CN213625555U - A operation platform can have enough to meet need for bored concrete pile construction - Google Patents

A operation platform can have enough to meet need for bored concrete pile construction Download PDF

Info

Publication number
CN213625555U
CN213625555U CN202022139907.XU CN202022139907U CN213625555U CN 213625555 U CN213625555 U CN 213625555U CN 202022139907 U CN202022139907 U CN 202022139907U CN 213625555 U CN213625555 U CN 213625555U
Authority
CN
China
Prior art keywords
platform
construction
hole
pile construction
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022139907.XU
Other languages
Chinese (zh)
Inventor
荚耀宗
姜张张
郑欣
代涛
孙建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN202022139907.XU priority Critical patent/CN213625555U/en
Application granted granted Critical
Publication of CN213625555U publication Critical patent/CN213625555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a rotatable operating platform for cast-in-situ bored pile construction, which comprises a platform, a ridge platform, a protective guard and a lifting ring; the middle part of the platform is provided with a hole; the ridge platform and the guard rail are respectively arranged at the upper end of the platform along the circumferential direction of the hole; the lifting ring is provided with at least two lifting rings which are uniformly and symmetrically arranged on the platform. Compared with a traditional platform which is integrally hardened in a construction site, the prefabricated turnover operation platform is lower in cost, the whole hardened part of the site does not need to be broken, the turnover operation platform can be used repeatedly, resources are saved, a cast-in-place concrete curing period does not exist, and the construction efficiency is improved; the construction operation platform can be guaranteed to be firm and stable, and guarantee is provided for the construction of the high-precision upright post pile by the reverse construction method; through the effect of bank platform and rail guard, can realize drilling bored concrete pile hole protection, prevent that personnel from weighing down and mud excessive, promote the finished product protection, prevent that the stand pile from being disturbed.

Description

A operation platform can have enough to meet need for bored concrete pile construction
Technical Field
The utility model relates to a construction technical field specifically indicates a can have enough to meet need operation platform for bored concrete pile construction.
Background
The construction of one column and one pile by a reverse construction method is often involved in building construction, a cast-in-situ bored pile construction process is required, and the existing main construction flow is as follows: leveling the field, hardening → lofting for measurement, embedding of a pile casing → positioning of a pile foundation, pore-forming → lowering of a reinforcement cage → lowering of a steel column → verticality adjustment of a steel column → concrete pouring. In general, when the construction of the cast-in-situ bored pile meets the poor geology: (1) the site is inconvenient to transport, and the site hardened concrete is difficult to transport; (2) when the pile casing is embedded, the excavation depth is deep, the hardening damage area to the periphery of a pile position is large, the pile position is easy to deviate during pile foundation construction, a secondary hardening mode is needed, and the construction period is prolonged; (3) the soil around the pile hole is extruded in the process of drilling the pile foundation, so that the periphery of the pile hole is hardened, sunk or raised, and the verticality adjustment of the steel column cannot ensure the quality; (4) after the construction of the upright post pile is finished, rigid protection is difficult to realize around the pile hole, manual disturbance is easily caused before the final setting of the upright post concrete, quality risk exists, rigid protection does not exist around the pile hole, and great potential safety hazard exists; (5) after the pile foundation construction is finished, the hardened part of the site needs to be integrally broken, and the resource waste is serious.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the problems of long construction period, large potential safety hazard, no guarantee of construction quality and serious resource waste in the existing cast-in-situ bored pile construction, and provides a rotatable operating platform for cast-in-situ bored pile construction, which comprises a platform, a ridge platform, a protective guard and a hanging ring; the middle part of the platform is provided with a hole; the ridge platform and the guard rail are respectively arranged at the upper end of the platform along the circumferential direction of the hole; the lifting ring is provided with at least two lifting rings which are uniformly and symmetrically arranged on the platform.
Further, the platform is a reinforced concrete platform, and reinforcing steel bars are arranged in the reinforced concrete platform; and the lifting ring is bound or welded with the steel bar.
Further, the protective guard is arranged on the outer side of the sill table.
Further, the platform and the ridge platform are of an integrated structure.
Furthermore, a plurality of mounting holes are formed in the upper end of the platform along the circumferential direction of the hole; the lower end of the guard rail is connected with the mounting hole in a socket and spigot mode.
Further, the hole is a circular hole or a rectangular hole.
Further, the reinforcing steel bars are double-layer bidirectional reinforcing steel bar meshes.
Furthermore, four lifting rings are arranged at the upper end of the platform respectively; the upper end of the platform is provided with a notch convenient to hoist at the position of the hanging ring.
The utility model has the advantages that: compared with a traditional platform which is integrally hardened in a construction site, the prefabricated turnover operation platform is lower in cost, the whole hardened part of the site does not need to be broken, the turnover operation platform can be used repeatedly, resources are saved, a cast-in-place concrete curing period does not exist, and the construction efficiency is improved; the construction operation platform can be guaranteed to be firm and stable, and guarantee is provided for the construction of the high-precision upright post pile by the reverse construction method; through the effect of bank platform and rail guard, can realize drilling bored concrete pile hole protection, prevent that personnel from weighing down and mud excessive, promote the finished product protection, prevent that the stand pile from being disturbed.
Drawings
Fig. 1 is the utility model discloses a can have enough to meet need operation platform's spatial structure schematic diagram for bored concrete pile construction.
Fig. 2 is a schematic perspective view of the hanging ring and the steel bars in the platform in fig. 1.
Fig. 3 is a schematic top view of the structure of fig. 1.
Fig. 4 is a schematic cross-sectional structure of fig. 1.
In the figure, 1, a platform, 2, a sill table, 3, a protective guard, 4, a lifting ring, 5, a hole, 6, a steel bar, 7, a mounting hole and 8, a notch are formed.
Detailed Description
The invention is described in further detail below with reference to the figures and the specific embodiments.
As shown in fig. 1 to 4, the reusable operating platform for cast-in-situ bored pile construction includes a platform 1, a ridge platform 2, a guard rail 3 and a lifting ring 4; the middle part of the platform 1 is provided with a hole 5; the sill table 2 and the protective guard 3 are respectively arranged at the upper end of the platform 1 along the circumferential direction of the opening 5.
The platform 1 is preferably a reinforced concrete platform, and reinforcing steel bars 6 are arranged in the platform; the hanging ring 4 is bound or welded with the steel bar 6. In the embodiment, four lifting rings 4 are arranged and are respectively and uniformly and symmetrically arranged at the upper end of the platform 1; the upper end of the platform 1 is provided with a notch 8 convenient for hoisting at the position of the hoisting ring 4.
In this embodiment, the platform 1 and the sill 2 are integrated. The guard rail 3 is arranged outside the bank table 2. A plurality of mounting holes 7 are formed in the upper end of the platform 1 along the circumferential direction of the hole 5; the lower end of the protective guard 3 is connected with the mounting hole 7 in a socket joint mode, and the protective guard 3 is convenient to disassemble and assemble. The hole 5 is a round or rectangular hole. The reinforcing steel bars 6 are double-layer bidirectional reinforcing steel bar meshes. Anti-crack distribution reinforcing steel bars are arranged at four corners of the platform 1.
During construction, firstly, a formwork is erected on site according to the sizes of the platform 1 and the ridge platform 2, and the steel bars 6 are placed in the erected formwork, the hoisting rings 4 in the embodiment are preferably phi 20 round steel, the round steel is processed to be in the shape of the hoisting rings 4, the hoisting rings 4 and the steel bars 6 are bound or welded and fixed, and finally concrete is poured to form a whole. And finally, inserting the guard rail 3 into the mounting hole 7 for fixing to form safety protection.
During the construction of the cast-in-situ bored pile, after the pile casing is embedded, the platform 1 of the embodiment is directly hoisted to a working surface without maintenance time, so that the work efficiency is improved; the platform 1 has good integrity, so that the deviation generated during pile foundation construction is controllable, secondary in-place adjustment operation is convenient after the deviation occurs, and the verticality adjusting quality of the steel column can be ensured; the platform 1 can realize rigid protection around a pile hole, and better realize protection and safety protection of a steel column construction finished product; the device can be repeatedly used in a turnover mode, and does not need to be broken in the later period, so that the cost is saved to a great extent.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that a person skilled in the art should also recognize that several modifications and decorations can be made without departing from the principle of the present invention, and the protection scope of the present invention is also covered.

Claims (8)

1. The utility model provides a can have enough to meet need operation platform for bored concrete pile construction which characterized in that: comprises a platform (1), a sill table (2), a protective guard (3) and a lifting ring (4); the middle part of the platform (1) is provided with a hole (5); the sill table (2) and the guard rail (3) are respectively arranged at the upper end of the platform (1) along the circumferential direction of the opening (5); the lifting ring is characterized in that the number of the lifting rings (4) is at least two, and the at least two lifting rings (4) are uniformly and symmetrically arranged on the platform (1).
2. A rotatable operation platform for bored pile construction according to claim 1, wherein: the platform (1) is a reinforced concrete platform, and reinforcing steel bars (6) are arranged in the platform; and the lifting ring (4) is bound with or welded with the steel bar (6).
3. A rotatable operation platform for bored pile construction according to claim 1, wherein: the protective guard (3) is arranged on the outer side of the sill table (2).
4. A rotatable operation platform for bored pile construction according to claim 1, wherein: the platform (1) and the ridge platform (2) are of an integral structure.
5. A rotatable operation platform for bored pile construction according to claim 1, wherein: a plurality of mounting holes (7) are formed in the upper end of the platform (1) along the circumferential direction of the hole (5); the lower end of the guard rail (3) is connected with the mounting hole (7) in a socket and spigot manner.
6. A rotatable operation platform for bored pile construction according to claim 1, wherein: the hole (5) is a round hole or a rectangular hole.
7. A rotatable operation platform for bored pile construction according to claim 2, wherein: the steel bars (6) are double-layer bidirectional steel bar meshes.
8. A rotatable operation platform for bored pile construction according to claim 2, wherein: four lifting rings (4) are arranged at the upper end of the platform (1) respectively; the upper end of the platform (1) is provided with a notch (8) convenient to hoist at the position of the hanging ring (4).
CN202022139907.XU 2020-09-26 2020-09-26 A operation platform can have enough to meet need for bored concrete pile construction Active CN213625555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022139907.XU CN213625555U (en) 2020-09-26 2020-09-26 A operation platform can have enough to meet need for bored concrete pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022139907.XU CN213625555U (en) 2020-09-26 2020-09-26 A operation platform can have enough to meet need for bored concrete pile construction

Publications (1)

Publication Number Publication Date
CN213625555U true CN213625555U (en) 2021-07-06

Family

ID=76655962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022139907.XU Active CN213625555U (en) 2020-09-26 2020-09-26 A operation platform can have enough to meet need for bored concrete pile construction

Country Status (1)

Country Link
CN (1) CN213625555U (en)

Similar Documents

Publication Publication Date Title
CN101691751B (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN109706939B (en) Deep foundation pit prestress combined steel support and construction method
CN111042185B (en) Construction method of basement raft foundation with tower crane foundation
CN105863042A (en) All-steel structure building and construction method thereof
CN109183812B (en) Construction method of combined deep foundation pit supporting structure
CN107044142B (en) Adjustable reinforcement deviation correcting method and structure for reducing uneven settlement of house
CN111005387A (en) Deep foundation pit prestress support replacement support construction method
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN114134928B (en) Construction method of steel pipe column tower crane foundation
CN110016919A (en) A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN103911989B (en) A kind of underwater casting base type foundation with retaining wall and construction method thereof
CN206902783U (en) For reducing the adjustable reinforcement and rectification structure of house differential settlement
CN213625555U (en) A operation platform can have enough to meet need for bored concrete pile construction
CN116856932A (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN108951654A (en) Different cutting depth basement construction method for supporting
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
CN211498929U (en) Street lamp basis prefabricated construction
CN211547797U (en) Tower crane foundation structure suitable for basement raft foundation
CN212452263U (en) Pier stud reinforcing bar construction tower cage and construction structure
CN212772377U (en) Recoverable foundation pit steel stand connecting device
CN108755669B (en) Construction method for cross-tunnel steel reinforced concrete cast-in-place pile and transfer beam
CN110847213A (en) Light steel cage type tower crane pedestal and assembly construction method
CN211974480U (en) Cat ladder basis base and cat ladder device
AU2016102393A4 (en) A Method of constructing a column, a tunnel, and a tunnel made from the method
CN104674796A (en) Formwork system of underground shelter cast-in-place pile and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant