CN213625492U - Water gate that water conservancy project used blocks - Google Patents

Water gate that water conservancy project used blocks Download PDF

Info

Publication number
CN213625492U
CN213625492U CN202022191257.3U CN202022191257U CN213625492U CN 213625492 U CN213625492 U CN 213625492U CN 202022191257 U CN202022191257 U CN 202022191257U CN 213625492 U CN213625492 U CN 213625492U
Authority
CN
China
Prior art keywords
gate
water
main body
base
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022191257.3U
Other languages
Chinese (zh)
Inventor
袁玉琳
张凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022191257.3U priority Critical patent/CN213625492U/en
Application granted granted Critical
Publication of CN213625492U publication Critical patent/CN213625492U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The utility model provides a water gate that blocks that hydraulic engineering used belongs to hydraulic engineering equipment technical field, including spud pile, gate main part, fixed slot and guide plate, the left and right sides of gate is equipped with the spud pile respectively, and the spud pile all with gate fixed connection, fixed mounting has the fixed slot to inlay respectively in the left and right sides of gate. This kind of water gate that hydraulic engineering used passes through the improvement of structure, make this device when in-service use, the stability of water gate when water gate is put to the water blocking that has improved current hydraulic engineering used, and then avoided making the impaired phenomenon of gate when the floodgate is opened and is let the water, the risk degree of floodgate has been reduced, the water gate that has solved current hydraulic engineering and used is because the surface of water floater is many, the problem of dashing to the low reaches area easily when the floodgate is opened and is let the water, the pollution of environment has been reduced, and the rivers efficiency of draining is improved, can be timely carry out flood discharge with water in the season, and then make the water gate that this kind of hydraulic engineering used in-service use effect better.

Description

Water gate that water conservancy project used blocks
Technical Field
The utility model relates to a hydraulic engineering equipment technical field specifically is a water gate that blocks that hydraulic engineering used.
Background
The gate is used for closing and opening the control facility of the drainage (discharge) water channel, the important component of the hydraulic structure can be used for intercepting water flow, controlling water level, adjusting flow, discharging silt and floating objects, etc., in water conservancy construction, the river is often required to be cut off, the water cut-off mode is that a water retaining structure is arranged in the river channel, an independent area can be formed through two water retaining structures, and the engineering construction can be carried out after water in the area is pumped out.
The existing water blocking gate for hydraulic engineering is poor in stability when water blocking and water releasing, low in water bearing pressure, easy to damage when water is released and water is discharged, and increases the risk degree of gate burst.
Therefore, it is desirable to upgrade and reform existing water gate gates for hydraulic engineering to overcome the existing problems and deficiencies.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems that the prior water gate for hydraulic engineering has poor stability and low bearing water pressure when water is blocked and released, the gate is easy to be damaged when the water is released and released, the risk degree of the water is increased, and the prior water gate for hydraulic engineering is easy to rush to downstream areas when the water is released and released due to a plurality of floaters on the water surface, thereby increasing the environmental pollution, has low water flow releasing efficiency, can not timely release water in flood season, and further has poor practical use effect, and provides the water gate for hydraulic engineering, which improves the stability and bearing water pressure when the water is blocked and released by arranging devices such as a concrete base, a gate base, a blocking column, a lifter, a guide plate and the like, and then avoided making the impaired phenomenon of gate when the floodgate is opened and is drained, reduced the risk degree of the floodgate of bursting, and solved current water conservancy project and used water-retaining gate because the surface of water floater is many, easily washed the problem to the low reaches area when the floodgate is opened and is drained to reduce the pollution of environment, and improved the rivers efficiency of draining, can be timely carry out the flood discharge with water in flood season, and then make the water-retaining gate that this kind of water conservancy project used actually use the effect better.
In order to realize the purpose, the utility model provides the following technical scheme, a water gate for hydraulic engineering comprises a fixing pile, a gate main body, a fixing groove, a guide plate and a gate plate, wherein the left side and the right side of the gate main body are respectively provided with the fixing pile which is fixedly connected with the gate main body, the left side and the right side of the gate main body are respectively embedded with the fixing groove, the left end and the right end of the upper part of the gate main body are respectively provided with the guide plate which is embedded and fixedly connected with the gate main body, the middle of the upper part of the gate main body is provided with the gate plate which is embedded and movably connected with the gate main body, the left side and the right side of the gate plate are respectively provided with a blocking pile which is fixedly connected with the gate main body, the gate plate is embedded and movably connected with the blocking pile, the blocking columns are respectively arranged on the upper part of, the middle of the intercepting column is respectively and fixedly provided with an intercepting rod, and the lower part of the left side of the gate main body is fixedly provided with a gate base.
Preferably, the inside fixed mounting of gate main part has the concrete base, and equidistant parallel distribution has the lift groove in the middle of the concrete base.
Preferably, the equal vertical fixed mounting in below of lift groove has hydraulic pressure base, and hydraulic pressure base's below is equipped with the controller respectively perpendicularly to controller and the mutual equidistance parallel distribution of hydraulic pressure base.
Preferably, the flow guide base is vertically arranged below the flow guide plate, an embedding groove is formed in the middle of the flow guide base, and the embedding grooves are arranged in parallel.
Preferably, equidistance parallel arrangement has the riser in the flashboard, and the inside of riser is equipped with hydraulic spring respectively to hydraulic spring is the equidistance and encircles the setting.
Preferably, the middle of the hydraulic spring is vertically provided with a lifting rod, a top plate is vertically arranged above the lifting rod, and the top plate and the intercepting column are vertically arranged.
Preferably, the gate base is the arc setting, and gate base and gate main part mutually perpendicular to the interception post of flashboard top is equidistance parallel arrangement.
Has the advantages that:
(1) this kind of water gate that hydraulic engineering used passes through the improvement of structure, make this device when in-service use, the stability of water gate that blocks that has used for current hydraulic engineering when the floodgate is put to the water blocking with bear hydraulic dynamics, and then avoided making the impaired phenomenon of gate when the floodgate is opened and is discharged, the risk degree of floodgate has been reduced, and solved current water gate that hydraulic engineering used because the surface of water floater is many, the problem of dashing to the low reaches area easily when the floodgate is opened and is discharged, thereby the pollution of environment has been reduced, and the rivers efficiency of draining has been improved, can be timely carry out the flood discharge with water in flood season, and then make the water gate that this kind of hydraulic engineering used actually usable effect better.
