CN213667633U - High-rise operation type safety bolt - Google Patents

High-rise operation type safety bolt Download PDF

Info

Publication number
CN213667633U
CN213667633U CN202022101062.5U CN202022101062U CN213667633U CN 213667633 U CN213667633 U CN 213667633U CN 202022101062 U CN202022101062 U CN 202022101062U CN 213667633 U CN213667633 U CN 213667633U
Authority
CN
China
Prior art keywords
safety
wall body
buckle
bottom plate
movable rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022101062.5U
Other languages
Chinese (zh)
Inventor
张琪
葛子军
张建波
周森
柳辉
李凯凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202022101062.5U priority Critical patent/CN213667633U/en
Application granted granted Critical
Publication of CN213667633U publication Critical patent/CN213667633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a high-rise operation formula safety is tied relates to safety and ties technical field. The utility model discloses a wall body, the inside through-hole of having seted up of wall body, wall body one side is provided with the bottom plate, and the dead lever is installed to bottom plate one side, and dead lever sliding fit is in the through-hole. The utility model discloses a dead lever at bottom plate one side installation, can fix the safety cock in one side of wall body fast, thereby improve work efficiency, solid fixed ring through setting up, can be quick with the rigging winding that high altitude construction needs used in fixed ring week side, thereby personnel for high altitude construction provide the guarantee, horizontal pole through setting up in the recess, can twine reserve rigging in horizontal pole week side, thereby personnel for high altitude construction provide the secondary guarantee, through the non-slip raised and the rubber pad that set up, can fix the safety cock in box one side, the stability of safety cock has been improved, through the rubber pad that sets up, the wearing and tearing of wall body one side that can reduce.

Description

High-rise operation type safety bolt
Technical Field
The utility model belongs to the technical field of the safety is tied, especially relate to a high-rise operation formula safety is tied.
Background
The work high above the ground generally means work high above the ground, and means work performed by a person at a height with reference to a certain position. The technical specification JGJ80-2016 specifies that the work at the high place where the falling height is more than 2m (including 2m) of the reference surface is possible is called the work at the high place. "according to this definition, the range of work at high altitudes is fairly broad in the construction industry. When the operation is performed in a building, the operation is performed on a frame with the length of more than 2m, namely the high-altitude operation.
The precaution work is needed when working at high altitude, but the just built community has no supporting point, so that the work at high altitude is troublesome, and the safety plug for installing the support needs to be damaged on the wall surface or the ground.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high-rise operation formula safety cock, dead lever through installation in bottom plate one side, can fix the safety cock in one side of wall body fast, thereby improve work efficiency, solid fixed ring through the setting, can be quick with the rigging winding that high altitude construction needs to use all sides at the fixed ring, thereby personnel for high altitude construction provide the guarantee, through the horizontal pole that sets up in the recess, can twine reserve rigging in horizontal pole all sides, thereby personnel for high altitude construction provide the secondary guarantee, through anti-skidding arch and the rubber pad that sets up, can fix the safety cock in box one side, the stability of safety cock has been improved, rubber pad through the setting, the wearing and tearing of wall body one side that can reduce, the problem that exists among the above-mentioned prior art has been solved.
In order to achieve the purpose, the utility model is realized by the following technical proposal:
a high-rise operation type safety plug comprises a wall body, wherein a through hole is formed in the wall body, a bottom plate is arranged on one side of the wall body, a fixed rod is arranged on one side of the bottom plate and is in sliding fit in the through hole, and a fixed ring is arranged at one end of the fixed rod;
one side equipartition of bottom plate is equipped with a plurality of non-slip raised, and the rubber pad is all installed to a plurality of non-slip raised's protruding end, and a plurality of non-slip raised and rubber pad are located between bottom plate and the wall body, and the week side that the dead lever stretches out wall body one end is seted up flutedly, and recess internally mounted has the horizontal pole, and the horizontal pole is located between two opposite faces of recess inner wall.
Optionally, a first hanging buckle is arranged on the periphery of the fixing ring, and a first safety rope is wound on the periphery of the first hanging buckle.
Optionally, a second hanging buckle is arranged on the periphery of the cross rod, and a second safety rope is wound on the periphery of the second hanging buckle.
Optionally, the length of the second safety rope is greater than the length of the first safety rope, and the safety buckle is wound around one end of each of the first safety rope and the second safety rope.
Optionally, one end of the safety buckle is provided with a safety belt, and the safety belt comprises a waist belt, a back shoulder belt and a shoulder restraining belt.
Optionally, the front ends of the two back shoulder straps are connected to the waistband, the tail ends of the two back shoulder straps are connected to the waistband after being crossed with each other, and the crossed part of the tail ends of the two back shoulder straps is sewn together and provided with a hanging ring.
Optionally, first string of knot is including detaining body and movable rod, and movable rod normal running fit is in the one end of detaining the body, detains the other end of body and has seted up the notch, and the lug with notch looks adaptation is installed to movable rod one end, detains all week sides of the one end of body and all week sides of the one end of movable rod and has seted up the thread groove, detains all week sides of body and movable rod and has detained the cover through thread groove threaded connection, and first string of knot is the same but the specification is different with the second string of knot structure.
The embodiment of the utility model has the following beneficial effect:
the utility model discloses an embodiment is through the dead lever of installation in bottom plate one side, can fix the safety cock in one side of wall body fast, thereby improve work efficiency, solid fixed ring through the setting, can be quick with the rigging winding that high altitude construction needs to use around the fixed ring, thereby personnel for high altitude construction provide safeguard, through the horizontal pole that sets up in the recess, can twine reserve rigging around the horizontal pole, thereby personnel for high altitude construction provide the secondary guarantee, through the non-slip raised and the rubber pad that set up, can fix the safety cock in box one side, the stability of safety cock has been improved, rubber pad through the setting, can reduce the wearing and tearing on one side of the wall body.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of an installation structure according to an embodiment of the present invention;
fig. 2 is a schematic perspective view of an embodiment of the present invention;
fig. 3 is a schematic view of a closed structure of the hanging buckle according to an embodiment of the present invention;
fig. 4 is a schematic view of a structure of the hanging buckle according to an embodiment of the present invention.
Wherein the figures include the following reference numerals:
wall body 1, through-hole 2, bottom plate 3, solid fixed ring 4, non slipping spur 5, rubber pad 6, recess 7, horizontal pole 8, dead lever 9, first string of knot 10, knot body 101, movable rod 102, notch 103, lug 104, detain cover 105, second string of knot 11, first safety rope 12, second safety rope 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
To maintain the following description of the embodiments of the present invention clear and concise, detailed descriptions of well-known functions and components may be omitted.
Referring to fig. 1-4, in the present embodiment, a high-rise safety plug is provided, which includes: the wall comprises a wall body 1, wherein a through hole 2 is formed in the wall body 1, a bottom plate 3 is arranged on one side of the wall body 1, a fixing rod 9 is arranged on one side of the bottom plate 3, the fixing rod 9 is in sliding fit in the through hole 2, and a fixing ring 4 is arranged at one end of the fixing rod 9;
one side equipartition of bottom plate 3 is equipped with a plurality of non-slip raised 5, and rubber pad 6 is all installed to the protruding end of a plurality of non-slip raised 5, and a plurality of non-slip raised 5 and rubber pad 6 are located between bottom plate 3 and wall body 1, and the week side that dead lever 9 stretches out 1 one end of wall body has seted up recess 7, and recess 7 internally mounted has horizontal pole 8, and horizontal pole 8 is located between two opposite faces of recess 7 inner wall.
The application of one aspect of the embodiment is as follows: when needing high altitude construction, find the through-hole 2 or oneself drilling that the air conditioner reserved in one side of wall body 1, push away bottom plate 3 to pressing close to wall body 1, at this moment, dead lever 9 passes through 3 sliding fit of bottom plate in through-hole 2, solid fixed ring 4 and horizontal pole 8 stretch out wall body 1 through dead lever 9, twine two safety ropes respectively in horizontal pole 8 and dead lever 9 week side, can begin high altitude construction, when finishing the operation, take off two safety ropes from horizontal pole 8 and dead lever 9, retrieve the safety cock from wall body 1 again, can finish the operation.
Through dead lever 9 at 3 side installations of bottom plate, can fix the safety catch in one side of wall body 1 fast, thereby improve work efficiency, solid fixed ring 4 through setting up, can be quick with the rigging winding that high altitude construction needs to be used at solid fixed ring 4 week side, thereby personnel for high altitude construction provide the guarantee, horizontal pole 8 through setting up in recess 7, can twine reserve rigging at horizontal pole 8 week side, thereby personnel for high altitude construction provide the secondary guarantee, through non-slip raised 5 and the rubber pad 6 that sets up, can fix the safety catch in box one side, the stability of safety catch has been improved, rubber pad 6 through setting up, the wearing and tearing of wall body 1 one side that can reduce.
The first hanging buckle 10 is arranged on the periphery of the fixing ring 4 of the embodiment, and the first safety rope 12 is wound around the periphery of the first hanging buckle 10.
The second hanging buckle 11 is arranged on the periphery of the cross rod 8 of the embodiment, and the second safety rope 13 is wound on the periphery of the second hanging buckle 11.
The length of the second safety rope 13 of this embodiment is greater than the length of the first safety rope 12, and the safety buckle is wound around one end of the first safety rope 12 and one end of the second safety rope 13. Through the safety buckle, the protective tool can be quickly worn by the high-altitude operation personnel, so that the operation time is reduced.
One end of the safety buckle of the embodiment is provided with a safety belt, and the safety belt comprises a waist belt, two shoulder belts and a shoulder restraint belt.
The front ends of the two back shoulder straps are connected to the waistband, the tail ends of the two back shoulder straps are connected to the waistband after being crossed with each other, and the crossed parts of the tail ends of the two back shoulder straps are sewn together and provided with hanging rings.
The first hanging buckle 10 of the embodiment comprises a buckle body 101 and a movable rod 102, the movable rod 102 is rotatably matched with one end of the buckle body 101, a notch 103 is formed in the other end of the buckle body 101, a convex block 104 matched with the notch 103 is installed at one end of the movable rod 102, thread grooves are formed in the peripheral side of one end of the buckle body 101 and the peripheral side of one end of the movable rod 102, a buckle sleeve 105 is connected to the peripheral sides of the buckle body 101 and the movable rod 102 through the thread grooves in a threaded manner, and the first hanging buckle 10 and the second hanging buckle 11 are identical in structure but different in specification.
The above embodiments may be combined with each other.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the application described herein are capable of operation in sequences other than those illustrated or described herein.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the orientation words such as "front, back, up, down, left, right", "horizontal, vertical, horizontal" and "top, bottom" etc. are usually based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, and in the case of not making a contrary explanation, these orientation words do not indicate and imply that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation, and therefore, should not be interpreted as limiting the scope of the present invention; the terms "inner and outer" refer to the inner and outer relative to the profile of the respective component itself.

Claims (7)

1. A high-rise operation type safety plug is characterized by comprising: the wall comprises a wall body (1), wherein a through hole (2) is formed in the wall body (1), a bottom plate (3) is arranged on one side of the wall body (1), a fixing rod (9) is arranged on one side of the bottom plate (3), the fixing rod (9) is in sliding fit in the through hole (2), and a fixing ring (4) is arranged at one end of the fixing rod (9);
one side equipartition of bottom plate (3) is equipped with a plurality of non-slip raised (5), and rubber pad (6) are all installed to the protruding end of a plurality of non-slip raised (5), and a plurality of non-slip raised (5) and rubber pad (6) are located between bottom plate (3) and wall body (1), and all sides that dead lever (9) stretch out wall body (1) one end are seted up flutedly (7), and recess (7) internally mounted has horizontal pole (8), and horizontal pole (8) are located between two opposite faces of recess (7) inner wall.
2. A safety bar as claimed in claim 1, wherein the fixing ring (4) is provided with a first hook (10) around its periphery, and the first safety rope (12) is wound around the first hook (10).
3. A high-rise operation type safety bar as claimed in claim 1, wherein the cross bar (8) is provided with a second hook (11) on the periphery thereof, and a second safety rope (13) is wound around the second hook (11).
4. A high rise working safety bar according to claim 3 wherein the length of the second safety line (13) is greater than the length of the first safety line (12) and the first (12) and second (13) safety lines are each provided with a safety buckle at one end.
5. A high rise working safety bar as claimed in claim 4 wherein the safety buckle has a safety belt at one end, the safety belt comprising a waist belt, two shoulder straps and a restraint strap.
6. The high rise work safety bar as claimed in claim 5, wherein the front ends of the two back shoulder straps are connected to the waist band, the rear ends of the two back shoulder straps are connected to the waist band in a crossing manner, and the crossing portions of the rear ends of the two back shoulder straps are sewn together and provided with hanging rings.
7. The safety cock for high-rise operations as claimed in claim 6, wherein the first hanging buckle (10) comprises a buckle body (101) and a movable rod (102), the movable rod (102) is rotatably fitted at one end of the buckle body (101), the other end of the buckle body (101) is provided with a notch (103), one end of the movable rod (102) is provided with a convex block (104) matched with the notch (103), both the peripheral side of one end of the buckle body (101) and the peripheral side of one end of the movable rod (102) are provided with thread grooves, the peripheral sides of the buckle body (101) and the movable rod (102) are in threaded connection with a buckle sleeve (105) through the thread grooves, and the first hanging buckle (10) and the second hanging buckle (11) have the same structure but different specifications.
CN202022101062.5U 2020-09-23 2020-09-23 High-rise operation type safety bolt Active CN213667633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022101062.5U CN213667633U (en) 2020-09-23 2020-09-23 High-rise operation type safety bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022101062.5U CN213667633U (en) 2020-09-23 2020-09-23 High-rise operation type safety bolt

Publications (1)

Publication Number Publication Date
CN213667633U true CN213667633U (en) 2021-07-13

Family

ID=76749465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022101062.5U Active CN213667633U (en) 2020-09-23 2020-09-23 High-rise operation type safety bolt

Country Status (1)

Country Link
CN (1) CN213667633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114156783A (en) * 2021-11-04 2022-03-08 国网浙江省电力有限公司淳安县供电公司 Connecting device for indirect electrified bypass cable and electrified lead of insulating rod

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114156783A (en) * 2021-11-04 2022-03-08 国网浙江省电力有限公司淳安县供电公司 Connecting device for indirect electrified bypass cable and electrified lead of insulating rod

Similar Documents

Publication Publication Date Title
US20090236176A1 (en) Integrated harness boiler suit
CN213667633U (en) High-rise operation type safety bolt
CN205460568U (en) Fall -protection safety equipment is climbed to transmission line shaft tower
CN110681086A (en) Safety belt for high-altitude operation and use method
CN203663278U (en) Full-body harness for overhead work
CN203436716U (en) High-altitude safety belt with air bag protection
CN211751942U (en) Building constructor safety arrangement
CN111714804A (en) Safety belt
CN114082118B (en) High-altitude anti-falling tool and using method
CN202478435U (en) High-altitude operation safety belt
JP2014061237A (en) Harness type safety belt including strap operation lock release type winder
CN204590558U (en) Light-duty descending manner dual fail-safe skate apparatus
CN205031809U (en) A early warning safety belt for construction
CN211912493U (en) High altitude electrical equipment overhauls safety fixed band
CN210331417U (en) High-altitude anti-falling assembly
CN203790460U (en) Protection and escape device for work high above the ground
CN107080906B (en) Protective safety belt
CN219481367U (en) Safety protection device for oilfield ascending operation
CN206852949U (en) Protection formula safety belt
CN215505212U (en) Safety belt for electric power engineering
CN216855550U (en) Building constructor safety arrangement
CN219404177U (en) Tool anti-falling belt
US20090188749A1 (en) Safety harness
JP5102472B2 (en) Safety vest
JP2020195518A (en) Lanyard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant