CN213626938U - Building engineering construction safety control rail - Google Patents

Building engineering construction safety control rail Download PDF

Info

Publication number
CN213626938U
CN213626938U CN202022442453.3U CN202022442453U CN213626938U CN 213626938 U CN213626938 U CN 213626938U CN 202022442453 U CN202022442453 U CN 202022442453U CN 213626938 U CN213626938 U CN 213626938U
Authority
CN
China
Prior art keywords
fixedly connected
fence
piston
side wall
construction safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022442453.3U
Other languages
Chinese (zh)
Inventor
徐传朋
郝雪梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022442453.3U priority Critical patent/CN213626938U/en
Application granted granted Critical
Publication of CN213626938U publication Critical patent/CN213626938U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a building engineering construction safety management rail, which belongs to the technical field of rails and comprises a rail body and a warning board, wherein the side wall of the top of the rail body is fixedly connected with a first supporting plate, the bottom of the first supporting plate is respectively fixedly connected with a motor and a piston, the output end of the motor is fixedly connected with a rotating shaft, a crankshaft is fixedly connected on the rotating shaft, the crankshaft is rotatably connected with the piston, one side of the rail body is provided with a scraper blade, the side wall of the rail body is slidably connected with a connecting rod, and one end of the connecting rod is fixedly connected with an L-shaped fixing plate; the utility model discloses simple structure, the simple operation mutually supports through connecting rod and L shape fixed plate and fixes the warning sign, removes dust to the warning sign through mutually supporting of motor and piston, and the practicality improves greatly.

Description

Building engineering construction safety control rail
Technical Field
The utility model relates to a rail technical field especially relates to a building engineering construction safety control rail.
Background
The building construction safety management fence aims to strengthen safety warning signs and construction site safety facility management, creates a safe and clear construction environment, guarantees the safety and health of constructors, creates a safe culture atmosphere and improves the site safety management level. In the building work progress, often need set up safety fence for remind constructor or people that pass by to notice construction safety, the safety fence that uses at present generally is subaerial fixed certain quantity's stand, and the pull house or bind some ropes between the stand to play suggestion, interception workman or pedestrian's effect, but on the market at present, current building engineering construction safety control rail, because of the construction place dust is more can not effectual remove dust and fix the shakiness to the warning sign.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the warning board can not be effectively removed dust and fixed unstability etc. and the building engineering construction safety management rail that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building engineering construction safety management fence comprises a fence body and a warning board, wherein a first supporting plate is fixedly connected to the side wall of the top of the fence body, a motor and a piston are fixedly connected to the bottom of the first supporting plate respectively, a rotating shaft is fixedly connected to the output end of the motor, a crankshaft is fixedly connected to the rotating shaft, the crankshaft is rotatably connected with the piston, a scraper is arranged on one side of the fence body, a connecting rod is slidably connected to the side wall of the fence body, an L-shaped fixing plate is fixedly connected to one end of the connecting rod, a second spring is connected between the L-shaped fixing plate and the side wall of the fence body, the L-shaped fixing plate abuts against the warning board, the scraper is attached to the warning board, a reciprocating mechanism is connected between the scraper and the rotating shaft, a spray head is arranged above the scraper, a hose is connected, and a pipeline is connected between the piston and the water tank.
Preferably, the reciprocating mechanism comprises a cam and a sliding rod, the cam is fixedly connected to the rotating shaft, the bottom of the first supporting plate is fixedly connected with a guide rod, and the sliding rod is connected with the guide rod in a sliding mode.
Preferably, the side wall of the guide rod is fixedly connected with a second support plate, a first spring is connected between the sliding rod and the second support plate, and the scraper and the spray head are respectively and fixedly connected to the bottom of the sliding rod.
Preferably, the second spring is sleeved on the connecting rod, and the water tank is fixedly connected with a water filling port.
Preferably, the bottom of the fence body is fixedly connected with a base, a supporting rod is fixedly connected between the base and the side wall of the fence body, and a balancing weight is arranged in the base.
Preferably, the pipeline and the hose are both internally provided with one-way valves.
Compared with the prior art, the utility model provides a building engineering construction safety control rail possesses following beneficial effect:
this building engineering construction safety control rail, during the use, artifical pulling connecting rod extrusion second spring, place the warning sign on the L shape fixed plate, the reaction force that the connecting rod passes through the second spring is fixed the warning sign to the unclamping, starter motor, the motor drives first axis of rotation and rotates, the axis of rotation drives the bent axle and rotates, the bent axle drives piston reciprocating motion, pass through the pipeline with the water in the water tank and carry in the hose, remove dust to the warning sign through the shower nozzle blowout at last, meanwhile, the axis of rotation drives the cam and rotates, the cam drives the slide bar reciprocating motion on the guide bar, make the scraper blade further remove dust to the warning sign.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses simple structure, the simple operation mutually supports through connecting rod and L shape fixed plate and fixes the warning sign, removes dust to the warning sign through mutually supporting of motor and piston, and the practicality improves greatly.
Drawings
Fig. 1 is a schematic structural view of a safety management fence for construction engineering according to the present invention;
fig. 2 is an enlarged view of a portion a in fig. 1 of the safety management fence for construction engineering of the present invention;
fig. 3 is an enlarged view of a portion B in fig. 1 of the safety management fence for construction engineering of the present invention;
fig. 4 is the utility model provides a side view of building engineering construction safety control rail scraper blade.
In the figure: 1. a fence body; 101. a base; 102. a balancing weight; 2. a warning board; 3. a first support plate; 301. a guide bar; 302. a slide bar; 303. a second support plate; 304. a first spring; 305. a spray head; 4. a motor; 401. a rotating shaft; 402. a crankshaft; 403. a cam; 5. a piston; 501. a pipeline; 502. a hose; 503. a one-way valve; 6. a squeegee; 7. a water tank; 701. a water filling port; 8. a support bar; 9. a connecting rod; 10. a second spring; 1001. an L-shaped fixing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a construction safety management fence for building engineering, comprising a fence body 1 and a warning board 2, wherein a first supporting plate 3 is fixedly connected to the top side wall of the fence body 1, a motor 4 and a piston 5 are respectively fixedly connected to the bottom of the first supporting plate 3, a rotating shaft 401 is fixedly connected to the output end of the motor 4, a crankshaft 402 is fixedly connected to the rotating shaft 401, the crankshaft 402 is rotatably connected to the piston 5, a scraper 6 is arranged on one side of the fence body 1, a connecting rod 9 is slidably connected to the side wall of the fence body 1, an L-shaped fixing plate is fixedly connected to one end of the connecting rod 9, a second spring 10 is connected between the L-shaped fixing plate 1001 and the side wall of the fence body 1, the L-shaped fixing plate 1001 abuts against the warning board 2, the scraper 6 abuts against the warning board 2, a reciprocating mechanism is connected between the scraper 6 and, the lateral wall of the fence body 1 is fixedly connected with a water tank 7, and a pipeline 501 is connected between the piston 5 and the water tank 7.
The reciprocating mechanism comprises a cam 403 and a slide bar 302, the cam 403 is fixedly connected to the rotating shaft 401, the bottom of the first support plate 3 is fixedly connected with a guide bar 301, and the slide bar 302 is slidably connected with the guide bar 301.
The side wall of the guide rod 301 is fixedly connected with a second support plate 303, a first spring 304 is connected between the sliding rod 302 and the second support plate 303, and the scraper 6 and the spray head 305 are respectively and fixedly connected to the bottom of the sliding rod 302.
The second spring 10 is sleeved on the connecting rod 9, and the water filling port 701 is fixedly connected to the water tank 7.
The bottom of the fence body 1 is fixedly connected with a base 101, a supporting rod 8 is fixedly connected between the base 101 and the side wall of the fence body 1, and a balancing weight 102 is arranged in the base 101.
The pipeline 501 and the hose 502 are both provided with a one-way valve 503.
The utility model discloses in, during the use, artifical pulling connecting rod 9 extrudees second spring 10, place warning sign 2 on L shape fixed plate 1001, loosen connecting rod 9 and fix warning sign 2 through second spring 10's reaction force, starter motor 4, motor 4 drives first axis of rotation 401 and rotates, axis of rotation 401 drives bent axle 402 and rotates, bent axle 402 drives piston 5 reciprocating motion, pass through pipeline 501 with the water in the water tank 7 and carry in the hose 502, remove dust to warning sign 2 through shower nozzle 305 blowout at last, meanwhile, axis of rotation 401 drives cam 403 and rotates, cam 403 drives slide bar 302 reciprocating motion on guide bar 301, make scraper blade 6 further remove dust to warning sign 2.
The above, it is only the preferred embodiment of the present invention is convenient, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is familiar with the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The building engineering construction safety management fence comprises a fence body (1) and a warning board (2), and is characterized in that a first supporting plate (3) is fixedly connected to the side wall of the top of the fence body (1), a motor (4) and a piston (5) are fixedly connected to the bottom of the first supporting plate (3) respectively, a rotating shaft (401) is fixedly connected to the output end of the motor (4), a crankshaft (402) is fixedly connected to the rotating shaft (401), the crankshaft (402) is rotatably connected with the piston (5), a scraper (6) is arranged on one side of the fence body (1), a connecting rod (9) is slidably connected to the side wall of the fence body (1), an L-shaped fixing plate (1001) is fixedly connected to one end of the connecting rod (9), and a second spring (10) is connected between the L-shaped fixing plate (1001) and the side wall of the fence body, l shape fixed plate (1001) offsets with warning sign (2), scraper blade (6) paste mutually with warning sign (2), be connected with reciprocating mechanism between scraper blade (6) and axis of rotation (401), scraper blade (6) top is equipped with shower nozzle (305), be connected with hose (502) between shower nozzle (305) and piston (5), rail body (1) lateral wall fixedly connected with water tank (7), be connected with pipeline (501) between piston (5) and water tank (7).
2. A safety management fence for constructional engineering construction according to claim 1, wherein the reciprocating mechanism comprises a cam (403) and a slide rod (302), the cam (403) is fixedly connected to the rotating shaft (401), the bottom of the first supporting plate (3) is fixedly connected with a guide rod (301), and the slide rod (302) is slidably connected with the guide rod (301).
3. The construction safety management fence according to claim 2, characterized in that a second support plate (303) is fixedly connected to the side wall of the guide bar (301), a first spring (304) is connected between the slide bar (302) and the second support plate (303), and the scraper (6) and the spray head (305) are respectively and fixedly connected to the bottom of the slide bar (302).
4. The construction safety management fence of claim 1, characterized in that the second spring (10) is sleeved on the connecting rod (9), and the water tank (7) is fixedly connected with a water filling port (701).
5. The building engineering construction safety management fence according to claim 1, characterized in that a base (101) is fixedly connected to the bottom of the fence body (1), a support rod (8) is fixedly connected between the base (101) and the side wall of the fence body (1), and a balancing weight (102) is arranged in the base (101).
6. A construction safety management fence according to claim 1, characterized in that the inside of the pipeline (501) and the hose (502) are provided with one-way valves (503).
CN202022442453.3U 2020-10-29 2020-10-29 Building engineering construction safety control rail Expired - Fee Related CN213626938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022442453.3U CN213626938U (en) 2020-10-29 2020-10-29 Building engineering construction safety control rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022442453.3U CN213626938U (en) 2020-10-29 2020-10-29 Building engineering construction safety control rail

Publications (1)

Publication Number Publication Date
CN213626938U true CN213626938U (en) 2021-07-06

Family

ID=76625539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022442453.3U Expired - Fee Related CN213626938U (en) 2020-10-29 2020-10-29 Building engineering construction safety control rail

Country Status (1)

Country Link
CN (1) CN213626938U (en)

Similar Documents

Publication Publication Date Title
CN205107544U (en) A cleaning machine for glass curtain wall
CN109351095B (en) Dust device for construction site
CN201234951Y (en) Multifunctional machine for cleaning and wiping electric door windowpane
CN215777828U (en) Outer wall cleaning machine
WO2013182865A2 (en) Surface cleaning system, and surface cleaning device for utilization thereof
CN107919844A (en) It is a kind of outdoor from motion tracking dedusting photovoltaic power generation apparatus
CN213626938U (en) Building engineering construction safety control rail
CN107773146A (en) A kind of high-altitude is with cleaning glass machine people
CN211898112U (en) Solar energy dust fall spraying vehicle for municipal works
CN217191419U (en) Roof water tank cleaning machine
CN207679380U (en) A kind of window-cleaning device with spraying function
CN201683845U (en) Window glass cleaning device
CN210121579U (en) Gate belt cleaning device for hydraulic engineering
CN109692831A (en) A kind of intelligence cleaning automobile parts device
CN211922941U (en) Integrated prefabricated pump station outer vertical surface cleaning device
CN2915007Y (en) Safety device for cleaning outdoor glass of high-rise buildings
CN2748020Y (en) External wall cleaning device
CN214364701U (en) Underground garage large tracts of land wear-resisting concrete terrace construction equipment
CN215948856U (en) Outer wall brushing hanging basket structure for building construction
CN220547117U (en) High-pressure water gun for rust removal of rail transit
CN215777728U (en) Curtain decontamination plant that cleaning performance is good
CN207588781U (en) It is a kind of outdoor from motion tracking dedusting photovoltaic power generation apparatus
CN218220111U (en) Outer wall cleaning device for building site
CN211550014U (en) Hand-lifting type motor-driven fire pump set
CN216498298U (en) Bridge construction is with portable dust device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210706