CN213626680U - Water stop pull rod structure for subway construction - Google Patents
Water stop pull rod structure for subway construction Download PDFInfo
- Publication number
- CN213626680U CN213626680U CN202021874675.6U CN202021874675U CN213626680U CN 213626680 U CN213626680 U CN 213626680U CN 202021874675 U CN202021874675 U CN 202021874675U CN 213626680 U CN213626680 U CN 213626680U
- Authority
- CN
- China
- Prior art keywords
- template
- pull rod
- wall
- clamping plate
- water stop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 30
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 230000006835 compression Effects 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 230000008878 coupling Effects 0.000 abstract description 4
- 238000010168 coupling process Methods 0.000 abstract description 4
- 238000005859 coupling reaction Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 230000002093 peripheral effect Effects 0.000 abstract 1
- 238000009415 formwork Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a subway construction is with stagnant water pull rod structure, include the section of going into the wall and can dismantle the section, the section of going into the wall including the coupling nut who goes into the wall pull rod and go into wall pull rod both ends, wherein coupling nut inboard with go into wall pull rod both ends welded fastening and coupling nut outside central point and put the processing and have the internal thread hole, the peripheral processing of internal thread hole have annular groove, annular groove inside pack in proper order and go into cushion ring and waterproof rubber ring, the section of dismantling include template inner splint, template outer splint and can dismantle the pull rod, the inboard central point of template inner splint put the department and be equipped with ring shape arch and imbed in annular groove. The screw rod outside the structure can be taken down for repeated use, has a better fixing effect on the template, and can ensure the quality of pouring the subway side wall.
Description
Technical Field
The utility model relates to a subway construction equipment technical field, more specifically say, relate to a stagnant water pull rod structure is used in subway construction.
Background
When the stagnant water screw rod is usually used for pouring of underground subway side wall (diaphragm wall), play the fixed die plate, the effect of control concrete placement thickness, it has the stagnant water piece to lie in the middle of the stagnant water screw rod with ordinary wall screw rod difference, when form removal, ordinary wall screw rod is whole takes out, used repeatedly, stagnant water screw rod is then saw off the outer two backs of wall, the interlude is left inside the wall body, in order to guarantee the imperviousness of wall body, traditional stagnant water screw rod is a segmentation structure, be whole full tooth screw rod usually, the centre has welded the stagnant water piece or has the inflation sealing washer, be used for preventing water to pass underground wall body. This structure has following problem, and the stagnant water screw rod both ends after the saw falls are directly scrapped, can not used repeatedly, and extravagant material is more, and economic benefits is not good enough, and the stagnant water screw rod that secondly has now is not good enough to the fixed effect of template, and when pouring, the template takes place vibrations or displacement easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a subway construction is with stagnant water pull rod structure, used repeatedly can be taken off to this structure outside screw rod, has better fixed effect to the template moreover, can guarantee the quality that the subway side wall was pour.
In order to realize the purpose, the utility model discloses a technical scheme as follows:
a water stop pull rod structure for subway construction comprises a wall-in section and a detachable section, wherein the wall-in section comprises a wall-in pull rod and connecting nuts at two ends of the wall-in pull rod, the inner side of each connecting nut is fixedly welded with two ends of the wall-in pull rod, an inner threaded hole is processed at the central position of the outer side of each connecting nut, a circular groove is processed at the periphery of the inner threaded hole, a buffer ring and a waterproof rubber ring are sequentially filled in the circular groove, the detachable section comprises a template inner clamping plate, a template outer clamping plate and a detachable pull rod, a circular bulge is arranged at the central position of the inner side of the template inner clamping plate and embedded in the circular groove, a construction template is clamped between the template inner clamping plate and the template outer clamping plate, through holes are processed at the corresponding positions of the centers of the template inner clamping plate and the template outer clamping plate, external threads are arranged at two ends of the detachable pull rod, one end of the detachable pull, the other end is screwed in the locking nut to fix the template outer clamping plate.
Furthermore, a water stop sheet is welded and fixed at the middle position of the wall-entering pull rod.
Furthermore, a compression piece is welded on the detachable pull rod between the template inner clamping plate and the template outer clamping plate.
Furthermore, the contact area between the inner and outer formworks and the inner and outer sides of the construction formwork is two to three times of the area of the water stop sheet.
Furthermore, the depth of the circular groove is one half of the length of the connecting nut.
Compared with the prior art, the utility model has the advantages that:
the utility model fixes the construction template by matching the locking nut and the relevant parts through the template inner clamping plate and the template outer clamping plate with larger areas, has better stability and can ensure the pouring construction quality; can dismantle draw bar structure through the setting, after pouring, need not saw the outer two of stagnant water screw rod wall, can dismantle the recovery and recycle, economic benefits is better.
Drawings
Fig. 1 is a schematic structural view of the water stop pull rod of the utility model;
in the figure: 1. a wall-in pull rod; 2. a water stop sheet; 3. a connecting nut; 4. a circular groove; 5. a buffer ring; 6. a waterproof rubber ring; 7. an inner template clamping plate; 8. a template outer clamping plate; 9. a detachable pull rod; 10. a circular bulge; 11. an internally threaded bore; 12. an external thread; 13. a compression sheet; 14. and locking the nut.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the utility model easy to understand and understand, the utility model is further explained by combining with the specific figures.
As shown in figure 1, the water stop pull rod structure for subway construction comprises a wall-in section and a detachable section, wherein the wall-in section comprises a wall-in pull rod 1 and connecting nuts 3 at two ends of the wall-in pull rod 1, the inner side of each connecting nut 3 is fixedly welded with two ends of the wall-in pull rod 1, an internal threaded hole 11 is processed at the central position of the outer side of each connecting nut 3, a circular groove 4 is processed at the periphery of the internal threaded hole 11, a buffer ring 5 and a waterproof rubber ring 6 are sequentially filled in the circular groove 4, the detachable section comprises a template inner clamping plate 7, a template outer clamping plate 8 and a detachable pull rod 9, a circular bulge 10 is arranged at the central position of the inner side of the template inner clamping plate 7 and embedded into the circular groove 4, a construction template is clamped between the template inner clamping plate 7 and the template outer clamping plate 8, through holes are processed at the central positions of the template inner clamping plate 7 and the template outer clamping plate 8, external threads 12 are arranged at two ends of the detachable pull rod 9, the other end is fixed with a template outer clamping plate 8 through a screw-in locking nut 14, a water stop sheet 2 is fixedly welded at the middle position of the wall-entering pull rod 1, a pressing sheet 13 is welded on a detachable pull rod 9 between the template inner clamping plate 7 and the template outer clamping plate 8, the contact areas of the template inner clamping plate 7 and the template outer clamping plate 8 with the inner side and the outer side of the construction template are two to three times of the area of the water stop sheet 2, and the depth of the annular groove 4 is one half of the length of the connecting nut 3.
When in actual use, firstly, mounting holes are drilled on the construction templates at two sides, then two detachable pull rods 9 penetrate through the mounting holes from the inside, and an upper template inner clamping plate 7 and a template outer clamping plate 8 are sleeved inside and outside the construction templates at each side simultaneously, the external thread 12 is screwed into the internal thread hole 11 to fix the buffer ring 5, the waterproof rubber ring 6, the middle wall-in pull rod 1 and other components, finally the clamp plate 8 is screwed down by the locking nut 14 to realize the clamping and fixing of the construction template and the installation of the wall-in pull rod 1, the concrete is poured between the construction templates, after the concrete is solidified, unscrew lock nut 14 through the spanner, take off template outer splint 8, construction formwork in proper order, can dismantle pull rod 9 and template inner clamping plate 7 and carry out recycle, inside coupling nut 3 stayed concrete layer with income wall pull rod 1, avoided traditional screw rod to pass the problem of leaking that the side wall caused.
The basic principles and main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a subway construction is with stagnant water pull rod structure which characterized in that: the construction template comprises a wall-in section and a detachable section, wherein the wall-in section comprises a wall-in pull rod and connecting nuts at two ends of the wall-in pull rod, the inner side of each connecting nut is fixedly welded with two ends of the wall-in pull rod, an inner threaded hole is processed at the central position of the outer side of each connecting nut, a circular groove is processed at the periphery of the inner threaded hole, a buffer ring and a waterproof rubber ring are sequentially filled in the circular groove, the detachable section comprises a template inner clamp plate, a template outer clamp plate and a detachable pull rod, a circular bulge is arranged at the central position of the inner side of the template inner clamp plate and is embedded in the circular groove, a construction template is clamped between the template inner clamp plate and the template outer clamp plate, through holes are processed at the corresponding positions of the template inner clamp plate and the template outer clamp plate, external threads are arranged at two ends of the detachable pull rod, one end of, the other end is screwed in the locking nut to fix the template outer clamping plate.
2. The water stop pull rod structure for subway construction as claimed in claim 1, wherein: and a water stop sheet is welded and fixed at the middle position of the wall-entering pull rod.
3. The water stop pull rod structure for subway construction as claimed in claim 1, wherein: and a compression piece is welded on the detachable pull rod between the template inner clamping plate and the template outer clamping plate.
4. The water stop pull rod structure for subway construction as claimed in claim 1, wherein: the contact area between the inner template clamping plate and the outer template clamping plate and the inner side and the outer side of the construction template is two to three times of the area of the water stop sheet.
5. The water stop pull rod structure for subway construction as claimed in claim 1, wherein: the depth of the circular ring-shaped groove is one half of the length of the connecting nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021874675.6U CN213626680U (en) | 2020-09-01 | 2020-09-01 | Water stop pull rod structure for subway construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021874675.6U CN213626680U (en) | 2020-09-01 | 2020-09-01 | Water stop pull rod structure for subway construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213626680U true CN213626680U (en) | 2021-07-06 |
Family
ID=76646450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021874675.6U Expired - Fee Related CN213626680U (en) | 2020-09-01 | 2020-09-01 | Water stop pull rod structure for subway construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213626680U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI822575B (en) * | 2022-12-21 | 2023-11-11 | 龍慶工業有限公司 | Tie rod device for formwork |
-
2020
- 2020-09-01 CN CN202021874675.6U patent/CN213626680U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI822575B (en) * | 2022-12-21 | 2023-11-11 | 龍慶工業有限公司 | Tie rod device for formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202644997U (en) | Simple plugging device for wall-penetrating holes of wall | |
CN213626680U (en) | Water stop pull rod structure for subway construction | |
CN211948525U (en) | Device for screwing in self-locking opposite-pulling type fixed bearing platform template by torque | |
CN106677529A (en) | Structure and construction method of reserved hole PVC sleeve mould | |
CN107675795A (en) | A kind of assembled wallboard dry type attachment structure and its assembly method | |
CN201649646U (en) | Support protection structure for cement templates | |
CN106948599A (en) | A kind of split bolt and its application method | |
CN112609963B (en) | Installation anchoring device of composite heat-insulation template and use method thereof | |
CN2893058Y (en) | Concrete shuttering counter-drawing combine external member | |
CN201372573Y (en) | Improved template reinforcing bolt | |
CN212224611U (en) | Shear force wall pouring template reinforcing apparatus | |
CN204960320U (en) | Concrete form is to drawing fastener | |
CN210858003U (en) | Aluminum alloy template beam with buckle device | |
CN100485151C (en) | Water stop screw rod | |
CN201162350Y (en) | Water stop screw in underground shearing force wall | |
CN203092752U (en) | Combined anchor head seal cap for motar pressing of prestressed pipeline | |
CN215520905U (en) | Water stop pull rod structure in subway construction | |
CN210117931U (en) | Multifunctional integrated mountain-shaped clamp | |
CN203960860U (en) | A kind of detachable anchoring piece | |
CN206158182U (en) | A support system for single -side supporting formwork | |
CN207757815U (en) | The dies plate tap structure of Precast T-Beam | |
CN202755655U (en) | Multifunctional draw bar device of construction formwork | |
CN218541543U (en) | Concrete wall pouring template fixing water-stop screw structure | |
CN219281288U (en) | Water-stopping bolt | |
CN201162352Y (en) | Water stop screw |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210706 |