CN213629631U - Engineering cost consulting management progress monitoring device - Google Patents

Engineering cost consulting management progress monitoring device Download PDF

Info

Publication number
CN213629631U
CN213629631U CN202022594889.4U CN202022594889U CN213629631U CN 213629631 U CN213629631 U CN 213629631U CN 202022594889 U CN202022594889 U CN 202022594889U CN 213629631 U CN213629631 U CN 213629631U
Authority
CN
China
Prior art keywords
fixedly connected
monitoring device
rod
block
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022594889.4U
Other languages
Chinese (zh)
Inventor
陈春成
程红梅
许文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Huarui Engineering Consulting Co ltd
Original Assignee
Hainan Huarui Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Huarui Engineering Consulting Co ltd filed Critical Hainan Huarui Engineering Consulting Co ltd
Priority to CN202022594889.4U priority Critical patent/CN213629631U/en
Application granted granted Critical
Publication of CN213629631U publication Critical patent/CN213629631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Studio Devices (AREA)

Abstract

The utility model discloses an engineering cost consultation management progress monitoring device belongs to engineering management technical field, including fixed plate and camera, the right side of fixed plate is equipped with the horizontal pole, the equal fixedly connected with sleeve pipe in both ends of horizontal pole, positioning bolt has been cup jointed to two intraductal equal slips of cover, one side fixedly connected with set nut of fixed plate, set nut and one of them set bolt threaded connection, another positioning bolt's lateral wall threaded connection has fixation nut, one side fixedly connected with bracing piece of fixation nut, the one end fixedly connected with annular block of bracing piece, the annular block in-connection has coupling mechanism, coupling mechanism is connected with the casing of camera, the lower extreme fixedly connected with backup pad of fixed plate. The utility model discloses, can install monitoring device fast fixedly at the job site to can also multi-angle quick adjustment monitoring device's shooting angle, also can realize monitoring device at the flexible coupling of job site simultaneously.

Description

Engineering cost consulting management progress monitoring device
Technical Field
The utility model relates to an engineering management technical field especially relates to an engineering cost consultation management progress monitoring device.
Background
The direct meaning of the construction cost is the construction price of the project and the three elements of project pricing: the engineering cost in the broad sense includes construction engineering cost, road engineering cost, water transportation engineering cost, railway engineering cost, water conservancy engineering cost, electric power engineering cost, communication engineering cost, aerospace engineering cost, etc., the engineering cost refers to the total cost spent on some engineering construction, and the core content is investment estimation, design approximate calculation, correction approximate calculation, construction diagram budget, engineering settlement, completion settlement, etc., when monitoring the engineering cost progress of a worker, in order to reduce the workload of a manager, the engineering cost progress of the worker often needs to be monitored by using an engineering cost management progress monitoring device.
At present, one of the main equipment for monitoring the progress of the engineering is the front-section camera, but the mounting structure of the camera is relatively fixed and is difficult to deal with the complex construction site environment, so that the mounting position and the angle of the camera are limited, and the camera is directly rigidly connected to a support after being mounted, so that the picture shot by the camera is not clear, and the shooting quality of the camera is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art monitoring device mounting structure of camera relatively fixed, be difficult to deal with complicated job site environment for the mounted position and the angle of camera are limited, and direct rigid connection is on the support after the camera installation, make the picture of camera shooting unclear, influence the problem of camera shooting quality, and an engineering cost consultation management progress monitoring device who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an engineering cost consultation management progress monitoring device, includes fixed plate and camera, the right side of fixed plate is equipped with the horizontal pole, the equal fixedly connected with sleeve pipe in both ends of horizontal pole, two positioning bolt has been cup jointed all to slide in the sleeve pipe, one side fixedly connected with set nut of fixed plate, set nut and one of them positioning bolt threaded connection, another positioning bolt's lateral wall threaded connection has set nut, one side fixedly connected with bracing piece of set nut, the one end fixedly connected with annular block of bracing piece, be connected with coupling mechanism in the annular block, coupling mechanism is connected with the casing of camera, the lower extreme fixedly connected with backup pad of fixed plate, one side of backup pad is connected with fixed establishment.
Preferably, coupling mechanism includes the lead screw of sliding sleeve joint in the annular block, the upper end fixedly connected with connecting block of lead screw, and the upper end of connecting block has seted up logical groove, it has the fixed block to lead to inslot through fixing bolt fastening connection, the upper end of fixed block and the lower extreme fixed connection of camera, the spring has been cup jointed in the slip on the pole wall of lead screw, the one end of spring and the lower extreme fixed connection of connecting block, the other end of spring and the upper end fixed connection of annular block, the lower extreme of lead screw passes annular block and threaded connection has hexagon nut.
Preferably, the rod wall of the screw rod is sleeved with a rubber ring and a gasket in a sliding manner, the gasket is fixedly connected with the lower end of the rubber ring, the upper end of the rubber ring is connected with the lower end of the annular block in a sliding manner, and the lower end of the gasket is connected with the upper end of the hexagon nut in a sliding manner.
Preferably, the fixing mechanism comprises a connecting plate arranged on one side of the supporting plate, a connecting rod is fixedly connected to the upper end of the connecting plate, the two ends of the connecting rod are respectively obliquely and fixedly connected with a fixing rod of an inverted L-shaped structure, a bolt is connected to the side wall of the connecting plate through a threaded hole in a threaded manner, one end of the bolt penetrates through the threaded hole and is in sliding connection with one side of the supporting plate, a positioning rod is sleeved on the rod wall of the connecting rod in a sliding manner through a positioning hole, and one end of the positioning rod penetrates through the positioning hole and is fixedly connected.
Preferably, one side of the supporting plate is sleeved with an L-shaped rod through a round hole in a sliding mode, and one end of the horizontal portion of the L-shaped rod penetrates through the round hole and is rotatably connected with one side of the connecting plate through a rolling bearing.
Compared with the prior art, the utility model provides an engineering cost consultation management progress monitoring device possesses following beneficial effect:
1. this engineering cost consultation management progress monitoring device, dead lever through being equipped with, with L shape pole and dead lever joint on job site's support, then the bolt is screwed up to the spanner, promote connecting plate reverse movement with screw hole interact when the bolt is rotatory, the connecting plate removes and drives connecting rod and dead lever removal, the connecting plate drives L shape pole removal simultaneously, and then can utilize L shape pole and dead lever centre gripping support and backup pad contact, thereby can accomplish installation supervisory equipment fast, use the spanner to screw up two positioning bolt and fix a position horizontal pole and bracing piece, and then can quick adjustment monitoring device's installation angle.
2. This engineering cost consultation management progress monitoring device, through the lead screw of setting in the annular block, when using the spanner to tighten hexagon nut on the lead screw, hexagon nut can extrude packing ring and rubber circle, and then make the lead screw reverse movement under the supporting role of annular block, pulling connecting block extrusion spring when the lead screw removes, and then can utilize the elasticity of spring and rubber circle to make and realize the flexible coupling between monitoring device and the supporter, avoid arousing monitoring device's violent vibrations, the fixing bolt of setting on the connecting block can be fixed block and camera, and then be convenient for when installation adjustment monitoring device's shooting angle.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses, can install monitoring device fast at the job site fixedly to can also multi-angle quick adjustment monitoring device's shooting angle, also can realize monitoring device at the flexible coupling of job site simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of a construction cost consultation management progress monitoring device provided by the utility model;
fig. 2 is the utility model provides a fixing mechanism's among construction cost consulting management progress monitoring device schematic structure.
In the figure: 1. a fixing plate; 2. a support plate; 3. a connecting plate; 4. a bolt; 5. positioning a rod; 6. a connecting rod; 7. an L-shaped rod; 8. fixing the rod; 9. a sleeve; 10. a cross bar; 11. positioning the bolt; 12. a support bar; 13. a screw rod; 14. a hexagonal nut; 15. a rubber ring; 16. a ring block; 17. a spring; 18. a camera is provided.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a construction cost consultation management progress monitoring device, comprising a fixing plate 1 and a camera 18, wherein a cross bar 10 is arranged on the right side of the fixing plate 1, sleeves 9 are fixedly connected to both ends of the cross bar 10, positioning bolts 11 are slidably sleeved in the two sleeves 9, a positioning nut is fixedly connected to one side of the fixing plate 1, the positioning nut is in threaded connection with one of the positioning bolts 11, a fixing nut is in threaded connection with the side wall of the other positioning bolt 11, a supporting rod 12 is fixedly connected to one side of the fixing nut, one end of the supporting rod 12 is fixedly connected with a ring block 16, a connecting mechanism is connected in the ring block 16, the connecting mechanism is connected with a shell of the camera 18, a supporting plate 2 is fixedly connected to the lower end of the fixing plate 1, a fixing mechanism is connected to one side of the supporting, upper end fixedly connected with connecting rod 6 of connecting plate 3, the dead lever 8 of the L shape structure of the equal slope fixedly connected with inversion in both ends of connecting rod 6, the lateral wall of connecting plate 3 has bolt 4 through screw hole threaded connection, bolt 4's one end pass the screw hole and with one side sliding connection of backup pad 2, the locating lever 5 has been cup jointed through locating hole slip on the pole wall of connecting rod 6, the one end of locating lever 5 pass the locating hole and with one side fixed connection of backup pad 2, L shape pole 7 has been cup jointed through the round hole slip in one side of backup pad 2, the round hole is passed and one side rotation connection of connecting plate 3 is passed through antifriction bearing to L shape pole 7's horizontal.
The connecting mechanism comprises a screw rod 13 which is sleeved in the annular block 16 in a sliding mode, the upper end of the screw rod 13 is fixedly connected with a connecting block, a through groove is formed in the upper end of the connecting block, a fixing block is fixedly connected in the through groove through a fixing bolt, the upper end of the fixing block is fixedly connected with the lower end of the camera 18, a spring 17 is sleeved on the rod wall of the screw rod 13 in a sliding mode, one end of the spring 17 is fixedly connected with the lower end of the connecting block, the other end of the spring 17 is fixedly connected with the upper end of the annular block 16, the lower end of the screw rod 13 penetrates through the annular block and is connected with a hexagon nut 14 in a threaded mode, a rubber ring 15 and a gasket are sleeved on the rod wall of the screw rod 13 in a sliding mode, the gasket is fixedly connected with the lower end of the rubber.
In the utility model, when in use, the L-shaped rod 7 and the fixed rod 8 are connected on the support of the construction site in a clamping way, then the bolt 4 is screwed by the wrench, the bolt 4 interacts with the threaded hole to push the connecting plate 3 to move reversely when rotating, the connecting plate 3 moves to drive the connecting rod 6 and the fixed rod 8 to move, meanwhile, the connecting plate 3 drives the L-shaped rod 7 to move, and then the support can be clamped by the L-shaped rod 7 and the fixed rod 8 to contact with the supporting plate 2, thereby the installation of the monitoring device can be completed quickly, the two positioning bolts 11 are screwed by the wrench to position the cross rod 10 and the supporting rod 12, and further the installation angle of the monitoring device can be adjusted quickly, through the lead screw 13 arranged in the annular block 16, when the hexagon nut 14 on the lead screw 13 is screwed by the wrench, the hexagon nut 4 can extrude the gasket and the rubber ring 15, so that the lead screw, the lead screw 13 stimulates the connecting block to extrude the spring 17 when moving, and then can utilize the elasticity of spring 17 and rubber ring 15 to realize the flexible coupling between monitoring device and the support, avoids arousing monitoring device's violent vibrations, and the fixing bolt who sets up on the connecting block can be fixed block and camera 18, and then is convenient for when installation adjustment monitoring device's shooting angle.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a construction cost consultation management progress monitoring device, includes fixed plate (1) and camera (18), its characterized in that, the right side of fixed plate (1) is equipped with horizontal pole (10), the equal fixedly connected with sleeve pipe (9) in both ends of horizontal pole (10), two equal slip has cup jointed positioning bolt (11) in sleeve pipe (9), one side fixedly connected with set nut of fixed plate (1), set nut and one of them positioning bolt (11) threaded connection, another positioning bolt (11)'s lateral wall threaded connection has set nut, one side fixedly connected with bracing piece (12) of set nut, the one end fixedly connected with ring piece (16) of bracing piece (12), the in-connection of ring piece (16) has coupling mechanism, coupling mechanism is connected with the casing of camera (18), the lower extreme fixedly connected with backup pad (2) of fixed plate (1), one side of backup pad (2) is connected with fixed establishment.
2. The construction cost consultation management progress monitoring device according to claim 1, wherein the connecting mechanism comprises a screw rod (13) which is slidably sleeved in a ring-shaped block (16), a connecting block is fixedly connected to the upper end of the screw rod (13), a through groove is formed in the upper end of the connecting block, a fixed block is fixedly connected in the through groove through a fixing bolt, the upper end of the fixed block is fixedly connected with the lower end of a camera (18), a spring (17) is slidably sleeved on the rod wall of the screw rod (13), one end of the spring (17) is fixedly connected with the lower end of the connecting block, the other end of the spring (17) is fixedly connected with the upper end of the ring-shaped block (16), and the lower end of the screw rod (13) penetrates through the ring-shaped block and is in threaded connection with a hexagon nut (14).
3. The construction cost consultation management progress monitoring device according to claim 2, wherein a rubber ring (15) and a gasket are sleeved on the rod wall of the screw rod (13) in a sliding mode, the gasket is fixedly connected with the lower end of the rubber ring (15), the upper end of the rubber ring (15) is connected with the lower end of the annular block (16) in a sliding mode, and the lower end of the gasket is connected with the upper end of the hexagon nut (14) in a sliding mode.
4. The construction cost consultation management progress monitoring device according to claim 1, wherein the fixing mechanism comprises a connecting plate (3) arranged on one side of the supporting plate (2), a connecting rod (6) is fixedly connected to the upper end of the connecting plate (3), fixing rods (8) of an inverted L-shaped structure are fixedly connected to both ends of the connecting rod (6) in an inclined manner, a bolt (4) is connected to the side wall of the connecting plate (3) through a threaded hole in a threaded manner, one end of the bolt (4) penetrates through the threaded hole and is in sliding connection with one side of the supporting plate (2), a positioning rod (5) is sleeved on the rod wall of the connecting rod (6) through a positioning hole in a sliding manner, and one end of the positioning rod (5) penetrates through the positioning hole and is fixedly connected with one side of the supporting plate.
5. The construction cost consultation management progress monitoring device according to claim 1, wherein an L-shaped rod (7) is slidably sleeved on one side of the supporting plate (2) through a round hole, and one end of a horizontal part of the L-shaped rod (7) penetrates through the round hole and is rotatably connected with one side of the connecting plate (3) through a rolling bearing.
CN202022594889.4U 2020-11-11 2020-11-11 Engineering cost consulting management progress monitoring device Active CN213629631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022594889.4U CN213629631U (en) 2020-11-11 2020-11-11 Engineering cost consulting management progress monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022594889.4U CN213629631U (en) 2020-11-11 2020-11-11 Engineering cost consulting management progress monitoring device

Publications (1)

Publication Number Publication Date
CN213629631U true CN213629631U (en) 2021-07-06

Family

ID=76632073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022594889.4U Active CN213629631U (en) 2020-11-11 2020-11-11 Engineering cost consulting management progress monitoring device

Country Status (1)

Country Link
CN (1) CN213629631U (en)

Similar Documents

Publication Publication Date Title
CN213629631U (en) Engineering cost consulting management progress monitoring device
CN206319575U (en) A kind of support attachment means
CN211396629U (en) Connecting and locking device for building template
CN112212092A (en) Fixing device for multi-pipeline connection
CN201428238Y (en) Expansion sleeve type scaffold connecting part
CN215071528U (en) Detachable high-strength energy-saving tubular bus electric power fitting
CN201321719Y (en) Scaffold fastener for buildings
CN213710503U (en) Steel structure bearing frame for building engineering
CN213740404U (en) Airport concrete pavement false seam dowel bar
CN205206290U (en) A cam connector link for scaffold installation
CN221314083U (en) Rag bolt fastening tool
CN210774698U (en) Planetary reducer noise test quick clamping mechanism
CN213452780U (en) Industrial energy-saving diagnosis and analysis device
CN211899588U (en) Building corner piece
CN218392167U (en) Equipment maintenance instrument that easily carries
CN220582584U (en) Air conditioner mounting rack
CN216327743U (en) Corrosion resistance detection clamp for end cover of hydraulic cylinder
CN211627494U (en) Air circumstance monitoring devices convenient to installation
CN219012174U (en) Novel stainless steel net frame structure
CN217927542U (en) Building plumbing outer wall pipeline fixing device
CN220503686U (en) Steel construction installation strutting arrangement of bridge
CN209875855U (en) Machine-building draw gear
CN216036381U (en) Support frame for precast reinforced concrete frame
CN211237570U (en) Electric pole number plate installation device
CN210013483U (en) Aluminum template supports connecting device