CN213571809U - Diversion tunnel inlet tower frame bypass structure for ecological drainage - Google Patents

Diversion tunnel inlet tower frame bypass structure for ecological drainage Download PDF

Info

Publication number
CN213571809U
CN213571809U CN202022465278.XU CN202022465278U CN213571809U CN 213571809 U CN213571809 U CN 213571809U CN 202022465278 U CN202022465278 U CN 202022465278U CN 213571809 U CN213571809 U CN 213571809U
Authority
CN
China
Prior art keywords
ecological
diversion tunnel
overflowing
valve chamber
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022465278.XU
Other languages
Chinese (zh)
Inventor
刘庆亮
刘新云
王惠芹
董甲甲
任松林
游慧杰
杨军义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN202022465278.XU priority Critical patent/CN213571809U/en
Application granted granted Critical
Publication of CN213571809U publication Critical patent/CN213571809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a diversion tunnel import pylon bypass structure for ecological drainage, including diversion tunnel's side mound and shutoff gate, still include the drainage portion, it is including setting up the ecological overflow valve chamber outside the side mound, ecological overflow valve is indoor to wear to be equipped with the ecological overflow pipe of rivers to parallel arrangement, ecological overflow pipe's one end is linked together with the river upper reaches, and the other end extends to in the side mound of shutoff gate low reaches and is linked together through diversion tunnel and river low reaches, still is provided with the automatically controlled valve that is located ecological overflow valve indoor on the ecological overflow pipe; and the maintenance part comprises a vertical shaft arranged at the top of the ecological overflow valve chamber, and the top of the vertical shaft is provided with a sealing cover plate. The utility model discloses simple structure, the construction of being convenient for, operation and maintenance are all very convenient.

Description

Diversion tunnel inlet tower frame bypass structure for ecological drainage
Technical Field
The utility model belongs to the technical field of the ecological drainage technique of water conservancy pivot and specifically relates to a diversion tunnel import pylon bypass structure for ecological drainage is related to.
Background
In recent years, with the increasing social demand, the development and utilization of natural resources in China are gradually enhanced, and the construction of hydraulic engineering such as river-blocking gate dams, reservoirs and the like not only changes the evolution law of river morphology and riverbed landform, but also changes the downstream hydrological flow and flow state, thereby causing the ecological crisis of rivers, and the concrete manifestations of the overall ecological function weakening of the rivers, reduction of biological diversity and the like are realized. Increasingly fragile river ecological environment seriously restricts sustainable development of water resources and water environment, and becomes a bottleneck restricting human survival and social development. With the increasing destruction of ecological and environmental resources, the problem of river ecological flow begins to be gradually concerned. The ecological flow is ensured to a certain extent, and the ecological water quality improving method has great significance for improving water ecology. The determination of reasonable ecological water demand and the implementation of ecological base flow discharge guarantee measures are the fundamental premise for slowing down the ecological influence of hydraulic engineering, so that the existing reservoir hubs are all matched with and built with ecological base flow permanent facilities. However, in the reservoir engineering, in order to maintain the basic form and ecological function of the downstream river and prevent the river from cutting off during the period that the diversion tunnel is down-gated and the reservoir water level is not stored to the application water level of the ecological basic flow permanent facility, the river ecological requirements are analyzed to determine the discharge flow, and the reasonable temporary ecological basic flow guarantee facility is built by combining with the engineering arrangement.
Disclosure of Invention
The utility model provides a diversion tunnel import pylon bypass structure for ecological drainage, aim at solve under the diversion tunnel floodgate, ecological basic flow permanent facility not yet maintain the problem of low reaches river basic morphology and ecological function during operation yet.
In order to achieve the above purpose, the utility model can adopt the following technical proposal:
diversion tunnel import tower frame bypass structure for ecological drainage, including diversion tunnel's side mound and shutoff gate, still include
The drainage part comprises an ecological overflowing valve chamber arranged outside the side pier, an ecological overflowing pipe arranged in parallel with the water flow direction is arranged in the ecological overflowing valve chamber in a penetrating mode, one end of the ecological overflowing pipe is communicated with the upstream of a river, the other end of the ecological overflowing pipe extends into the side pier at the downstream of the plugging gate and is communicated with the downstream of the river through a diversion tunnel, and an electric control valve positioned in the ecological overflowing valve chamber is further arranged on the ecological overflowing pipe;
and the maintenance part comprises a vertical shaft arranged at the top of the ecological overflow valve chamber, and the top of the vertical shaft is provided with a sealing cover plate.
And mounting holes for penetrating the ecological overflowing valve are formed in the side wall of the ecological overflowing valve chamber and the side pier at the downstream of the plugging gate.
And the side wall of the vertical shaft is provided with a ladder stand.
The utility model provides a diversion tunnel import pylon bypass structure for ecological drainage, simple structure, the construction of being convenient for, operation and maintenance are all very convenient. Compared with the prior art, the method has the following advantages:
(1) the ecological base flow is led to the tail end of the water inlet tower frame by additionally arranging the ecological base flow valve chamber and the bypass steel pipe positioned in the ecological base flow valve chamber on the side face of the water inlet tower frame of the diversion tunnel, and the ecological base flow is discharged to a downstream river channel by utilizing the diversion tunnel section, so that the method is simple, the construction is convenient, and the engineering investment can be saved;
(2) the purposes of opening, closing and regulating the flow of the raw base flow are achieved by remotely operating the electric control valve in the ecological base flow valve chamber, and the management and the operation are very convenient;
(3) the top of the ecological base flow valve chamber is provided with the people inlet vertical shaft, if equipment failure occurs in the drainage operation process, a maintainer can overhaul the ecological base flow valve chamber through the people inlet vertical shaft, the operation is very convenient, the investment of the people inlet vertical shaft is small, and a layer of powerful guarantee can be added for the continuous flow of the ecological base flow.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a sectional view taken along line a-a in fig. 1.
Fig. 3 is a view from B-B in fig. 1.
Detailed Description
The embodiments of the present invention will be described in detail with reference to the accompanying drawings, and the embodiments are implemented on the premise of the technical solution of the present invention, and detailed embodiments and specific operation procedures are given, but the scope of the present invention is not limited to the following embodiments.
As shown in figures 1-3, a diversion tunnel import tower bypass structure for ecological drainage, including side pier 1 and shutoff gate 2, still include drainage portion and maintenance portion. Specifically, the drainage part comprises an ecological overflow valve chamber 3 positioned outside the side pier 1, and is constructed simultaneously with the diversion tunnel inlet tower. The side wall of the ecological overflow valve chamber 3 and the side pier 1 at the downstream of the plugging gate 2 are provided with mounting holes for penetrating the ecological overflow pipe 4 arranged in parallel with the water flow direction. The ecological overflow pipe 4 is usually made of steel pipe, one end of which is communicated with the upstream of the river, and the other end of which is communicated with the downstream of the river after passing through a mounting hole arranged on the side pier 1 at the downstream of the plugging gate 2, so as to form a bypass pipeline. And the ecological overflow pipe 4 passes through the mounting hole and then seals the gap of the mounting hole by using concrete. An electric control valve 5 is also arranged on the ecological overflow pipe 4 and is positioned in the ecological overflow valve chamber 3, and the electric control valve 5 can be remotely controlled. In order to conveniently overhaul the electric control valve 5, a vertical shaft 6 is built at the top of the ecological overflow valve chamber 3, a sealing cover plate 7 is installed at the top of the vertical shaft 6, and a ladder stand is installed on the side wall.
When the diversion tunnel is used for water storage, the water level in the reservoir area is not stored to the water level of the ecological basic flow permanent facility application, and no other ecological basic flow guarantee measures exist, the electric control valve 5 in the ecological overflow valve chamber 3 is opened through remote operation, and the ecological base flows through a bypass pipeline formed by the ecological overflow pipes 4 and is led to the tail end of the diversion tunnel water inlet tower frame, and then is drained to a downstream river channel through the diversion tunnel. In the operation process, if equipment fails, a maintainer can overhaul the ecological overflow valve chamber 3 through the ladder stand of the people inlet vertical shaft 7. When the reservoir water level rises to a certain height and the ecological base flow does not need to be discharged through the ecological overflow valve chamber 3 any more, the electric control valve 5 is closed.

Claims (3)

1. The utility model provides a diversion tunnel import pylon bypass structure for ecological drainage, includes diversion tunnel's side mound and shutoff gate, its characterized in that: also comprises
The drainage part comprises an ecological overflowing valve chamber arranged outside the side pier, an ecological overflowing pipe arranged in parallel with the water flow direction is arranged in the ecological overflowing valve chamber in a penetrating mode, one end of the ecological overflowing pipe is communicated with the upstream of a river, the other end of the ecological overflowing pipe extends into the side pier at the downstream of the plugging gate and is communicated with the downstream of the river through a diversion tunnel, and an electric control valve positioned in the ecological overflowing valve chamber is further arranged on the ecological overflowing pipe;
and the maintenance part comprises a vertical shaft arranged at the top of the ecological overflow valve chamber, and the top of the vertical shaft is provided with a sealing cover plate.
2. The diversion tunnel inlet tower bypass structure for ecological drainage according to claim 1, wherein: and mounting holes for penetrating the ecological overflowing valve are formed in the side wall of the ecological overflowing valve chamber and the side pier at the downstream of the plugging gate.
3. The diversion tunnel inlet tower bypass structure for ecological drainage according to claim 1, wherein: and the side wall of the vertical shaft is provided with a ladder stand.
CN202022465278.XU 2020-10-30 2020-10-30 Diversion tunnel inlet tower frame bypass structure for ecological drainage Active CN213571809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022465278.XU CN213571809U (en) 2020-10-30 2020-10-30 Diversion tunnel inlet tower frame bypass structure for ecological drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022465278.XU CN213571809U (en) 2020-10-30 2020-10-30 Diversion tunnel inlet tower frame bypass structure for ecological drainage

Publications (1)

Publication Number Publication Date
CN213571809U true CN213571809U (en) 2021-06-29

Family

ID=76531255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022465278.XU Active CN213571809U (en) 2020-10-30 2020-10-30 Diversion tunnel inlet tower frame bypass structure for ecological drainage

Country Status (1)

Country Link
CN (1) CN213571809U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030115A (en) * 2022-06-22 2022-09-09 中国电建集团华东勘测设计研究院有限公司 Hydraulic operation valve system capable of replacing tail gate chamber gate and headstock gear of pumped storage power station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030115A (en) * 2022-06-22 2022-09-09 中国电建集团华东勘测设计研究院有限公司 Hydraulic operation valve system capable of replacing tail gate chamber gate and headstock gear of pumped storage power station
CN115030115B (en) * 2022-06-22 2024-01-26 中国电建集团华东勘测设计研究院有限公司 Hydraulic operation valve system capable of replacing gate of tail gate chamber of pumping and storing station and hoist

Similar Documents

Publication Publication Date Title
CN213571809U (en) Diversion tunnel inlet tower frame bypass structure for ecological drainage
CN103526765A (en) Self-floating steel cofferdam for underwater concrete plane construction
CN104179159B (en) Power station bright flowing full tail water system
CN108560497A (en) Eservoir diversion tunnel import for medium-small flow is independently intake tower structure
CN201056682Y (en) Water sealing device of high water head radial gate
CN206800313U (en) A kind of paddy field automates water conservancy irrigation device
CN205975522U (en) Formula of swaing water sluicegate equipment that control performance is good
CN207032177U (en) Cradle-type checkdam structure
CN209277121U (en) Pump lock double-layer drainage structure
CN213538900U (en) Desilting and sand-discharging device for steel dam
CN201317929Y (en) Roller connecting bar type hydraulic automatic shutter gate structure with pretilt angle
CN205501946U (en) Steel dam gate with micromatic setting
CN209975479U (en) Novel water delivery building
CN210712774U (en) Novel structure of built-in desilting basin of dam rolls
CN208346761U (en) Eservoir diversion tunnel import for medium-small flow is independently intake tower structure
CN203594040U (en) Self-floating-type steel cofferdam for underwater concrete plane construction
CN200971486Y (en) Two-way water wash reservoir desilting system
CN109371921B (en) Pump gate double-layer drainage structure
CN109555089A (en) Oblique stand alone type flood discharging tunnel water inlet tower structure and its construction method
CN211113493U (en) Buttress landscape dam
CN212960006U (en) Novel hang square flap valve of open down
CN203603124U (en) Landscape hydraulic flap gate
CN2591091Y (en) Water release gate
CN212772251U (en) Multiple overflow layering water intaking hydraulic engineering
CN214219826U (en) Reservoir layering water intaking structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant