CN213668482U - Building construction working face sprays dust fall heat sink - Google Patents

Building construction working face sprays dust fall heat sink Download PDF

Info

Publication number
CN213668482U
CN213668482U CN202022709006.XU CN202022709006U CN213668482U CN 213668482 U CN213668482 U CN 213668482U CN 202022709006 U CN202022709006 U CN 202022709006U CN 213668482 U CN213668482 U CN 213668482U
Authority
CN
China
Prior art keywords
water
pipe
base
water tank
working face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022709006.XU
Other languages
Chinese (zh)
Inventor
吴兴邦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022709006.XU priority Critical patent/CN213668482U/en
Application granted granted Critical
Publication of CN213668482U publication Critical patent/CN213668482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Blowing Cold Air, Devices For Blowing Warm Air, And Means For Preventing Water Condensation In Air Conditioning Units (AREA)

Abstract

The utility model discloses a building construction working face sprays dust fall heat sink belongs to the equipment field that sprays. A spraying dust-reducing and cooling device for a building construction working face comprises a base, wherein a water tank is arranged on the base, a water guide bin is arranged on the base, a guide pipe is connected between the water guide bin and the water tank, a water pump is arranged on the guide pipe, a water spray pipe is rotatably connected to the water guide bin, a spray head is arranged at the upper end of the water spray pipe, a driving motor is arranged on the base, a gear is fixedly connected to the output end of the driving motor, a driven wheel is arranged on the water spray pipe, the gear is meshed with the driven wheel, and a cold air box is arranged on the water; the utility model discloses, be convenient for drive the spray pipe rotation through gear, from setting up of driving wheel, the increase sprays the area, increases the efficiency and the effect of dust fall cooling, is convenient for cool down the water in the water tank through setting up of actuating mechanism, pump drainage mechanism and cold air box, has improved the cooling effect of water to the construction area environment.

Description

Building construction working face sprays dust fall heat sink
Technical Field
The utility model relates to a spray equipment technical field especially relates to a building construction working face sprays dust fall heat sink.
Background
Dust is inevitably generated in the building construction process, and under the condition that the country pays more and more attention to the environmental problem, the construction problem must be paid attention to, so that a spraying device capable of reducing dust is needed. When the main structure of the building engineering is constructed, the working face is mostly exposed under burning sun, the temperature of the construction working face is very high even exceeds 40 ℃ in hot summer, so that the construction has to stagger high-temperature time periods, and even so, the problems of sunstroke and faint of workers caused by high temperature during construction operation occur occasionally, so that the temperature of the construction working face is reduced, the high-temperature environment of the construction working face is improved, and the main structure becomes a human-oriented green construction and a key factor for improving the construction efficiency of the building engineering.
But the shower nozzle that current building construction operation face sprayed dust fall heat sink is mostly fixed, and the area of spraying is less, and the water temperature in the water tank also can rise and lead to the effect of water spray cooling to weaken of water tank after outdoor long-time placing moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art that the area that sprays is less, the water tank also can rise the problem that leads to the effect of water spray cooling to weaken of the temperature in the outdoor long-time back water tank of placing moreover, and the building construction working face that provides sprays dust fall heat sink.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building construction working face sprays dust fall heat sink, includes the base, be equipped with the water tank on the base, be equipped with the water guide storehouse on the base, be connected with the pipe between water guide storehouse and the water tank, be equipped with the water pump on the pipe, it is connected with the spray pipe to rotate on the water guide storehouse, the upper end of spray pipe is equipped with the shower nozzle, be equipped with driving motor on the base, driving motor's output fixedly connected with gear, be equipped with on the spray pipe from the driving wheel, the gear meshes with from the driving wheel mutually, be equipped with the cold air box on the water tank, be equipped with the refrigerator in the cold air box, be equipped with exhaust mechanism on the water tank, exhaust mechanism's input inserts in the cold air box, exhaust mechanism's output inserts in the water tank, be equipped.
Preferably, actuating mechanism includes the cam, the cam is located the spray pipe, pump exhauster constructs including the inflator, sliding connection has the piston in the inflator, fixedly connected with push rod on the piston, the one end sliding connection that the piston was kept away from to the push rod is at the edge of the lateral wall of cam, be connected with the intake pipe between inflator and the cold air box, be connected with the blast pipe between inflator and the water tank, the one end that the blast pipe is located the water tank extends to the bottom of water tank, all be equipped with the check valve on intake pipe and the blast pipe.
Preferably, one end of the exhaust pipe, which is positioned in the water tank, is fixedly connected with an air blowing ball, and the position of the air blowing ball is matched with the water guide pipe.
Preferably, an atomizer is arranged on the water spraying pipe.
Preferably, the base bottom is equipped with the universal wheel, the base lateral wall is equipped with multiunit hydraulic support pole, hydraulic support pole bottom is equipped with the backup pad.
Preferably, a waterproof cover is arranged on the base, and the driving motor is located in the waterproof cover.
Compared with the prior art, the utility model provides a building construction working face sprays dust fall heat sink possesses following beneficial effect:
1. this building construction operation face sprays dust fall heat sink, the staff removes the device to the construction area of treating the dust fall in, start the water pump and deliver to the water guide storehouse in with the water pump in the water tank, the water that gets into in the water guide storehouse is discharged along the spray pipe, and by the shower nozzle blowout, carry out the dust fall cooling to the construction area, meanwhile, start driving motor, driving motor passes through the gear, it rotates to make the shower nozzle rotate the water spray to drive the spray pipe from the driving wheel, increase the area of dust fall, it is further, the refrigerator is cooled down to the air that gets into in the cold air box, the spray pipe drives through drive mechanism and takes out the leading-in water tank of air conditioning of exhaust mechanism in with the cold air box, cool down the water in the water tank, the cooling effect of water to the construction area has.
2. The spraying dust-reducing and temperature-reducing device for the building construction working face drives the piston to slide in the air cylinder in a reciprocating mode through the water spraying pipe, the cam and the push rod, when the piston slides in the direction close to the cam, cold air in the cold air box enters the air cylinder along the air inlet pipe, and when the piston slides in the direction far away from the cam, the cold air in the air cylinder is discharged into the water tank along the air outlet pipe to reduce the temperature of water in the water tank.
3. This building construction working face sprays dust fall heat sink, is convenient for increase the cooling effect to the water that flows in the aqueduct through the setting of drum balloon.
4. This building construction working face sprays dust fall heat sink, the setting through the atomizer is convenient for refine shower nozzle spun drop of water, increases dust fall effect.
5. This building construction working face sprays dust fall heat sink, the device nimble removal of being convenient for through the setting of universal wheel, the setting of hydraulic support pole is convenient for support the device, and the setting of backup pad is convenient for increase the stability of support.
6. This building construction working face sprays dust fall heat sink is convenient for carry out water proof protection to driving motor through the setting of buckler.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses, through the gear, be convenient for drive the spray pipe rotation from the setting of driving wheel, the increase sprays the area, increases the efficiency and the effect of dust fall cooling, is convenient for cool down the water in the water tank through the setting of actuating mechanism, pump drainage mechanism and cold air box, has improved the cooling effect of water to the construction area environment.
Drawings
Fig. 1 is a schematic structural view of a spraying dust-settling and cooling device for a construction working face provided by the utility model;
fig. 2 is the utility model provides a building construction working face sprays dust fall heat sink A part's schematic structure.
In the figure: 1. a base; 2. a water tank; 201. a water conduit; 3. a water guide bin; 4. a water spray pipe; 5. a drive motor; 6. a gear; 7. a driven wheel; 8. a cam; 9. a spray head; 10. an air conditioning box; 101. a refrigerator; 11. an air cylinder; 111. a piston; 112. a push rod; 113. an air inlet pipe; 114. an exhaust pipe; 115. a balloon; 12. a hydraulic support rod; 13. a universal wheel; 14. an atomizer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1-2, a spraying dust-settling and cooling device for a building construction working surface comprises a base 1, a water tank 2 is arranged on the base 1, a water guide bin 3 is arranged on the base 1, a guide pipe is connected between the water guide bin 3 and the water tank 2, a water pump is arranged on the guide pipe, a water spray pipe 4 is rotatably connected to the water guide bin 3, a spray head 9 is arranged at the upper end of the water spray pipe 4, a driving motor 5 is arranged on the base 1, a gear 6 is fixedly connected to the output end of the driving motor 5, a driven wheel 7 is arranged on the water spray pipe 4, the gear 6 is meshed with the driven wheel 7, a cold air tank 10 is arranged on the water tank 2, a refrigerator 101 is arranged in the cold air tank 10, an exhaust mechanism is arranged on the water tank 2, the input end of the exhaust mechanism is connected into the.
The worker moves the device to the construction area to be dusted, the water pump is started to send the water pump in the water tank 2 to the water guide bin 3, the water entering the water guide bin 3 is discharged along the water spray pipe 4 and is sprayed out by the spray head 9 to perform dustfall cooling on the construction area, meanwhile, the driving motor 5 is started, the driving motor 5 drives the water spray pipe 4 to rotate through the gear 6 and the driven wheel 7 to enable the spray head 9 to spray water in a rotating mode, the dustfall area is increased, further, the refrigerator 101 cools the air entering the cold air box 10, the water spray pipe 4 drives the air suction and exhaust mechanism through the driving mechanism to guide the cold air in the cold air box 10 into the water tank 2 to cool the water in the water tank 2, the cooling effect of the construction area by the water is increased, and it should be noted that the driving motor 5 in the above factual manner adopts a variable frequency motor with model number of YVF160L-6, but is not limited to the motor, through gear 6, be convenient for drive spray pipe 4 rotation from the setting of driving wheel 7, the increase sprays the area, increases the efficiency and the effect of dust fall cooling, is convenient for cool down the water in water tank 2 through the setting of actuating mechanism, pump drainage mechanism and cold air box 10, has improved the cooling effect of water to the construction area environment.
Example 2:
referring to fig. 1-2, a spraying dust-settling and temperature-reducing device for construction work surfaces, which is substantially the same as that in embodiment 1, further, the driving mechanism includes a cam 8, the cam 8 is located on the water spraying pipe 4, the air pumping and exhausting mechanism includes an air cylinder 11, a piston 111 is slidably connected in the air cylinder 11, a push rod 112 is fixedly connected to the piston 111, one end of the push rod 112, which is far away from the piston 111, is slidably connected to an edge of a side wall of the cam 8, an air inlet pipe 113 is connected between the air cylinder 11 and the air cooling box 10, an exhaust pipe 114 is connected between the air cylinder 11 and the water cooling box 2, one end of the exhaust pipe 114, which is located in the water cooling box 2, extends to the bottom of the water cooling box 2, one-way valves are respectively arranged on the air inlet pipe 113 and the exhaust pipe 114, the water spraying pipe 4 drives the piston 111 to slide in the air, when the piston 111 slides in a direction away from the cam 8, the cold air in the air cylinder 11 is discharged into the water tank 2 along the exhaust pipe 114, and the water in the water tank 2 is cooled.
Example 3:
referring to fig. 1-2, a spraying dust-settling and cooling device for a construction working surface is substantially the same as that in embodiment 1, further, one end of the exhaust pipe 114, which is located in the water tank 2, is fixedly connected with a balloon 115, the position of the balloon 115 is matched with the water conduit 201, and the balloon 115 is arranged to increase the cooling effect on water flowing into the water conduit 201.
Example 4:
referring to fig. 1-2, a spraying dust-settling and cooling device for a construction working surface is basically the same as that in embodiment 1, and further, an atomizer 14 is arranged on the water spray pipe 4, and the arrangement of the atomizer 14 facilitates the refinement of water drops sprayed by the spray head 9, so that the dust-settling effect is increased.
Example 5:
referring to fig. 1-2, a building construction working face sprays dust fall heat sink, is basically the same as embodiment 1, and further, base 1 bottom is equipped with universal wheel 13, and base 1 lateral wall is equipped with multiunit hydraulic support pole 12, and hydraulic support pole 12 bottom is equipped with the backup pad, and the device nimble removal of being convenient for of the setting of universal wheel 13, and the setting of hydraulic support pole 12 is convenient for support the device, and the setting of backup pad is convenient for increase the stability of supporting.
Example 6:
referring to fig. 1-2, a spraying dust-settling and cooling device for a construction working surface is substantially the same as that in embodiment 1, and further, a waterproof cover is arranged on the base 1, the driving motor 5 is located in the waterproof cover, and the waterproof cover is arranged to facilitate waterproof protection of the driving motor 5.
The utility model discloses in, be convenient for drive spray pipe 4 through gear 6, from the setting of driving wheel 7 and rotate, the increase sprays the area, increases the efficiency and the effect of dust fall cooling, is convenient for cool down the water in water tank 2 through the setting of actuating mechanism, pump drainage mechanism and air conditioning box 10, has improved the cooling effect of water to the construction area environment.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The spraying dust-settling and cooling device for the building construction working face comprises a base (1) and is characterized in that a water tank (2) is arranged on the base (1), a water guide bin (3) is arranged on the base (1), a guide pipe is connected between the water guide bin (3) and the water tank (2), a water pump is arranged on the guide pipe, a water spray pipe (4) is rotatably connected onto the water guide bin (3), a spray head (9) is arranged at the upper end of the water spray pipe (4), a driving motor (5) is arranged on the base (1), a gear (6) is fixedly connected with the output end of the driving motor (5), a driven wheel (7) is arranged on the water spray pipe (4), the gear (6) is meshed with the driven wheel (7), a cold air box (10) is arranged on the water tank (2), a refrigerator (101) is arranged in the cold air box (10), and an exhaust mechanism is arranged on, the input end of the exhaust mechanism is connected into the cold air box (10), the output end of the exhaust mechanism is connected into the water box (2), and the spray pipe (4) is provided with a driving mechanism for driving the exhaust mechanism.
2. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 1, the driving mechanism comprises a cam (8), the cam (8) is positioned on the spray pipe (4), the air pumping and exhausting mechanism comprises an air cylinder (11), a piston (111) is connected in the air cylinder (11) in a sliding way, a push rod (112) is fixedly connected to the piston (111), one end of the push rod (112) far away from the piston (111) is connected to the edge of the side wall of the cam (8) in a sliding manner, an air inlet pipe (113) is connected between the air cylinder (11) and the cold air box (10), an exhaust pipe (114) is connected between the air cylinder (11) and the water tank (2), one end of the exhaust pipe (114) located in the water tank (2) extends to the bottom of the water tank (2), and the air inlet pipe (113) and the exhaust pipe (114) are both provided with one-way valves.
3. The spraying dust-reducing and temperature-reducing device for the building construction working surface as claimed in claim 2, wherein one end of the exhaust pipe (114) positioned in the water tank (2) is fixedly connected with an air-blowing balloon (115), and the position of the air-blowing balloon (115) is matched with the water guide pipe (201).
4. The spraying, dust-reducing and temperature-reducing device for the construction working face of claim 1, wherein an atomizer (14) is arranged on the water spraying pipe (4).
5. The spraying dust-reducing and temperature-reducing device for the construction working face of the building according to claim 4, wherein universal wheels (13) are arranged at the bottom of the base (1), a plurality of groups of hydraulic support rods (12) are arranged on the side wall of the base (1), and support plates are arranged at the bottoms of the hydraulic support rods (12).
6. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 5 is characterized in that a waterproof cover is arranged on the base (1), and the driving motor (5) is located in the waterproof cover.
CN202022709006.XU 2020-11-21 2020-11-21 Building construction working face sprays dust fall heat sink Expired - Fee Related CN213668482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022709006.XU CN213668482U (en) 2020-11-21 2020-11-21 Building construction working face sprays dust fall heat sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022709006.XU CN213668482U (en) 2020-11-21 2020-11-21 Building construction working face sprays dust fall heat sink

Publications (1)

Publication Number Publication Date
CN213668482U true CN213668482U (en) 2021-07-13

Family

ID=76735130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022709006.XU Expired - Fee Related CN213668482U (en) 2020-11-21 2020-11-21 Building construction working face sprays dust fall heat sink

Country Status (1)

Country Link
CN (1) CN213668482U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113750423A (en) * 2021-09-23 2021-12-07 陕西建工集团有限公司 High-temperature automatic spraying system for temporary building
CN115676395A (en) * 2022-11-04 2023-02-03 界首市金龙机械设备有限公司 Grain-sucking and water-pumping two-purpose machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113750423A (en) * 2021-09-23 2021-12-07 陕西建工集团有限公司 High-temperature automatic spraying system for temporary building
CN115676395A (en) * 2022-11-04 2023-02-03 界首市金龙机械设备有限公司 Grain-sucking and water-pumping two-purpose machine

Similar Documents

Publication Publication Date Title
CN213668482U (en) Building construction working face sprays dust fall heat sink
CN108954561A (en) A kind of energy-efficient outdoor machine of air-conditioner fin cleaning device
CN202613627U (en) Heat pipe heat recovery type evaporative cooling and ventilation cooling unit for subway stations
CN201973823U (en) Direct evaporation moving type air cooler
CN212959006U (en) Air-cooled integrated compressor
CN103604180B (en) The evaporative cooling of integration Winter-summer dual purpose combines air-conditioner set with mechanical refrigeration
CN213793455U (en) Cooling device for H-shaped steel rolling
CN214089661U (en) Building construction working face sprays dust fall heat sink
CN110281409B (en) Automatic dust device for cutting CF wallboard
CN112350660A (en) Be provided with photovoltaic board of hot-blast snow removing structure
CN208671243U (en) A kind of conditioner
CN215490085U (en) Heatstroke prevention spraying device for building roof construction
CN114704125A (en) Steel construction assembled green building
CN103743010A (en) Air conditioning unit combining wind power generation with evaporative cooling
CN217077681U (en) Cooling device for normalizing heat treatment of metal plate
CN208900427U (en) A kind of vehicle turbine supercharging device radiator
CN216523202U (en) Energy-saving and environment-friendly water vector power cooling tower
CN207210488U (en) A kind of quenching cooling device
CN106801136B (en) Water mist cooling method after heat treatment of wheels
CN218928376U (en) Ceramic seal ring cooling device
CN213498561U (en) Rounding device for aluminum veneer production
CN214950055U (en) Cooling device for machining of aircraft parts
CN114061329A (en) Energy-saving and environment-friendly water vector power cooling tower
CN217764115U (en) Cooling device in glass cleaner production
CN220119493U (en) Movable storage type air cooler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210713