatus as claimed in claim 1, wherein: the observation assembly comprises a sleeve (41) fixedly arranged on the positioning plate (2), a connecting rod (42) arranged in the sleeve (41) in a sliding manner and an elastic piece for pushing the connecting rod (42) to extend out of the sleeve (41); the sleeve (41) is provided with an observation hole (411) along the axial direction, and the connecting rod (42) can extend out of the sleeve (41) and abut against the rotating disc (31).
3. A construction plastering thickness controlling apparatus as claimed in claim 2, wherein: the elastic piece is a spring (43) arranged in the sleeve (41), one end of the spring (43) is fixed with the positioning plate (2), and the other end of the spring (43) is fixed with the connecting rod (42).
4. A construction plastering thickness controlling apparatus as claimed in claim 2, wherein: scales are arranged on the sleeve (41) along the observation hole (411).
5. A construction plastering thickness controlling apparatus as claimed in claim 2, wherein: one side of the rotating disc (31) close to the positioning plate (2) is provided with a sliding groove (32), the sliding groove (32) is formed in a complete annular shape along the axis of the rotating disc (31), and one end, deviating from the sleeve (41), of the connecting rod (42) is arranged in the sliding groove (32) in a sliding mode.
6. A construction plastering thickness controlling apparatus as claimed in claim 1, wherein: a threaded pipe (21) is fixedly arranged on the positioning plate (2), and the screw rod (3) is in threaded connection with the threaded pipe (21).
7. A construction plastering thickness controlling apparatus as claimed in claim 1, wherein: a guide pipe (22) is fixedly arranged on the positioning plate (2), and the guide rod (13) is sleeved in the guide pipe (22).
8. A construction plastering thickness controlling apparatus as claimed in claim 1, wherein: the locating nail (12) is sleeved with a connecting spring (14), one end of the connecting spring (14) is fixed with the locating ring (11), and the other end of the connecting spring is fixed with the locating nail (12).
CN202022261052.8U 2020-10-10 2020-10-10 Building thickness control device that plasters Expired - Fee Related CN213683098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022261052.8U CN213683098U (en) 2020-10-10 2020-10-10 Building thickness control device that plasters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022261052.8U CN213683098U (en) 2020-10-10 2020-10-10 Building thickness control device that plasters

Publications (1)

Publication Number Publication Date
CN213683098U true CN213683098U (en) 2021-07-13

Family

ID=76756368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022261052.8U Expired - Fee Related CN213683098U (en) 2020-10-10 2020-10-10 Building thickness control device that plasters

Country Status (1)

Country Link
CN (1) CN213683098U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622631A (en) * 2021-09-23 2021-11-09 中建五局华东建设有限公司 Precast ash cake for concrete layer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622631A (en) * 2021-09-23 2021-11-09 中建五局华东建设有限公司 Precast ash cake for concrete layer

Similar Documents

Publication Publication Date Title
CN213683098U (en) Building thickness control device that plasters
CN204461264U (en) Special portable folding chi is surveyed and drawn in a kind of construction work
CN211118517U (en) Support for surveying instrument capable of improving surveying and mapping precision
CN111879266A (en) Assembled steel construction building fire retardant coating thickness detects instrument
CN208443396U (en) A kind of total station
CN210952564U (en) Multifunctional measuring device for mechanical design
CN110409850B (en) Horizontal plane determining device convenient for steel structure construction and application
CN209077904U (en) A kind of hydraulic engineering pipe cutting apparatus that can measure length with fixed structure
CN209727087U (en) Process capability test level bracket
CN205537659U (en) It surveys mark mound increase device to force thoughts of returning home
CN205742301U (en) A kind of Construction of Civil Engineering base pricker
CN216695000U (en) On-spot mapping device of engineering cost
CN214224128U (en) Intelligent measuring device for hydraulic engineering management
CN209698233U (en) The cutting torch supporting device of NC flame cutting machine
CN220770549U (en) Site mapping device
CN216348577U (en) Integrated inclination measuring instrument for agricultural house
CN219588450U (en) On-spot survey and drawing device of building engineering cost
CN221072770U (en) Deep foundation pit monitoring device
CN219453438U (en) Mapping instrument positioning device
CN219531856U (en) Multifunctional steel structure measuring ruler
CN218270768U (en) On-spot mapping device that engineering cost used
CN216977878U (en) Surveyor's level transfer equipment for hydraulic engineering site operation
CN218208119U (en) Water supply pipe construction reinforcing apparatus
CN220206680U (en) Range finder for engineering cost
CN216158734U (en) Portable measuring device for building engineering of angle modulation can carry out

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210713