(2) This kind of water conservancy project is with blocking water gate's advantage lies in: through the improvement of structure to the setting has installed devices such as concrete base and gate base, because the inside fixed mounting of gate has the concrete base, and the left side below fixed mounting of gate has the gate base, and gate base and gate mutually perpendicular etc. and then improved the stability of the water-stop gate that current hydraulic engineering used when water-stop is put to the floodgate and bear hydraulic dynamics, and then avoided making the impaired phenomenon of gate when the floodgate is opened and is drained, reduced the risk degree of ulcerate floodgate.
(3) Secondly, the method comprises the following steps: through the improvement of structure, and set up and installed the interception post, devices such as riser and guide plate, because the interception post of flashboard top is equidistance parallel arrangement, and equidistance parallel arrangement has the riser in the flashboard, and the below of guide plate is installed perpendicularly and is led water conservancy diversion base etc. and then solved the water-retaining gate that current hydraulic engineering used because the surface of water floater is many, easily rush to the problem in low reaches area when the floodgate is opened the water, thereby the pollution of environment has been reduced, and the rivers efficiency of draining has been improved, can be timely carry out the flood discharge with water in flood season, and then make the water-retaining gate that this kind of hydraulic engineering used practical use effect better.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of a local structure of the shutter of the present invention.
Fig. 3 is a schematic view of a partial structure of the gate of the present invention.
Fig. 4 is a schematic view of the local structure of the flow guide plate of the present invention.
In FIGS. 1-4: 1. fixing the pile; 2. a gate main body; 201. a concrete base; 202. a lifting groove; 203. a controller; 204. a hydraulic base; 3. fixing grooves; 4. a baffle; 401. a flow guide base; 402. embedding a groove; 5. a shutter plate; 501. a lifter; 502. a hydraulic spring; 503. A lifting rod; 504. a top plate; 6. intercepting columns; 7. a catch bar; 8. pile clamping; 9. the gate base.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention.
Example (b):
with reference to the figures 1-4 of the drawings,
the embodiment provides a water gate for hydraulic engineering, which comprises a fixed pile 1, a gate main body 2, a fixed groove 3, a guide plate 4 and a gate plate 5, wherein the left side and the right side of the gate main body 2 are respectively provided with the fixed piles 1, the fixed piles 1 are fixedly connected with the gate main body 2, the left side and the right side of the gate main body 2 are respectively embedded and fixedly provided with the fixed groove 3, the left end and the right end of the upper part of the gate main body 2 are respectively provided with the guide plate 4, the guide plate 4 is embedded and fixedly connected with the gate main body 2, the middle of the upper part of the gate main body 2 is provided with the gate plate 5, the gate plate 5 is embedded and movably connected with the gate main body 2, the left side and the right side of the gate plate 5 are respectively provided with a blocking pile 8, the blocking pile 5 is embedded and movably connected with the blocking pile 8, the upper part of the gate main body 2, the middle parts of the interception columns 6 are respectively and fixedly provided with interception rods 7, and the lower part of the left side of the gate main body 2 is fixedly provided with a gate base 9.
Further, a concrete base 201 is fixedly installed inside the gate main body 2, and lifting grooves 202 are equidistantly and parallelly distributed in the middle of the concrete base 201;
in this embodiment, because equidistance parallel distribution has lift groove 202 in the middle of concrete foundation 201, improve stability and structural strength that the installation of gate main part 2 was used through concrete foundation 201 to make flashboard 5 can inlay the piston operation through lift groove 202 and go up and down.
Further, hydraulic bases 204 are vertically and fixedly installed below the lifting grooves 202, controllers 203 are vertically arranged below the hydraulic bases 204, and the controllers 203 and the hydraulic bases 204 are distributed in parallel at equal intervals;
in this embodiment, the lifting operation of the gate plate 5 is controlled by the hydraulic base 204 below the lifting groove 202, and the controller 203 receives a remote signal to operate the hydraulic base 204, so as to control the gate plate 5 to lift for discharging water and flood.
Further, a flow guide base 401 is vertically installed below the flow guide plate 4, an embedding groove 402 is formed in the middle of the flow guide base 401, and the embedding grooves 402 are arranged in parallel;
in this embodiment, since the middle of the diversion base 401 is provided with the embedding groove 402, and the embedding grooves 402 are arranged in parallel, the diversion base 401 below the diversion plate 4 enables the device to be fixedly mounted, and the diversion plate 4 is embedded, fixedly mounted and used through the embedding groove 402 on the diversion base 401.
Furthermore, lifters 501 are equidistantly and parallelly installed in the gate plate 5, hydraulic springs 502 are respectively arranged inside the lifters 501, and the hydraulic springs 502 are equidistantly arranged in a surrounding manner;
in this embodiment, since the hydraulic springs 502 are respectively disposed inside the lifters 501, and the hydraulic springs 502 are disposed around the lifters 501 at equal intervals, the lifters 501 control the lifting operation of the shutter 5, and the hydraulic springs 502 support the shutter 5 to provide a lifting force during lifting.
Further, a lifting rod 503 is vertically installed in the middle of the hydraulic spring 502, a top plate 504 is vertically installed above the lifting rod 503, and the top plate 504 and the intercepting column 6 are vertically arranged;
in this embodiment, since the lifting rod 503 is vertically installed in the middle of the hydraulic spring 502, and the top plate 504 is vertically installed above the lifting rod 503, the lifting rod 503 in the middle of the hydraulic spring 502 can maintain the stability during lifting, and the top of the gate plate 5 can be supported and the intercepting column 6 can be fixedly installed and used through the top plate 504.
Further, the gate base 9 is arranged in an arc shape, the gate base 9 is perpendicular to the gate main body 2, and the interception columns 6 above the gate plate 5 are arranged in parallel at equal intervals;
in this embodiment, because gate base 9 and gate main part 2 mutually perpendicular, and the interception post 6 of flashboard 5 top is equidistance parallel arrangement, is fixed mutually with the impoundment through gate base 9, and then reduces the direct pressure to gate main part 2 of water pressure to intercept the processing with surface of water rubbish through interception post 6 and the interception pole 7 of flashboard 5 top, and then reduced the influence to the low reaches environment.
The working principle is as follows:
when the water gate for hydraulic engineering provided by the utility model is used, firstly, the stability and integrity of the water gate for hydraulic engineering are checked, when the equipment is determined to be intact, firstly, the gate main body 2 is fixedly installed through the fixing pile 1 and the fixing groove 3, and the flashboard 5 is fixed through the clamping pile 8, the stability and structural strength of the installation and use of the gate main body 2 are improved through the concrete base 201, the flashboard 5 can be embedded with the piston to operate and lift through the lifting groove 202, secondly, the lifting operation of the flashboard 5 is controlled through the hydraulic base 204 below the lifting groove 202, the hydraulic base 204 is operated through the controller 203 to receive remote signals, further, the flashboard 5 is controlled to lift to discharge water, flood discharge and the like, the equipment is fixedly installed through the flow guide base 401 below the flow guide plate 4, and the flow guide plate 4 is embedded and fixedly installed and used through the embedding groove 402 on the flow guide base 401, the lifting operation of the gate plate 5 is controlled through the lifter 501, the gate plate 5 is supported by the hydraulic spring 502 to provide lifting force when lifting, the lifting rod 503 in the middle of the hydraulic spring 502 keeps stability when lifting, the top of the gate plate 5 is supported by the top plate 504 and fixedly mounted on the intercepting column 6, the gate base 9 is fixed with a water storage area, pressure of water pressure on the gate body 2 is reduced, water surface garbage is intercepted by the intercepting column 6 and the intercepting rod 7 above the gate plate 5, and the actual use effect of the water intercepting gate for hydraulic engineering is better.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not exhaustive and do not limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. A water-blocking gate for hydraulic engineering comprises fixing piles (1), a gate main body (2), fixing grooves (3), guide plates (4) and gate plates (5), and is characterized in that the fixing piles (1) are respectively arranged on the left side and the right side of the gate main body (2), the fixing piles (1) are fixedly connected with the gate main body (2), the fixing grooves (3) are respectively embedded and fixedly installed on the left side and the right side of the gate main body (2), the guide plates (4) are respectively arranged at the left end and the right end above the gate main body (2), the guide plates (4) are respectively embedded and fixedly connected with the gate main body (2), the gate plates (5) are arranged in the middle of the upper part of the gate main body (2), the gate plates (5) are movably connected with the gate main body (2) in an embedded manner, the blocking piles (8) are respectively arranged on the left side and the right side of the gate plates (5), and the blocking piles, and swing joint is inlayed with calorie stake (8) in flashboard (5), the top of gate main part (2) is equipped with respectively blocks post (6), and blocks post (6) all with gate main part (2) fixed connection, the centre of blocking post (6) fixed mounting respectively has blocks pole (7), the left side below fixed mounting of gate main part (2) has gate base (9).
2. The water-retaining gate for the water conservancy project according to claim 1, wherein a concrete base (201) is fixedly installed inside the gate main body (2), and lifting grooves (202) are equidistantly and parallelly distributed in the middle of the concrete base (201).
3. The water gate according to claim 2, wherein the hydraulic bases (204) are vertically and fixedly arranged below the lifting grooves (202), the controllers (203) are vertically arranged below the hydraulic bases (204), and the controllers (203) and the hydraulic bases (204) are equidistantly and parallelly distributed.
4. The water gate according to claim 1, wherein a guide base (401) is vertically installed below the guide plate (4), an embedding groove (402) is formed in the middle of the guide base (401), and the embedding grooves (402) are arranged in parallel.
5. The water gate according to claim 1, wherein lifters (501) are equidistantly and parallelly installed in the gate plate (5), hydraulic springs (502) are respectively arranged in the lifters (501), and the hydraulic springs (502) are equidistantly arranged in a surrounding manner.
6. The water gate according to claim 5, wherein the hydraulic spring (502) is vertically provided with a lifting rod (503) in the middle, a top plate (504) is vertically arranged above the lifting rod (503), and the top plate (504) and the intercepting column (6) are vertically arranged.
7. The water gate according to claim 1, characterized in that the gate base (9) is arc-shaped, the gate base (9) and the gate body (2) are perpendicular to each other, and the intercepting columns (6) above the gate plate (5) are equidistantly arranged in parallel.
CN202022191257.3U 2020-09-30 2020-09-30 Water gate that water conservancy project used blocks Expired - Fee Related CN213625492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022191257.3U CN213625492U (en) 2020-09-30 2020-09-30 Water gate that water conservancy project used blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022191257.3U CN213625492U (en) 2020-09-30 2020-09-30 Water gate that water conservancy project used blocks

Publications (1)

Publication Number Publication Date
CN213625492U true CN213625492U (en) 2021-07-06

Family

ID=76657057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022191257.3U Expired - Fee Related CN213625492U (en) 2020-09-30 2020-09-30 Water gate that water conservancy project used blocks

Country Status (1)

Country Link
CN (1) CN213625492U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561917A (en) * 2022-04-06 2022-05-31 史秀惠 River channel desilting gate system based on hydraulic engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561917A (en) * 2022-04-06 2022-05-31 史秀惠 River channel desilting gate system based on hydraulic engineering
CN114561917B (en) * 2022-04-06 2023-08-22 史秀惠 River channel dredging gate system based on hydraulic engineering

Similar Documents

Publication Publication Date Title
CN111101486B (en) Retaining gate for small and medium-sized barrage of mountainous area sandy river
CN213625492U (en) Water gate that water conservancy project used blocks
CN104264637B (en) Clino-axis type hydraulic self-control gate
CN201125377Y (en) Air-actuated thyroid shutter
US11286630B2 (en) Pile foundation permeable breakwater with variable permeability and construction method thereof
CN111088780A (en) Floating box type transverse-moving tidal gate structure
CN116733021A (en) Basement leakage treatment structure construction method
CN214939820U (en) Dykes and dams for hydraulic engineering
CN114753300B (en) Diversion type flood control dike for hydraulic engineering
CN217462250U (en) Tunnel foundation pit diversion construction structure penetrating through non-navigation river channel
CN113818446B (en) Tunnel foundation pit construction method for traversing non-navigable river channel
CN212103947U (en) Micro-power water level-changing hydraulic automatic flap gate
CN212865831U (en) Multi-functional ecological floodgate that keeps off tide
KR100514954B1 (en) Vanished movable weir
CN211772960U (en) Culvert structure for hydraulic engineering
CN209875989U (en) Pipeline gate for hydraulic engineering
CN112982319A (en) Structure and method for conducting diversion, emptying and water taking through dam foundation culvert
CN210262950U (en) Pump floodgate construction structures
CN117431892B (en) Synchronous rapid construction method for bent river channel lock water lock parallelism
CN221029982U (en) Water stopping structure of concrete gravity dam
CN221072526U (en) Sluice structure
CN216765774U (en) Water conservancy facility frame-type dam body structure
CN209907337U (en) Flood isolation gate
CN214695476U (en) Integrated pump gate
CN215164836U (en) Box culvert type embankment penetrating structure for drainage station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210706