CN213557587U - Building decoration garbage comprehensive treatment system - Google Patents

Building decoration garbage comprehensive treatment system Download PDF

Info

Publication number
CN213557587U
CN213557587U CN202021914875.XU CN202021914875U CN213557587U CN 213557587 U CN213557587 U CN 213557587U CN 202021914875 U CN202021914875 U CN 202021914875U CN 213557587 U CN213557587 U CN 213557587U
Authority
CN
China
Prior art keywords
construction
waste
treatment system
decoration
conveyor belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021914875.XU
Other languages
Chinese (zh)
Inventor
林高
毛文博
汤才周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianqilidi Hubei Environmental Protection Technology Group Co ltd
Original Assignee
Tianqilidi Hubei Environmental Protection Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianqilidi Hubei Environmental Protection Technology Group Co ltd filed Critical Tianqilidi Hubei Environmental Protection Technology Group Co ltd
Priority to CN202021914875.XU priority Critical patent/CN213557587U/en
Application granted granted Critical
Publication of CN213557587U publication Critical patent/CN213557587U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

本实用新型提供了建筑装修垃圾综合处理系统,所述建筑装修垃圾包括大件垃圾、装修垃圾和建筑垃圾;所述装修垃圾通过输送带与装修垃圾处理系统相连,并将装修垃圾处理划分成轻质物和重质物;所述建筑垃圾通过输送带与建筑垃圾处理系统相连,并将建筑垃圾处理成不同粒径的建筑骨料;所述重质物与建筑垃圾处理系统相连,并最终处理成不同粒径的建筑骨料;所述大件垃圾通过输送带与大件垃圾处理系统相连,并将大件垃圾处理成可燃料包;所述轻质物与大件垃圾处理系统相连,并将轻质物处理成可燃料包。可以将大件垃圾、装修垃圾、拆建垃圾的产线统一结合起来。

Figure 202021914875

The utility model provides a comprehensive treatment system for construction and decoration waste, wherein the construction and decoration waste includes bulky waste, decoration waste and construction waste; the decoration waste is connected with a decoration waste treatment system through a conveyor belt, and the decoration waste is divided into light Substances and heavy substances; the construction waste is connected to the construction waste treatment system through a conveyor belt, and the construction waste is processed into construction aggregates of different particle sizes; the heavy substances are connected to the construction waste treatment system and are finally processed building aggregates of different particle sizes; the bulky waste is connected to the bulky waste treatment system through a conveyor belt, and the bulky waste is processed into fuelable bales; the light matter is connected to the bulky waste treatment system, and the Processes light materials into fuelable bales. The production lines of bulky waste, decoration waste, and demolition and construction waste can be unified.

Figure 202021914875

Description

Building decoration garbage comprehensive treatment system
Technical Field
The utility model relates to a building rubbish handles technical field, concretely relates to building decoration rubbish integrated processing system.
Background
With the development of society, building waste has seriously affected the living environment of urban and rural people as an accompanying object for urban construction and development. The building waste disposal capacity is insufficient, the management level is not high, and the resource utilization level is low, so that the building waste disposal capacity is an outstanding short board influencing the high-quality development of cities. Meanwhile, the increase of the infrastructure construction requirement of China and the national policy of sustainable development also aggravate the contradiction between the development of the construction industry and the supply and demand of sandstone aggregates, under the background, the originally abandoned and accumulated demolition and construction garbage becomes a resource for misplacement, and under the guidance ideas of resource utilization, reduction and harmlessness, the urban demolition and construction garbage is recycled, so that the national industrial policy is met, the market requirement is met, and good economic and social benefits are generated.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a provide building decoration rubbish integrated processing system, can combine together the production line of major possession rubbish, fitment rubbish, demolition rubbish in unison, practiced thrift equipment, produce line power load also less, used operating personnel is also less.
In order to realize the technical characteristics, the purpose of the utility model is realized as follows: the comprehensive treatment system for the building decoration garbage comprises large garbage, decoration garbage and building garbage;
the decoration garbage is connected with a decoration garbage treatment system through a conveyer belt, and the decoration garbage treatment is divided into light matters and heavy matters;
the construction waste is connected with a construction waste treatment system through a conveying belt, and the construction waste is treated into construction aggregates with different particle sizes;
the heavy material is connected with a construction waste treatment system and is finally treated into construction aggregates with different particle sizes;
the large garbage is connected with a large garbage treatment system through a conveying belt and is treated into a combustible material bag;
the light material is connected with a large garbage treatment system and is treated into a combustible material bag.
The building decoration garbage is integrally stacked in a building decoration garbage storage yard, and the building decoration garbage storage yard is divided into a large garbage storage yard, a decoration garbage storage yard and a building garbage storage yard.
Fitment refuse treatment system includes the hydraulic breaker who links to each other with fitment rubbish storage yard, hydraulic breaker's discharge gate links to each other with the 3D screening machine through first conveyer belt, install first permanent magnet de-ironing separator on the first conveyer belt, the 3D screening machine falls into the material below 80mm and the material more than 80mm with the material.
The materials with the thickness of more than 80mm are connected with a first density winnowing machine through a conveying belt;
the materials below 80mm are connected with the gallop sieve through a conveying belt, and the gallop sieve is connected with the density winnowing machine II through the conveying belt;
the light substances of the first density winnowing machine and the second density winnowing machine are gathered on the same belt and are finally connected with an automatic packing machine of a large garbage treatment system;
and the heavy materials of the first density winnowing machine and the second density winnowing machine are converged on a belt and are finally connected with an impact crusher of a construction waste treatment system.
The construction waste treatment system comprises a vibrating feeder connected with a construction waste storage yard, the vibrating feeder is connected with a jaw crusher, the jaw crusher is connected with an impact crusher through a second conveying belt, a second permanent magnet iron remover is installed on the second conveying belt, the impact crusher is connected with a vibrating screening machine, and the vibrating screening machine screens materials into three kinds of construction aggregates with different specification particle sizes.
The large garbage disposal system comprises a double-shaft crusher connected with a large garbage storage yard, the double-shaft crusher is connected with an automatic packing machine through a third conveying belt, an iron remover is installed on the third conveying belt, and the automatic packing machine packs materials into combustible material bags.
The building aggregate is divided into 0-5mm sand material, 5-15mm aggregate and 15-30mm aggregate.
And returning the aggregates with the particle size larger than 30mm of the vibration screening machine to the impact crusher.
The dust removal system is used for removing dust of the decoration garbage disposal system, the building garbage disposal system and the large garbage disposal system;
comprises a whole plant dedusting system for dedusting the whole plant area.
The utility model discloses there is following beneficial effect:
1. the comprehensive treatment system for the building decoration garbage, which adopts the process flow and the structure, can be used for sand making of the demolition garbage, generates good economic benefit, and realizes resource recycling of the demolition garbage.
2. Through the process flow, the problems that the demolition and construction garbage occupies land, pollutes the environment and destroys natural ecological balance are solved, and the environment-friendly effect is achieved.
3. Through the system, the production lines of large garbage, decoration garbage and demolition garbage are combined together in a unified mode, equipment is saved, the power load of the production line is small, and the number of used operators is small.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a plan view of the present invention.
In the figure: the device comprises a building decoration garbage storage yard 1, a large garbage storage yard 2, a double-shaft crusher 3, an iron remover 4, an automatic packing machine 5, a decoration garbage storage yard 6, a hydraulic crusher 7, a first permanent magnet iron remover 8, a 3D screening machine 9, a first density winnowing machine 10, a tension sieve 11, a second density winnowing machine 12, a building garbage storage yard 13, a vibrating feeder 14, a jaw crusher 15, a second permanent magnet iron remover 16, a counterattack crusher 17, a vibrating screening machine 18, building aggregate 19, a dust removal system 20, a whole plant dust removal system 21 and a combustible material package 22.
Detailed Description
The following describes embodiments of the present invention with reference to the accompanying drawings.
Referring to fig. 1, the building decoration garbage comprehensive treatment system comprises large garbage, decoration garbage and building garbage; the decoration garbage is connected with a decoration garbage treatment system through a conveyer belt, and the decoration garbage treatment is divided into light matters and heavy matters; the construction waste is connected with a construction waste treatment system through a conveyer belt, and the construction waste is treated into construction aggregates 19 with different particle sizes; the heavy material is connected with a construction waste treatment system and is finally treated into construction aggregates 19 with different particle sizes; the large garbage is connected with a large garbage treatment system through a conveying belt, and is treated into a combustible material bag 22; the light matter is connected to a bulk waste disposal system and is disposed of into a combustible material package 22. Through adopting foretell integrated processing system, can carry out integrated processing with stifled rubbish, effectual with major possession rubbish, fitment rubbish, tear the production line of building rubbish and unite, practiced thrift equipment, produce line power load also less, used operating personnel is also less.
Further, the building decoration garbage is integrally stacked in a building decoration garbage storage yard 1, and the building decoration garbage storage yard 1 is divided into a large garbage storage yard 2, a decoration garbage storage yard 6 and a building garbage storage yard 13. Through the yard, the construction waste can be effectively classified, stacked and stacked.
Further, fitment garbage disposal system includes hydraulic crusher 7 that links to each other with fitment rubbish dump 6, hydraulic crusher 7's discharge gate passes through first conveyer belt and links to each other with 3D screening machine 9, install first permanent magnet de-ironing separator 8 on the first conveyer belt, 3D screening machine 9 falls into the material below 80mm and the material more than 80mm with the material. The decoration garbage treatment system can be used for treating decoration garbage.
Further, the materials with the thickness of more than 80mm are connected with a first density winnowing machine 10 through a conveying belt; the materials below 80mm are connected with the gallop sieve 11 through a conveying belt, and the gallop sieve 11 is connected with the density winnowing machine II 12 through the conveying belt; the light substances of the first density winnowing machine 10 and the second density winnowing machine 12 are gathered on the same belt and are finally connected with an automatic packing machine 5 of a large garbage treatment system; the heavy materials of the first density winnowing machine 10 and the second density winnowing machine 12 are gathered on a belt and are finally connected with an impact crusher 17 of a construction waste treatment system. The processing system can effectively separate the light materials and the heavy materials so as to be convenient for the next processing of the light materials and the heavy materials.
Further, the construction waste treatment system comprises a vibrating feeder 14 connected with a construction waste storage yard 13, the vibrating feeder 14 is connected with a jaw crusher 15, the jaw crusher 15 is connected with an impact crusher 17 through a second conveying belt, a second permanent magnet iron remover 16 is installed on the second conveying belt, the impact crusher 17 is connected with a vibrating screening machine 18, and the vibrating screening machine 18 screens materials into three construction aggregates 19 with different specification particle sizes. The construction waste can be finally processed into the construction aggregate 19 meeting the requirements through the construction waste processing system so as to be convenient for recycling.
Further, major possession refuse handling system includes the biax breaker 3 that links to each other with major possession rubbish dump 2, biax breaker 3 links to each other with automatic packing machine 5 through the third conveyer belt, install de-ironing separator 4 on the third conveyer belt, automatic packing machine 5 packs the material into combustible material package 22. The large garbage treatment system can realize the treatment of large garbage.
Further, the building aggregate 19 is divided into sand material of 0-5mm, aggregate of 5-15mm and aggregate of 15-30 mm.
Further, the aggregates with the grain size of more than 30mm in the vibrating screen machine 18 are returned to the impact crusher 17.
Further, the dust removal system 20 is used for removing dust of the decoration garbage disposal system, the building garbage disposal system and the large garbage disposal system; including a factory wide de-dusting system 21 for de-dusting the entire factory floor. The dust removal system 20 and the whole plant dust removal system 21 have good dust removal effect and achieve the purpose of environmental protection.
Example 2:
the process for treating the building decoration garbage by the building decoration garbage comprehensive treatment system comprises the following steps:
the method comprises the following steps: roughly sorting the building decoration garbage;
step two: crushing the coarsely sorted decoration garbage by a hydraulic crusher 7, then removing iron by a first permanent magnet iron remover 8, and separating the materials into materials below 80mm and materials above 80mm by a 3D screening machine 9;
removing soil in the materials with the thickness of less than 80mm by a relaxation sieve 11, and then separating light substances in the materials by a second density winnowing machine 12;
directly feeding the materials with the thickness of more than 80mm into a density separator I10, and selecting light substances in the materials;
the light substances separated by the first density separator 10 and the second density separator 12 are collected on the same belt;
the heavy substances separated by the first density separator 10 and the second density separator 12 are gathered on a belt, and after being selected by a sorting robot or manually, the heavy substances are gathered on the same belt;
step three: conveying the large garbage to a double-shaft crusher 3 through a chain plate machine for crushing, removing iron in the large garbage through an iron remover 4, mixing the large garbage with the light materials in the step two, feeding the large garbage and the light materials into a light material bin for packing and storing, and packing the materials into a combustible material bag 22 through an automatic packing machine 5;
step four: conveying the roughly sorted high-quality demolition construction waste to a vibrating feeder 14, and uniformly conveying the material into a jaw crusher 15 through the vibrating feeder 14;
after the materials are crushed by the jaw, removing iron in the materials by a second permanent magnet iron remover 16, and then crushing the materials in a back-impact crusher 17;
meanwhile, the heavy substances in the second step are collected into a counterattack crusher 17 to be crushed, and the crushed materials are respectively sorted out 0-5mm of sand, 5-15mm of aggregate and 15-30mm of aggregate through a vibrating screening machine 18; the aggregates larger than 30mm are returned to the impact crusher 17 to continue crushing until the crushed material meets the requirements.

Claims (9)

1.建筑装修垃圾综合处理系统,其特征在于:所述建筑装修垃圾包括大件垃圾、装修垃圾和建筑垃圾;1. A comprehensive treatment system for construction and decoration waste, characterized in that: the construction and decoration waste comprises bulky waste, decoration waste and construction waste; 所述装修垃圾通过输送带与装修垃圾处理系统相连,并将装修垃圾处理划分成轻质物和重质物;The decoration waste is connected to the decoration waste treatment system through a conveyor belt, and the decoration waste is divided into light substances and heavy substances; 所述建筑垃圾通过输送带与建筑垃圾处理系统相连,并将建筑垃圾处理成不同粒径的建筑骨料(19);The construction waste is connected to a construction waste treatment system through a conveyor belt, and the construction waste is processed into construction aggregates with different particle sizes (19); 所述重质物与建筑垃圾处理系统相连,并最终处理成不同粒径的建筑骨料(19);The heavy substances are connected to the construction waste treatment system, and are finally processed into construction aggregates with different particle sizes (19); 所述大件垃圾通过输送带与大件垃圾处理系统相连,并将大件垃圾处理成可燃料包(22);The bulky garbage is connected to the bulky garbage disposal system through a conveyor belt, and the bulky garbage is processed into fuelable bales (22); 所述轻质物与大件垃圾处理系统相连,并将轻质物处理成可燃料包(22)。The lightweights are connected to a bulk waste disposal system and process the lightweights into fuelable bales (22). 2.根据权利要求1所述建筑装修垃圾综合处理系统,其特征在于:所述建筑装修垃圾整体堆放在建筑装修垃圾堆场(1),所述建筑装修垃圾堆场(1)划分为大件垃圾堆场(2)、装修垃圾堆场(6)和建筑垃圾堆场(13)。2. The comprehensive treatment system for construction and decoration waste according to claim 1, characterized in that: the construction and decoration waste is piled up in the construction and decoration waste yard (1) as a whole, and the construction and decoration waste yard (1) is divided into large pieces Garbage yard (2), decoration waste yard (6) and construction waste yard (13). 3.根据权利要求1所述建筑装修垃圾综合处理系统,其特征在于:所述装修垃圾处理系统包括与装修垃圾堆场(6)相连的液压破碎机(7),所述液压破碎机(7)的出料口通过第一输送带与3D筛分机(9)相连,所述第一输送带上安装有第一永磁铁除铁器(8),所述3D筛分机(9)将物料分成80mm以下的物料和80mm以上的物料。3. The comprehensive construction and decoration waste treatment system according to claim 1, characterized in that: the decoration waste treatment system comprises a hydraulic crusher (7) connected to a decoration waste yard (6), and the hydraulic crusher (7) ) is connected to the 3D screening machine (9) through the first conveyor belt, the first permanent magnet iron remover (8) is installed on the first conveyor belt, and the 3D screening machine (9) divides the material into 80mm The material below and the material above 80mm. 4.根据权利要求3所述建筑装修垃圾综合处理系统,其特征在于:所述80mm以上的物料通过输送带与密度风选机一(10)相连;4. The comprehensive treatment system for construction and decoration waste according to claim 3, characterized in that: the material above 80mm is connected to the density wind separator one (10) through a conveyor belt; 所述80mm以下的物料通过输送带与驰张筛(11)相连,所述驰张筛(11)通过输送带与密度风选机二(12)相连;The material below 80mm is connected with the relaxation screen (11) through the conveyor belt, and the relaxation screen (11) is connected with the second density wind separator (12) through the conveyor belt; 所述密度风选机一(10)和密度风选机二(12)的轻物质汇集在同一条皮带上,并最终与大件垃圾处理系统的自动打包机(5)相连;The light substances of the density air separator 1 (10) and the density air separator 2 (12) are collected on the same belt, and finally connected with the automatic baler (5) of the bulky waste treatment system; 所述密度风选机一(10)和密度风选机二(12)的重物质汇集在一条皮带上,并最终与建筑垃圾处理系统的反击式破碎机(17)相连。The heavy substances of the density air separator one (10) and the density air separator two (12) are collected on a belt, and finally connected to the impact crusher (17) of the construction waste treatment system. 5.根据权利要求1所述建筑装修垃圾综合处理系统,其特征在于:所述建筑垃圾处理系统包括与建筑垃圾堆场(13)相连的振动给料机(14),所述振动给料机(14)与鄂式破碎机(15)相连,所述鄂式破碎机(15)通过第二输送带与反击式破碎机(17)相连,所述第二输送带上安装有第二永磁铁除铁器(16),所述反击式破碎机(17)与振动筛分机(18)相连,所述振动筛分机(18)将物料筛分成三种不同规格粒径的建筑骨料(19)。5 . The comprehensive construction and decoration waste treatment system according to claim 1 , wherein the construction waste treatment system comprises a vibrating feeder ( 14 ) connected to a construction waste yard ( 13 ). The vibrating feeder (14) is connected to the jaw crusher (15), the jaw crusher (15) is connected to the impact crusher (17) through a second conveyor belt, and a second permanent magnet is installed on the second conveyor belt The iron remover (16), the impact crusher (17) is connected to the vibrating screener (18), and the vibrating screener (18) screens the material into construction aggregates (19) of three different sizes and sizes. 6.根据权利要求1所述建筑装修垃圾综合处理系统,其特征在于:所述大件垃圾处理系统包括与大件垃圾堆场(2)相连的双轴破碎机(3),所述双轴破碎机(3)通过第三输送带与自动打包机(5)相连,所述第三输送带上安装有除铁器(4),所述自动打包机(5)将物料打包为可燃料包(22)。6. The comprehensive construction and decoration waste treatment system according to claim 1, characterized in that: the bulky waste treatment system comprises a double-shaft crusher (3) connected to a bulky waste yard (2). The crusher (3) is connected to the automatic baler (5) through a third conveyor belt on which an iron remover (4) is installed, and the automatic baler (5) packs the material into fuelable bales ( twenty two). 7.根据权利要求5所述建筑装修垃圾综合处理系统,其特征在于:所述建筑骨料(19)分为0-5mm的砂料、5-15mm的骨料和15-30mm的骨料。7 . The comprehensive treatment system for construction and decoration waste according to claim 5 , wherein the construction aggregate ( 19 ) is divided into 0-5mm sand, 5-15mm and 15-30mm aggregate. 8 . 8.根据权利要求5所述建筑装修垃圾综合处理系统,其特征在于:所述振动筛分机(18)的粒径大于30mm的骨料返回至反击式破碎机(17)。8 . The comprehensive treatment system for construction and decoration waste according to claim 5 , characterized in that: aggregates with a particle size larger than 30 mm of the vibrating screener ( 18 ) are returned to the impact crusher ( 17 ). 9 . 9.根据权利要求1所述建筑装修垃圾综合处理系统,其特征在于:还包括用于对装修垃圾处理系统、建筑垃圾处理系统和大件垃圾处理系统进行除尘的除尘系统(20);9 . The comprehensive construction and decoration waste treatment system according to claim 1 , further comprising a dedusting system ( 20 ) for dedusting the decoration waste treatment system, the construction waste treatment system and the bulky waste treatment system; 9 . 包括用于对整个厂区进行除尘的整厂除尘系统(21)。Includes a plant-wide dedusting system (21) for dedusting the entire plant area.
CN202021914875.XU 2020-09-04 2020-09-04 Building decoration garbage comprehensive treatment system Expired - Fee Related CN213557587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021914875.XU CN213557587U (en) 2020-09-04 2020-09-04 Building decoration garbage comprehensive treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021914875.XU CN213557587U (en) 2020-09-04 2020-09-04 Building decoration garbage comprehensive treatment system

Publications (1)

Publication Number Publication Date
CN213557587U true CN213557587U (en) 2021-06-29

Family

ID=76570125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021914875.XU Expired - Fee Related CN213557587U (en) 2020-09-04 2020-09-04 Building decoration garbage comprehensive treatment system

Country Status (1)

Country Link
CN (1) CN213557587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112206904A (en) * 2020-09-04 2021-01-12 天奇力帝(湖北)环保科技集团有限公司 Comprehensive treatment system and process for building decoration garbage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112206904A (en) * 2020-09-04 2021-01-12 天奇力帝(湖北)环保科技集团有限公司 Comprehensive treatment system and process for building decoration garbage

Similar Documents

Publication Publication Date Title
CN112206904A (en) Comprehensive treatment system and process for building decoration garbage
CN105127176B (en) Construction refuse resource is disposed with utilizing integral treatment method and its processing system
CN201442005U (en) Construction waste comprehensive treatment equipment
CN201150926Y (en) Builders rubbish comprehensive processing and utilizing system
CN202192080U (en) Integral crushing and comprehensive recovery processing line for scraped car body
CN201357163Y (en) Domestic garbage and construction waste mixture sorting device
CN107344186B (en) Domestic waste source classification method and sorting machine
CN111570471B (en) Automatic treatment system for building decoration garbage and working method thereof
CN110170377A (en) A kind of sorting consumer waste technique and household garbage sorting system
CN108311519A (en) A kind of decoration building waste sorting sorting technique and system
CN102765146B (en) Clearer production process and preparation system for junked tire
CN214919137U (en) Demolish rubbish and fitment refuse treatment system
CN107335520A (en) The devices and methods therefor that a kind of building waste environmental protection utilizes
CN110903044A (en) System and method for cooperatively treating construction waste by using cement kiln
CN113751465A (en) Resource disposal process for construction waste and decoration waste
CN111744941A (en) Decoration garbage disposal method
CN205463577U (en) Resourceful treatment system of major possession rubbish
CN108080397A (en) A kind of doping separating device for construction wastes and its separation method
CN115090655A (en) A kind of demolition and decoration garbage recycling and processing method
CN213557587U (en) Building decoration garbage comprehensive treatment system
CN207952196U (en) A kind of construction refuse resource regeneration disposal system
CN206996798U (en) A kind of mobile construction waste sorter
CN213529043U (en) System suitable for soft or hard classification of fitment rubbish
CN210097947U (en) Household garbage sorting system
CN210965481U (en) A building rubbish preprocessing device for concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210629