CN213597032U - Piping lane prefab and assembled rectangle utility tunnel - Google Patents

Piping lane prefab and assembled rectangle utility tunnel Download PDF

Info

Publication number
CN213597032U
CN213597032U CN202022346943.3U CN202022346943U CN213597032U CN 213597032 U CN213597032 U CN 213597032U CN 202022346943 U CN202022346943 U CN 202022346943U CN 213597032 U CN213597032 U CN 213597032U
Authority
CN
China
Prior art keywords
apron
riser
guide
plate
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022346943.3U
Other languages
Chinese (zh)
Inventor
张雁红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Hongtai Construction Engineering Co ltd
Original Assignee
Huizhou Hongtai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Hongtai Construction Engineering Co ltd filed Critical Huizhou Hongtai Construction Engineering Co ltd
Priority to CN202022346943.3U priority Critical patent/CN213597032U/en
Application granted granted Critical
Publication of CN213597032U publication Critical patent/CN213597032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the technique of building element and specifically relates to a piping lane prefab and assembled rectangle utility tunnel is related to, and it includes bottom plate, riser and apron, and the riser is just being provided with two, and the equal fixed connection in the top of bottom plate of coexistence board, and the joint groove has been seted up to one side of apron, and the joint groove is provided with two and corresponds with the coexistence board respectively, and the riser cooperates with joint groove joint, is provided with the guide on the apron, and the guide is used for leading to the installation of apron. The assembly construction volume when this application has utility tunnel shaping is less, construction simple process, and the transportation is convenient, and then the effect that the staff of being convenient for installed fast utility tunnel structure.

Description

Piping lane prefab and assembled rectangle utility tunnel
Technical Field
The application relates to the field of building elements, especially, relate to a piping lane prefab and assembled rectangle utility tunnel.
Background
Because the traditional directly buried pipeline occupies more underground space of the road, and meanwhile, the laying of the pipeline often cannot be synchronous with the road construction, so that the road is frequently excavated, the normal traffic of the road is seriously influenced, and the serious environmental pollution problems such as noise, dust and the like are also brought, so that the traffic and the living agencies of people are greatly inconvenient, and the comprehensive pipe gallery structure for laying the underground pipeline is generated for solving the problems.
The comprehensive pipe gallery structure in the related art usually needs to be subjected to processes of reinforcement processing and binding, formwork erecting, concrete pouring, maintenance, formwork removal and the like on a construction site during forming.
Aiming at the related technologies, the inventor considers that the construction process of the comprehensive pipe rack is complex and the construction period is long, and the quick installation of the comprehensive pipe rack structure is inconvenient.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the quick installation to utility tunnel structure, this application provides a piping lane prefab and assembled rectangle utility tunnel.
In a first aspect, the present application provides a piping lane preform, which adopts the following technical scheme:
the utility model provides a piping lane prefab, includes bottom plate, riser and apron, the riser is just to being provided with two, and two the equal fixed connection in the top of bottom plate of riser, the joint groove has been seted up to one side of apron, the joint groove is provided with two and corresponds with two risers respectively, riser and joint groove joint cooperation, be provided with the guide on the apron, the guide is used for leading to the installation of apron.
Through adopting the above-mentioned technical scheme, when installing the utility tunnel, insert two joint grooves of apron with the coexistence board, and then accomplish the concatenation of single piping lane prefab, arrange the installation in proper order with a plurality of piping lane prefabs afterwards and can accomplish laying to the utility tunnel, use this structure to lay the utility tunnel, make the assembly construction volume when the utility tunnel shaping less, construction process is simple, and the transportation is convenient, and then the staff of being convenient for installs the utility tunnel structure fast, the guide part plays the guide effect when apron and riser installation, and then the staff of being convenient for inserts the joint groove of apron with the riser.
Optionally, the vertical plates are fixedly connected with clamping plates, and when the vertical plates are inserted into the clamping grooves, the clamping plates are abutted against one side of the cover plate.
Through adopting above-mentioned technical scheme, the joint board plays to the riser after inserting the joint groove, to the further fixed action of apron to be favorable to further improving apron and riser installation back, its overall structure's after the piping lane prefab assembles stability promptly.
Optionally, the clamping plate is provided with a plurality of clamping plates along the horizontal direction.
Through adopting above-mentioned technical scheme, the setting up of a plurality of joint boards makes the apron receive further spacing to the position after the apron installation is further fixed, thereby is favorable to further promoting the stability of its position after the apron installation.
Optionally, the guide piece is vertical and fixed connection in the gib block of apron, the joint board is seted up and is corresponded and follow the guide way that vertical direction extended with gib block position, the gib block slides the cooperation with the guide way.
Through adopting above-mentioned technical scheme, the guide strip plays the guide effect when installing the apron with the cooperation of guide way for its horizontal direction's position is difficult for squinting when the apron is installed, and then is favorable to improving the stability when the apron is installed.
Optionally, one end of the vertical plate, which is far away from the bottom plate, is provided with a chamfer.
Through adopting above-mentioned technical scheme, the setting up of chamfer makes the riser have certain inclined plane transition when inserting the joint groove, and then plays the guide effect when installing the riser to the staff of being convenient for installs the riser.
The second aspect, the application provides an assembled rectangle utility tunnel, adopts following technical scheme:
the utility model provides an assembled rectangle utility tunnel, bottom plate, riser, apron and connecting plate, bottom plate, riser and apron are laminated along the horizontal direction end to end in proper order and are distributed, the connecting plate includes horizontal plate portion and connecting portion, connecting portion fixed connection is in one side of horizontal plate portion, just connecting portion distribute along the direction of its face in place has two, the spread groove has all been seted up at the apron top, and is same two connecting portions of connecting plate cooperate with two spread groove joints of two adjacent apron respectively.
Through adopting above-mentioned technical scheme, the cooperation of connecting plate and spread groove plays further limiting displacement behind the installation to two adjacent apron to be favorable to further reinforcing two adjacent apron to splice mutually the back, the stability of its position.
Optionally, a sealing gasket is fixedly connected to a groove wall of the connecting groove, and when the connecting portion is inserted into the connecting groove, the sealing gasket abuts against the connecting portion.
Through adopting above-mentioned technical scheme, sealed the tight effect of sealing up is favorable to further strengthening its position's after connecting portion insert the spread groove stability to the further support of connecting portion, and simultaneously, sealed effect of filling up makes in the difficult spread groove that enters into of external impurity.
Optionally, one side of the cover plate in the horizontal direction is fixedly connected with an insertion block, and adjacent to the cover plate, one side of the cover plate facing the insertion block is provided with an insertion hole, and the insertion block is in insertion fit with the insertion hole.
Through adopting above-mentioned technical scheme, the guide effect when the grafting cooperation of inserted block and jack plays two adjacent apron concatenations to the staff of being convenient for splices two adjacent apron.
Optionally, the bottoms of the bottom plates are fixedly connected with bases, and the cross-sectional areas of the bases are larger than that of the bottom plates.
Through adopting above-mentioned technical scheme, being provided with of base does benefit to when the increase bottom plate is arranged in the ground, with the area of contact between the ground to be favorable to further improving the stability of bottom plate when arranging the ground in.
In summary, the present application includes at least one of the following beneficial technical effects:
the comprehensive pipe rack structure is used for paving the comprehensive pipe rack, so that the assembly construction amount is less when the comprehensive pipe rack is formed, the construction process is simple, the transportation is convenient, and the quick installation of the comprehensive pipe rack structure by workers is further facilitated;
the clamping plate plays a role in further fixing the cover plate after the opposite plate is inserted into the clamping groove, so that the stability of the whole structure of the cover plate and the opposite plate after installation, namely the assembly of the pipe gallery prefabricated part, is further improved;
the cooperation of connecting plate and spread groove plays further limiting displacement behind two adjacent apron installations to be favorable to further reinforcing two adjacent apron concatenation backs mutually, the stability of its position.
Drawings
Fig. 1 is a schematic structural view of a pipe gallery preform in an embodiment of the present application.
Fig. 2 is an exploded view of the vertical plate and the cover plate in the embodiment of the present application.
Fig. 3 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 4 is a schematic diagram of the explosion relationship between two adjacent pipe gallery preforms in the embodiment of the present application.
Description of reference numerals: 1. a base plate; 2. a vertical plate; 3. a cover plate; 4. a base; 5. a clamping groove; 6. a clamping and connecting plate; 601. a vertical portion; 602. a horizontal portion; 7. a guide strip; 8. a guide groove; 9. a connecting plate; 901. a lateral plate portion; 902. a connecting portion; 10. inserting a block; 11. a jack; 12. a half-groove is accommodated; 13. a containing groove; 14. a gasket; 15. and connecting the grooves.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses piping lane prefab.
Referring to fig. 1, the piping lane prefab includes bottom plate 1, riser 2 and apron 3, wherein, bottom plate 1 roughly is rectangular plate structure, riser 2 is just being provided with two, and two equal fixed connection of riser 2 are in the top of bottom plate 1 one side that the cross-sectional area of bottom plate 1 is great, coexistence board 2 is close to the both sides setting of its place face horizontal direction respectively, for the stability when reinforcing bottom plate 1 arranges the ground in, bottom plate 1 bottom is the great opposite side fixedly connected with base 4 of 1 cross-sectional area of bottom plate, the cross-section of base 4 is the rectangle, and the cross-sectional area of base 4 is greater than the cross-sectional area of bottom plate 1.
Referring to fig. 1 and 2, two joint grooves 5 have been seted up to one side of apron 3, joint groove 5 extends to two terminal surfaces of apron 3 along the horizontal direction, the position in two joint grooves 5 respectively with 2 corresponding and with the cooperation of 2 joints of riser in coexistence board position, when coexistence board 2 inserted two joint grooves 5 respectively, accomplish apron 3 and riser 2 and be the installation of piping lane prefab, insert joint groove 5 for riser 2 is convenient for, the one end that bottom plate 1 was kept away from to riser 2 is provided with the chamfer.
Continuing to refer to fig. 1 and fig. 2, after inserting joint groove 5 for further reinforcing riser 2, stability between apron 3 and the riser 2, the equal fixedly connected with joint board 6 in one side that riser 2 kept away from mutually, joint board 6 includes vertical portion 601 and horizontal part 602, wherein the equal fixed connection of horizontal part 602 in riser 2, the equal fixed connection of vertical portion 601 is in the one end that riser 2 was kept away from to horizontal part 602, riser 2 card is gone into behind joint groove 5, apron 3 butt supports tight apron 3 in the top of horizontal part 602 and the one side of vertical portion 601 orientation riser 2, and then further fixes apron 3 position, joint board 6 has threely along horizontal direction evenly distributed, with the stability of its position after further reinforcing apron 3 installation.
Referring to fig. 2, for the installation of apron 3, be provided with the guide on the apron 3 for being convenient for, the guide is vertical and fixed connection in apron 3 gib block 7, gib block 7 corresponds with each joint board 6 of two risers 2 and is provided with six, vertical portion 601 is seted up and is corresponded and follow the guide way 8 that vertical direction extended to vertical portion 601 top with gib block 7 position, gib block 7 and the cooperation of sliding of guide way 8 to play the guide effect when installing apron 3.
The implementation principle of this application embodiment pipe gallery prefab does: lay utility tunnel structure, at first insert two joint grooves 5 of apron 3 with two risers 2, make each vertical portion 601 support tight apron 3, and then accomplish the concatenation of single piping lane prefab, arrange the installation in proper order with a plurality of piping lane prefabs afterwards and can accomplish laying to the utility tunnel, use this structure to lay the utility tunnel, make the assembly construction volume when the utility tunnel shaping less, construction process is simple, and the transportation is convenient, and then be convenient for the staff to install the utility tunnel structure fast, the guide bar 7 plays the guide effect when apron 3 and riser 2 are installed with the cooperation of guide way 8, and then the staff of being convenient for inserts the joint groove 5 of apron 3 with riser 2.
The embodiment of the application further discloses an assembled rectangle utility tunnel. Referring to fig. 3 and 4, the assembled rectangular utility tunnel includes a bottom plate 1, a vertical plate 2, a cover plate 3, a clamping plate 6, a base 4 and a connecting plate 9, wherein the connection relationship and the position relationship between the bottom plate 1, the vertical plate 2, the cover plate 3, the clamping plate 6 and the base 4 and the parts of the prefabricated member of the pipe gallery are the same, and therefore, the description is omitted here.
Continuing to refer to fig. 3 and 4, bottom plate 1, riser 2, base 4 and apron 3 follow the horizontal direction and laminate the distribution end to end in proper order, be convenient for connect spare part, two inserted blocks 10 of the equal fixedly connected with in one side of apron 3 and 1 horizontal direction of bottom plate, jack 11 that corresponds with each inserted block 10 position is all seted up towards one side of inserted block 10 to adjacent apron 3 and bottom plate 1, inserted block 10 is pegged graft with jack 11 and is cooperated, in order to play the guide effect to when each spare part is installed.
Referring to fig. 4, the connecting plate 9 includes a transverse plate portion 901 and two connecting portions 902, the two connecting portions 902 are fixedly connected to one side of the transverse plate portion 901 and distributed along the length direction of the surface where the two connecting portions 902 are located, the two connecting portions 902 are respectively disposed near the two sides of the length direction of the transverse plate portion 901, the connecting grooves 15 are disposed at the top of the cover plate 3, and the two connecting portions 902 of the same connecting plate 9 are respectively in clamping fit with the two connecting grooves 15 of the two adjacent cover plates 3 to further fix the positions of the two cover plates 3.
Referring to fig. 3 and 4, in order to keep the flatness of the top of the cover plate 3, the top of the cover plate 3 has been provided with half-grooves 12, the half-grooves 12 of two adjacent cover plates 3 are spliced to form a containing groove 13, the horizontal plate portion 901 is in clamping fit with the containing groove 13, when two connecting portions 902 of the same connecting plate 9 are inserted into two connecting grooves 15 of two cover plates 3, the horizontal plate portion 901 is located in the containing groove 13, after the connecting plate 9 is fixed to two adjacent cover plates 3, the stability of the position of the horizontal plate portion is enhanced, a sealing gasket 14 is bonded and fixed on one groove wall of the connecting groove 15 in the horizontal direction, when the connecting portion 902 is inserted into the connecting groove 15.
The implementation principle of an assembled rectangle utility tunnel of the embodiment of this application does: at first insert two joint grooves 5 of apron 3 with two risers 2, make each vertical portion 601 support tight apron 3, and then accomplish the concatenation of single piping lane prefab, insert the inserted block 10 of each apron 3 and bottom plate 1 into adjacent apron 3 and bottom plate 1's jack 11 and then accomplish the range of each piping lane prefab afterwards, insert connecting plate 9 again and can accomplish laying to the utility tunnel with spread groove 13 and spread groove 15, the assembly construction volume when the utility tunnel shaping is less, construction process is simple, and the transportation is convenient, and then be convenient for the staff to install the utility tunnel structure fast, connecting plate 9 plays further limiting displacement behind the installation of adjacent two apron 3 with the cooperation of spread groove 15, thereby be favorable to further reinforcing after adjacent two apron 3 splices mutually, the stability of its position.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (5)

1. A piping lane prefab which characterized in that: including bottom plate (1), riser (2) and apron (3), riser (2) are just to being provided with two, and two equal fixed connection in the top of bottom plate (1) riser (2), joint groove (5) have been seted up to one side of apron (3), joint groove (5) are provided with two and are corresponding with coexistence board (2) respectively, riser (2) and joint groove (5) joint cooperation, be provided with the guide on apron (3), the guide is used for leading to the installation of apron (3).
2. A tube lane preform according to claim 1, wherein: the vertical plates (2) are fixedly connected with clamping plates (6), and when the vertical plates (2) are inserted into the clamping grooves (5), the clamping plates (6) are tightly abutted to one side of the cover plate (3).
3. A tube lane preform according to claim 2, wherein: the clamping plates (6) are arranged in a plurality along the horizontal direction.
4. A tube lane preform according to claim 2, wherein: the guide piece is vertical and fixedly connected with a guide strip (7) of the cover plate (3), a guide groove (8) which corresponds to the guide strip (7) in position and extends along the vertical direction is formed in the clamping plate (6), and the guide strip (7) is matched with the guide groove (8) in a sliding mode.
5. A tube lane preform according to claim 1, wherein: and a chamfer is arranged at one end of the vertical plate (2) far away from the bottom plate (1).
CN202022346943.3U 2020-10-20 2020-10-20 Piping lane prefab and assembled rectangle utility tunnel Active CN213597032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022346943.3U CN213597032U (en) 2020-10-20 2020-10-20 Piping lane prefab and assembled rectangle utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022346943.3U CN213597032U (en) 2020-10-20 2020-10-20 Piping lane prefab and assembled rectangle utility tunnel

Publications (1)

Publication Number Publication Date
CN213597032U true CN213597032U (en) 2021-07-02

Family

ID=76591522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022346943.3U Active CN213597032U (en) 2020-10-20 2020-10-20 Piping lane prefab and assembled rectangle utility tunnel

Country Status (1)

Country Link
CN (1) CN213597032U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045208A (en) * 2022-06-23 2022-09-13 广东东楚建设有限公司 Assembled underground box culvert of superimposed sheet form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045208A (en) * 2022-06-23 2022-09-13 广东东楚建设有限公司 Assembled underground box culvert of superimposed sheet form

Similar Documents

Publication Publication Date Title
CN105696706B (en) A kind of plug-in type assembled house
CN207934022U (en) A kind of assembled underground continuous wall
CN206844147U (en) Full prefabricated modular assembled pipe gallery
CN204356907U (en) The syndeton of columns supported integrated building module
CN109208787B (en) Assembly type shear wall connecting structure and construction method thereof
CN111287219B (en) Prefabricated assembled cable working well and construction method thereof
CN213597032U (en) Piping lane prefab and assembled rectangle utility tunnel
CN105401593A (en) Assembly type square underground pipe gallery
CN111636906A (en) Connecting water-stopping structure between pipe joints of transverse bearing pipe curtain and construction method thereof
CN107060150B (en) Prefabricated assembled integral frame filling wall system and construction method thereof
CN110029753A (en) A kind of crack resistence exempts from float strips board wall body and construction method
CN207878505U (en) A kind of prefabricated piping lane of assembly concrete
CN114197521A (en) Waterproof structure of box culvert movement joint
CN211973568U (en) Precast concrete culvert pipe and prefabricated utility tunnel
CN106760173B (en) Prefabricated plate at post-pouring zone of basement outer wall
CN109629664B (en) basement construction method based on assembled resin concrete drainage ditch
CN113931339B (en) Composite prefabricated outer wall structure of prefabricated building and construction method thereof
CN214364434U (en) Assembled constructional column suitable for prefabricated wallboard of frame construction
CN210195028U (en) Slat internal partition wall door opening structure and internal partition wall
CN211735513U (en) Prefabricated assembled energy-conserving utility tunnel
CN114060042A (en) Binding structure of concrete pipe joint and construction method thereof
CN211773881U (en) Prefabricated utility tunnel's installation component
CN211922702U (en) Prefabricated cable utility tunnel
CN210195027U (en) Prevent partition wall door opening structure and interior partition wall in ftractureing slat