CN213572702U - Vertical column roughening rain shelter - Google Patents

Vertical column roughening rain shelter Download PDF

Info

Publication number
CN213572702U
CN213572702U CN202021882414.9U CN202021882414U CN213572702U CN 213572702 U CN213572702 U CN 213572702U CN 202021882414 U CN202021882414 U CN 202021882414U CN 213572702 U CN213572702 U CN 213572702U
Authority
CN
China
Prior art keywords
rod
horizontal
frame
rods
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021882414.9U
Other languages
Chinese (zh)
Inventor
宁英杰
黄晓伟
白丽辉
赵颖超
龚世文
黄祎涵
何英东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Communications Construction Group Co Ltd filed Critical Zhejiang Communications Construction Group Co Ltd
Priority to CN202021882414.9U priority Critical patent/CN213572702U/en
Application granted granted Critical
Publication of CN213572702U publication Critical patent/CN213572702U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The upright post roughening rain shelter comprises a ceiling, a plurality of bearing rods, a plurality of frame rods, a plurality of horizontal rods and at least two connecting rod groups; the end parts of the horizontal rod and the frame rod are connected to the top of the bearing rod, the frame rod is positioned above the horizontal rod, and one end of the frame rod, facing the bearing rod, is downwards inclined and is connected with the top of the bearing rod; the ceiling is connected to the frame rods, and the size of the ceiling corresponds to the size formed by the frame rods; the connecting rod groups are connected below the horizontal rods, the connecting rod groups are connected to the horizontal rods on the two outermost sides, and the connecting rod groups on the two sides are arranged inwards relatively; a horizontal support rod is connected between the tops of the bearing rods; compared with the prior art, bearing bar, horizontal support pole and horizon bar form the frame construction of the canopy body, through set up connecting rod group under the horizon bar, through being connected the connecting rod group and the stand and realize being connected of canopy, and through the connecting rod group and the different positions of stand be connected the flexible of canopy that realizes.

Description

Vertical column roughening rain shelter
Technical Field
The utility model belongs to the technical field of the concrete chisel hair, especially, relate to a stand chisel hair rainshelter.
Background
The concrete is chiseled, in order to be firmly adhered, the surface of the concrete is chiseled according to the requirement, the chiseled surface is cleaned, floating ash, mortar, oil stain and the like are used, the chiseled operation is used for chiseling the hardened emulsion skin on the surface of the old concrete to form a rough surface, the chiseling depth is based on that 1/3-1/2 of stones on the old concrete are exposed, in order to ensure that a base layer surface and bottom layer mortar are better bonded, loose concrete, mortar slag and the like on the base layer surface are cleaned, the protruding obvious part on the base layer surface of the concrete wall surface and the smooth concrete surface need to be chiseled. It is necessary to repair for significant depressions to be present.
When needs carry out the chisel hair during operation at the stand, because current chisel hair work adopts artifical chisel hair to carry out the operation usually, when the workman carries out chisel hair work, when the stand size is too big, there is certain difficulty in workman's chisel hair operation, and when facing when raining, can influence workman's chisel hair operation.
SUMMERY OF THE UTILITY MODEL
The utility model relates to an overcome the defect among the above-mentioned prior art, provide a simple structure, the chisel hair of being convenient for, stand chisel hair canopy that hides wind and keeps off the rain.
In order to achieve the above purpose, the utility model adopts the technical scheme that: the upright post roughening rain shelter comprises a ceiling, a plurality of bearing rods, a plurality of frame rods, a plurality of horizontal rods and at least two connecting rod groups; the end parts of the horizontal rod and the frame rod are connected to the top of the bearing rod, the frame rod is positioned above the horizontal rod, and one end of the frame rod, facing the bearing rod, is downwards inclined and is connected with the top of the bearing rod; the ceiling is connected to the frame rods, and the size of the ceiling corresponds to the size formed by the frame rods; the connecting rod groups are connected below the horizontal rods, the connecting rod groups are connected to the horizontal rods on the two outermost sides, and the connecting rod groups on the two sides are arranged inwards relatively; and a horizontal support rod is connected between the tops of the bearing rods.
As an optimized scheme of the utility model, the quantity of bearing bar, frame pole and horizon bar is unanimous, and the top of bearing bar links to each other simultaneously with the tip of corresponding frame pole and the tip of horizon bar.
As an optimized scheme of the utility model, the length of ceiling sets up along the length of frame pole, and the ceiling is consistent with the horizontal width of many frame poles towards the one end downward sloping of bearing bar, the width of ceiling.
As an optimized scheme of the utility model, the position of horizon bar and frame pole is corresponding, and the horizon bar and the frame pole of same position department are located same vertical face.
As a preferred scheme of the utility model, even there is at least one connecting rod group on the horizon bar.
As the utility model discloses a preferred scheme, connecting rod group includes montant, first horizontal pole and second horizontal pole, and the montant top links to each other with the horizon bar, and first horizontal pole is connected in the montant bottom, and the second horizontal pole is connected in the montant middle part, and is equipped with the down tube between second horizontal pole and the montant, and the down tube is connected in the junction of montant top and horizon bar.
As an optimized scheme of the utility model, first horizontal pole and second horizontal pole parallel arrangement, and first horizontal pole and second horizontal pole orientation are the same.
As an optimized scheme of the utility model, it is adjacent be equipped with cross arrangement's first bracing between the bearing bar, and the bearing bar bottom is equipped with the supporting seat.
As an optimal scheme of the utility model, it is adjacent be equipped with cross arrangement's second bracing between the horizon bar.
As an optimized scheme of the utility model, be equipped with the third bracing of cross arrangement between the horizon bar on the same vertical face and the frame pole.
The beneficial effects of the utility model are that, compare with prior art: bearing bar, horizontal support pole and horizon bar form the frame construction of the canopy body, through set up connecting rod group under the horizon bar, through being connected the connecting rod group with the stand and realizing the connection of weather shed, and through the connecting rod group with the different positions of stand be connected the flexible of realization weather shed, under the effect of first bracing, second bracing and third bracing for weather shed has better support nature.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is a bottom view of the present invention;
FIG. 4 is a diagram illustrating the usage status of the present invention;
reference numbers in the figures: the novel support frame comprises a ceiling 1, a bearing rod 2, a support seat 2-1, a frame rod 3, a horizontal rod 4, a connecting rod group 5, a vertical rod 5-1, a first cross rod 5-2, a second cross rod 5-3, an inclined rod 5-4, a first inclined strut 6, a second inclined strut 7, a third inclined strut 8 and a horizontal support rod 9.
Detailed Description
The following describes embodiments of the present invention in detail with reference to the accompanying drawings.
As shown in fig. 1-4, the pillar-based roughening canopy includes a ceiling 1, a plurality of bearing rods 2, a plurality of frame rods 3, a plurality of horizontal rods 4, and at least two connecting rod sets 5; the end parts of the horizontal rod 4 and the frame rod 3 are connected to the top of the bearing rod 2, the frame rod 3 is positioned above the horizontal rod 4, and one end of the frame rod 3, facing the bearing rod 2, is downwards inclined and is connected with the top of the bearing rod 2; the ceiling 1 is connected to the frame rods 3, and the size of the ceiling 1 corresponds to the size formed by the plurality of frame rods 3; the connecting rod groups 5 are connected below the horizontal rods 4, the connecting rod groups 5 are connected to the horizontal rods 4 on the two outermost sides, and the connecting rod groups 5 on the two sides are arranged inwards oppositely; the top parts of the bearing rods 2 are connected with a horizontal supporting rod 9.
The quantity of bearing bar 2 sets up according to actual need, and all bearing bars 2 are located the coplanar, and all bearing bar 2 parallel arrangement, and the quantity of the frame pole 3 of the same reason sets up according to actual need, and all frame poles 3 are located the coplanar, and all frame poles 3 parallel arrangement, and the quantity of the horizon bar 4 of the same reason sets up according to actual need, and all horizon bars 4 are located the coplanar, and all horizon bars 4 parallel arrangement.
The horizontal support rods 9 are horizontally arranged at the tops of all the bearing rods 2, the horizontal support rods 9 are welded and fixed with the tops of all the bearing rods 2, the horizontal support rods 9 and the horizontal rods 4 form a frame structure of the shed body, and the bearing rods 2, the horizontal support rods 9 and the horizontal rods 4 are welded and fixed.
The number of the bearing rods 2, the number of the frame rods 3 and the number of the horizontal rods 4 are consistent, the top of each bearing rod 2 is connected with the end of the corresponding frame rod 3 and the end of the corresponding horizontal rod 4 at the same time, and the top of each bearing rod 2 is welded and fixed with the end of the corresponding frame rod 3 and the end of the corresponding horizontal rod 4.
The length of ceiling 1 sets up along the length of frame pole 3, and ceiling 1 orientation bearing bar 2's one end downward sloping, and the width of ceiling 1 is unanimous with many frame pole 3's horizontal width, and ceiling 1 passes through ligature or welded fastening with frame pole 3, and ceiling 1 can be plastics or cloth structure as required.
The positions of the horizontal rods 4 and the frame rods 3 correspond to each other, the horizontal rods 4 and the frame rods 3 at the same positions are positioned on the same vertical plane, the horizontal rods 4 and the frame rods 3 are partially arranged in parallel, and the ends of the frame rods 3 are bent downwards to be connected with the horizontal rods 4.
The horizontal rod 4 is connected with at least one connecting rod group 5, the connecting rod group 5 comprises a vertical rod 5-1, a first transverse rod 5-2 and a second transverse rod 5-3, the top of the vertical rod 5-1 is connected with the horizontal rod 4, the first transverse rod 5-2 is connected to the bottom of the vertical rod 5-1, the second transverse rod 5-3 is connected to the middle of the vertical rod 5-1, an inclined rod 5-4 is arranged between the second transverse rod 5-3 and the vertical rod 5-1, the inclined rod 5-4 is connected to the joint of the top of the vertical rod 5-1 and the horizontal rod 4, the first transverse rod 5-2 and the second transverse rod 5-3 are arranged in parallel, and the first transverse rod 5-2 and the second transverse rod 5-3 are in the same direction.
The vertical rod 5-1 and the first cross rod 5-2 are welded and fixed, the second cross rod 5-3 and the diagonal rod 5-4 are welded and fixed, and the diagonal rod 5-4 and the vertical rod 5-1 are welded and fixed.
The first cross rod 5-2 and the second cross rod 5-3 are used for abutting against the upright posts, and the connecting rod groups 5 on the horizontal rods 4 on the two outermost sides are arranged inwards relatively, so that the first cross rod 5-2 and the second cross rod 5-3 connect the surfaces on two opposite sides of the upright posts, and the rain shelter is positioned.
The openings are formed in the surfaces of the upright posts, the first cross rod 5-2 and the second cross rod 5-3 are connected with the openings through bolts or screws, so that the rain shelter is positioned and supported, and the rain shelter is stretched through connection of the first cross rod 5-2 and the second cross rod 5-3 with different positions of the upright posts.
Be equipped with first bracing 6 of cross arrangement between the adjacent bearing bar 2, first bracing 6 and bearing bar 2 welded fastening, the effect of first bracing 6 makes and has better stability between the bearing bar 2, and bearing bar 2 bottom is equipped with supporting seat 2-1, and supporting seat 2-1 makes and has bigger area of contact between bearing bar 2 and the ground.
Be equipped with second bracing 7 of cross arrangement between the adjacent horizontal pole 4, second bracing 7 and horizontal pole 4 welded fastening make under the effect of second bracing 7 have better stability between the horizontal pole 4.
Be equipped with the third bracing 8 of cross arrangement between horizontal bar 4 and the frame pole 3 on the same vertical face, third bracing 8 and horizontal bar 4 and frame pole 3 welded fastening make under the effect of third bracing 8 have better stability between horizontal bar 4 and the frame pole 3.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention; thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Although the reference numerals in the figures are used more here: ceiling 1, bearing rods 2, supporting seats 2-1, frame rods 3, horizontal rods 4, connecting rod groups 5, vertical rods 5-1, first cross rods 5-2, second cross rods 5-3, inclined rods 5-4, first inclined struts 6, second inclined struts 7, third inclined struts 8, horizontal supporting rods 9 and other terms, but the possibility of using other terms is not excluded; these terms are used merely to more conveniently describe and explain the nature of the present invention; they are to be construed in a manner that is inconsistent with the spirit of the invention.

Claims (10)

1. The upright post roughening rain shelter is characterized by comprising a ceiling (1), a plurality of bearing rods (2), a plurality of frame rods (3), a plurality of horizontal rods (4) and at least two connecting rod groups (5); the end parts of the horizontal rod (4) and the frame rod (3) are connected to the top of the bearing rod (2), the frame rod (3) is positioned above the horizontal rod (4), and the frame rod (3) is downwards inclined towards one end of the bearing rod (2) and is connected with the top of the bearing rod (2); the ceiling (1) is connected to the frame rods (3), and the size of the ceiling (1) corresponds to the size formed by the plurality of frame rods (3); the connecting rod groups (5) are connected below the horizontal rods (4), the connecting rod groups (5) are connected to the horizontal rods (4) on the two outermost sides, and the connecting rod groups (5) on the two sides are arranged inwards oppositely; and a horizontal support rod (9) is connected between the tops of the bearing rods (2).
2. A pole-brimming rainshelter according to claim 1, characterized in that the number of said bearing bars (2), frame bars (3) and horizontal bars (4) is the same, the top of the bearing bar (2) being connected to the end of the corresponding frame bar (3) and horizontal bar (4) simultaneously.
3. A pillar chisel canopy according to claim 1, wherein the length of the canopy (1) is arranged along the length of the frame bars (3) and the canopy (1) is inclined downwards towards one end of the bearing bar (2), the width of the canopy (1) corresponding to the horizontal width of the plurality of frame bars (3).
4. A pole-brimming rainshelter according to claim 1, characterized in that the horizontal bars (4) and the frame bars (3) correspond in position, the horizontal bars (4) and the frame bars (3) in the same position being located on the same vertical plane.
5. An upright-furring awning according to claim 1, characterized in that at least one connecting rod set (5) is attached to said horizontal rod (4).
6. The upright post scabbling canopy according to claim 5, wherein said connecting rod group (5) comprises a vertical rod (5-1), a first horizontal rod (5-2) and a second horizontal rod (5-3), the top of the vertical rod (5-1) is connected with the horizontal rod (4), the first horizontal rod (5-2) is connected with the bottom of the vertical rod (5-1), the second horizontal rod (5-3) is connected with the middle of the vertical rod (5-1), an inclined rod (5-4) is arranged between the second horizontal rod (5-3) and the vertical rod (5-1), and the inclined rod (5-4) is connected with the joint of the top of the vertical rod (5-1) and the horizontal rod (4).
7. A post-chisel edge flashing shelter as claimed in claim 6, characterized in that the first bar (5-2) and the second bar (5-3) are arranged in parallel and that the first bar (5-2) and the second bar (5-3) are oriented in the same direction.
8. The upright-type roughening canopy according to claim 1, wherein a first cross brace (6) is provided between adjacent bearing rods (2), and a support base (2-1) is provided at the bottom of the bearing rods (2).
9. An upright-furring awning according to claim 1, characterized in that a second cross brace (7) is provided between adjacent horizontal bars (4).
10. A pillar chiseling awning as claimed in claim 4, wherein a third cross brace (8) is provided between the horizontal bar (4) and the frame bar (3) on the same vertical plane.
CN202021882414.9U 2020-09-02 2020-09-02 Vertical column roughening rain shelter Active CN213572702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021882414.9U CN213572702U (en) 2020-09-02 2020-09-02 Vertical column roughening rain shelter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021882414.9U CN213572702U (en) 2020-09-02 2020-09-02 Vertical column roughening rain shelter

Publications (1)

Publication Number Publication Date
CN213572702U true CN213572702U (en) 2021-06-29

Family

ID=76568856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021882414.9U Active CN213572702U (en) 2020-09-02 2020-09-02 Vertical column roughening rain shelter

Country Status (1)

Country Link
CN (1) CN213572702U (en)

Similar Documents

Publication Publication Date Title
CN213572702U (en) Vertical column roughening rain shelter
FR2614920B1 (en) SUPPORT FRAME FOR A TENT CANVAS OF A LIGHT SHELTER
CN212518892U (en) Solar photovoltaic panel support with cleaning function
CN217269133U (en) Steel structure stadium structure with Y-shaped stand column
CN216380315U (en) Platform canopy construction supporting structure
CN210459260U (en) High pile cap construction platform of encorbelmenting
CN209942292U (en) Building shed convenient to dismantle and install
CN216007809U (en) Cantilever beam template supporting structure
CN213509743U (en) Regularization telescopic steel bar shed
CN215368967U (en) Temporary reinforcing steel bar processing shed
CN211714749U (en) Multifunctional telescopic folding tent
CN214273072U (en) Outdoor automatic shading shed
CN216277163U (en) Electric bicycle charging shed
CN210928824U (en) Winter-warm type sunlight greenhouse
CN219548569U (en) Tent upright post top connecting piece
CN219431518U (en) Flat-top tent
CN209817092U (en) Vertical beam column structure with ancient building style
CN211691002U (en) Toll station steel structure net rack
CN217216411U (en) Flexible photovoltaic support of large-span
CN218509119U (en) Multi-person swing gallery frame
CN220167160U (en) Prefabricated green house building
CN220365359U (en) Shed roof structure
CN216553368U (en) Novel deer-raising net
CN218176592U (en) Large-span roof overhanging support system
CN218375682U (en) Water accumulation preventing mechanism of shed frame and shed frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant