CN213539223U - Waterproof drainage device is used in hydraulic engineering construction - Google Patents

Waterproof drainage device is used in hydraulic engineering construction Download PDF

Info

Publication number
CN213539223U
CN213539223U CN202022063366.7U CN202022063366U CN213539223U CN 213539223 U CN213539223 U CN 213539223U CN 202022063366 U CN202022063366 U CN 202022063366U CN 213539223 U CN213539223 U CN 213539223U
Authority
CN
China
Prior art keywords
water
fixedly connected
drainage
dam body
drainage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022063366.7U
Other languages
Chinese (zh)
Inventor
姚德昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yushengyuan Construction Development Group Co ltd
Original Assignee
Shandong Yushengyuan Construction Development Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yushengyuan Construction Development Group Co ltd filed Critical Shandong Yushengyuan Construction Development Group Co ltd
Priority to CN202022063366.7U priority Critical patent/CN213539223U/en
Application granted granted Critical
Publication of CN213539223U publication Critical patent/CN213539223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a water conservancy project construction is with waterproof drainage device, including the dam body and drainage box, the outlet has been seted up to the intermediate position of dam body, the fixed slot has been seted up to the right-hand member of dam body, both ends fixedly connected with installation piece about drainage box's the left side, one side of installation piece is run through and has been seted up first screw hole, the first threaded rod has been cup jointed in the first screw hole, the dam body is in the same place through installation piece and first threaded rod threaded connection with drainage box. Through setting up the dam body, arrange water box, installation piece, filter, water inlet and delivery port, through the better installation with the dam body and arrange water box installation of installation piece that sets up to make equipment more convenient, then the better water that will get into through the water inlet of filter through setting up filters, thereby discharges water, then can be better clear up the rubbish that filters through the clearance mouth that sets up, thereby prevent to take place the phenomenon of jam.

Description

Waterproof drainage device is used in hydraulic engineering construction
Technical Field
The utility model belongs to the technical field of hydraulic engineering, especially, relate to a waterproof drainage device is used in hydraulic engineering construction.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purpose of removing harm and benefiting, is also called water engineering, water is a valuable resource essential for human production and life, but the naturally existing state of the water does not completely meet the requirement of human, and water flow can be controlled only by building the hydraulic engineering to prevent flood disasters and adjust and distribute water quantity to meet the requirement of people on water resources in life and production.
The existing waterproof drainage device for hydraulic engineering construction can drain water through the drain hole, but impurities can be contained in water, if the impurities are accumulated when passing through the drain hole, the drain hole can be blocked, drainage is not smooth, and in addition, when the external pressure is too large in the drainage process, the backflow phenomenon is easy to occur, so that drainage failure is caused.
SUMMERY OF THE UTILITY MODEL
Problem to prior art exists, the utility model provides a hydraulic engineering construction is with waterproof drainage device, through setting up the dam body, arrange water box, the installation piece, the filter, water inlet and delivery port, through the better installation with the dam body with arrange water box of installation piece that sets up, thereby make equipment convenience more, then through the better water that will get into through the water inlet of the filter that sets up filter filters, thereby discharge water, then can be better clear up the rubbish that filters through the clearance mouth that sets up, thereby prevent to take place the phenomenon of jam.
The utility model discloses a realize like this, including dam body and drainage box, the outlet has been seted up to the intermediate position of dam body, the fixed slot has been seted up to the right-hand member of dam body, both ends fixedly connected with installation piece about drainage box's the left side, one side of installation piece is run through and has been seted up first screw hole, first threaded rod has been cup jointed in the first screw hole, the dam body is in the same place through installation piece and first threaded rod threaded connection with drainage box, the water inlet has been seted up on drainage box's upper end right side, the clearance mouth has been seted up to drainage box's right-hand member intermediate position, the water shutoff stopper has been cup jointed to the clearance mouth, be provided with first rubber pad between water shutoff stopper and the clearance mouth, the delivery port has been seted up to drainage box's left end intermediate position, drainage box's.
As the utility model discloses it is preferred, the water inlet lower extreme one side fixedly connected with fixed plate that the upper end of drainage box set up, the lower extreme of fixed plate is seted up flutedly, the inner wall both sides fixedly connected with bearing of recess, two the bull stick has been cup jointed between the bearing.
As the utility model discloses it is preferred, the baffle has been cup jointed at the both ends of bull stick, baffle both ends fixedly connected with torsional spring, the torsional spring cup joints with the bull stick.
As the utility model discloses it is preferred, the fixed cover of left end delivery port department fixedly connected with of drainage box, the spout has been seted up to the intermediate position of fixed cover, the slide bar has been cup jointed in the spout, both ends are the first water of fixedly connected with towards board and second water towards board respectively about the slide bar, one side fixedly connected with sealing rubber pad of first water towards board.
As the utility model discloses preferred, the wash port has been seted up at both ends about the right side of fixed cover.
As the utility model discloses preferred, the filter sets up for the slope.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the dam body, arrange water box, installation piece, filter, water inlet and delivery port, through the better installation with the dam body and arrange water box of installation piece that sets up to make the equipment more convenient, then the better water that will get into through the water inlet of filter through setting up filters, thereby discharges water, then can be better through the clearance mouth that sets up clear up the rubbish that filters, thereby prevent to take place the phenomenon of jam.
2. The utility model discloses a fixed plate, recess, bearing and bull stick that set up, through the water inlet lower extreme one side fixedly connected with fixed plate that sets up in the upper end of drainage box, then seted up flutedly at the lower extreme of fixed plate, then at the inner wall both sides fixedly connected with bearing of recess, then cup jointed the bull stick between two bearings thereby make the baffle that the fixed plate is connected open under impacting through rivers to put into rivers, thereby conveniently carry out the drainage.
3. The utility model discloses a baffle and the torsional spring that set up have cup jointed the baffle through the both ends at the bull stick, then at baffle both ends fixedly connected with torsional spring, then cup joint torsional spring and bull stick in order to carry out the separation with external impurity that can be better through the baffle to reduce the dust and get into, then can be better through the torsional spring that sets up make the drainage accomplish the backplate can reset fast.
4. The utility model discloses a spout that sets up, the slide bar, first water washes the board, second water washes board and sealing rubber pad, through the fixed cover of left end outlet department fixedly connected with of drainage box, then the spout has been seted up at the intermediate position of fixed cover, then the slide bar has been cup jointed in the spout, then both ends are the first water of fixedly connected with respectively and wash board and second water and wash the board about the slide bar, then one side fixedly connected with sealing rubber pad that washes the board at first water is for the pressure that can be better through rivers slides the slide bar through the second wash board, thereby make it open the wash port, thereby conveniently carry out the drainage, then the phenomenon of the backward flow of prevention rivers that can be better through the second water washed board that sets up.
5. The utility model discloses a wash port that sets up discharges rivers through set up about the right side of fixed cover both ends that the wash port can be better to conveniently prevent the backward flow.
6. The utility model discloses a filter that sets up is through setting up the filter into the slope in order to better filter the rubbish that produces among the drainage process to better convenience gathers rubbish, thereby convenient clearance.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is an enlarged view of a point a in fig. 1 according to an embodiment of the present invention;
fig. 3 is an enlarged view of fig. 1 at B according to an embodiment of the present invention;
fig. 4 is a side view of the structure at C in fig. 1 according to an embodiment of the present invention.
In the figure: 1. a dam body; 2. a water outlet; 3. a drain box; 4. mounting blocks; 5. a first threaded hole; 6. fixing grooves; 7. a first threaded rod; 8. a water outlet; 9. cleaning the opening; 10. water plugging; 11. a first rubber pad; 12. a water inlet; 13. a fixing plate; 14. a rotating rod; 15. a baffle plate; 16. a groove; 17. a bearing; 18. a torsion spring; 19. fixing a sleeve; 20. a chute; 21. a drain hole; 22. a slide bar; 23. a first water-washing plate; 24. a second water-washing plate; 25. sealing the rubber pad; 26. a filter plate.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, the embodiment of the utility model provides a pair of water conservancy project is with waterproof drainage device for construction, including dam body 1 and drainage box 3, outlet 2 has been seted up to the intermediate position of dam body 1, fixed slot 6 has been seted up to the right-hand member of dam body 1, both ends fixedly connected with installation piece 4 about drainage box 3's the left side, one side of installation piece 4 is run through and has been seted up first screw hole 5, first threaded rod 7 has been cup jointed in first screw hole 5, dam body 1 and drainage box 3 are in the same place through installation piece 4 and first threaded rod 7 threaded connection, water inlet 12 has been seted up on drainage box 3's upper end right side, drainage box 3's right-hand member intermediate position has been seted up clearance mouth 9, clearance mouth 9 has cup jointed water shutoff plug 10, be provided with first rubber pad 11 between water shutoff plug 10 and the clearance mouth 9, drainage box 3's left end intermediate position has seted up delivery port 8, drainage box 3's.
Referring to fig. 1 and 4, a fixing plate 13 is fixedly connected to one side of the lower end of a water inlet 12 formed in the upper end of the drainage box 3, a groove 16 is formed in the lower end of the fixing plate 13, bearings 17 are fixedly connected to two sides of the inner wall of the groove 16, and a rotating rod 14 is sleeved between the two bearings 17.
Adopt above-mentioned scheme: through the fixed plate 13 that sets up, recess 16, bearing 17 and bull stick 14, water inlet 12 lower extreme one side fixedly connected with fixed plate 13 through setting up in the upper end of drainage box 3, then recess 16 has been seted up to the lower extreme at fixed plate 13, then at the inner wall both sides fixedly connected with bearing 17 of recess 16, then cup jointed the bull stick 14 between two bearings 17 and be in order to make baffle 15 that fixed plate 13 connects open under the impact through rivers, thereby put into rivers, thereby conveniently carry out the drainage.
Referring to fig. 1 and 4, two ends of the rotating rod 14 are sleeved with a baffle 15, two ends of the baffle 15 are fixedly connected with a torsion spring 18, and the torsion spring 18 is sleeved with the rotating rod 14.
Adopt above-mentioned scheme: through the baffle 15 and the torsional spring 18 that set up, have cup jointed baffle 15 through the both ends at bull stick 14, then at baffle 15 both ends fixedly connected with torsional spring 18, then cup joint torsional spring 18 and bull stick 14 in order to carry out the separation with external impurity that can be better through baffle 15 to reduce the dust and get into, then can be better through the torsional spring 18 that sets up make the drainage accomplish backplate 15 can reset fast.
Referring to fig. 1, a fixed sleeve 19 is fixedly connected to a left end water outlet 8 of the drainage box 3, a sliding groove 20 is formed in the middle of the fixed sleeve 19, a sliding rod 22 is sleeved in the sliding groove 20, a first water flushing plate 23 and a second water flushing plate 24 are fixedly connected to the left end and the right end of the sliding rod 22 respectively, and a sealing rubber gasket 25 is fixedly connected to one side of the first water flushing plate 23.
Adopt above-mentioned scheme: through the spout 20 that sets up, the slide bar 22, first water dashes board 23, second water dashes board 24 and sealing rubber pad 25, through the fixed cover 19 of fixedly connected with in the left end delivery port 8 department of drainage box 3, then spout 20 has been seted up at the intermediate position of fixed cover 19, then cup jointed slide bar 22 in the spout 20, then both ends fixedly connected with first water dashes board 23 and second water towards board 24 respectively about slide bar 22, then one side fixedly connected with sealing rubber pad 25 at first water dashes board 23 is for the pressure through rivers that can be better slides slide bar 22 through second water towards board 24, thereby make it open wash port 21, thereby conveniently carry out the drainage, then dash the phenomenon of the backward flow of prevention rivers that can be better through the second water that sets up towards board 24.
Referring to fig. 1, the fixing sleeve 19 is provided with water discharge holes 21 at upper and lower ends of the right side thereof.
Adopt above-mentioned scheme: through the arranged drain holes 21, the water flow can be better discharged through the drain holes 21 arranged at the upper end and the lower end of the right side of the fixed sleeve 19, so that the backflow is conveniently prevented.
Referring to fig. 1, the filter plate 26 is obliquely disposed.
Adopt above-mentioned scheme: through the filter 26 that sets up, through setting up the filter 26 to the slope in order can be better to filter the rubbish that the drainage in-process produced to better convenience is gathered rubbish, thereby convenient clearance.
The utility model discloses a theory of operation:
when in use, the drainage box 3 is firstly installed with the dam body 1 through the installation block 4 and the first threaded rod 7, then the water inlet 12 is connected with a place needing drainage, then the baffle 15 at the lower end of the water inlet 12 is flushed through the pressure of water flow, then the water flow flows into the drainage box 3 through the water inlet 12, then impurities or garbage in the water flow are filtered in the drainage box 3 through the filter plate 26, then the second flushing plate 24 is pressed through the pressure of the water flow, so that the sliding rod 22 slides in the sliding groove 20, then the drainage hole 21 is opened, so that water is drained, when the pressure of the right water flow is higher, the first flushing plate 23 is pressed, so that the sliding rod 22 moves rightwards in the sliding groove 20, so that the sealing rubber gasket 25 on the first flushing plate 23 seals the sliding rod, and backflow phenomenon during drainage is better prevented, after the drainage is finished, the filtered garbage can be cleaned through the cleaning opening 9 by opening the water blocking plug 10.
In summary, the following steps: the waterproof drainage device for hydraulic engineering construction solves the problems that the existing waterproof drainage device for hydraulic engineering construction can drain water through a drain hole, but has impurities in water, if the impurities are accumulated when passing through the drain hole, the drain hole is blocked, drainage is not smooth, and in addition, when external pressure is overlarge in the drainage process, a backflow phenomenon easily occurs, resulting in a problem of drainage failure.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic engineering construction is with waterproof drainage device, includes dam body (1) and drainage box (3), its characterized in that: a water outlet (2) is formed in the middle of the dam body (1), a fixing groove (6) is formed in the right end of the dam body (1), an installation block (4) is fixedly connected to the upper end and the lower end of the left side of the drainage box (3), a first threaded hole (5) is formed in one side of the installation block (4) in a penetrating mode, a first threaded rod (7) is sleeved in the first threaded hole (5), the dam body (1) and the drainage box (3) are connected with the first threaded rod (7) through the installation block (4) in a threaded mode, a water inlet (12) is formed in the right side of the upper end of the drainage box (3), a cleaning opening (9) is formed in the middle of the right end of the drainage box (3), a water blocking plug (10) is sleeved on the cleaning opening (9), a first rubber pad (11) is arranged between the water blocking plug (10) and the cleaning opening (9), a water outlet (8) is formed in the middle of the left, the inside fixedly connected with filter (26) of drainage box (3).
2. The waterproof and drainage device for the hydraulic engineering construction according to claim 1, wherein: the water inlet (12) that the upper end of drainage box (3) set up one side fixedly connected with fixed plate (13) of lower extreme, the lower extreme of fixed plate (13) is seted up flutedly (16), the inner wall both sides fixedly connected with bearing (17) of recess (16), two bull stick (14) have been cup jointed between bearing (17).
3. The waterproof and drainage device for the hydraulic engineering construction according to claim 2, wherein: baffle (15) have been cup jointed at the both ends of bull stick (14), baffle (15) both ends fixedly connected with torsional spring (18), torsional spring (18) cup joint with bull stick (14).
4. The waterproof and drainage device for the hydraulic engineering construction according to claim 1, wherein: the left end outlet (8) of drainage box (3) locate fixedly connected with fixed cover (19), spout (20) have been seted up to the intermediate position of fixed cover (19), slide bar (22) have been cup jointed in spout (20), both ends are first water towards board (23) and second water towards board (24) of fixedly connected with respectively about slide bar (22), one side fixedly connected with sealing rubber pad (25) of first water towards board (23).
5. The waterproof and drainage device for the hydraulic engineering construction according to claim 4, wherein: the upper end and the lower end of the right side of the fixed sleeve (19) are provided with drain holes (21).
6. The waterproof and drainage device for the hydraulic engineering construction according to claim 1, wherein: the filter plate (26) is arranged obliquely.
CN202022063366.7U 2020-09-20 2020-09-20 Waterproof drainage device is used in hydraulic engineering construction Active CN213539223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022063366.7U CN213539223U (en) 2020-09-20 2020-09-20 Waterproof drainage device is used in hydraulic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022063366.7U CN213539223U (en) 2020-09-20 2020-09-20 Waterproof drainage device is used in hydraulic engineering construction

Publications (1)

Publication Number Publication Date
CN213539223U true CN213539223U (en) 2021-06-25

Family

ID=76494274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022063366.7U Active CN213539223U (en) 2020-09-20 2020-09-20 Waterproof drainage device is used in hydraulic engineering construction

Country Status (1)

Country Link
CN (1) CN213539223U (en)

Similar Documents

Publication Publication Date Title
CN207330544U (en) A kind of domestic living waste water treater
CN209891332U (en) Drainage pipe for hydraulic engineering
CN213539223U (en) Waterproof drainage device is used in hydraulic engineering construction
CN209276937U (en) A kind of drainage arrangement suitable for express highway pavement
CN109518749A (en) A kind of water conservancy may filter that muddy water removes mud equipment
CN213174084U (en) Town road drainage structures
CN212641484U (en) Water collecting device of building basement waterproofing system
CN211864066U (en) Municipal administration rainwater pipeline impurity filtering device
CN211997126U (en) Drainage assembly for water receiving disc of discharging opening of outer coal bunker
CN208293682U (en) A kind of household bathroom accessories water-saving system
CN111021514A (en) Drainage ditch rubbish filtration
CN212318087U (en) Special check valve of detachable tunnel drain pipe
CN213192742U (en) Hydraulic engineering is with device that has high-efficient blowdown structure
CN212104480U (en) A prevent stifled cistern for hydraulic engineering
CN109372067A (en) A kind of bathroom hand washing sink wastewater collection utilizes device
CN205062996U (en) Excessive floor drain is prevented returning by readily removable
CN219128494U (en) Integrated rainwater processor
CN210797755U (en) Prevent blockking up adjustable drainage device
CN211257234U (en) Water supply and drainage engineering building seepage prevention structure
CN215387954U (en) Drainage filtration for interior decoration
CN220725355U (en) Novel dirt sucking and discharging device
CN209652006U (en) A kind of underground water pollution preventing treatment device
CN210530918U (en) Drainage equipment for coal mining
CN219010855U (en) Road drainage device for sponge city
CN220394799U (en) Waterproof maintenance drainage device of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant