CN213625447U - Water baffle with fast assembling structure - Google Patents

Water baffle with fast assembling structure Download PDF

Info

Publication number
CN213625447U
CN213625447U CN202022110241.5U CN202022110241U CN213625447U CN 213625447 U CN213625447 U CN 213625447U CN 202022110241 U CN202022110241 U CN 202022110241U CN 213625447 U CN213625447 U CN 213625447U
Authority
CN
China
Prior art keywords
water baffle
support
loop bar
rod
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022110241.5U
Other languages
Chinese (zh)
Inventor
宋林霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingjiang Jiayi Air Conditioning Equipment Manufacturing Co ltd
Original Assignee
Jingjiang Jiayi Air Conditioning Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingjiang Jiayi Air Conditioning Equipment Manufacturing Co ltd filed Critical Jingjiang Jiayi Air Conditioning Equipment Manufacturing Co ltd
Priority to CN202022110241.5U priority Critical patent/CN213625447U/en
Application granted granted Critical
Publication of CN213625447U publication Critical patent/CN213625447U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a big breakwater technical field specifically is a breakwater with assemble structure fast, including installation curb plate and breakwater main part, the inside of installation curb plate is inserted and is equipped with the breakwater main part, the fixed slot has all been seted up at the both ends of breakwater main part, the top of installation curb plate is provided with the roof, the inside fixed mounting of roof has the dead lever, the inside at the fixed slot is inserted to the dead lever, the dead lever is provided with two sets ofly, and another group's dead lever is located the bottom of installation curb plate, the caulking groove has been seted up on the top of installation curb plate, the bottom fixed mounting of roof has the inserted bar. The utility model discloses a be provided with roof and dead lever, can put into the inside of installation curb plate with the breakwater main part, make the dead lever imbed the inside of fixed slot, make the position of roof fix the back, can make the breakwater main part fix, and then make the installation of breakwater main part more convenient, easy operation, convenient to use.

Description

Water baffle with fast assembling structure
Technical Field
The utility model relates to a breakwater technical field specifically is a breakwater with assemble structure fast.
Background
The water baffle is a very important workpiece in the flood prevention project, can block water, and can be used after being assembled and installed in the flood prevention project.
But present breakwater need put into the place back with the mounting bracket, put into the mounting bracket with the breakwater in proper order on, need fix through the multiunit bolt afterwards, the installation is comparatively complicated, and the efficiency of installation is lower, uses comparatively inconveniently, consequently needs a breakwater that has the structure of assembling fast to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a breakwater with assemble structure fast to the installation that proposes in solving above-mentioned background is comparatively complicated, and the efficiency of installation is lower, uses comparatively inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: a water baffle with a quick assembly structure comprises an installation side plate and a water baffle main body, wherein the water baffle main body is inserted into the installation side plate, fixing grooves are formed in two ends of the water baffle main body, a top plate is arranged at the top end of the installation side plate, fixing rods are fixedly installed in the top plate and are inserted into the fixing grooves, two groups of fixing rods are arranged, the other group of fixing rods are located at the bottom end of the installation side plate, an inserting groove is formed in the top end of the installation side plate, an inserting rod is fixedly installed at the bottom end of the top plate and is inserted into the inserting groove, a first pressure spring is fixedly installed in the inserting groove, a hole is formed in the outer wall of the installation side plate, an inserting rod is inserted into the hole, a second pressure spring is sleeved on the outer wall of the inserting rod, and a hole is formed in the inserting rod, and the inserted bar is inserted in the hole of the embedded bar.
Preferably, the front intermediate position department fixed mounting of installation curb plate has first installation piece, there is first support loop bar inside of first installation piece through pivot movable mounting, the hole has been seted up to the inside of first support loop bar, and the inside of hole is inserted and is equipped with first support pole that contracts, the outer wall bottom of first support loop bar is inserted and is equipped with the threaded rod.
Preferably, the bottom fixed mounting of installation curb plate has the second installation piece, there is the second support loop bar bottom of second installation piece through pivot movable mounting, the inside of second support loop bar is inserted and is equipped with the second and support the throat, the one end that the second support loop bar was kept away from to the second support throat has the connecting block through pivot movable mounting.
Preferably, one end of the inserted bar extending to the inner wall of the caulking groove is arranged in a circular arc manner.
Preferably, the second mounting block and the second support sleeve rod are provided with two groups, and one ends of the two groups of second support telescopic rods far away from the second support sleeve rod are movably connected with the connecting block through rotating shafts.
Preferably, a clamping seat is fixedly installed at the top end of the connecting block, a cross rod is arranged at the top end of the clamping seat, a groove is formed in the bottom end of the first support shrinkage rod, and the groove is matched with the cross rod at the top end of the clamping seat.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device is provided with roof and dead lever, can put into the inside of installation curb plate with the breakwater main part, makes the inside of dead lever embedding fixed slot, makes the position of roof fix the back, can make the breakwater main part fix, and then makes the installation of breakwater main part more convenient, easy operation, convenient to use.
2. The device is provided with first support loop bar and second support loop bar, and first support loop bar can support the breakwater main part, and then makes the stability of breakwater main part better, avoids the breakwater main part to take place the condition of empting at flood prevention's in-process, and the second supports the loop bar simultaneously and can support the installation curb plate, cooperates with first support loop bar simultaneously, forms triangle-shaped can further increase the stable setting of breakwater main part, and it is comparatively convenient to use.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1;
fig. 3 is a schematic sectional view of the top view structure of the present invention;
fig. 4 is a schematic side view of the structural section of the present invention.
In the figure: 1. installing a side plate; 2. a breakwater main body; 3. fixing grooves; 4. a top plate; 5. fixing the rod; 6. embedding a rod; 7. caulking grooves; 8. a first pressure spring; 9. inserting a rod; 10. a second pressure spring; 11. a first mounting block; 12. a first support loop bar; 13. a first support telescopic rod; 14. a threaded rod; 15. a second mounting block; 16. a second support loop bar; 17. a second support telescopic rod; 18. connecting blocks; 19. a card seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment:
a water baffle with a quick assembly structure comprises an installation side plate 1 and a water baffle main body 2, wherein the water baffle main body 2 is inserted into the installation side plate 1, fixing grooves 3 are formed in two ends of the water baffle main body 2, a top plate 4 is arranged at the top end of the installation side plate 1, fixing rods 5 are fixedly installed inside the top plate 4, the fixing rods 5 are inserted into the fixing grooves 3, two groups of fixing rods 5 are arranged, the other group of fixing rods 5 are located at the bottom end of the installation side plate 1, an embedding groove 7 is formed in the top end of the installation side plate 1, an embedding rod 6 is fixedly installed at the bottom end of the top plate 4, the fixing rods 5 are inserted into the embedding groove 7, a first pressure spring 8 is fixedly installed inside the embedding groove 7, a hole is formed in the outer wall of the installation side plate 1, an inserting rod 9 is inserted into the inside of the hole, a second pressure spring 10 is sleeved on, and the insert rod 9 is inserted inside the hole of the insert rod 6.
Further, the positive intermediate position department fixed mounting of installation curb plate 1 has first installation piece 11, there is first support loop bar 12 inside of first installation piece 11 through pivot movable mounting, the hole has been seted up to the inside of first support loop bar 12, and the inside of hole is inserted and is equipped with first support pole 13 that contracts, threaded rod 14 is inserted and is equipped with to the outer wall bottom of first support loop bar 12, rotate threaded rod 14, can make threaded rod 14 break away from inside the hole on the first support pole 13 that contracts, and then make first support pole 13 that contracts extend, can make first support pole 13 that contracts support breakwater main part 2, avoid the great condition that causes breakwater main part 2 to take place to empty of water pressure, high durability and convenient use.
Further, the bottom end of the mounting side plate 1 is fixedly provided with a second mounting block 15, the bottom end of the second mounting block 15 is movably provided with a second supporting sleeve rod 16 through a rotating shaft, a second supporting telescopic rod 17 is inserted in the second supporting sleeve rod 16, and one end, far away from the second supporting sleeve rod 16, of the second supporting telescopic rod 17 is movably provided with a connecting block 18 through a rotating shaft.
Further, the one end that inserted bar 9 extends to 7 inner walls of caulking groove is the circular arc setting, accomplish the back with 2 installations of breakwater main part, need make roof 4 recover, roof 4 drives inserted bar 6 and causes the extrusion to inserted bar 9, and then makes inserted bar 9 begin to shrink along the arc surface, second pressure spring 10 drives inserted bar 9 afterwards and recovers, makes inserted bar 9 imbed the hole inside and fixes, and then accomplishes the fixed mounting of breakwater main part 2, and is easy to operate, and convenient to use.
Further, second installation piece 15 and second support loop bar 16 are provided with two sets ofly, and two sets of seconds support the one end that the second supported loop bar 16 was kept away from to throat 17 and all through pivot and 18 swing joint of connecting block, pulling connecting block 18, can make connecting block 18 drive two sets of seconds and support throat 17 and extend, and then make the second support throat 17 form the contained angle, can support the base of breakwater main part 2 and roof 4, further promoted the stability of breakwater main part 2, avoid breakwater main part 2 to take place the condition of empting, it is more convenient to make breakwater main part 2 use.
Further, the top fixed mounting of connecting block 18 has cassette 19, the top of cassette 19 is provided with the horizontal pole, the bottom of first support pole 13 that contracts is provided with the fluting, and the horizontal pole looks adaptation on grooved and cassette 19 top can make the bottom of first support pole 13 that contracts imbed the horizontal pole on cassette 19, it is better to get into the stability that makes first installation piece 11, cooperation second support loop bar 16 can make holistic stability further obtain improving simultaneously, convenient to use.
The working principle is as follows: during the use, pulling roof 4, and then make roof 4 drive dead lever 5 and rise, with the inside of putting into installation curb plate 1 of breakwater main part 2 afterwards, make the inside of dead lever 5 embedding fixed slot 3, roof 4 just begins to descend through first pressure spring 8 afterwards, and then make embedded bar 6 and inserted bar 9 take place the extrusion, can make inserted bar 9 begin to shrink along the arc surface, second pressure spring 10 drives inserted bar 9 afterwards and recovers, make inserted bar 9 embed into the hole inside and fix, and then accomplish the fixed mounting of breakwater main part 2, and is simple in operation, and convenient to use.
Pulling connecting block 18, can make connecting block 18 drive two sets of second and support draw back 17 and extend, and then make the second support draw back 17 and form the contained angle, can support the base of breakwater main part 2 and roof 4, the stability of breakwater main part 2 has been promoted, threaded rod 14 rotates afterwards, can make threaded rod 14 break away from inside the hole on the first support draw back 13, and then make first support draw back 13 extend, on embedding the horizontal pole on cassette 19 with the bottom of first support draw back 13, it is better to get into the stability that makes first installation piece 11, cooperation second support loop bar 16 simultaneously can make holistic stability further obtain improving, high durability and convenient use, the above is the whole theory of operation of this scheme.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a breakwater with assemble structure fast, includes installation curb plate (1) and breakwater main part (2), its characterized in that: the water baffle plate comprises a mounting side plate (1), a water baffle plate main body (2) is inserted into the mounting side plate (1), fixing grooves (3) are formed in two ends of the water baffle plate main body (2), a top plate (4) is arranged at the top end of the mounting side plate (1), fixing rods (5) are fixedly mounted in the top plate (4), the fixing rods (5) are inserted into the fixing grooves (3), two groups of fixing rods (5) are arranged, the other group of fixing rods (5) are located at the bottom end of the mounting side plate (1), an embedding groove (7) is formed in the top end of the mounting side plate (1), an embedding rod (6) is fixedly mounted at the bottom end of the top plate (4), the fixing rods (5) are inserted into the embedding groove (7), a first pressure spring (8) is fixedly mounted in the embedding groove (7), a hole is formed in the outer wall of the mounting side plate (1), and an inserting rod, the outer wall of the inserted link (9) is sleeved with a second pressure spring (10), a hole is formed in the embedded link (6), and the inserted link (9) is inserted into the hole of the embedded link (6).
2. The water baffle with the rapid assembling structure as claimed in claim 1, wherein: the utility model discloses a supporting side plate, including installation curb plate (1), the front intermediate position department fixed mounting of installation curb plate (1) has first installation piece (11), there is first support loop bar (12) inside of first installation piece (11) through pivot movable mounting, the hole has been seted up to the inside of first support loop bar (12), and the inside of hole is inserted and is equipped with first support telescopic link (13), threaded rod (14) are inserted to the outer wall bottom of first support loop bar (12).
3. The water baffle with the rapid assembling structure as claimed in claim 2, wherein: the bottom fixed mounting of installation curb plate (1) has second installation piece (15), there is second support loop bar (16) bottom of second installation piece (15) through pivot movable mounting, the inside of second support loop bar (16) is inserted and is equipped with second support throat (17), the second supports throat (17) and keeps away from the one end that second supported loop bar (16) and has connecting block (18) through pivot movable mounting.
4. The water baffle with the rapid assembling structure as claimed in claim 1, wherein: one end of the inserted bar (9) extending to the inner wall of the caulking groove (7) is arranged in a circular arc shape.
5. The water baffle with the rapid assembling structure as claimed in claim 3, wherein: the second mounting block (15) and the second supporting sleeve rod (16) are provided with two groups, and one ends of the two groups of second supporting telescopic rods (17) far away from the second supporting sleeve rod (16) are movably connected with the connecting block (18) through rotating shafts.
6. The water baffle with the rapid assembling structure as claimed in claim 3, wherein: the top end of the connecting block (18) is fixedly provided with a clamping seat (19), the top end of the clamping seat (19) is provided with a cross rod, the bottom end of the first support telescopic rod (13) is provided with a groove, and the groove is matched with the cross rod at the top end of the clamping seat (19).
CN202022110241.5U 2020-09-24 2020-09-24 Water baffle with fast assembling structure Expired - Fee Related CN213625447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022110241.5U CN213625447U (en) 2020-09-24 2020-09-24 Water baffle with fast assembling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022110241.5U CN213625447U (en) 2020-09-24 2020-09-24 Water baffle with fast assembling structure

Publications (1)

Publication Number Publication Date
CN213625447U true CN213625447U (en) 2021-07-06

Family

ID=76652952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022110241.5U Expired - Fee Related CN213625447U (en) 2020-09-24 2020-09-24 Water baffle with fast assembling structure

Country Status (1)

Country Link
CN (1) CN213625447U (en)

Similar Documents

Publication Publication Date Title
CN213625447U (en) Water baffle with fast assembling structure
CN210462037U (en) Steel pipe convenient to external connection
CN213783210U (en) Photovoltaic module that anti-seismic performance is outstanding
CN109944739B (en) Installation method of externally-hung vertical axis wind power generation equipment
CN210345223U (en) Street lamp with seat
CN209957303U (en) Embedded pneumatic elevation structure
CN213626743U (en) Wall body strutting arrangement for building assembly
CN212835907U (en) High-pressure-bearing combined steel structure convenient for fast assembly structure
CN218545827U (en) River levee water level monitoring post
CN214745354U (en) Assembly structure of LED lamp
CN213379406U (en) Mechanical part production line for wind power generation
CN213626734U (en) Leveling device convenient to mount and dismount for building construction
CN218800924U (en) Metal protection panel beating for lathe
CN214008623U (en) Silicon-based OLED display module convenient to concatenation equipment
CN219176714U (en) Light energy-reducing prevention automobile stand column
CN220973965U (en) New energy automobile fills electric pile mounting structure
CN210927553U (en) Mounting component of double-glass photovoltaic module
CN219015311U (en) Bridge is on-spot pole of surveying for architectural design
CN210766853U (en) Column pre-buried iron structure
CN215443181U (en) Limiting device is demolishd to steel bar guiding tube for building assembly
CN211939183U (en) Fixed drilling equipment in photovoltaic support bottom
CN219802198U (en) Soil-inserted photovoltaic bracket
CN213426065U (en) Solar photovoltaic support convenient for angle adjustment
CN211549125U (en) Protector for engineering safety management
CN215208169U (en) Energy-saving building tower crane preassembling component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210706