CN213595822U - Shear force crane is removed in construction of house wall building - Google Patents
Shear force crane is removed in construction of house wall building Download PDFInfo
- Publication number
- CN213595822U CN213595822U CN202022606062.0U CN202022606062U CN213595822U CN 213595822 U CN213595822 U CN 213595822U CN 202022606062 U CN202022606062 U CN 202022606062U CN 213595822 U CN213595822 U CN 213595822U
- Authority
- CN
- China
- Prior art keywords
- base
- guardrail
- shear
- frame
- main station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a shear force crane is removed in construction of house wall building, include: the lifting frame body, the shear frame, the base, the support arm, the roller and the standing frame; the bottom of the lifting frame body is provided with a base; a shear frame is arranged above the base and is fixedly connected with the base; support arms are arranged on two sides of the base and connected with the base through a rotating shaft; the bottom of the base is provided with a roller; a stand frame is arranged at the top of the shear frame; a main station plate is arranged on the station frame; the main station board is provided with two extension boards, and the extension boards are connected with the main station board in a sliding manner; the utility model discloses a to the improvement of a building wall building construction removal shear force crane, it is reasonable to have a structural design, and extension board and guardrail can all extend, increase constructor range of motion's advantage to the effectual problem of having solved current device appearance is with not enough.
Description
Technical Field
The utility model relates to a construction facilities technical field, more specifically the theory that says so especially relates to a shear force crane is removed in construction of house wall building.
Background
During building construction of house wall surfaces, construction personnel are lifted by a lifting device and then operated, and the lifting device used during building construction is a shear lifting frame at present.
However, the space of the personnel standing frame at the top of the currently used shear lifting frame is small, the size of the personnel standing frame is similar to the size of the overlooking area of the shear frame, the moving range of construction operators is small, and the use is very inconvenient.
In view of this, research improvement is carried out to current problem, provides a building wall construction removal shear force crane, has structural design rationally, and extension board and guardrail can all extend, increase constructor range of motion's advantage, aims at through this technique, reaches the purpose of problem solution and improvement practical value nature.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a shear force crane is removed in construction of house wall building to the problem of proposing in solving above-mentioned background art with not enough.
In order to achieve the above object, the utility model provides a shear force crane is removed in construction of house wall building is reached by following specific technological means: the utility model provides a shear force crane is removed in construction of house wall, includes: the lifting frame comprises a lifting frame body, a shear frame, a base, a support arm, a roller, a station frame, a main station plate, an extension plate, a main guardrail, a left guardrail and a right guardrail; the bottom of the lifting frame body is provided with a base; a shear frame is arranged above the base and is fixedly connected with the base; support arms are arranged on two sides of the base and connected with the base through a rotating shaft; the bottom of the base is provided with a roller; a stand frame is arranged at the top of the shear frame; a main station plate is arranged on the station frame; the main station board is provided with two extension boards, and the extension boards are connected with the main station board in a sliding manner; main guardrails are arranged at two ends of the upper side of the main station board, and the main guardrails are connected with the main station board in a fixed mode; the both sides of main station board are provided with left guardrail and right guardrail, and left guardrail and right guardrail are connected through the slip mode with main station board.
As a further optimization of the technical scheme, open slots are formed in two sides of the main station board and are arranged up and down.
As a further optimization of the technical scheme, the overlooking appearance characteristics of the extension plates are in a T shape, and the two extension plates are respectively arranged on two sides of the main station plate.
As a further optimization of the technical scheme, the overlooking appearance characteristics of the left guardrail and the right guardrail are in a Contraband shape, and the left guardrail and the right guardrail are arranged in a vertically staggered manner.
As a further optimization of the technical scheme, the appearance characteristic of the main guardrail is n-shaped, and three parallel connecting rods are arranged inside the main guardrail.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the two sides of the main station plate are provided with open slots, and the open slots are arranged vertically, so that the extension plate is convenient to fix, and the moving range of constructors is increased.
2. Overlooking appearance characteristics of the extension plates are in a T shape, the two extension plates are arranged on two sides of the main station plate respectively and extend to two sides of the main station plate, and the moving range of constructors is enlarged.
3. Look down appearance characteristic through left guardrail and right guardrail is "Contraband" form, and left guardrail and right guardrail be staggered arrangement's setting from top to bottom, play the guard action after extending, can be with left guardrail and right guardrail shrink moreover.
4. The utility model discloses a to the improvement of a building wall building construction removal shear force crane, it is reasonable to have a structural design, and extension board and guardrail can all extend, increase constructor range of motion's advantage, thereby effectual solution the utility model discloses the problem that proposes in background art one with not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic view of an axial measurement structure of the present invention;
fig. 2 is a schematic view of an extended-state pedestal axis measurement structure of the present invention;
fig. 3 is a side view of the folding stand of the present invention;
fig. 4 is a schematic view of the folding-state stand axial measurement structure of the present invention;
FIG. 5 is a schematic view of the main station board axial measurement structure of the present invention;
fig. 6 is a schematic view of the structure of the extension board shaft of the present invention.
In the figure: the lifting frame comprises a lifting frame body 1, a shear frame 2, a base 3, a support arm 4, a roller 5, a standing frame 6, a main standing plate 601, an extension plate 602, a main guardrail 603, a left guardrail 604 and a right guardrail 605.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 6, a shear crane for building construction of a wall surface of a house includes: the lifting frame comprises a lifting frame body 1, a shear frame 2, a base 3, a support arm 4, a roller 5, a standing frame 6, a main standing plate 601, an extension plate 602, a main guardrail 603, a left guardrail 604 and a right guardrail 605; the bottom of the lifting frame body 1 is provided with a base 3; a shear frame 2 is arranged above the base 3, and the shear frame 2 is connected with the base 3 in a fixed mode; two sides of the base 3 are provided with support arms 4, and the support arms 4 are connected with the base 3 through a rotating shaft; the bottom of the base 3 is provided with a roller 5; a stand frame 6 is arranged at the top of the shear frame 2; a main station board 601 is arranged on the station frame 6; two extension plates 602 are arranged on the main station plate 601, and the extension plates 602 are connected with the main station plate 601 in a sliding manner; the two ends of the upper side of the main station board 601 are provided with main guardrails 603, and the main guardrails 603 are fixedly connected with the main station board 601; the left guardrail 604 and the right guardrail 605 are arranged on two sides of the main station board 601, and the left guardrail 604 and the right guardrail 605 are connected with the main station board 601 in a sliding manner.
Specifically, as shown in fig. 5, open slots are formed in both sides of the main station board 601, and the open slots are arranged up and down, so that the extension board 602 can be fixed conveniently, and the range of motion of constructors can be increased.
Specifically, as shown in fig. 6, the top view appearance of the extension plate 602 is "T" shaped, and the two extension plates 602 are respectively disposed on two sides of the main station plate 601 and extend on two sides of the main station plate 601, so as to increase the range of motion of the constructors.
Specifically, as shown in fig. 3 and 4, the top-view appearance features of the left guard rail 604 and the right guard rail 605 are "Contraband", and the left guard rail 604 and the right guard rail 605 are arranged in a vertically staggered manner, so as to protect the extended left guard rail 604 and the right guard rail 605, and the left guard rail 604 and the right guard rail 605 can be retracted.
Specifically, as shown in fig. 1 and fig. 2, the main guard rail 603 is shaped like a "n", and three parallel connecting rods are disposed inside the main guard rail 603 to enhance the protection effect.
The method comprises the following specific implementation steps: when using this shear force crane is removed in building construction of house wall, remove crane body 1 to the construction site, adjust support arm 4 and fix crane body 1, when the area that needs the construction is great, at first the extension board 602 of 6 both sides of standing, expand left guardrail 604 and right guardrail 605 simultaneously, increase constructor's home range, make again shear force frame 2 rise to the construction height, this shear force crane is removed in building construction of house wall, structural design is reasonable, extension board and guardrail can all extend, increase constructor home range's advantage, construction's user demand has been satisfied.
In summary, the following steps: according to the movable shear lifting frame for building wall construction, open slots are formed in two sides of a main station plate, and are arranged up and down, so that an extension plate can be fixed conveniently, and the moving range of constructors is increased; the overlooking appearance characteristics of the extension plates are in a T shape, and the two extension plates are respectively arranged on two sides of the main station plate and extend on two sides of the main station plate, so that the moving range of constructors is increased; the overlooking appearance characteristics of the left guardrail and the right guardrail are Contraband, and the left guardrail and the right guardrail are arranged in a vertically staggered manner, so that the protection effect is achieved after the left guardrail and the right guardrail are extended, and the left guardrail and the right guardrail can be retracted; through the improvement to a building wall building construction removes shear force crane, it is reasonable to have structural design, and extension board and guardrail can all extend, increase constructor home range's advantage to effectual solution the utility model discloses the problem that proposes in the background art is with not enough.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a shear force crane is removed in construction of house wall, includes: the lifting frame comprises a lifting frame body (1), a shear frame (2), a base (3), a support arm (4), rollers (5), a standing frame (6), a main station plate (601), an extension plate (602), a main guardrail (603), a left guardrail (604) and a right guardrail (605); the method is characterized in that: a base (3) is arranged at the bottom of the lifting frame body (1); a shear frame (2) is arranged above the base (3), and the shear frame (2) is fixedly connected with the base (3); support arms (4) are arranged on two sides of the base (3), and the support arms (4) are connected with the base (3) through rotating shafts; the bottom of the base (3) is provided with a roller (5); a standing frame (6) is arranged at the top of the shear frame (2); a main station plate (601) is arranged on the station frame (6); two extension plates (602) are arranged on the main station plate (601), and the extension plates (602) are connected with the main station plate (601) in a sliding manner; the two ends of the upper side of the main station board (601) are provided with main guardrails (603), and the main guardrails (603) are fixedly connected with the main station board (601); the two sides of the main station board (601) are provided with a left guardrail (604) and a right guardrail (605), and the left guardrail (604) and the right guardrail (605) are connected with the main station board (601) in a sliding mode.
2. The shear crane is removed in building wall construction according to claim 1, its characterized in that: open slots are formed in the two sides of the main station board (601), and the open slots are arranged up and down.
3. The shear crane is removed in building wall construction according to claim 1, its characterized in that: the overlooking appearance characteristics of the extension plates (602) are in a T shape, and the two extension plates (602) are respectively arranged on two sides of the main station plate (601).
4. The shear crane is removed in building wall construction according to claim 1, its characterized in that: the overlooking appearance characteristics of the left guardrail (604) and the right guardrail (605) are Contraband-shaped, and the left guardrail (604) and the right guardrail (605) are arranged in a vertically staggered manner.
5. The shear crane is removed in building wall construction according to claim 1, its characterized in that: the appearance characteristic of the main guardrail (603) is n-shaped, and three parallel connecting rods are arranged inside the main guardrail (603).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022606062.0U CN213595822U (en) | 2020-11-12 | 2020-11-12 | Shear force crane is removed in construction of house wall building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022606062.0U CN213595822U (en) | 2020-11-12 | 2020-11-12 | Shear force crane is removed in construction of house wall building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213595822U true CN213595822U (en) | 2021-07-02 |
Family
ID=76595402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022606062.0U Expired - Fee Related CN213595822U (en) | 2020-11-12 | 2020-11-12 | Shear force crane is removed in construction of house wall building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213595822U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113716503A (en) * | 2021-11-01 | 2021-11-30 | 山东金科星机电股份有限公司 | Intelligent lifting device based on farm house inspection and control method thereof |
-
2020
- 2020-11-12 CN CN202022606062.0U patent/CN213595822U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113716503A (en) * | 2021-11-01 | 2021-11-30 | 山东金科星机电股份有限公司 | Intelligent lifting device based on farm house inspection and control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213595822U (en) | Shear force crane is removed in construction of house wall building | |
CN207296338U (en) | One kind builds work elevating scaffold | |
CN111894440A (en) | Electric power overhauls support convenient to remove transport | |
CN215926629U (en) | Scaffold frame that building engineering used | |
CN212065492U (en) | Retractable rat-proof baffle | |
CN111186800A (en) | Portable power maintenance device | |
CN211524298U (en) | Line engineering iron tower | |
CN213204908U (en) | High movable scaffold frame of stability | |
CN212669157U (en) | Telescopic bracket for overhauling substation equipment | |
CN209799326U (en) | liftable oblique-pulling operation platform | |
CN206874213U (en) | A kind of herringbone lift | |
CN207973477U (en) | A kind of construction Machines elevator | |
CN217420455U (en) | Telescopic vertical rod | |
CN219792437U (en) | Portable high-altitude operation platform | |
CN218240270U (en) | Explosion-proof electrical apparatus protection performance test bench | |
CN206164003U (en) | A erect instrument for 10kV overhead line | |
CN218562944U (en) | Engineering construction scaffold | |
CN215221033U (en) | Road lightning grounding device | |
CN210391381U (en) | Side wall limiting mounting bracket for left and right of automobile | |
CN214091676U (en) | Electric power construction is with cat ladder of ascending a height | |
CN212642175U (en) | High-rise public building construction is with platform of unloading | |
CN210939620U (en) | Engineering plastic plate drilling machine | |
CN214495633U (en) | Operation platform for electric power installation | |
CN217996679U (en) | A lifting device for construction is built in room | |
CN220909334U (en) | Guardrail protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210702 Termination date: 20211112 |
|
CF01 | Termination of patent right due to non-payment of annual fee |