CN213539484U - Steel construction assembled wallboard - Google Patents

Steel construction assembled wallboard Download PDF

Info

Publication number
CN213539484U
CN213539484U CN202022461294.1U CN202022461294U CN213539484U CN 213539484 U CN213539484 U CN 213539484U CN 202022461294 U CN202022461294 U CN 202022461294U CN 213539484 U CN213539484 U CN 213539484U
Authority
CN
China
Prior art keywords
installation
guide rail
rail groove
diaphragm
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022461294.1U
Other languages
Chinese (zh)
Inventor
胡红伟
施中云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongsheng Auto Parts Technology Co ltd
Original Assignee
Henan Zhongsheng Auto Parts Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongsheng Auto Parts Technology Co ltd filed Critical Henan Zhongsheng Auto Parts Technology Co ltd
Priority to CN202022461294.1U priority Critical patent/CN213539484U/en
Application granted granted Critical
Publication of CN213539484U publication Critical patent/CN213539484U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a steel construction assembled wallboard, including installation riser and installation diaphragm, installation riser and installation diaphragm mutually perpendicular cross installation, the middle part of installation riser and installation diaphragm is provided with first guide rail groove and second guide rail groove respectively, install first mounting bar and second mounting bar between installation riser and the installation diaphragm, the supporting seat is installed to the bottom of installation riser. The utility model discloses a skeleton is formed by installation riser and the combination of installation diaphragm mutually perpendicular alternately concatenation, moreover, the steam generator is simple in structure, the combination is convenient, and be provided with first guide rail groove and second guide rail groove on installation riser and installation diaphragm respectively, install second guide block and first guide block respectively in the inside in first guide rail groove and second guide rail groove, be provided with on second guide block and first guide block and inlay the groove, can adjust according to the installation dimension and the shape of wallboard through it, the flexibility has been increased, and the convenience is used.

Description

Steel construction assembled wallboard
Technical Field
The utility model relates to a wallboard correlation field specifically is a steel construction assembled wallboard.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other components made of section steel, steel plates and the like, rust removal and rust prevention processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted, all components or parts are usually connected by welding seams, bolts or rivets, and the structure is light in self weight, simple and convenient to construct, widely applied to the fields of large-scale factory buildings, venues, super-high buildings and the like, easy to rust the steel structures, and generally needs rust removal, galvanization or coating and regular maintenance.
The building structure is a bearing system consisting of walls and floor slabs, wherein the bearing walls of the wallboard structure can be made of bricks, building blocks, prefabricated or cast-in-place concrete, and can be divided into a mixed structure, an assembled large-plate structure and a cast-in-place wallboard structure according to different materials and construction methods.
The wallboard in the current stage has many disadvantages, for example, the assembly and splicing are inconvenient, the flexibility is poor, the wallboard cannot be adjusted according to the shape and the size of the wallboard, the installation of the wallboard cannot be layered, and the protection capability of the wallboard is single.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction assembled wallboard to the equipment concatenation that proposes in solving above-mentioned background is inconvenient, and the flexibility is poor, can't adjust according to wallboard shape and size, and the installation of wallboard can't be layered, makes the single problem of wallboard protective capacities.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction assembled wallboard, is including installation riser and installation diaphragm, installation riser and installation diaphragm mutually perpendicular cross installation, the middle part of installation riser and installation diaphragm is provided with first guide rail groove and second guide rail groove respectively, the both ends in first guide rail groove are provided with first mounting hole, install first installation strip and second installation strip between installation riser and the installation diaphragm, the supporting seat is installed to the bottom of installation riser.
In a further embodiment, the first mounting bar and the second mounting bar are perpendicularly and crosswise mounted, and a second mounting hole is formed at the intersection of the first mounting bar and the second mounting bar.
In a further embodiment, the first mounting strip and the second mounting strip are provided with inner lining plates on two sides, the inner sides of the inner lining plates are provided with plugs, and the plugs are connected with the second mounting holes in an embedding manner.
In a further embodiment, the two ends of the lining plate are provided with convex grooves, and the convex grooves are connected with the inner sides of the mounting vertical plates in an embedded mode.
In a further embodiment, an outer wall panel is mounted on the outer side of the inner lining panel, and a mounting head is mounted on the inner side of the outer wall panel.
In a further embodiment, the first guide rail groove and the second guide rail groove are respectively provided with a second guide block and a first guide block, the middle parts of the second guide block and the first guide block are respectively provided with an embedding groove, and the embedding grooves are connected with the mounting head in an embedding manner.
In a further embodiment, both ends of the mounting transverse plate are provided with lug plates, lug holes are formed in the lug plates, and the lug plates are fixedly connected with the first mounting holes through the lug holes through bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a skeleton is formed by installation riser and the combination of installation diaphragm mutually perpendicular alternately concatenation, moreover, the steam generator is simple in structure, the combination is convenient, and be provided with first guide rail groove and second guide rail groove on installation riser and installation diaphragm respectively, install second guide block and first guide block respectively in the inside in first guide rail groove and second guide rail groove, be provided with on second guide block and first guide block and inlay the groove, can adjust according to the installation dimension and the shape of wallboard through it, the flexibility has been increased, and the convenience is used.
2. The utility model discloses a middle part position installs first mounting bar and second mounting bar between installation riser and the installation diaphragm, is provided with the second mounting hole on first mounting bar and second mounting bar, through its welt structure that can add different functions in wallboard middle part position, not only can improve the protective capacities of wallboard, and can improve its safeguard function.
Drawings
Fig. 1 is a schematic structural view of a steel-structure assembled wallboard of the present invention;
FIG. 2 is a schematic structural view of a rigid skeleton according to the present invention;
fig. 3 is a top view of the external wall panel of the present invention;
FIG. 4 is a top view of the inner liner of the present invention;
fig. 5 is a front view of the installation cross plate of the present invention.
In the figure: 1. a first guide rail groove; 2. a first mounting hole; 3. installing a vertical plate; 4. an external wall panel; 5. A first guide block; 6. embedding a groove; 7. installing a transverse plate; 8. a second guide rail groove; 9. an inner liner plate; 10. A supporting seat; 11. a second guide block; 12. a first mounting bar; 13. a second mounting bar; 14. a second mounting hole; 15. an ear plate; 16. an ear hole; 17. a plug; 18. a convex groove; 19. and (5) mounting the head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, the present invention provides an embodiment: the utility model provides a steel construction assembled wallboard, including installation riser 3 and installation diaphragm 7, installation riser 3 and the installation diaphragm 7 mutually perpendicular cross installation, the middle part of installation riser 3 and installation diaphragm 7 is provided with first guide rail groove 1 and second guide rail groove 8 respectively, first guide rail groove 1 and second guide rail groove 8 can be adjusted second guide block 11 and first guide block 5's position, the both ends in first guide rail groove 1 are provided with first mounting hole 2, first mounting hole 2 is used for with otic placode 15 bolt fastening, install first installation strip 12 and second installation strip 13 between installation riser 3 and the installation diaphragm 7, supporting seat 10 is installed to the bottom of installation riser 3, supporting seat 10 is used for carrying out the outrigger to installation riser 3.
Further, the first mounting bar 12 and the second mounting bar 13 are installed perpendicularly and crosswise to each other, and a second mounting hole 14 is formed at the intersection of the first mounting bar 12 and the second mounting bar 13, so that the first mounting bar and the second mounting bar can be conveniently connected with a plug 17 on the inner lining plate 9 in an embedded mode through the second mounting hole 14.
Further, interior welt 9 is installed to the two-sided of first mounting bar 12 and second mounting bar 13, and the inboard of interior welt 9 is installed plug 17, and plug 17 inlays with second mounting hole 14 and is connected, can strengthen the protective capacities of wallboard through interior welt 9, and can increase the functionality of wallboard.
Furthermore, both ends of the inner lining plate 9 are provided with convex grooves 18, and the convex grooves 18 are embedded and connected with the inner sides of the mounting vertical plates 3.
Further, an outer wall panel 4 is mounted on the outer side of the inner lining panel 9, and a mounting head 19 is mounted on the inner side of the outer wall panel 4.
Further, install second guide block 11 and first guide block 5 on first guide rail groove 1 and the second guide rail groove 8 respectively, the middle part of second guide block 11 and first guide block 5 all is provided with inlays groove 6, and inlays groove 6 and install the head 19 and inlay and be connected, and this kind of design can be adjusted according to the size of side fascia 4.
Further, both ends of the installation transverse plate 7 are provided with lug plates 15, lug holes 16 are formed in the lug plates 15, the lug plates 15 are fixedly connected with the first installation holes 2 through the lug holes 16, and the installation transverse plate 7 and the installation vertical plate 3 are conveniently spliced and combined through the lug plates 15.
The working principle is as follows: during the use, will install diaphragm 7 through the otic placode 15 and the installation riser 3 between the combination of splicing of its both ends, make the otic placode 16 and the 2 bolt fixed connection of first mounting hole on the otic placode 15, inlay the concatenation with interior welt 9 through tongue 18 and the one side of installing diaphragm 7 at its both ends and be connected, and make the inboard plug 17 of welt 9 and second mounting hole 14 inlay and be connected, then install side fascia 4 in the outside of welt 9, make the inboard installation head 19 of side fascia 4 and the groove 6 of inlaying on the second guide block 11 inlay the concatenation, carry out the wallboard of capping and closed end department simultaneously and the inboard first guide block 5 of installing diaphragm 7 and inlay the connection, thereby accomplish the equipment concatenation of wallboard.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a steel construction assembled wallboard, includes installation riser (3) and installation diaphragm (7), its characterized in that: installation riser (3) and installation diaphragm (7) mutually perpendicular cross installation, the middle part of installation riser (3) and installation diaphragm (7) is provided with first guide rail groove (1) and second guide rail groove (8) respectively, the both ends in first guide rail groove (1) are provided with first mounting hole (2), install between installation riser (3) and installation diaphragm (7) first installation strip (12) and second installation strip (13), supporting seat (10) are installed to the bottom of installation riser (3).
2. The steel structure assembled wallboard of claim 1, wherein: the first mounting strip (12) and the second mounting strip (13) are perpendicularly and crosswise mounted, and a second mounting hole (14) is formed in the intersection of the first mounting strip (12) and the second mounting strip (13).
3. The steel structure assembled wallboard of claim 1, wherein: and the two surfaces of the first mounting strip (12) and the second mounting strip (13) are provided with lining plates (9), the inner sides of the lining plates (9) are provided with plugs (17), and the plugs (17) are connected with the second mounting holes (14) in an embedded manner.
4. The steel structure assembled wallboard of claim 3, wherein: the two ends of the inner lining plate (9) are provided with convex grooves (18), and the convex grooves (18) are embedded and connected with the inner sides of the mounting vertical plates (3).
5. The steel structure assembled wallboard of claim 3, wherein: and the outer side of the inner lining plate (9) is provided with an outer wall plate (4), and the inner side of the outer wall plate (4) is provided with an installation head (19).
6. The steel structure assembled wallboard of claim 1, wherein: install second guide block (11) and first guide block (5) on first guide rail groove (1) and second guide rail groove (8) respectively, the middle part of second guide block (11) and first guide block (5) all is provided with inlays groove (6), and inlays groove (6) and inlay and be connected with installation head (19) are inlayed.
7. The steel structure assembled wallboard of claim 1, wherein: both ends of installation diaphragm (7) all are provided with otic placode (15), be provided with earhole (16) on otic placode (15), and otic placode (15) are through earhole (16) and first mounting hole (2) bolt fixed connection.
CN202022461294.1U 2020-10-29 2020-10-29 Steel construction assembled wallboard Active CN213539484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022461294.1U CN213539484U (en) 2020-10-29 2020-10-29 Steel construction assembled wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022461294.1U CN213539484U (en) 2020-10-29 2020-10-29 Steel construction assembled wallboard

Publications (1)

Publication Number Publication Date
CN213539484U true CN213539484U (en) 2021-06-25

Family

ID=76501814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022461294.1U Active CN213539484U (en) 2020-10-29 2020-10-29 Steel construction assembled wallboard

Country Status (1)

Country Link
CN (1) CN213539484U (en)

Similar Documents

Publication Publication Date Title
CN104179278B (en) The concealed two-in-one dry type connected node of prefabricated out-hung panel
CN209227776U (en) A kind of three-dimensional building module
CN103696517B (en) A kind of modular Glass Rib outer decoration system
CN213539484U (en) Steel construction assembled wallboard
CN210263610U (en) Prefabricated wallboard structure keeps warm
CN105804416A (en) Connecting structure for prefabricated assembling type building tower crane
KR102432031B1 (en) Reinforcing structure for earthquake-proof
US20220220733A1 (en) A modular structural system and construction method thereof
CN209837287U (en) Steel beam and steel plate shear wall, otic placode, angle steel stud welding connection structure
CN105909006A (en) Prefabricated splicing-combined transformer substation
CN207829219U (en) A kind of precast shear wall with groove
CN211665949U (en) Right-angle connection combined steel structure
CN104989015A (en) Heat insulation installation structure for novel stone curtain wall
CN207363065U (en) Curtain skeleton connects system
CN220285022U (en) Assembled steel construction for civil engineering
CN217580670U (en) Wallboard prefabricated component and assembled wall body
CN211548238U (en) Assembled wallboard convenient to steel construction building construction
CN217027609U (en) Side wall and bottom plate connecting node of assembly type structure
CN202658774U (en) Curtain wallboard joint waterproof frame strip structure
CN210947264U (en) Multi-functional integrative buckling restrained wall post structure
CN217105517U (en) Assembly type building main structure convenient to install
CN215054524U (en) Assembled externally-hung wallboard structure
CN219992834U (en) Curtain wall corner waterproof structure
CN211523229U (en) A assemble backplate for shallow foundation ditch construction
CN210067332U (en) Hidden connecting device of precast concrete external wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant