CN213596967U - Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped - Google Patents

Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped Download PDF

Info

Publication number
CN213596967U
CN213596967U CN202022598619.0U CN202022598619U CN213596967U CN 213596967 U CN213596967 U CN 213596967U CN 202022598619 U CN202022598619 U CN 202022598619U CN 213596967 U CN213596967 U CN 213596967U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
steel
fixed
iron plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022598619.0U
Other languages
Chinese (zh)
Inventor
李建文
李广盼
王晓坡
刘帅
秦晓伟
李欣
苏明
甄虎
徐岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN202022598619.0U priority Critical patent/CN213596967U/en
Application granted granted Critical
Publication of CN213596967U publication Critical patent/CN213596967U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a drilling bored concrete pile steel reinforcement cage temporary fixation equips, including four steel reinforcement cage that are the rectangle structural arrangement, per two steel reinforcement cage places for a set of symmetry, per two be provided with a plurality of fixed arc muscle and a fixed iron plate on the steel reinforcement cage, and is a plurality of fixed arc muscle sets up side by side and connects and be a set of on the steel reinforcement cage, fixed iron plate connects and is a set of steel reinforcement cage's bottom, one of them steel reinforcement cage's both ends are connected with the sleeve, be provided with the inserted bar in the sleeve, the top of inserted bar sets up to the crotch. The utility model discloses think about ingenious, compact structure is reasonable, utilizes the fixed arc muscle of different positions, realizes the temporary fixation of drilling bored concrete pile steel reinforcement cage under the different elevation circumstances, and need not weld with the steel reinforcement cage, can cyclic utilization, has characteristics such as cost of manufacture low, convenient operation, safe in utilization, work efficiency height.

Description

Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped
Technical Field
The utility model relates to a pile foundation construction equipment field especially relates to a drilling bored concrete pile steel reinforcement cage temporary fixation equips.
Background
At present, with more and more urban roads, local roads and expressways, the construction quantity of bridge projects is increased. The construction quality of the bored pile directly influences the construction quality of bridge engineering, and the conventional method adopts fixed-length hanging bars for fixing when a reinforcement cage of the bored pile is temporarily fixed, so that the method is complex to operate, high in requirement on the size of the hanging bars and long in construction time.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a drilling bored concrete pile steel reinforcement cage temporary fixation equips, the problem of solution.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to a drilling bored concrete pile steel reinforcement cage temporary fixation equips, including four steel reinforcement cage that are the rectangle structural arrangement, per two steel reinforcement cage places for a set of symmetry, per two be provided with a plurality of fixed arc muscle and a fixed iron plate on the steel reinforcement cage, and is a plurality of fixed arc muscle sets up side by side and connects and be a set of on the steel reinforcement cage, fixed iron plate connects and is a set of steel reinforcement cage's bottom, one of them steel reinforcement cage's both ends are connected with the sleeve, be provided with the inserted bar in the sleeve, the top of inserted bar sets up to the crotch.
It is further, a plurality of fixed arc muscle is equidistant arranges and welds two on steel reinforcement cage's the opposite face, it is a plurality of fixed arc muscle is followed steel reinforcement cage's well lower part is arranged the top, and the bottom welding of two steel reinforcement cage is in the both sides of fixed iron plate, the sleeve welding is in on steel reinforcement cage's the lateral surface.
Still further, the fixed iron plate specifically adopts square steel plate, a U-shaped breach has been seted up on the square steel plate, the edge of fixed iron plate just is located the upper and lower both sides welding of U-shaped breach has two the sleeve.
Still further, the steel reinforcement framework adopts phi 16 round steel, and the fixed arc-shaped rib adopts phi 10 round steel.
Compared with the prior art, the utility model discloses a beneficial technological effect:
the utility model relates to a drilling bored concrete pile steel reinforcement cage temporary fixation equips, including four steel reinforcement cage, a plurality of fixed arc muscle and two fixed iron plates, a plurality of fixed arc muscle sets up the welding side by side on two steel reinforcement cage, and the welding of a fixed iron plate is in this group steel reinforcement cage's bottom, is connected with the sleeve of placing the inserted bar on a steel reinforcement cage, and the top of inserted bar sets up to the crotch. During the use, carry out ground drilling at selected bored concrete pile position, the open-top department of drilling is provided with protects a section of thick bamboo, and the top of protecting a section of thick bamboo is passed through the sleeper location, then places two sets of steel reinforcement cage symmetries that the welding is good, places the interim fixed equipment that forms the rectangular structure in the drilling through protecting a section of thick bamboo, places the steel reinforcement cage inside this interim fixed equipment again, and the setting is finalized the design after concrete placement is accomplished, reachs the settlement time, takes out two sets of steel reinforcement cage through the crotch at inserted bar top. The utility model discloses think about ingenious, compact structure is reasonable, utilizes the fixed arc muscle of different positions, realizes the temporary fixation of drilling bored concrete pile steel reinforcement cage under the different elevation circumstances, and need not weld with the steel reinforcement cage, can cyclic utilization, has characteristics such as cost of manufacture low, convenient operation, safe in utilization, work efficiency height.
Drawings
The present invention will be further explained with reference to the following description of the drawings.
Fig. 1 is a schematic view of the temporary fixing equipment for the bored concrete pile reinforcement cage of the present invention;
FIG. 2 is a schematic view of the present invention in use;
description of reference numerals: 1. a steel reinforcement cage; 2. inserting a rod; 3. fixing the arc-shaped ribs; 4. fixing the iron plate; 5. a collar; 6. a reinforcement cage; 7. protecting the cylinder; 8. crossties; 9. and (3) soil.
Detailed Description
As shown in fig. 1, a drilling bored concrete pile steel reinforcement cage temporary fixation is equipped, including being four steel reinforcement cage 1 that the rectangle structure arranged, per two steel reinforcement cage 1 is a set of symmetry and places, per two be provided with a plurality of fixed arc muscle 3 and a fixed iron plate 4 on the steel reinforcement cage 1, and is a plurality of fixed arc muscle 3 sets up side by side and connects and be a set of on the steel reinforcement cage 1, fixed iron plate 4 connects and is a set of steel reinforcement cage 1's bottom, one of them steel reinforcement cage 1's both ends are connected with sleeve 5, be provided with inserted bar 2 in the sleeve 5, the top of inserted bar 2 sets up to the crotch.
It is specific, a plurality of fixed arc muscle 3 equidistant arrange and weld two on framework 1's the opposite face, it is a plurality of fixed arc muscle 3 follows framework 1's well lower part is arranged the top, and the bottom welding of two framework 1 is in fixed iron plate 4's both sides, the welding of sleeve 5 is in on framework 1's the lateral surface.
The fixed iron plate 4 specifically adopts a square steel plate, a U-shaped notch is formed in the square steel plate, and the edge of the fixed iron plate 4 is located at the upper side and the lower side of the U-shaped notch, and the two sleeves 5 are welded to the upper side and the lower side of the U-shaped notch.
The steel bar framework 1 is made of phi 16 round steel, and the fixed arc-shaped ribs 3 are made of phi 10 round steel.
The utility model discloses a use as follows:
as shown in fig. 2, when the device is used, ground drilling is carried out at a selected cast-in-place pile position, a pile casing 7 is arranged at an opening at the top of the drilled hole, sleepers 8 are arranged beside the pile casing, the temporary fixing equipment 1 is symmetrically arranged, the reinforcement cage 6 is connected with the temporary fixing equipment, after concrete pouring is finished, shaping is carried out, set time is reached, and two groups of reinforcement cages are taken out through hooks at the tops of the inserted rods 5; because the periphery side of the temporary fixing equipment is soil 9, the temporary fixing equipment is convenient to take out and has small resistance. Specifically, the upper end of the temporary fixing equipment is connected with a cross arm on the sleeper 8 through the fixed arc-shaped rib 3, and the lower end of the temporary fixing equipment is connected with a reinforcement cage. The top elevation of the bored pile reinforcement cage during fixing can be adjusted as long as the cross arm passes through the fixed arc-shaped ribs at different positions.
The utility model discloses utilize the fixed arc muscle of different positions, top surface elevation when adjusting drilling bored concrete pile steel reinforcement cage and fixing can realize interim fixed equipment's reuse. Meanwhile, the temporary fixing equipment and the reinforcement cage do not need to be welded, the installation is convenient, and the construction efficiency of the cast-in-situ bored pile can be improved.
The above-mentioned embodiments are only intended to describe the preferred embodiments of the present invention, but not to limit the scope of the present invention, and those skilled in the art should also be able to make various modifications and improvements to the technical solution of the present invention without departing from the spirit of the present invention, and all such modifications and improvements are intended to fall within the scope of the present invention as defined in the appended claims.

Claims (4)

1. The utility model provides a drilling bored concrete pile steel reinforcement cage is fixed equipment temporarily which characterized in that: including four steel reinforcement cage that are the rectangle structure and arrange, per two steel reinforcement cage places for a set of symmetry, per two steel reinforcement cage is last to be provided with a plurality of fixed arc muscle and a fixed iron plate, and is a plurality of fixed arc muscle sets up side by side to be connected and is a set of steel reinforcement cage is last, fixed iron plate connects and is a set of steel reinforcement cage's bottom, and one of them steel reinforcement cage's both ends are connected with the sleeve, be provided with the inserted bar in the sleeve, the top of inserted bar sets up to the crotch.
2. The bored pile reinforcement cage temporary fixation apparatus as set forth in claim 1, wherein: it is a plurality of fixed arc muscle is equidistant arranges and welds two on steel reinforcement frame's the opposite face, it is a plurality of fixed arc muscle is followed steel reinforcement frame's well lower part is arranged to the top, and the bottom welding of two steel reinforcement frame is in the both sides of fixed iron plate, the sleeve welding is in on steel reinforcement frame's the lateral surface.
3. The bored pile reinforcement cage temporary fixation apparatus as set forth in claim 2, wherein: the fixed iron plate specifically adopts square steel plate, a U-shaped gap has been seted up on the square steel plate, the edge of fixed iron plate just is located the upper and lower both sides welding of U-shaped gap has two the sleeve.
4. The bored pile reinforcement cage temporary fixation apparatus as set forth in claim 1, wherein: the steel bar framework adopts phi 16 round steel, and the fixed arc-shaped rib adopts phi 10 round steel.
CN202022598619.0U 2020-11-11 2020-11-11 Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped Active CN213596967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022598619.0U CN213596967U (en) 2020-11-11 2020-11-11 Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022598619.0U CN213596967U (en) 2020-11-11 2020-11-11 Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped

Publications (1)

Publication Number Publication Date
CN213596967U true CN213596967U (en) 2021-07-02

Family

ID=76595632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022598619.0U Active CN213596967U (en) 2020-11-11 2020-11-11 Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped

Country Status (1)

Country Link
CN (1) CN213596967U (en)

Similar Documents

Publication Publication Date Title
CN209066909U (en) A kind of reinforcing bar positioning check device
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN210242766U (en) Highway subgrade settlement observation device
CN213596967U (en) Drilling bored concrete pile steel reinforcement cage temporary fixation is equipped
CN204982673U (en) Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash
CN211464691U (en) Pile cap reinforcing bar net piece making devices
CN213204093U (en) Structure for preventing reinforcement cage from floating upwards in concrete pouring process
CN215053203U (en) A structure is buried underground to protruding basic surface support for fixing buried bolt in advance
CN214194505U (en) Precast pile splicing device and precast pile
CN212357850U (en) Grid for improvement of road engineering foundation soil body
CN209339172U (en) Novel pile plate composite foundation
CN211922777U (en) Device for cleaning silt in vertical concrete pile core
CN206887746U (en) A kind of concrete circular stub binder backward construction column-form
CN209323552U (en) A kind of ground base enforcement device
CN108590042B (en) Multifunctional stirrup for controlling thickness of steel bar protection layer and floor slab
CN211143507U (en) Adjustable longitudinal rib positioning device for frame column of shear wall
CN212671806U (en) River bottom tunnel shield working well
CN220394617U (en) Karst geology is with bridge pile foundation
CN205614240U (en) Bored concrete pile steel reinforcement cage owner muscle interval fixing tool
CN109440800A (en) Novel pile-plate composite foundation and construction method
CN220353436U (en) Tool type steel bar support frame for binding cast-in-situ concrete beam steel bars
CN217949119U (en) Reinforced concrete frame lattice formula tower crane basis
CN211621636U (en) Reinforcing apparatus is used in construction of water conservancy diversion cofferdam
CN209837082U (en) Assembled fence basis rapid construction device
CN214573947U (en) Tubular column positioning tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant