CN218208119U - Water supply pipe construction reinforcing apparatus - Google Patents

Water supply pipe construction reinforcing apparatus Download PDF

Info

Publication number
CN218208119U
CN218208119U CN202222690879.XU CN202222690879U CN218208119U CN 218208119 U CN218208119 U CN 218208119U CN 202222690879 U CN202222690879 U CN 202222690879U CN 218208119 U CN218208119 U CN 218208119U
Authority
CN
China
Prior art keywords
slider
bottom plate
lead screw
backup pad
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222690879.XU
Other languages
Chinese (zh)
Inventor
陈健
吴茂林
尹国荐
雷鸣
董斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuxiong Yi Shuirun Water Conservancy And Hydropower Survey And Design Co ltd
Original Assignee
Chuxiong Yi Shuirun Water Conservancy And Hydropower Survey And Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuxiong Yi Shuirun Water Conservancy And Hydropower Survey And Design Co ltd filed Critical Chuxiong Yi Shuirun Water Conservancy And Hydropower Survey And Design Co ltd
Priority to CN202222690879.XU priority Critical patent/CN218208119U/en
Application granted granted Critical
Publication of CN218208119U publication Critical patent/CN218208119U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the construction, a water supply pipe construction reinforcing apparatus is disclosed, comprising a base plate, one side surface of bottom plate rotates installs the dwang, the one end of dwang is rotated and is installed the backup pad, one side fixed surface of backup pad installs the slide bar, the outside of slide bar slides and has first slider, one side of first slider is fixed with the snap ring, one side of backup pad is rotated and is had lead screw one, one side of bottom plate is fixed with the slide rail, the outside of slide rail slides and has slider two, the outside of slider two is rotated and is had the connecting rod, one side of bottom plate is rotated and is had lead screw two, the outside of lead screw two is fixed with the gear, one side of bottom plate is seted up flutedly, the recess internal fixation has the dead lever, the outside of dead lever slides and has the rack, one side of rack is fixed with the spring. The utility model discloses have rational in infrastructure, be convenient for control and the beneficial effect who adjusts.

Description

Water supply pipe construction reinforcing apparatus
Technical Field
The application relates to the technical field of building construction, more specifically says, relates to a water supply line construction reinforcing apparatus.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
In the building work progress, need carry out laying of water supply pipe, at the laying process, can consolidate water supply pipe mostly, prevent its offset, present water supply pipe reinforcing apparatus adopts mostly and uses concrete placement foundation pile in predetermineeing the slot, reuse the fastener to fix water supply pipe on the foundation pile, this mode is higher to the position required precision of placing of pipeline, the laying position that needs accurate measurement pipeline, when the pipeline position is inconsistent, it is comparatively inconvenient to adjust.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the application provides a water supply pipeline construction reinforcing apparatus.
The application provides a pair of water supply pipeline construction reinforcing apparatus adopts following technical scheme:
the utility model provides a water supply line construction reinforcing apparatus, includes the bottom plate, one side surface of bottom plate rotates installs the dwang, the one end of dwang is rotated and is installed the backup pad, one side fixed surface of backup pad installs the slide bar, the outside of slide bar slides and has slider one, one side of slider one is fixed with the snap ring, one side of backup pad is rotated and is had lead screw one, one side of bottom plate is fixed with the slide rail, the outside of slide rail slides and has slider two, the outside of slider two is rotated and is had the connecting rod, one side of bottom plate is rotated and is had lead screw two, the outside of lead screw two is fixed with the gear, one side of bottom plate is seted up flutedly, the recess internal fixation has the dead lever, the outside of dead lever slides and has the rack, one side of rack is fixed with the spring.
Furthermore, the dwang symmetry is provided with four, singly the backup pad is rotated and is installed two keep away from bottom plate one end of dwang.
Through above-mentioned technical scheme, through the dwang that sets up for the rotation regulation of dwang can drive the altitude mixture control of backup pad.
Furthermore, it is single be provided with two slide bars in the backup pad, slider one and snap ring all constitute sliding connection through slide bar and backup pad, the snap ring is the semi-ring structure, be threaded connection between lead screw one and the slider one, and two on the same lead screw one the threaded connection opposite direction of slider one and lead screw one.
Through the technical scheme, the sliding rod is arranged, so that the sliding adjustment of the first sliding block can drive the clamping ring to adjust the position.
Furthermore, the second sliding block is in sliding connection with the bottom plate through a sliding rail, and one end, far away from the second sliding block, of the connecting rod is rotatably installed on the surface of one side of the rotating rod.
Through the technical scheme, the second sliding block can be adjusted on the surface of the sliding rail in a sliding mode through the arranged sliding rail.
Furthermore, two sliding blocks are symmetrically arranged, the screw rod is in threaded connection with the second sliding block, and the threaded connection directions between the second sliding blocks and the screw rod are opposite.
Through the technical scheme, the two sliding blocks are connected with the screw rod II through threads in opposite directions, so that the screw rod II can drive the sliding blocks II to move oppositely.
Furthermore, one end, far away from the rack, of the spring is fixedly installed on the surface of the bottom of the inner side of the groove, and the gear and the rack are meshed with each other.
Through the technical scheme, the spring can apply elasticity to the rack through the arranged spring, so that the rack is meshed with the gear.
In summary, the present application includes at least one of the following advantageous technical effects:
1. the second screw rod can drive the second slide block to slide oppositely on the surface of the slide rail for adjustment by rotating the second screw rod, the rotating rod is driven to rotate for adjustment under the action of the connecting rod, so that the height of the support plate is adjusted, and the first screw rod is rotated to drive the first slide block to move oppositely, so that the clamp ring is limited for the pipeline, the whole device is relatively simple and convenient for reinforcing the pipeline, is convenient to adjust, and can be suitable for laying pipelines at different heights;
2. through the spring that sets up for rack and gear intermeshing, the rack can be fixed the circumference of gear, makes two fixed of lead screw, thereby makes the high position of snap ring fixed, makes to the regulation of snap ring and fixed simple and convenient that becomes.
Drawings
FIG. 1 is a perspective view of the present application;
FIG. 2 is a schematic front view of the present application;
FIG. 3 is an enlarged schematic view of the structure at the point A;
fig. 4 is a schematic cross-sectional structure diagram of the rack and pinion in the present application.
The reference numbers in the figures illustrate:
1. a base plate; 2. rotating the rod; 3. a support plate; 4. a slide bar; 5. a first sliding block; 6. a snap ring; 7. a first screw rod; 8. a slide rail; 9. a second sliding block; 10. a connecting rod; 11. a second screw rod; 12. a gear; 13. a groove; 14. fixing the rod; 15. a rack; 16. a spring.
Detailed Description
The technical solution in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application; it is obvious that the embodiments described are only a part of the embodiments of the present application, and not all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without making creative efforts based on the embodiments in the present application belong to the protection scope of the present application.
In the description of the present application, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, which are merely for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and operate, and thus, should not be construed as limiting the present application. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present application, it should be noted that, unless otherwise explicitly stated or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like, are to be interpreted broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in this application will be understood to be a specific case for those of ordinary skill in the art.
Example (b):
the present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses a water supply pipe construction reinforcing apparatus, please refer to fig. 1-4, a water supply pipe construction reinforcing apparatus, including bottom plate 1, one side surface rotation of bottom plate 1 installs dwang 2, the one end rotation of dwang 2 installs backup pad 3, one side fixed surface of backup pad 3 installs slide bar 4, the outside of slide bar 4 slides there is slider one 5, one side of slider one 5 is fixed with snap ring 6, one side rotation of backup pad 3 has lead screw one 7, one side of bottom plate 1 is fixed with slide rail 8, the outside of slide rail 8 slides there is slider two 9, the outside of slider two 9 rotates there is connecting rod 10, one side rotation of bottom plate 1 has lead screw two 11, the outside of lead screw two 11 is fixed with gear 12, one side of bottom plate 1 has seted up recess 13, the recess 13 internal fixation has dead lever 14, the outside of dead lever 14 slides there is rack 15, one side of rack 15 is fixed with spring 16.
Dwang 2 symmetry is provided with four, single backup pad 3 rotates and installs 1 one end of keeping away from the bottom plate at two dwang 2, be provided with two slide bars 4 on the single backup pad 3, slider 5 and snap ring 6 all constitute sliding connection through slide bar 4 and backup pad 3, snap ring 6 is the semi-annular structure, be threaded connection between lead screw 7 and slider 5, and the threaded connection opposite direction of two slider 5 on the same lead screw 7 and lead screw 7, threaded connection opposite direction through two slider 5 on the same lead screw 7 that sets up and lead screw 7, make the rotation regulation of lead screw 7 can drive the relative motion of slider 5 and snap ring 6, make snap ring 6 can carry out the centre gripping to the pipeline fixed.
The second sliding block 9 is in sliding connection with the bottom plate 1 through the sliding rail 8, one end, far away from the second sliding block 9, of the connecting rod 10 is rotatably installed on one side surface of the rotating rod 2, the two sliding blocks 9 are symmetrically arranged, the second screw rod 11 is in threaded connection with the second sliding block 9, the threaded connection directions between the two sliding blocks 9 and the second screw rod 11 are opposite, one end, far away from the rack 15, of the spring 16 is fixedly installed on the bottom surface of the inner side of the groove 13, the gear 12 is meshed with the rack 15, and in a natural state, the spring 16 can apply elastic force to the rack 15 to enable the rack 15 to be meshed with the gear 12.
The implementation principle of the water supply pipeline construction reinforcing device in the embodiment of the application is as follows: through fixing bottom plate 1 in predetermineeing the slot, through pressing down rack 15, make rack 15 and gear 12 separate, rotate lead screw two 11, make lead screw two 11 drive slider two 9 and adjust in the slide rail 8 surface sliding in opposite directions, under the effect of connecting rod 10, drive dwang 2 and rotate and adjust, make the altitude mixture control of backup pad 3, adjust to suitable position after, loosen rack 15, make rack 15 under the effect of spring 16, with gear 12 intermeshing, make gear 12 circumference fixed, can realize the fixed of backup pad 3 height, rotate lead screw one 7, make lead screw one 7 drive slider one 5 and snap ring 6 and move in opposite directions, make snap ring 6 carry out the centre gripping to water supply pipe, make the reinforcement to water supply pipe comparatively simple and convenient, and be convenient for adjust.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. The utility model provides a water supply pipe construction reinforcing apparatus, includes bottom plate (1), its characterized in that: one side surface of bottom plate (1) rotates and installs dwang (2), the one end of dwang (2) is rotated and is installed backup pad (3), one side fixed surface of backup pad (3) installs slide bar (4), the outside of slide bar (4) slides and has slider one (5), one side of slider one (5) is fixed with snap ring (6), one side of backup pad (3) is rotated and is had lead screw one (7), one side of bottom plate (1) is fixed with slide rail (8), the outside of slide rail (8) slides and has slider two (9), the outside of slider two (9) is rotated and is had connecting rod (10), one side of bottom plate (1) is rotated and is had lead screw two (11), the outside of lead screw two (11) is fixed with gear (12), one side of bottom plate (1) is seted up fluted (13), recess (13) internal fixation has dead lever (14), the outside of dead lever (14) slides and has rack (15), one side of rack (15) is fixed with spring (16).
2. The reinforcing device for the construction of the water supply pipeline, according to claim 1, is characterized in that: dwang (2) symmetry is provided with four, singly backup pad (3) rotates and installs two bottom plate (1) one end is kept away from of dwang (2).
3. The reinforcing device for the construction of the water supply pipeline as claimed in claim 1, wherein: singly be provided with two slide bars (4) on backup pad (3), slider (5) and snap ring (6) all constitute sliding connection through slide bar (4) and backup pad (3), snap ring (6) are the semi-ring structure, be threaded connection between lead screw (7) and slider (5), and two on the same lead screw (7) the threaded connection opposite direction of slider (5) and lead screw (7).
4. The reinforcing device for the construction of the water supply pipeline, according to claim 1, is characterized in that: the second sliding block (9) is connected with the bottom plate (1) in a sliding mode through a sliding rail (8), and one end, far away from the second sliding block (9), of the connecting rod (10) is rotatably installed on one side surface of the rotating rod (2).
5. The reinforcing device for the construction of the water supply pipeline, according to claim 1, is characterized in that: the two sliding blocks (9) are symmetrically arranged, the screw rod II (11) is in threaded connection with the sliding block II (9), and the threaded connection directions between the two sliding blocks II (9) and the screw rod II (11) are opposite.
6. The reinforcing device for the construction of the water supply pipeline, according to claim 1, is characterized in that: one end of the spring (16), which is far away from the rack (15), is fixedly arranged on the inner bottom surface of the groove (13), and the gear (12) is meshed with the rack (15).
CN202222690879.XU 2022-10-12 2022-10-12 Water supply pipe construction reinforcing apparatus Active CN218208119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222690879.XU CN218208119U (en) 2022-10-12 2022-10-12 Water supply pipe construction reinforcing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222690879.XU CN218208119U (en) 2022-10-12 2022-10-12 Water supply pipe construction reinforcing apparatus

Publications (1)

Publication Number Publication Date
CN218208119U true CN218208119U (en) 2023-01-03

Family

ID=84642420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222690879.XU Active CN218208119U (en) 2022-10-12 2022-10-12 Water supply pipe construction reinforcing apparatus

Country Status (1)

Country Link
CN (1) CN218208119U (en)

Similar Documents

Publication Publication Date Title
CN219511523U (en) Automatic monitoring device for building settlement
CN218208119U (en) Water supply pipe construction reinforcing apparatus
CN211499887U (en) Reinforcing apparatus of ancient building
CN209653402U (en) A kind of connection locking device of building template
CN209799405U (en) Supporting mechanism for prefabricated concrete slab
CN208744624U (en) A kind of new energy components producting energy enough clamps clamping device of different shapes
CN206071066U (en) Concreting surface smoothness precise control instrument
CN213775940U (en) Aluminum template connecting piece
CN212671220U (en) Thick and elevation device of two-way arc ramp plate
CN215434409U (en) Positioning and punching equipment for concrete block production
CN206930253U (en) Steel plate bending angle measurement equipment
CN220224977U (en) Tower column steel-wood combined template
CN218319985U (en) Quick cable bundling equipment for environment-friendly construction
CN217806110U (en) Safety protection mechanism of construction material conveying equipment
CN220434212U (en) Deformation joint template assembly
CN215907427U (en) Connecting and locking device for building template
CN211898523U (en) Positioning and clamping device for secondary pouring of steel bar bolt
CN218786483U (en) Tower crane installation leveling device
CN213805274U (en) Floating device after ditch shaping
CN217353585U (en) Be applied to double-end regulation silk that assembled local-style dwelling houses template supported
CN218117301U (en) Novel quick cloth ash ware
CN109102841B (en) Make things convenient for angle regulation's fixing device for instrument and meter installation
CN217949728U (en) Support frame connecting piece structure for municipal construction
CN220955575U (en) Pick snap ring mounting device
CN219034076U (en) House construction bed course equipment of making level